PDF 42 MB Posted

Attached to
Y1DA--504-18-119 Replace Boilers and Piping Federal contract opportunity
Solicitation number
36C25722R0010
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

This document provides details on a federal contract solicitation. The solicitation number is 36C25722R0010 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 for replacing boilers and piping at VA-22-00004245. The opportunity type is listed as a solicitation to replace existing boilers and piping. No other salient details are provided in this document.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--504-18-119 Replace Boilers and Piping, newest first.
File Type Posted
Amendment 36C25722R0010 0001.docx DOCX document
Past Performance Questionnaire.pdf PDF
Answers to Questions 36C25722R0010 DB Replace Boilers.pdf PDF
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING REQUIREMENT.pdf PDF
Mech 035 - Pages 1-3.pdf PDF
OSHA - EMR requirement.pdf PDF
BP-3-Boiler-steam.pdf PDF
BP-1-Boiler-fueloil.pdf PDF
36C25722R0010_1.docx DOCX document
Mech 035 - Pages 7-12.pdf PDF
Phasing sheets.pdf PDF
Struct 035.pdf PDF
SELF-PERFORMED CALCULATIONS.pdf PDF
Mech 035 - Pages 8-19.pdf PDF
BP-2-Boilers-natgasandpropane.pdf PDF
20-09 035 Narrative 02 1r1 Phasing Narrative.pdf PDF
20-09 035 Narrative 06 1r1 Civil-LS Design Narrative.pdf PDF
20-09 035 Narrative 13 1r1 Specs TOC 000110 035 21-06-30.pdf PDF
AS ST Series Sheets.pdf PDF
AD AE Series Sheets.pdf PDF
Elect 035.pdf PDF
G Series Sheets.pdf PDF
BP-4-Water-Treatment.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STORAGE

ELEVATOR/MACH

MECHANICAL

ROOM

1005B

EXISTING HEAT

EXCHANGER ABOVE

AHU

EXISTING AHU

REPLACE EXISTING

PRESSURE

REDUCING VALVE

REPLACE EXISTING

STEAM TO HOT

WATER HEAT

EXCHANGER

3/4" CONDESATE

MPS

GENERAL NOTES:

1. REINSULATE EXISTING STEAM AND CONDENSATE PIPING.

FURNISH LABELS ON ALL STEAM AND CONDENSATE PIPING.

2. RE-PIPE EXISTING CONDENSATE AND REMOVE ABANDONED

PIPING.

EXISTING HEAT

EXCHANGER ABOVE

AHU TO REMAIN

EXISTING AHU-19

REPLACE EXISTING

PRESSURE

REDUCING VALVE

REPLACE CONDESATE

RECEIVER WITH DUAL

PUMP CONDENSATE

RECEIVER

HPS FROM FLOOR

BELOW

REPLACE EXISTING

DOMESTIC HOT

WATER HEAT

EXCHANGER

3/4" CONDESATE

MPS

GENERAL NOTES:

1. REINSULATE EXISTING STEAM AND CONDENSATE PIPING.

FURNISH LABELS ON ALL STEAM AND CONDENSATE PIPING.

2. RE-PIPE EXISTING CONDENSATE AND REMOVE ABANDONED

PIPING.

NO SCALE2

DOMESTIC RECIRC PUMP

NO SCALE3

CONDENSATE PIPING

NO SCALE4

PIPE RISER

NO SCALE5

CONDENSATE RECEIVER

NO SCALE14

CONDENSATE RECEIVER

NO SCALE15

DOMESTIC RECIRC PUMP

NO SCALE16

PRV

NO SCALE10

WATER HEATER

NO SCALE11

AHU AND HEAT EXCHANGER

NO SCALE12

UNINSULATED PIPE

NO SCALE13

UNINSULATED PIPING

NO SCALE6

RISERS FROM TUNNEL

NO SCALE7

PRV

NO SCALE8

WATER HEATER

NO SCALE9

UNINSULATED PIPE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

Shaffer & Stevens 9910 North 48th Street

Omaha, Nebraska68152

Phone: 402.455.7698 Fax: 402.455.7597

504-18-119

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

IMEG Corp.

14755 Preston Rd., Suite 845

Dallas, TX 75254

Phone:(972) 239-6100

15% Design Submission 07/14/2020

20% Design Submission

30% Design Submission

35%/SD1 Schematic Design Submission

09/08/2020

08/14/2020

11/17/2020

FOR REFERENCE

ONLY NOT FOR

CONSTRUCTION

C R e v it L o c a l F ile s \M

E

.0

A m a ri llo B o ile r R e p la c e m e n t_ C d e ta c h e d

P a u l.

W

.L ic h te n h a n .r v t

/1 /2

:4

:5

P M

04-M-100

EXISTING CONDITIONS PLAN AND

PHOTOS - MECH ROOM - BLDG 4

November 17, 2020

Replace Boilers and PipingSD-1 35% SUBMITTAL

REQUEST FOR PROPOSAL

Thomas E. Creek VAMC-Amarillo, TX

REFERENCE SCALE IN INCHES

0 1 2 3

PROJECT #

IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS

DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE

THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN

APPROVAL AND PARTICIPATION OF IMEG CORP. © 2020 IMEG CORP.

14755 PRESTON ROAD, SUITE 845

DALLAS, TX 75254

972.239.6100 FAX: 972.239.6102

www.imegcorp.com

TBPE# F-18632

20001967.00

N O R

HT

1/4" = 1'-0"

FIRST FLOOR PLAN- BLDG. 4 - MECHANICAL ROOM 1001

Revisions: Date:

1 1/2"LPC

4"LPS

11-B-4

(EXIST)

11-B-3 11-B-2 11-B-1

11-DA-1

11-HVU-1

2.2

C K M N

4A

A

2.7

B

GD E F

3.5

L

2.2

H

1A

JC1

19-SW-2 19-SW-319-SW-1

EXISTING

LOUVER TO

REMAIN

6"HPS

6"HPS

6"HPS

4"HPS

"H

P S

2"RO

2"SCW

2"CW

11-B-2 11-B-311-B-4 11-B-1

DA-1

1 1

ST-1

(EXIST)

19-WS-219-WS-1 19-WS-319-BT-1

(EXIST)

4"CW

(EXIST)

2"SW

(EXIST)

2"RO

(EXIST)

2"SW

(EXIST)

2"CW

(EXIST)

2"CW

(EXIST)

2.2

C K M N

4A

A

2.7

B

GD E F

3.5

L

2.2

H

1A

JC1

15 9

16 16

2"LPS

(EXIST)

1"LPC

(EXIST)

FLOW METER

(EXIST)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

Shaffer & Stevens 9910 North 48th Street

Omaha, Nebraska68152

Phone: 402.455.7698 Fax: 402.455.7597

504-18-119

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

IMEG Corp.

14755 Preston Rd., Suite 845

Dallas, TX 75254

Phone:(972) 239-6100

15% Design Submission 07/14/2020

20% Design Submission

30% Design Submission

35%/SD1 Schematic Design Submission

09/08/2020

08/14/2020

11/17/2020

FOR REFERENCE

ONLY NOT FOR

CONSTRUCTION

C R e v it L o c a l F ile s \M

E

.0

A m a ri llo B o ile r R e p la c e m e n t_ C d e ta c h e d

P a u l.

W

.L ic h te n h a n .r v t

/1 /2

:5

:5

P M

11-M-100

FIRST FLOOR PLAN - MECHANICAL -

BLDGS. 11, 16, & 19

November 17, 2020

Replace Boilers and PipingSD-1 35% SUBMITTAL

REQUEST FOR PROPOSAL

Thomas E. Creek VAMC-Amarillo, TX

REFERENCE SCALE IN INCHES

0 1 2 3

PROJECT #

IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS

DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE

THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN

APPROVAL AND PARTICIPATION OF IMEG CORP. © 2020 IMEG CORP.

14755 PRESTON ROAD, SUITE 845

DALLAS, TX 75254

972.239.6100 FAX: 972.239.6102

www.imegcorp.com

TBPE# F-18632

20001967.00

KEYNOTES:

1. PROVIDE NEW BOILER BREECHING

ECONOMIZER AT NEW BOILER. (TYPICAL OF

BOILER 1, 2 & 3)

2. PROVIDE NEW 250 BHP BOILER AS

SCHEDULED. (TYPICAL OF BOILER 1, 2 & 3)

3. 2" BOILER BLOW DOWN. RUN PIPING IN

EXISTING TRENCH. (TYPICAL OF BOILER 1, 2 &

3)

4. BOILER SAFETY RELIEF VALVE PIPING UP

THROUGH ROOF. (TYPICAL OF BOILER 1, 2 & 3)

5. NEW 2" BOILER BLOW DOWN MAIN PIPING IN

EXISTING TRENCH. ROUTE TO NEW BOILER

BLOW DOWN SEPARATOR.

6. NEW BOILER BLOWDOWN SEPARATOR. ROUTE

NEW VENT UP THROUGH ROOF AND CONNECT

AFTER COOLER TO DRAIN.

7. FURNISH NEW BOILER FUEL OIL PIPING.

8. PROVIDE NEW BOILER FUEL OIL PUMPS.

9. FURNISH NEW BOILER HIGH PRESSURE STEAM

HEADER WITH SHUT OFF VALVES AND DRAIN

AS REQUIRED TO CONNECT NEW BOILERS.

10. 1" BOILER FEEDWATER SUPPLY AND RETURN

TO ECONOMIZER. (TYPICAL OF BOILER 1, 2 & 3)

11. NEW BOILER FUEL OIL SUPPLY AND RETURN

PIPING. ROUTE IN EXISTING PIPE TRENCH TO

EACH NEW BOILER.

12. PROVIDE NEW BOILER ROOM COMBUSTION AIR

SUPPLY UNIT. FURNISH WITH STEAM HEATING

COIL. CONNECT INTAKE DUCTWORK TO

EXISTING LOUVER. ROUTE NEW DISTRIBUTION

DUCTWORK THROUGHOUT BOILER PLANT AS

SHOWN.

13. PROVIDE NEW STEAM HEADER SUPPORT

PEDESTAL SIMILAR TO EXISTING.

14. REPLACE EXISTING WATER SOFTENERS. (TYP.)

15. FURNISH NEW DEARATOR. EXISTING PUMPS

TO REMAIN RECONNECT TO EXISTING PIPING.

16. NEW 8" HPS EMERGENCY CONNECTION.

PROVIDE CONDENSATE PIPING AND NATURAL

GAS PIPE CONNECTIONS. COORDINATE EXACT

LOCATION WITH OWNER.

17. PROVIDE 1-1/4" MAKEUP COLD WATER

CONNECTION FOR DEARATOR.

18. FURNISH NEW BOILER ROOM EXHAUST FAN

VENTILATION SYSTEM.

N O R

HT

1/8" = 1'-0"

FIRST FLOOR PLAN - MECHANICAL

ADD ALTERNATE:

19. PROVIDE NEW GENERATOR FLUE AND

MUFFLER. CONNECT FUEL OIL PIPING TO

EXISTING. FURNISH NEW RADIATOR DUCT

CONNECTION FROM RADIATOR TO EXISTING

LOUVER. REFER TO 6/M307

N O R

HT

1/8" = 1'-0"

FIRST FLOOR DEMOLITION - MECHANICAL

DEMOLTION KEYNOTES:

1. DEMOLISH EXISTING 200 BHP BOILER AND ALL

ASSOCIATED APPURTENANCES INCLUDING

BOILER BREECHING AND CATWALK PLATFORM

(TYPICAL 3). BOILER #4 TO REMAIN.

2. DEMOLISH EXISTING DEAERATOR AT

MEZZANINE LEVEL AND ALL ASSOCIATED

APPURTENANCES. PUMPS TO REMAIN.

3. DEMOLISH EXISTING WATER SOFTENERS.

4. EXISTING BRINE TANK TO REMAIN.

5. EXISTING REVERSE OSMOSIS TRANSFER

PUMPS TO REMAIN.

6. EXISTING REVERSE OSMOSIS WATER

STORAGE TANKS TO REMAIN.

7. EXISTING REVERSE OSMOSIS FILTER SYSTEM

TO REMAIN.

8. EXISTING CHARCOAL FILTER WATER TANK TO

REMAIN.

9. EXISTING CONDUIT TRAY OVERHEAD TO

REMAIN.

10. DEMOLISH EXISTING BOILER BLOW DOWN

SEPARATOR TANK, INCLUDING VENT AND

DRAIN.

11. EXISTING DUPLEX CONDENSATE PUMP UNIT IN

LOWER LEVEL TO REMAIN.

12. DEMOLISH EXISTING BOILER PLANT EXHAUST

FAN SYSTEM.

13. DEMOLISH COMBUSTION AIR SUPPLY UNIT

INCLUDING DUCTWORK, PIPING, AND AIR

DEVICES.

14. DEMOLISH EXISTING BOILER FUEL OIL PUMPS

INCLUDING FUEL OIL PIPING TO EACH BOILER.

15. DEMOLISH EXISTING COLUMN MOUNTED

STEAM PRESSURE TRANSMITTERS.

16. REMOVE EXISTING GANTRY AND TROLLEY AS

REQUIRED FOR NEW BOILER PLACEMENT.

GANTRY AND TROLLEY SHALL BE REUSED AND

REPOSITIONED. REFER TO NEW WORK FOR

LOCATION. PRIOR TO REMOVAL OF GANTRY

THE CONTRACTOR SHALL TEMPORARILY

SUPPORT THE EXISTING BOILER FEED WATER

SUPPLY PIPING.

GENERAL NOTES:

1. REFER TO BOILER PLAN- WATER AND STEAM

DIAGRAMS. NEW WORK AND DEMO; SHEETS

M-400 AND M-401.

2. REFER TO BOILER FUEL OIL DIAGRAM NEW

AND DEMO ON SHEETS M-403 AND M-404.

C

4A

D

3.5

1A

C1

11-FOP-211-FOP-1

11-CP-1

11-CP-2

11-BDS-1

C

4A

D

3.5

1A

C1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Calvin rchitects, P.C.L 3705 North 200th Street

Elkhorn, Nebraska 68022

Phone: 402.291.6941 Fax: 402.291.9193

AH. INZ

Shaffer & Stevens 9910 North 48th Street

Omaha, Nebraska68152

Phone: 402.455.7698 Fax: 402.455.7597

504-18-119

AMI Environmental Inc

8802 S 135th Street

Omaha, NE 68138

Phone:(402) 397-5001

IMEG Corp.

14755 Preston Rd., Suite 845

Dallas, TX 75254

Phone:(972) 239-6100

15% Design Submission 07/14/2020

20% Design Submission

30% Design Submission

35%/SD1 Schematic Design Submission

09/08/2020

08/14/2020

11/17/2020

FOR REFERENCE

ONLY NOT FOR

CONSTRUCTION

C R e v it L o c a l F ile s \M

E

.0

A m a ri llo B o ile r R e p la c e m e n t_ C d e ta c h e d

P a u l.

W

.L ic h te n h a n .r v t

/1 /2

:5

:5

P M

11-M-101

PARTIAL LOWER LEVEL -

MECHANICAL- BLDG. 11

November 17, 2020

Replace Boilers and PipingSD-1 35% SUBMITTAL

REQUEST FOR PROPOSAL

Thomas E. Creek VAMC-Amarillo, TX

REFERENCE SCALE IN INCHES

0 1 2 3

PROJECT #

IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS

DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE

THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR

REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN

APPROVAL AND PARTICIPATION OF IMEG CORP. © 2020 IMEG CORP.

14755 PRESTON ROAD, SUITE 845

DALLAS, TX 75254

972.239.6100 FAX: 972.239.6102

www.imegcorp.com

TBPE# F-18632

20001967.00

N O R

HT

1/8" = 1'-0"

PARTIAL LOWER FLOOR PLAN - MECHANICAL

KEYNOTES:

1. NEW BOILER BLOW DOWN SEPARATOR TANK.

ROUTE VENT UP THROUGH ROOF AND

CONNECT UNIT DRAIN TO SANITARY DRAIN.

2. PROVIDE COLD WATER CONNECTION TO NEW

BLOW DOWN SEPARATOR.

3. NEW BOILER FUEL OIL PUMPS AS SCHEDULED.

PROVIDE FUEL SPILL CONTAINMENT PAN AT

PUMPS AND ROUTE FOS & FOR IN EXISTING

FLOOR TRENCH.

4. EXISTING CONDENSATE TRANSFER PUMPS TO

REMAIN.

5. EXISTING BOILER FEED PUMPS TO REMAIN.

6. PROVIDE NEW FEED WATER FILTER.

7. EXISTING AIR COMPRESSORS TO REMAIN.

8. 2" DEAERATOR OVERFLOW DRAIN DROP FROM

ABOVE.

9. CONNECT PUMPED CONDENSATE AT ELBOW

UP TO EXISTING DEAERATOR AT MEZZANINE

LEVEL.

N O R

HT

1/8" = 1'-0"

PARTIAL LOWER FLOOR DEMOLITION - MECHANICAL

DEMOLITION KEYNOTES:

1. DEMOLISH EXISTING BOILER BLOW DOWN

SEPARATOR TANK, INCLUDING VENT AND

DRAIN.

2. EXISTING CONDENSATE PUMP UNIT IN LOWER

LEVEL TO REMAIN.

3. DEMOLISH EXISTING BOILER FUEL OIL PUMPS

INCLUDING FUEL OIL PIPING TO EACH BOILER.

4. EXISTING CONDENSATE TRANSFER PUMPS TO

REMAIN.

5. EXISTING BOILER FEED PUMPS TO REMAIN.

6. DEMOLISH EXISTING WATER FILTER.

7. EXISTING AIR COMPRESSORS TO REMAIN.

8. DEMOLISH 2" DEAERATOR OVERFLOW DRAIN

DROP FROM ABOVE.

9. DEMOLISH PUMPED CONDENSATE FROM

ELBOW UP TO EXISTING DEAERATOR AT

MEZZANINE LEVEL.