ST5322_1.PDF

PDF 133 KB Posted

Attached to
Master Agreement AZ|CTR057596
Contract number
CTR057596
Issued by
Arizona

About this file

This document is a Best and Final Offer (BAFO) request email from the Arizona Game and Fish Department (AZGFD) to Stantec, a professional engineering services firm, regarding Solicitation BPM003384 for Hydrological Engineering Services. The communication involves Elizabeth Burgard from AZGFD and Scot Schlund from Stantec, with potential subcontractors including ACS, Ninyo and Moore, App Weather Associates, and LTM.

The solicitation seeks hydrological engineering services focused on dam safety, dam assessments, dam and outlet/spillway rehabilitation, hydrology and hydraulics, inundation studies, and flood warning. AZGFD requested Stantec revise its fee schedule, noting that some rates were 15-78% higher than average, with landscape designer fees over 106% higher. The department emphasized that Stantec's high rates could jeopardize contract award. Stantec was instructed to submit a signed fee schedule with revised rates by September 23, 2021, at 4:30 p.m., with the understanding that their previously submitted qualifications package would be included as part of the Best and Final Offer.

View the file

Other files

File Type Posted
BPM003384_-_Evaluation_SPO_Form_120_-_Procurement_Disclosure_Statement_narasin.pdf PDF
COI_Stantec_Consulting_Serv_CGL_AL_WC_5-1-22_to_5-1-23_0001.pdf PDF
Evaluation_Narrative_for_BPM003384_-NS.pdf PDF
Evaluation_for_Committee_Members_-drodriguez.pdf PDF
Proposal_Score_Sheet_BPM003384.xlsx XLSX spreadsheet
Proposal_Score_Sheet_BPM003384.xlsx_-_drodriguez.pdf PDF
RFP_BPM003384_Hydro_Eng_Services_Award_Determination_signed.pdf PDF
ST9C6B_1.PDF PDF
STAZMail_10-14-21_-_NOA_-_BPM003384__Hydro_Engineering_Services_-_Stantec.pdf PDF
STAZ_Mail_-_Stantec_Insurance_Certification_10-11-21_10.40am.pdf PDF
Stantec_BAFO_Sheet_9-22-21.xlsx XLSX spreadsheet
Stantec_Negotiations_Sheet_8-10-21Stantec.xlsx XLSX spreadsheet
THE_STATE_OF_ARIZONA__17936182.pdf PDF
pds_drodriguez_pg1.jpeg JPEG file
CTR057596_YR5_Contract_Renewal_AZGFD_Signed.pdf PDF
CTR057596_Yr_4_Renewal.pdf PDF
Guidelines_for_Evaluation_for_Committee_Members.pdf PDF
Proposal_Score_Sheet_BPM003384_-_NS.pdf PDF
STAZMA_1.PDF PDF
STAZMA_4.PDF PDF
STAZMail_to_Unsucessfuls-_10-14-21_Solicitation_-_BPM003384__Hydro_Engineering_Services.pdf PDF
STAZ_Mail_-_BPM003384_-_Evaluation_Committee_ENGSERVICES-_HYDRO.pdf PDF
STAZ_Mail_-_Request_BAFO__BPM003384_-TO_9.16.21Stantec.pdf PDF
YR3_RENEWAL_CTR057596_-_Hydrological_Engineering_Services.pdf PDF
pds_drodriguez_pg2.jpeg JPEG file
pds_drodriguez_pg3.jpeg JPEG file
BPM003384_Hydro_Eng_-Price_Negotiations_6-29-21Stantec.pdf PDF
EXECUTIVE_SUMMARY_BPM003384.pdf PDF
RFP_BPM003384_Hydro_Eng_Services_Award_Determination.docx DOCX document
Stantec_AZ_Corp_Commision_report.docx DOCX document
TO_Stantec_BAFO_Sheet_9-15-21.xlsx XLSX spreadsheet
BPM003384_Due_Diligence_Check_List.pdf PDF
BPM003_2.PDF PDF
CTR057596_Stantec_Hydrological_Engineering_Services_executed.pdf PDF
Evaluation_Narrative_for_BPM003384_-_NS.pdf PDF
Evaluation_Score_BPM003384.pdf PDF
Evaluation_Team_Meeting_Sign_in_Sheet.docx DOCX document
RFP_BPM003384_Hydro_Eng_Services_Award_Determination.pdf PDF
SAM_EntityInformation-Stantec.pdf PDF
ST15C8_1.PDF PDF
STAZMA_2.PDF PDF
STAZMA_3.PDF PDF
STB9E1_1.PDF PDF
Stantec-AZ_SOQ_Stantec.pdf PDF
Stantec-O_A_signed.pdf PDF
StantecInsurance.pdf PDF
Stantec_Insurance_Certification_10-1-21_to_10-1-22.pdf PDF
Stantec_Insurance_Certification_5-1-21_to_5-1-22.pdf PDF
Stantec_Negotiations_Sheet_8-17-21-Stantec.xlsx XLSX spreadsheet
Stantec_Negotiations_Sheet_8-17-21Stantec.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9/22/21, 12:18 PM State of Arizona Mail - Request for Best and Final Offer: Solicitation BPM003384 Hydrological Engineering Services -Stantec https://mail.google.com/mail/u/0?ik=0fa87e1f2a&view=pt&search=all&permthid=thread-a%3Ar8781239055817944053%7Cmsg-f%3A17116299522647… 1/3

Elizabeth Burgard <eburgard@azgfd.gov>

Request for Best and Final Offer: Solicitation BPM003384 Hydrological Engineering Services - Stantec

1 message

Schlund, Scot <scot.schlund@stantec.com> Wed, Sep 22, 2021 at 12:05 PM To: Elizabeth Burgard <EBURGARD@azgfd.gov>, "Eichinger, Bob" <Bob.Eichinger@stantec.com> Cc: "Eichinger, Bob" <Bob.Eichinger@stantec.com>

Elizabeth

Please find attached our Best and Final Offer rates for the above referenced solicitation. These rates reflect the team and services presented in our qualifications package (proposal) submitted previously via the Arizona Procurement Portal and is included as part of this Best and Final Offer by reference.

Please note that the Stantec team is highly experienced in dam safety, dam assessments, dam and outlet/spillway rehabilitation, hydrology and hydraulics, inundation studies, flood warning, site specific precipitation determinations, and other pertinent dam related disciplines and features. We have successfully provided these services to the AZGFD in the past and thoroughly understand the purpose and function of

AZGFD

dams. And we are currently providing similar dam-related services through work with the Natural Resources Conservation Services (NRCS) in various states and our local flood control district in Maricopa County, Arizona. Our rates have been approved and used by these agencies.

We strive to provide our clients with the best talent to match the anticipated work and our team presented to you reflects the demands of what can be high risk work in the civil engineering world – dams.

Many thanks for the time you and the team at AZGFD have put into this solicitation. We look forward to continuing our relationship with the

AZGFD.

Scot

Scot Schlund PE

Senior Principal

Direct: 480 687-6231

Mobile: 602 363-5742

Fax: 602 431-9562 scot.schlund@stantec.com

Stantec

The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately.

From: Elizabeth Burgard <EBURGARD@azgfd.gov>

Sent: Thursday, September 16, 2021 2:56 PM mailto:scot.schlund@stantec.com http://www.stantec.com/ mailto:EBURGARD@azgfd.gov

9/22/21, 12:18 PM State of Arizona Mail - Request for Best and Final Offer: Solicitation BPM003384 Hydrological Engineering Services -Stantec https://mail.google.com/mail/u/0?ik=0fa87e1f2a&view=pt&search=all&permthid=thread-a%3Ar8781239055817944053%7Cmsg-f%3A17116299522647… 2/3

To: Eichinger, Bob <Bob.Eichinger@stantec.com>

Cc: Schlund, Scot <scot.schlund@stantec.com>

Subject: Request for Best and Final Offer: Solicitation BPM003384 Hydrological Engineering Services -Stantec

Dear Mr. Eichinger;

In accordance with §A.R.S 41-2534, Competitive Sealed Proposals, and A.A.C R2-7-C315, Offer Revisions and Best and Final Offers the AGFD hereby requests a final proposal revision from your organization regarding BPM00003384 Request For Qualifications - Hydrological Engineering Services .

To clarify - any subcontractors hired that are not listed on the fee schedule (ACS, Ninyo and Moore, App Weather Associates, and LTM), are not subject to any markup, as your firm is offering 0% markup on subcontractors. If your firm intends to charge a markup for subcontractors not specifically listed, you may want to reconsider your fee.

The items on the fee schedule highlighted in yellow are still considered to be higher than the average for these services by 15-78 percent. The landscape designer fees are over 106 percent higher. The rates for LTM are 60-95 percent higher Please seriously consider lowering these fees as your firm is at risk of not being awarded a contract based on these higher fees.

The Department requests a Final Proposal Revision/ Best and Final Offer (BAFO) to include:

· A Statement that the information your organization submitted in APP is included as part of your BAFO

· Attached a signed Fee schedule.

Please include the attached Fee schedule updated with your best offer and signed to your BAFO email response. The proposal submitted in APP does not need to be reattached to the BAFO email response, it just needs to be mentioned as "included" in your BAFO.

If you do not submit a written notice (email) of with-drawl or a written BAFO, the award cannot be completed. If you have any questions please contact me by email or by phone at (623) 236-7459. It is acceptable to respond by email.

A response is due as soon as possible or by September 23, 2021 by 4:30 p.m.

Thank you.

Sincerely;

ELIZABETH BURGARD I PROCUREMENT SUPERVISOR

ARIZONA GAME AND FISH DEPARTMENT

OFFICE: 623.236.7459, FAX: 623.236.7327, CELL: 480.617.3962

EMAIL: eburgard@azgfd.gov

5000 West Carefree Highway, Phoenix, AZ 85086 mailto:Bob.Eichinger@stantec.com mailto:scot.schlund@stantec.com mailto:eburgard@azgfd.gov https://www.google.com/maps/search/5000+West+Carefree+Highway,+Phoenix,+AZ+85086?entry=gmail&source=g

9/22/21, 12:18 PM State of Arizona Mail - Request for Best and Final Offer: Solicitation BPM003384 Hydrological Engineering Services -Stantec https://mail.google.com/mail/u/0?ik=0fa87e1f2a&view=pt&search=all&permthid=thread-a%3Ar8781239055817944053%7Cmsg-f%3A17116299522647… 3/3

Join our new Conservation Membership program and ensure a wildlife legacy for the future.

Stantec BAFO Sheet 9-22-21.xlsx

95K https://can01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.azwildlifehero.com%2Fsupport-us%2Fbecome-a-member&data=04%7C01%7Cscot.schlund%40stantec.com%7Caedb623f009e49526f4808d9795d0781%7C413c6f2c219a469297d3f2b4d80281e7%7C0%7C0%7C637674262907620288%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=zA%2FzYvhTEX8v28oxmP3y4eM2%2FEwnT5XMyu0Un504Lk8%3D&reserved=0 https://mail.google.com/mail/u/0?ui=2&ik=0fa87e1f2a&view=att&th=17c0ee5f7ba89cd0&attid=0.1&disp=attd&safe=1&zw

File details come from the government source that posted it. Updated .