Proposal_Score_Sheet_BPM003384_-_NS.pdf

PDF 139 KB Posted

Attached to
Master Agreement AZ|CTR057596
Contract number
CTR057596
Issued by
Arizona

About this file

This document is an evaluation scoresheet for a Request for Statement of Qualification (RFQ) for Hydro Engineering Services issued by the Arizona Game and Fish Department (AZGFD) under solicitation number BPM00384. The solicitation involved nine offerors: Cardno Inc, Dowl Hkm, J2 Engineering and Environmental Design LLC, JE Fuller Hydrology & Geomorphology Inc, Natural Channel Design Inc, NextGen Engineering Inc, Stantec Consulting Services Inc, TetraTech, and Wilson & Co.

The evaluation assessed the offerors across four criteria: Project Experience (40 points), Overall Experience (20 points), Design Philosophy, Process, QA/QC (15 points), and Common Problems (15 points), with an additional 10 points for Overall Quality of Proposal. JE Fuller Hydrology & Geomorphology Inc received the highest total score of 83 points, ranking first, followed by Dowl Hkm with 80 points and Wilson & Co with 82 points. The evaluation was conducted by Nara Sin, Project Manager for AZGFD SSDV, on 05/27/21, with the final ranking reflecting the evaluator's assessment of the bidders' proposals based on the established evaluation criteria.

View the file

Other files

File Type Posted
BPM003384_-_Evaluation_SPO_Form_120_-_Procurement_Disclosure_Statement_narasin.pdf PDF
COI_Stantec_Consulting_Serv_CGL_AL_WC_5-1-22_to_5-1-23_0001.pdf PDF
Evaluation_Narrative_for_BPM003384_-NS.pdf PDF
Evaluation_for_Committee_Members_-drodriguez.pdf PDF
Proposal_Score_Sheet_BPM003384.xlsx XLSX spreadsheet
Proposal_Score_Sheet_BPM003384.xlsx_-_drodriguez.pdf PDF
RFP_BPM003384_Hydro_Eng_Services_Award_Determination_signed.pdf PDF
ST5322_1.PDF PDF
ST9C6B_1.PDF PDF
STAZMail_10-14-21_-_NOA_-_BPM003384__Hydro_Engineering_Services_-_Stantec.pdf PDF
STAZ_Mail_-_Stantec_Insurance_Certification_10-11-21_10.40am.pdf PDF
Stantec_BAFO_Sheet_9-22-21.xlsx XLSX spreadsheet
Stantec_Negotiations_Sheet_8-10-21Stantec.xlsx XLSX spreadsheet
THE_STATE_OF_ARIZONA__17936182.pdf PDF
pds_drodriguez_pg1.jpeg JPEG file
BPM003384_Hydro_Eng_-Price_Negotiations_6-29-21Stantec.pdf PDF
EXECUTIVE_SUMMARY_BPM003384.pdf PDF
RFP_BPM003384_Hydro_Eng_Services_Award_Determination.docx DOCX document
Stantec_AZ_Corp_Commision_report.docx DOCX document
TO_Stantec_BAFO_Sheet_9-15-21.xlsx XLSX spreadsheet
CTR057596_YR5_Contract_Renewal_AZGFD_Signed.pdf PDF
CTR057596_Yr_4_Renewal.pdf PDF
Guidelines_for_Evaluation_for_Committee_Members.pdf PDF
STAZMA_1.PDF PDF
STAZMA_4.PDF PDF
STAZMail_to_Unsucessfuls-_10-14-21_Solicitation_-_BPM003384__Hydro_Engineering_Services.pdf PDF
STAZ_Mail_-_BPM003384_-_Evaluation_Committee_ENGSERVICES-_HYDRO.pdf PDF
STAZ_Mail_-_Request_BAFO__BPM003384_-TO_9.16.21Stantec.pdf PDF
YR3_RENEWAL_CTR057596_-_Hydrological_Engineering_Services.pdf PDF
pds_drodriguez_pg2.jpeg JPEG file
pds_drodriguez_pg3.jpeg JPEG file
BPM003384_Due_Diligence_Check_List.pdf PDF
BPM003_2.PDF PDF
CTR057596_Stantec_Hydrological_Engineering_Services_executed.pdf PDF
Evaluation_Narrative_for_BPM003384_-_NS.pdf PDF
Evaluation_Score_BPM003384.pdf PDF
Evaluation_Team_Meeting_Sign_in_Sheet.docx DOCX document
RFP_BPM003384_Hydro_Eng_Services_Award_Determination.pdf PDF
SAM_EntityInformation-Stantec.pdf PDF
ST15C8_1.PDF PDF
STAZMA_2.PDF PDF
STAZMA_3.PDF PDF
STB9E1_1.PDF PDF
Stantec-AZ_SOQ_Stantec.pdf PDF
Stantec-O_A_signed.pdf PDF
StantecInsurance.pdf PDF
Stantec_Insurance_Certification_10-1-21_to_10-1-22.pdf PDF
Stantec_Insurance_Certification_5-1-21_to_5-1-22.pdf PDF
Stantec_Negotiations_Sheet_8-17-21-Stantec.xlsx XLSX spreadsheet
Stantec_Negotiations_Sheet_8-17-21Stantec.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

40 28 32 25 35 20 15 30 31 32

20 15 13 15 18 10 10 18 15 17

15 12 14 12 13 10 10 12 12 12

15 12 12 12 10 10 10 8 8 12

10 8 9 10 7 9 6 8 8 9

100 75 80 74 83 59 51 76 74 82 I hereby attest that the points awarded to each bidder listed above were scored in accordance with the established evaluation criterita and represent my best judgement of the bidder's proposal. As indicated by the highest total score, my ranking of the proposals are:

SIGNATURE

PRINTED NAME TITLE

DEPARTMENT DATE

Offerors

N ex tG en

E ng in ee rin g

In c

St an te c

C on su lti ng

Se rv ic es

In c

Te tra

T ec h In c

W ils on

C o.

C ar dn o

In c

D ow l H km

J 2 E ng in ee rin g an d En vi ro nm en ta l D es ig n

LL

C

JE

F ul le r H yd ro lo gy

G eo m or ph ol og y In c

N at ur al

C ha nn el

D es ig n In c

Design Philosophy, Process, QA/QC

ARIZONA GAME AND FISH DEPARTMENT

Request for Statement of Qualification for Hydro Engineering Services Solicitation BPM003384

6 TetraTech 7 J2 8 Natural Channel 9 Next Gen

1 JE Fuller 2 Wilson & Co 3 DOWL Hkm 4 Stantec 5 Cardno

Project Experience

M ax im um

P oi nt s

TOTAL POINTS

Evaluator's name:

Overall Experience

Common Problems

Overall Quality of Proposal

Nara Sin Project Manager

AZGFD SSDV 05/27/21

File details come from the government source that posted it. Updated .