QA 16JAN thru 11FEB2021.docx

DOCX document 25 KB Posted

Attached to
F-16 Brake Control System Redesign (BCSR) Federal contract opportunity
Solicitation number
SPRHA1-21-R-7000
Issued by
Defense Logistics Agency Aviation

About this file

This document contains questions and answers regarding a solicitation for the F-16 Brake Control System Redesign (BCSR) program. Key details include that the solicitation number is SPRHA1-21-R-7000 and is being issued by the Defense Logistics Agency Aviation located at Hill Air Force Base in Utah. The intent of the program is to redesign the brake control system for continued operations of the F-16 aircraft throughout its remaining service life. Offerors are advised that drawings of certain components will not be provided due to disclosure restrictions, but interface information is included in the performance specification. Repair of circuit cards at the depot level is envisioned, but extensive repair is not expected or required.

View the file

Other files for this federal contract opportunity

Other files attached to F-16 Brake Control System Redesign (BCSR), newest first.
File Type Posted
SPRHA1-21-R-7000-0004.pdf PDF
QA 12APR-16APR2021.pdf PDF
SPRHA1-21-R-7000-0003.pdf PDF
Section L_REV04162021.pdf PDF
Section M.pdf PDF
QA 01MAR-05MAR2021.pdf PDF
A016_DID_TIR_VACR.pdf PDF
A016_CDRL_TIR_VACR.pdf PDF
A008_CDRL_TIR_FMECA.pdf PDF
A011_TDP_CDMAL.pdf PDF
A007_CDRL_CDR.pdf PDF
A001_CDRL_IMS_BCSR.pdf PDF
A018_CDRL_TIR_THIR.pdf PDF
PPQ.pdf PDF
Subcont_Consent.pdf PDF
SPRHA121R7000.pdf PDF
A015_CDRL_LMI.pdf PDF
A015_LMI_Attachment2.pdf PDF
A013_CDRL_ST_DMAL.pdf PDF
A012_CDRL_SIE_DMAL.pdf PDF
A011_CDRL_CDMAL.pdf PDF
A013_TDP_ST_DMAL.pdf PDF
A009_DID_TRR.pdf PDF
A002_CDRL_SRR.pdf PDF
B001_DID_PDMAL_PEDDAL.pdf PDF
C002_CDRL_CHR_FF_signed.pdf PDF
C004_CBDR_CDRL_signed.pdf PDF
A005_DID_TP.pdf PDF
A006_CDRL_PDR.pdf PDF
A017_CDRL_SSR.pdf PDF
A014_CDRL_TMCR_TO.pdf PDF
A010_CDRL_TIR_QTR.pdf PDF
A010_DID_TIR_QTR.pdf PDF
A011_DID_CDMAL_CEDDAL.pdf PDF
A009_CDRL_TRR.pdf PDF
A003_CDRL_ConfAgenda.pdf PDF
A008_DID_TIR_FMECA.pdf PDF
A005_CDRL_TP.pdf PDF
A007_DID_CDR_AWS.pdf PDF
A006_DID_PDR_AWS.pdf PDF
A002_DID_SRR_AWS.pdf PDF
B001_CDRL_PDM_DMAL.pdf PDF
B001_CDRL_PDMAL_AD.pdf PDF
C003_CDRL_QDR_signed.pdf PDF
C001_CDRL_RDT_signed.pdf PDF
Attachment_0002_ResourceDistributionTable.xlsx XLSX spreadsheet
F16_BCSR_TRDSOW_20201028_RevA.pdf PDF
PPISSample.pdf PDF
ClientLtr.pdf PDF
PS_RFP.pdf PDF
Show all 50

F-16 Brake Control System Redesign (BCSR) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q4:

Are Offeror(s) supposed to fill out the PPQs?

A4:

There is no need to fill out the PPQ. If an Offeror would like to add the POC information to the PPQ, that is acceptable, however the questions are for the POCs to fill out. If it is easier, Offerors are permitted to simply send over the POC information requested in section L, “Past Performance Questionnaire (PPQ): For each PPIS the Offeror plans to submit in their Past Performance Volume it would be highly beneficial to provide the following no later than 45 days after release of the initial RFP: 1) Contract number; 2) the associated Cage Code and DUNS Number for that contract (if applicable); 3) at least one, preferably two POCs, including their name (i.e.; Mr. John Smith) and title (e.g.; CO, Program Manager, Engineer, Etc.), along with a current phone number and email address.”

Q5:

Is it permissible to make changes to the harness (W9513020) between J1 and the BACU?

A5:

The current funding prevents wire harness W9513020 from being changed in relation to this program. As a result, the referenced wire harness must remain as-is.

Q6:

PS Document Request:

1) Brake System Procurement Specifications listed in PS paragraph 3.2.2.

a. PS 965529 (Cage Code 98747) Light Weight (Block 30 and earlier) Part #: 2-1543

b. PS 16ZL030B (Cage Code 81755) Heavy Weight (Post Block 30) Part #: 2-1523

c. TO 1-1A-14 A6:

USAF does not believe these drawings will provide any useful information beyond what is in the Performance Specification. The relevant information from external documents has been incorporated into the Performance Specification for this acquisition which was cleared for release. The requested documents have not been cleared for foreign disclosure. It may be possible to seek authorization for distribution post-award, if necessary. If there appears to be incomplete information necessary for the sole purpose of responding to the solicitation, please let Ryan Peacock know ryan.peacock@us.af.mil.

Q7:

The following drawings are requested:

Q4: Drawing Requests PS Para
PN
Cage Code
Description
Application
Question / Concern
3.2.3.2.3.3
6F2986-2
99240
Restrictor Valve
Gear Retract Braking
Need drawing or spec details of Restrictor
3.1.5.1
4C3104
99240
Check valve Fitting
System B Supply Pressure
Need drawing/details on Part.

Supplier supply chain has not received sufficient data when reaching out to the OEMs.

Confirm Supplier is not supplying these - just need to interface with - per Figure 6

3.1.5.1
6F3094-100
99240
Miniature One-Way Restrictor Fitting
Accumulator Pressure
3.1.5.1
A2540
50276
Check valve Fitting
System B Supply Pressure
3.1.5.1
AE16524-4
00624
Union Port to Male Lipseal Fitting
Gear Retract Pressure
3.1.5.1
AE16524-6
00624
Union Port to Male Lipseal Fitting
Return Pressure
3.1.5.1
AFP1269T04
30974
Union Port to Male Lipseal Fitting
Brake Pressure
3.1.5.1
AFP1269T06
30974
Union Port to Male Lipseal Fitting
Return Pressure
3.1.5.1
AFP126T04
30974
Union Port to Male Lipseal Fitting
Gear Retract Pressure
3.1.5.1
AP312T04
01673
Union Port to Male Lipseal Fitting
Gear Retract Pressure
3.1.5.1
AP312T06
1673
Union Port to Male Lipseal Fitting
Return Pressure
3.1.5.1
R44703T-04
50599
Union Port to Male Lipseal Fitting
Gear Retract Pressure
3.1.5.1
R44703T-06
50599
Union Port to Male Lipseal Fitting
Return Pressure

A7:

The Supplier is not required to provide these fittings as part of the BCSR program. Drawing 6F2986-2 is not available to the USAF and will not be provided. The remaining drawings listed are not necessary, the numbers are provided for reference only.

Q8:

In regard to “2.6.3; 4.2 –Tooling, Fixtures, and Inspection Equipment; Commodity TO Source Data,” is the intent of the Government to be able to repair subcomponents (SRU) in the system (for example, being able to replace a flash memory chip on the BACU CPU CCA), or is it to identify that a certain SRU has malfunctioned (such as the CPU CCA) and to be able to replace that SRU with a functioning one without repairing the faulty SRU? … If the intent is to be able to repair subcomponents at the depot level, does that mean that the test equipment described in 2.6.3 is the equipment that will be used, along with the TO described in 4.2, to effect the repairs?

A8:

Tooling, Fixtures, and Inspection Equipment: The Government intends to repair the BACU by identifying which circuit card(s) have failed and replacing them. Some circuit card repair is possible within the USAF depot capabilities, but extensive circuit card repair is not expected or necessary.

Q9:

Will it be possible to receive a copy of the referenced TOs (e.g.; TO 4BA8-47-3, TO 4BA4-131-3)?

A9:

The referenced T.O.s were intended to be provided to the awarded contractor, if necessary, to be used as a template/guide for developing the contract T.O. deliverables. They have not been cleared for foreign disclosure at this time. USAF is unaware of any useful relevant information contained in them which is necessary for responding to the solicitation. If there appears to be incomplete information necessary for the sole purpose of responding to the solicitation, please let Ryan Peacock know ryan.peacock@us.af.mil.