This document contains questions and answers regarding a forthcoming federal solicitation for the F-16 Brake Control System Redesign program. The solicitation will be issued by the Defense Logistics Agency Aviation and seeks proposals to redesign the brake control system for the F-16 fighter aircraft to enable continued safe operations over the remainder of the airframe's service life. Offerors are advised that funding is anticipated to be in place prior to award. The contract line items will request quantities of 153 brake actuator control units and 93 brake control valve assemblies, which represents the sum of initial investment spares and projected operational spares over the life of the contract. Offerors are instructed to quote the quantities listed in the solicitation documents. The document provides guidance that past performance questionnaires for relevant prior contracts should be submitted no later than 45 days after solicitation release to facilitate evaluation.

View the file

Other files

File Type Posted
Section L_REV04232021.pdf PDF
SPRHA1-21-R-7000-0004.pdf PDF
QA 19APR-23APR2021.pdf PDF
SPRHA1-21-R-7000-0003.pdf PDF
QA 12APR-16APR2021.pdf PDF
Section M_REV04162021.pdf PDF
Section L_REV04162021.pdf PDF
SPRHA1-21-R-7000-0002.pdf PDF
Section L.pdf PDF
F-16_BCSR_(TRD-SOW)_20210329_RevB.pdf PDF
Section M.pdf PDF
SPRHA121R7000_______0001.pdf PDF
QA 01MAR-05MAR2021.pdf PDF
QA 16JAN thru 11FEB2021.docx DOCX document
QA 11JAN thru 15JAN2021.pdf PDF
CSDR_SOW_20201123.pdf PDF
A001_DID_IMS_BCSR.pdf PDF
A011_CDRL_CDMAL.pdf PDF
C004_CBDR_CDRL_signed.pdf PDF
A011_TDP_CDMAL.pdf PDF
Subcont_Consent.pdf PDF
B001_TDP_PDMAL_AD.pdf PDF
A006_CDRL_PDR.pdf PDF
A005_DID_TP.pdf PDF
F16_BCSR_TRDSOW_20201028_RevA.pdf PDF
A007_DID_CDR_AWS.pdf PDF
A004_DID_ContractorCMP.pdf PDF
A012_DID_SIE_EDDAL.pdf PDF
B001_DID_PDM_DMAL.PDF PDF
C003_CDRL_QDR_signed.pdf PDF
PPISSample.pdf PDF
ClientLtr.pdf PDF
A016_DID_TIR_VACR.pdf PDF
A016_CDRL_TIR_VACR.pdf PDF
B001_DID_CGEP_CSPEI.pdf PDF
A017_CDRL_SSR.pdf PDF
A006_DID_PDR_AWS.pdf PDF
A013_DID_ST_EDDAL.pdf PDF
A010_CDRL_TIR_QTR.pdf PDF
A005_CDRL_TP.pdf PDF
A009_CDRL_TRR.pdf PDF
A003_DID_ConfAgenda.pdf PDF
A012_TDP_SIE_DMAL.pdf PDF
Nongovernmental.pdf PDF
Attachment_0002_ResourceDistributionTable.xlsx XLSX spreadsheet
A010_DID_TIR_QTR.pdf PDF
B001_CDRL_PDMAL_AD.pdf PDF
A011_DID_CDMAL_CEDDAL.pdf PDF
SPRHA121R7000.pdf PDF
Attachment_0001_DD2794_CSDR_Plan.xls XLS spreadsheet
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question:

Has this program has been funded by the government?

Answer:

Funding is anticipated to be in place prior to award. This requirement is not for planning purposes.

Question:

The SOW indicates a quantity of 40 BACU and 40 BCVA for the initial quantity of investment spares, but the contract line items request quantities of 153 and 93, respectively. What quantity is expected to be quoted on the proposal regarding CLIN 0005AB and 0005AC?

Answer:

Please quote the contract line item quantities listed in the TRD/SOW. CLIN(s) are a combination of investment spares (40 each) and POS/RSP spares (113 BACUs and 53 BCVs). In short, quote the CLIN which is the POS/RSP numbers, plus the investment spares (113 + 40 = 153, and 53 + 40 = 93).

Question:

Are there any files due immediately to be considered a participant? It appears there are files that need to be submitted prior to the proposal.

Answer:

Per section L; Paragraph 3.2 Past Performance Questionnaire (PPQ)

For each PPIS the Offeror plans to submit in their Past Performance Volume it would be highly beneficial to provide the following no later than 45 days after release of the initial RFP: 1) Contract number; 2) the associated Cage Code and DUNS Number for that contract (if applicable); 3) at least one, preferably two POCs, including their name (i.e.; Mr. John Smith) and title (e.g.; CO, Program Manager, Engineer, Etc.), along with a current phone number and email address…

Offerors who choose not to provide the preceding PPIS/PPQ information, shall send a PPQ (Attached) to each POC (COs, Program Managers, Engineers) for each PPIS submitted in the Past Performance Volume. POCs will submit the completed PPQ directly to the Government. The information contained in completed PPQs shall be considered sensitive and shall not be released to the Offeror. A cover letter for transmitting the PPQ to each POC is provided (Attached).

*In summation: we would like the PPQ POCs early (ETA 2/26/2021), to expedite processes, but early submittals are not a factor for qualification/consideration.*