A005_DID_TP.pdf

PDF 23 KB Posted

Attached to
F-16 Brake Control System Redesign (BCSR) Federal contract opportunity
Solicitation number
SPRHA1-21-R-7000
Issued by
Defense Logistics Agency Aviation

About this file

This Data Item Description outlines test plan requirements for the F-16 Brake Control System Redesign solicitation. The solicitation seeks redesign of the F-16 brake control system and calls for test plans to document contractor plans for conducting and analyzing tests to verify system performance meets specifications. Test plans must include an introduction with objectives, flow diagrams, milestones, participation details, locations, schedules and security measures. The master test list is to specify all tests in order, with descriptions, applicable specifications, parameters, objectives, equipment, instrumentation, data collection and analysis methods, and validation procedures. The Defense Logistics Agency Aviation contracting office at Hill Air Force Base, Utah issued the solicitation, with pre-solicitation details available at the provided link.

View the file

Other files for this federal contract opportunity

Other files attached to F-16 Brake Control System Redesign (BCSR), newest first.
File Type Posted
Section L_REV04232021.pdf PDF
QA 19APR-23APR2021.pdf PDF
QA 12APR-16APR2021.pdf PDF
SPRHA1-21-R-7000-0003.pdf PDF
Section M_REV04162021.pdf PDF
Section L.pdf PDF
Section M.pdf PDF
SPRHA121R7000_______0001.pdf PDF
QA 01MAR-05MAR2021.pdf PDF
22FEB-26FEB2021.pdf PDF
QA 11JAN thru 15JAN2021.pdf PDF
A016_DID_TIR_VACR.pdf PDF
A016_CDRL_TIR_VACR.pdf PDF
A008_CDRL_TIR_FMECA.pdf PDF
A011_TDP_CDMAL.pdf PDF
A007_CDRL_CDR.pdf PDF
A001_CDRL_IMS_BCSR.pdf PDF
A018_CDRL_TIR_THIR.pdf PDF
PPQ.pdf PDF
Subcont_Consent.pdf PDF
SPRHA121R7000.pdf PDF
A014_DID_TMCR_TO.pdf PDF
A015_LMI_Attachment3.pdf PDF
A015_LMI_Attachment1.pdf PDF
A012_TDP_SIE_DMAL.pdf PDF
A012_DID_SIE_EDDAL.pdf PDF
A004_CDRL_ContractorCMP.pdf PDF
A003_DID_ConfAgenda.pdf PDF
B001_CDRL_CGEP_DMAL.pdf PDF
B001_TDP_PDMAL_AD.pdf PDF
B001_DID_CGEP_CSPEI.pdf PDF
B001_DID_PDM_DMAL.PDF PDF
A018_DID_TIR_THIR.pdf PDF
A017_DID_SSR_CPSR.pdf PDF
Attachment_0001_DD2794_CSDR_Plan.xls XLS spreadsheet
Nongovernmental.pdf PDF
A004_DID_ContractorCMP.pdf PDF
CSDR_SOW_20201123.pdf PDF
A001_DID_IMS_BCSR.pdf PDF
A015_CDRL_LMI.pdf PDF
A015_LMI_Attachment2.pdf PDF
A013_CDRL_ST_DMAL.pdf PDF
A012_CDRL_SIE_DMAL.pdf PDF
A011_CDRL_CDMAL.pdf PDF
A013_TDP_ST_DMAL.pdf PDF
A009_DID_TRR.pdf PDF
A002_CDRL_SRR.pdf PDF
B001_DID_PDMAL_PEDDAL.pdf PDF
C002_CDRL_CHR_FF_signed.pdf PDF
C004_CBDR_CDRL_signed.pdf PDF
Show all 50

F-16 Brake Control System Redesign (BCSR) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Test Plan

Number: DI-NDTI-80566A Approval Date: 14 Nov 2006 AMSC Number: 7639 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A

Use/relationship: The Test Plan outlines the plans and performance objectives at every level of testing on systems or equipment. It provides the procuring activity with the test concept, objectives and requirements to be satisfied, test methods, elements, responsible activities associated with the testing, measures required and recording procedures to be used.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID is applicable to system and equipment tests that include design evaluation tests, engineering tests, preliminary qualification tests, formal qualification tests, human factors tests, operational tests and acceptance tests.

This DID supersede DI-NDTI-80566.

Requirements:

1. Reference documents. None.

2. General. The test plan shall document in detail the contractor’s plan for conducting tests and analyzing the test results to show how the system, when fielded, will satisfy the requirements of the applicable design specification.

3. Format: The plan shall be in contractor’s format.

4. Contents. The plan shall contain the following:

4.1 Title page. The title page shall include the following:

a. Title of the test to be conducted.

b. Identification of system being tested.

c. Contractor’s name.

d. Contractor number.

DI-NDTI-80566A

e. Security classification.

f. Distribution statement.

4.2 Introduction. Consists of an overview of the objectives of the test plan, including flow diagrams, milestones, personnel participation, locations, schedules, and security measures to be observed. The plan shall include the following:

4.3 Flow diagrams. The flow diagrams will reflect a functional description of the test program using a block diagram portrayal of the functions that must be met to satisfy the total test program. Functions shall be numbered 1.0, 2.0, 3.0, etc.

4.4 Milestones. Identifies the start and expected completion dates of each test to be performed.

4.5 Participation. Identifies the government and contractor participation roles and responsibilties.

4.6 Location. Identifies the facilities where the testing will be performed.

4.7 Schedule. States when testing will be performed, whether testing is on schedule, and if not, what procedures will be taken to meet the schedule.

4.8 Security. Identify and state briefly any security measures of guidelines to be observed.

4.9 Master test list. Lists all tests to be accomplished in the order they are to be performed. A separate listing for each location shall be provided. Each listing shall include the following:

4.9.1 Test description. Name and brief description of test to be performed.

4.9.2 Applicable specification (s). The specifications shall be identified as follows:

a. Title and identification number.

b. Paragraph number associated with the tests.

c. Title of test.

d. Functional category of test.

4.9.3 Parameters. The number of cycles the test will be performed and selected parameters to be observed.

4.9.4 Special tests. Provides a list of special or unusual tests and examination necessary to verify satisfactory equipment performance to specifications.

DI-NDTI-80566A

4.9.5 Test classification category. State the functional area of each test performed.

4.9.6 Test objectives. Describes the objectives of each test performed, including the criteria, baseline, duration, and number of times each test should be performed.

a. Success/failure criteria.

b. Baseline.

c. Duration.

d. Quantity of test.

4.9.7 Test equipment. List all equipment to be used in the test and identify as follows:

a. Description.

b. Nomenclature.

c. Serial number.

4.9.8 Support equipment. List all support equipment that will be used to perform the tests and identify as follows:

a. Description.

b. Nomenclature.

c. Serial number.

d. Calibration constants.

e. Calibration procedures.

f. Operating instructions.

4.9.9 Special test equipment. List all special test equipment required to be designed or fabricated for use on the program as follows:

a. Description.

b. Nomenclature.

c. Data required.

4.9.10 Approach. Describe the steps used to perform each test.

4.9.11 Instrumentation. Indicates the type and recording devices that will be used and the number and types of parameters to be recorded.

4.9.12 Data reduction and analysis. Describes data to be recorded and the data reduction and analysis techniques that will be used to interpret the data.

4.9.13 Government test facilities. Identifies applicable facility and includes a reference to the appropriate facility requirements documents.

Validation procedure. An overview of the procedures that the contractor will use to validate the test results.

5. END OF DI-NDTI-80566A

DATA ITEM DESCRIPTION
Requirements:

File details come from the government source that posted it. Updated .