A009_CDRL_TRR.pdf
PDF 290 KB Posted
- Attached to
- F-16 Brake Control System Redesign (BCSR) Federal contract opportunity
- Solicitation number
- SPRHA1-21-R-7000
- Issued by
- Defense Logistics Agency Aviation
About this file
This Contract Data Requirements List (CDRL) outlines documentation requirements for a Test Readiness Review (TRR) related to the F-16 Brake Control System Redesign (BCSR) program. Key deliverables for the TRR include a checklist, test schedule, risk management plan, test facilities assessment, and briefing materials. Draft TRR documentation is due 15 days before the review with the formal TRR 7 days before testing. Corrections are expected 3 days before testing. Distribution of the TRR documentation is restricted to U.S. government agencies only. The Defense Logistics Agency Aviation solicitation SPRHA1-21-R-7000 seeks proposals for the F-16 BCSR program to support continued operations of the aircraft throughout its remaining service life.
View the file
Other files for this federal contract opportunity
Show all 50
F-16 Brake Control System Redesign (BCSR) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
| data_item: A009 |
| title: Test Readiness Review (TRR) |
| sub: F-16 Brake Control System Redesign (BCSR) |
| auth: DI-NDTI-80603A |
| ref: IAW TRD PARAGRAPH 3.3 |
| req_ofc: 417 SCMS/GUEA |
| dd250: LO |
| appcode: A |
| dist: B |
| freq: Block 16 |
| asof: Block 16 |
| firstsub: Block 16 |
| subsub: Block 16 |
| addressee1: Landing Gear Office |
| draft1: |
| reg1: 1 |
| repro1: |
| addressee2: 417 SCMS/GUEA |
| draft2: |
| reg2: |
| repro2: |
| addressee3: 6040 Gum Lane |
| draft3: |
| reg3: |
| repro3: |
| addressee4: Hill AFB, UT |
| draft4: |
| reg4: |
| repro4: |
| addressee5: 84056-5285 |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: DLA-AUB |
| draft11: |
| reg11: |
| repro11: |
| addressee12: 6050 Gum Lane |
| draft12: |
| reg12: |
| repro12: |
| addressee13: Bldg 1225 |
| draft13: |
| reg13: |
| repro13: |
| addressee14: Hill AFB, UT 84056 |
| draft14: |
| reg14: |
| repro14: |
| addressee15: (SEE BLOCK 16) |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: WAWF |
| draft17: |
| reg17: |
| repro17: |
| addressee18: (SEE BLOCK 16) |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_reg: 1 |
| total_repro: 0 |
| remarks: Block 4: |
DI-NDTI-80603A shall be tailored for Test Readiness Review (TRR) prior to Qualification Testing. Changes to DI-NDTI-8060A, as follows:
Use/relationship:
Delete first paragraph and replace with:
"This Test Readiness Review identifies the documentation necessary to determine if the systems testing under review is ready to proceed into formal developmental, qualification, or acceptance testing. It also identifies whether the test procedures and set-up are complete and verifies their compliance with the test plan."
Requirements:
2. Format: Delete and replace with:
TRR documentation, including briefing materials, may be in Contractor's Format, but all drafts and the Final TRR will be delivered in fully-modifiable Word format (or PowerPoint for the briefing), including all text, tables, charts, and calculations. All draft revisions supplied in Word format will be supplied with tracked-changes from all previous draft revisions until Final acceptance by the Government. Final TRR documentation will also be delivered in PDF format. PDF of approved TRR Documentation will be the only copy with digital signatures, if applicable.
Delete Paragraphs 3.1.2, 3.1.3, 3.2 and all subparagraphs and insert the following paragraphs:
3.2 Body of document: The TRR should address:
◾The purpose of the testing;
◾How the test verifies a requirement back to a system specification or program requirement;
◾Whether the system being tested is sufficiently mature, defined, and representative to accomplish the planned test objectives and/or to support defined program objectives;
◾Whether all planning, procedures, equipment, tooling, and personnel are ready to begin testing with appropriate resources;
◾If all preliminary models, analyses, subsystems testing have been conducted with satisfactory results;
◾What is the expected result and how can the test results affect the program;
◾What are the test risks and how are they being mitigated;
◾What is the fall-back plan should a technical issue or potential show-stopper arise during testing.
| group: |
| total_price: |
| prep_name: Michael Schow, 417 SCMS/GUEA |
| line_item: 0001AJ |
| exhibit: A |
| xtdp: Off |
| xtm: Off |
| othercat: X |
| system: F-16 Brake Control System |
| ctr_no: FD20202001103 |
| contr: TBD |
| remarksb: 3.3 TRR Success Criteria: |
◾Completed and approved test plans for the system under test;
◾Completed identification and coordination of required test resources;
◾The judgment that previous component, subsystem, and system test results form a satisfactory basis for proceeding into planned tests; and ◾Identified risk level acceptable to the program leadership.
BLOCK 9: Distribution Statement B: Distribution authorized to U.S. Government agencies only, administrative or operational use, dated 2020/11/01. Other requests for this document shall be referred to OO-ALC/417 SCMS/GUEA, Hill AFB, Utah 84056-5811.
Blocks 10 through 13:
Draft TRR documentation must be provided no later than (NLT) 15 days before the TRR milestone, with the formal TRR milestone occurring NLT 7 days prior to the beginning of testing. TRR corrections to be delivered NLT 3 days prior to the beginning of testing.
Government comments will be provided NLT 30 days after each submittal. If Government review is delayed, contract milestones may be postponed until the review is completed.
Contractor must satisfy Government concerns/comments with no more than 2 revisions (i.e. 1st draft, 2nd draft, Final revision accepted by Government), as outlined in PWS Service Summary, Table 2. TRR deliverables requiring more than 2 revisions may affect the Contractor's CPARS Quality rating.
Block 14:
Deliver digital copies via electronic submission to applicable addresses listed.
Test Readiness Review (TRR) and provide the following documentation as a minimum in support of the TRR;
• TRR Checklist and Closure Sheet (Supplier and USAF signatures)
• Qualification Test Schedule
• Risk Management Plan
• Test Facilities/Equipment/Resources Assessment
• Briefing materials and supporting data
EXPORT CONTROL WARNING: All technical documents that are determined to contain export-controlled technical data shall be marked: “WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et q.) or the Export Administration of Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.” When it is technically infeasible to use the entire statement, an abbreviated marking may be used, and a copy of the full statement added to the “Notice To Accompany Release of Export Controlled Data” required by DoD Directive 5230.25 (reference (c)).
| Page2: 2 | |
| Reset: | |
| 2020-10-26T10:36:11-0600 | |
| SCHOW.MICHAEL.N.1252332606 |
| prep_date: 20201026 | |
| app_by: Ron Montgomery, 417 SCMS/GUEA | |
| 2020-10-26T12:15:58-0600 | |
| MONTGOMERY.RONALD.L.1243849620 |
| app_date: 20201026 |
| Page: 1 |
| of_pages: 3 |
| app: Adobe Professional 8.0 |
File details come from the government source that posted it. Updated .