A009_CDRL_TRR.pdf

PDF 290 KB Posted

Attached to
F-16 Brake Control System Redesign (BCSR) Federal contract opportunity
Solicitation number
SPRHA1-21-R-7000
Issued by
Defense Logistics Agency Aviation

About this file

This Contract Data Requirements List (CDRL) outlines documentation requirements for a Test Readiness Review (TRR) related to the F-16 Brake Control System Redesign (BCSR) program. Key deliverables for the TRR include a checklist, test schedule, risk management plan, test facilities assessment, and briefing materials. Draft TRR documentation is due 15 days before the review with the formal TRR 7 days before testing. Corrections are expected 3 days before testing. Distribution of the TRR documentation is restricted to U.S. government agencies only. The Defense Logistics Agency Aviation solicitation SPRHA1-21-R-7000 seeks proposals for the F-16 BCSR program to support continued operations of the aircraft throughout its remaining service life.

View the file

Other files for this federal contract opportunity

Other files attached to F-16 Brake Control System Redesign (BCSR), newest first.
File Type Posted
Section L_REV04232021.pdf PDF
QA 19APR-23APR2021.pdf PDF
QA 12APR-16APR2021.pdf PDF
SPRHA1-21-R-7000-0003.pdf PDF
Section M_REV04162021.pdf PDF
Section L.pdf PDF
Section M.pdf PDF
SPRHA121R7000_______0001.pdf PDF
QA 01MAR-05MAR2021.pdf PDF
22FEB-26FEB2021.pdf PDF
QA 11JAN thru 15JAN2021.pdf PDF
A016_DID_TIR_VACR.pdf PDF
A016_CDRL_TIR_VACR.pdf PDF
A008_CDRL_TIR_FMECA.pdf PDF
A011_TDP_CDMAL.pdf PDF
A007_CDRL_CDR.pdf PDF
A001_CDRL_IMS_BCSR.pdf PDF
A018_CDRL_TIR_THIR.pdf PDF
PPQ.pdf PDF
Subcont_Consent.pdf PDF
SPRHA121R7000.pdf PDF
A014_DID_TMCR_TO.pdf PDF
A015_LMI_Attachment3.pdf PDF
A015_LMI_Attachment1.pdf PDF
A012_TDP_SIE_DMAL.pdf PDF
A012_DID_SIE_EDDAL.pdf PDF
A004_CDRL_ContractorCMP.pdf PDF
A003_DID_ConfAgenda.pdf PDF
B001_CDRL_CGEP_DMAL.pdf PDF
B001_TDP_PDMAL_AD.pdf PDF
B001_DID_CGEP_CSPEI.pdf PDF
B001_DID_PDM_DMAL.PDF PDF
A018_DID_TIR_THIR.pdf PDF
A017_DID_SSR_CPSR.pdf PDF
Attachment_0001_DD2794_CSDR_Plan.xls XLS spreadsheet
Nongovernmental.pdf PDF
A004_DID_ContractorCMP.pdf PDF
CSDR_SOW_20201123.pdf PDF
A001_DID_IMS_BCSR.pdf PDF
A015_CDRL_LMI.pdf PDF
A015_LMI_Attachment2.pdf PDF
A013_CDRL_ST_DMAL.pdf PDF
A012_CDRL_SIE_DMAL.pdf PDF
A011_CDRL_CDMAL.pdf PDF
A013_TDP_ST_DMAL.pdf PDF
A009_DID_TRR.pdf PDF
A002_CDRL_SRR.pdf PDF
B001_DID_PDMAL_PEDDAL.pdf PDF
C002_CDRL_CHR_FF_signed.pdf PDF
C004_CBDR_CDRL_signed.pdf PDF
Show all 50

F-16 Brake Control System Redesign (BCSR) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A009
title: Test Readiness Review (TRR)
sub: F-16 Brake Control System Redesign (BCSR)
auth: DI-NDTI-80603A
ref: IAW TRD PARAGRAPH 3.3
req_ofc: 417 SCMS/GUEA
dd250: LO
appcode: A
dist: B
freq: Block 16
asof: Block 16
firstsub: Block 16
subsub: Block 16
addressee1: Landing Gear Office
draft1:
reg1: 1
repro1:
addressee2: 417 SCMS/GUEA
draft2:
reg2:
repro2:
addressee3: 6040 Gum Lane
draft3:
reg3:
repro3:
addressee4: Hill AFB, UT
draft4:
reg4:
repro4:
addressee5: 84056-5285
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11: DLA-AUB
draft11:
reg11:
repro11:
addressee12: 6050 Gum Lane
draft12:
reg12:
repro12:
addressee13: Bldg 1225
draft13:
reg13:
repro13:
addressee14: Hill AFB, UT 84056
draft14:
reg14:
repro14:
addressee15: (SEE BLOCK 16)
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17: WAWF
draft17:
reg17:
repro17:
addressee18: (SEE BLOCK 16)
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 1
total_repro: 0
remarks: Block 4:

DI-NDTI-80603A shall be tailored for Test Readiness Review (TRR) prior to Qualification Testing. Changes to DI-NDTI-8060A, as follows:

Use/relationship:

Delete first paragraph and replace with:

"This Test Readiness Review identifies the documentation necessary to determine if the systems testing under review is ready to proceed into formal developmental, qualification, or acceptance testing. It also identifies whether the test procedures and set-up are complete and verifies their compliance with the test plan."

Requirements:

2. Format: Delete and replace with:

TRR documentation, including briefing materials, may be in Contractor's Format, but all drafts and the Final TRR will be delivered in fully-modifiable Word format (or PowerPoint for the briefing), including all text, tables, charts, and calculations. All draft revisions supplied in Word format will be supplied with tracked-changes from all previous draft revisions until Final acceptance by the Government. Final TRR documentation will also be delivered in PDF format. PDF of approved TRR Documentation will be the only copy with digital signatures, if applicable.

Delete Paragraphs 3.1.2, 3.1.3, 3.2 and all subparagraphs and insert the following paragraphs:

3.2 Body of document: The TRR should address:

◾The purpose of the testing;

◾How the test verifies a requirement back to a system specification or program requirement;

◾Whether the system being tested is sufficiently mature, defined, and representative to accomplish the planned test objectives and/or to support defined program objectives;

◾Whether all planning, procedures, equipment, tooling, and personnel are ready to begin testing with appropriate resources;

◾If all preliminary models, analyses, subsystems testing have been conducted with satisfactory results;

◾What is the expected result and how can the test results affect the program;

◾What are the test risks and how are they being mitigated;

◾What is the fall-back plan should a technical issue or potential show-stopper arise during testing.

group:
total_price:
prep_name: Michael Schow, 417 SCMS/GUEA
line_item: 0001AJ
exhibit: A
xtdp: Off
xtm: Off
othercat: X
system: F-16 Brake Control System
ctr_no: FD20202001103
contr: TBD
remarksb: 3.3 TRR Success Criteria:

◾Completed and approved test plans for the system under test;

◾Completed identification and coordination of required test resources;

◾The judgment that previous component, subsystem, and system test results form a satisfactory basis for proceeding into planned tests; and ◾Identified risk level acceptable to the program leadership.

BLOCK 9: Distribution Statement B: Distribution authorized to U.S. Government agencies only, administrative or operational use, dated 2020/11/01. Other requests for this document shall be referred to OO-ALC/417 SCMS/GUEA, Hill AFB, Utah 84056-5811.

Blocks 10 through 13:

Draft TRR documentation must be provided no later than (NLT) 15 days before the TRR milestone, with the formal TRR milestone occurring NLT 7 days prior to the beginning of testing. TRR corrections to be delivered NLT 3 days prior to the beginning of testing.

Government comments will be provided NLT 30 days after each submittal. If Government review is delayed, contract milestones may be postponed until the review is completed.

Contractor must satisfy Government concerns/comments with no more than 2 revisions (i.e. 1st draft, 2nd draft, Final revision accepted by Government), as outlined in PWS Service Summary, Table 2. TRR deliverables requiring more than 2 revisions may affect the Contractor's CPARS Quality rating.

Block 14:

Deliver digital copies via electronic submission to applicable addresses listed.

Test Readiness Review (TRR) and provide the following documentation as a minimum in support of the TRR;

• TRR Checklist and Closure Sheet (Supplier and USAF signatures)

• Qualification Test Schedule

• Risk Management Plan

• Test Facilities/Equipment/Resources Assessment

• Briefing materials and supporting data

EXPORT CONTROL WARNING: All technical documents that are determined to contain export-controlled technical data shall be marked: “WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et q.) or the Export Administration of Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.” When it is technically infeasible to use the entire statement, an abbreviated marking may be used, and a copy of the full statement added to the “Notice To Accompany Release of Export Controlled Data” required by DoD Directive 5230.25 (reference (c)).

Page2: 2
Reset:
2020-10-26T10:36:11-0600
SCHOW.MICHAEL.N.1252332606
prep_date: 20201026
app_by: Ron Montgomery, 417 SCMS/GUEA
2020-10-26T12:15:58-0600
MONTGOMERY.RONALD.L.1243849620
app_date: 20201026
Page: 1
of_pages: 3
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .