This scope of work document outlines requirements for a federal contract to provide cost and software data reporting (CSDR) services. The selected contractor must systematically collect and report actual contract costs for various defense programs according to specified contract data requirement lists and a CSDR plan. This includes preparing and submitting resource distribution tables, cost and hour reports, quantity data reports, and contractor business data reports. Subcontractors exceeding $50 million must directly report CSDR deliverables. The contractor must host a post-award conference within 60 days of award to review requirements and accounting system mapping. The associated federal contract opportunity is a solicitation to redesign the F-16 brake control system, with a pre-solicitation notice posted at the provided Sam.gov link.

View the file

Other files for this federal contract opportunity

Other files attached to F-16 Brake Control System Redesign (BCSR), newest first.
File Type Posted
Section L_REV04232021.pdf PDF
QA 19APR-23APR2021.pdf PDF
QA 12APR-16APR2021.pdf PDF
SPRHA1-21-R-7000-0003.pdf PDF
Section M_REV04162021.pdf PDF
Section L.pdf PDF
SPRHA121R7000_______0001.pdf PDF
22FEB-26FEB2021.pdf PDF
QA 11JAN thru 15JAN2021.pdf PDF
A016_DID_TIR_VACR.pdf PDF
A016_CDRL_TIR_VACR.pdf PDF
A008_CDRL_TIR_FMECA.pdf PDF
A011_TDP_CDMAL.pdf PDF
A007_CDRL_CDR.pdf PDF
A001_CDRL_IMS_BCSR.pdf PDF
A018_CDRL_TIR_THIR.pdf PDF
PPQ.pdf PDF
Subcont_Consent.pdf PDF
SPRHA121R7000.pdf PDF
A014_DID_TMCR_TO.pdf PDF
A015_LMI_Attachment3.pdf PDF
A015_LMI_Attachment1.pdf PDF
A012_TDP_SIE_DMAL.pdf PDF
A012_DID_SIE_EDDAL.pdf PDF
A004_CDRL_ContractorCMP.pdf PDF
A003_DID_ConfAgenda.pdf PDF
B001_CDRL_CGEP_DMAL.pdf PDF
B001_TDP_PDMAL_AD.pdf PDF
B001_DID_CGEP_CSPEI.pdf PDF
B001_DID_PDM_DMAL.PDF PDF
A018_DID_TIR_THIR.pdf PDF
A017_DID_SSR_CPSR.pdf PDF
Attachment_0001_DD2794_CSDR_Plan.xls XLS spreadsheet
Nongovernmental.pdf PDF
A004_DID_ContractorCMP.pdf PDF
A001_DID_IMS_BCSR.pdf PDF
A017_CDRL_SSR.pdf PDF
A014_CDRL_TMCR_TO.pdf PDF
A010_CDRL_TIR_QTR.pdf PDF
A010_DID_TIR_QTR.pdf PDF
A011_DID_CDMAL_CEDDAL.pdf PDF
A009_CDRL_TRR.pdf PDF
A003_CDRL_ConfAgenda.pdf PDF
A008_DID_TIR_FMECA.pdf PDF
A005_CDRL_TP.pdf PDF
A007_DID_CDR_AWS.pdf PDF
A006_DID_PDR_AWS.pdf PDF
A002_DID_SRR_AWS.pdf PDF
B001_CDRL_PDM_DMAL.pdf PDF
B001_CDRL_PDMAL_AD.pdf PDF
Show all 50

F-16 Brake Control System Redesign (BCSR) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Reporting Scope of Work

Cost and Software Data Reporting (CSDR)

Cost and Software Data are the primary means by which the Department of Defense (DoD) collects data on the costs that contractors incur on DoD programs. Reliable and comprehensive cost data is essential to produce credible cost estimates as required in both statute and regulation. The Government’s goals and use of CSDR data is to improve the quality of cost estimates, ensure proper resource allocation occurs within the DoD, and enable data driven decision making by program and department leadership.

The contractor shall systematically collect and report actual contract costs in accordance with the following Contract Data Requirements Lists (CDRLs) and Attachment 1, the “Contract Cost and Software Data Reporting (CSDR) Plan”:

Report Title CDRL Resource Distribution Table C001 Cost and Hour Report (FlexFile) C002 Quantity Data Report C003 Contractor Business Data Report (DD Form 1921-3) C004

Application to Subcontractors

The contractor shall flow down CSDR requirements referenced in section and its sub-paragraphs to subcontractors (regardless of subcontractor tier) when the subcontract value is expected to exceed $50 million using the maximum allowable contract quantities, hours, or options (as applicable), as required by Department of Defense (DoD) Instruction

5000.73 - Cost Analysis Guidance and Procedures. Subcontractors that meet the CSDR flow-down requirement are referred to as “direct reporting subcontractors”. The contractor shall require direct reporting subcontractors to electronically submit CSDRs deliverables directly to the Defense Cost and Resource Center (DCARC). The contractor shall ensure that direct reporting subcontractors collect data in sufficient detail to meet Attachment 1 - CSDR Plan and DoD Manual 5000.04 - CSDR Manual requirements. The contractor shall collect and deliver data on all subcontractors to comply with Attachment 2 - Resource Distribution Table, CDRL C001, and Attachment 1 - CSDR Plan requirements. A “subcontract” is any agreement, purchase order, or instrument other than a prime contract calling for work or for the material required for the performance of one or more prime contracts. A “subcontract” usually covers procurement of major components or subsystems that require the subcontractor to do extensive design, development, engineering, and testing to meet a prime contractor’s procurement specifications or performs work on behalf of the prime contractor in order to complete the prime contractor’s scope of work requirements.

Resource Distribution Table (RDT)

The contractor shall prepare and submit the “Resource Distribution Table (RDT)” in accordance with CDRL C001 and Attachment 2 - Resource Distribution Table. The “Resource Distribution Table (RDT)” identifies the value of work assigned to the Contractor and its subcontractors by for each WBS element listed in Attachment 1 - CSDR Plan, and is the primary means of identifying which subcontractors qualify for CSDR flow down reporting.

Cost and Hour Report (FlexFile)

The contractor shall prepare and submit the “Cost and Hour Report (FlexFile)” in accordance with CDRL C002. The “Cost and Hour Report (FlexFile)” reports incurred and forecasted costs and hours related business data in order to perform this contract.

Quantity Data Report

The contractor shall prepare and submit the “Quantity Data Report” in accordance with CDRL C003. The “Quantity Data Report” reports quantity information to provide context to the data reported in FlexFile submissions and in order to derive accurate unit cost information.

Contractor Business Data Report (CBDR, DD Form 1921-3)

The contractor shall prepare and submit the “Contractor Business Data Report (DD Form 1921-3)” in accordance with CDRL C004. The “Contractor Business Data Report (DD Form 1921-3)” reports data to facilitate estimating and analysis of indirect contract costs and rates.

Post-Award Cost (PAC) and Software Data Reporting Conference

The contractor shall host a CSDR Post-Award Conference (PAC) at the contractor’s facility where CSDRs are prepared with the Government’s Cost Working Group Integrated Product Team (CWIPT) IAW DFARS 242.503-2(b) and DoD Manual 5000.04 (CSDR Manual). The purpose of the Post-Award CSDR Conference is to review the contract’s CSDR requirements and assess how the Contractor’s accounting system satisfies the CSDR requirements found in DoD 5000.04 (CSDR Manual) and Attachment 1 - CSDR Plan. In a briefing presented by the Contractor in its own format, the Contractor shall:

- Demonstrate how it collects cost data in its accounting system and how that data will be utilized to provide actual cost transactions and minimize cost allocations when preparing CSDR data deliverables.

- Describe how recurring vs. nonrecurring costs are segregated in its accounting system and for the purpose of CSDR reporting.

- Demonstrate how the data from its accounting system will be mapped into the CSDR reports required by Attachment 1 - CSDR Plan and associated CDRLs.

- Present the methodologies used for mapping internal cost accounts to the WBS, specifically showing how individual WBS elements and functional element codes will be populated.

- Propose any changes to Attachment 1 - CSDR Plan in order to tailor the plan to the contractor’s accounting system, to include any contractor recommended changes or additions to the WBS elements. These changes may include adjustments to the submission events and/or submission timelines, particularly in the case of a direct-reporting subcontractor performing against a different delivery schedule than the associated prime contractor.

The contractor and CWIPT will also review the initial submission of the “Resource Distribution Table (RDT)” (CDRL C001), in order to finalize which subcontractors will be required to provide CSDR reporting and electronic submission of deliverables directly to the Defense Cost and Resource Center (DCARC) and which subcontractors may qualify for a CSDR direct reporting subcontractor waiver.

The PAC shall be held within 60 days of contract award or the start of work meeting on a date mutually agreed to by the CWIPT and the contractor. This meeting has an anticipated duration of one business day.

Cost and Software Data Reporting (CSDR)
Application to Subcontractors
Resource Distribution Table (RDT)
Cost and Hour Report (FlexFile)
Quantity Data Report
Contractor Business Data Report (CBDR, DD Form 1921-3)
Post-Award Cost (PAC) and Software Data Reporting Conference

File details come from the government source that posted it. Updated .