A017_CDRL_SSR.pdf

PDF 282 KB Posted

Attached to
F-16 Brake Control System Redesign (BCSR) Federal contract opportunity
Solicitation number
SPRHA1-21-R-7000
Issued by
Defense Logistics Agency Aviation

About this file

This document contains a Contract Data Requirements List (CDRL) and related details for the F-16 Brake Control System Redesign (BCSR) program. The CDRL requires a monthly Supplier Status Report (SSR) indicating current activities, status, plans for forthcoming milestones, anticipated problems and estimated completion dates. The initial SSR is due the first day of the month following contract award, with subsequent monthly submissions due the first day of each month. The SSR must be submitted via email and FTP to the Hill AFB Landing Gear Office and DLA Aviation contracting point of contact, with an invoice also submitted to WAWF. The related solicitation is for the F-16 BCSR program being conducted by the USAF, with the contracting office listed as DLA Aviation located at Hill AFB. Pre-solicitation details can be found on SAM.gov.

View the file

Other files for this federal contract opportunity

Other files attached to F-16 Brake Control System Redesign (BCSR), newest first.
File Type Posted
QA 12APR-16APR2021.pdf PDF
SPRHA1-21-R-7000-0003.pdf PDF
SPRHA1-21-R-7000-0002.pdf PDF
F-16_BCSR_(TRD-SOW)_20210329_RevB.pdf PDF
QA 16JAN thru 11FEB2021.docx DOCX document
A016_DID_TIR_VACR.pdf PDF
A016_CDRL_TIR_VACR.pdf PDF
A008_CDRL_TIR_FMECA.pdf PDF
A011_TDP_CDMAL.pdf PDF
A007_CDRL_CDR.pdf PDF
A001_CDRL_IMS_BCSR.pdf PDF
A018_CDRL_TIR_THIR.pdf PDF
PPQ.pdf PDF
Subcont_Consent.pdf PDF
SPRHA121R7000.pdf PDF
A014_CDRL_TMCR_TO.pdf PDF
A010_CDRL_TIR_QTR.pdf PDF
A010_DID_TIR_QTR.pdf PDF
A011_DID_CDMAL_CEDDAL.pdf PDF
A009_CDRL_TRR.pdf PDF
A003_CDRL_ConfAgenda.pdf PDF
A008_DID_TIR_FMECA.pdf PDF
A005_CDRL_TP.pdf PDF
A007_DID_CDR_AWS.pdf PDF
A006_DID_PDR_AWS.pdf PDF
A002_DID_SRR_AWS.pdf PDF
B001_CDRL_PDM_DMAL.pdf PDF
B001_CDRL_PDMAL_AD.pdf PDF
C003_CDRL_QDR_signed.pdf PDF
C001_CDRL_RDT_signed.pdf PDF
Attachment_0002_ResourceDistributionTable.xlsx XLSX spreadsheet
F16_BCSR_TRDSOW_20201028_RevA.pdf PDF
PPISSample.pdf PDF
ClientLtr.pdf PDF
PS_RFP.pdf PDF
A013_DID_ST_EDDAL.pdf PDF
A014_DID_TMCR_TO.pdf PDF
A015_LMI_Attachment3.pdf PDF
A015_LMI_Attachment1.pdf PDF
A012_TDP_SIE_DMAL.pdf PDF
A012_DID_SIE_EDDAL.pdf PDF
A004_CDRL_ContractorCMP.pdf PDF
A003_DID_ConfAgenda.pdf PDF
B001_CDRL_CGEP_DMAL.pdf PDF
B001_TDP_PDMAL_AD.pdf PDF
B001_DID_CGEP_CSPEI.pdf PDF
B001_DID_PDM_DMAL.PDF PDF
A018_DID_TIR_THIR.pdf PDF
A017_DID_SSR_CPSR.pdf PDF
Attachment_0001_DD2794_CSDR_Plan.xls XLS spreadsheet
Show all 50

F-16 Brake Control System Redesign (BCSR) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A017
title: SUPPLIER STATUS REPORT (SSR)
sub: F-16 Brake Control System Redesign (BCSR)
auth: DI-MGMT-81928
ref: IAW TRD PARAGRAPH 2.1
req_ofc: 417 SCMS/GUEA
dd250: LO
appcode: A
dist: B
freq: SEE BLK 16
asof: SEE BLK 16
firstsub: SEE BLK 16
subsub: SEE BLK 16
addressee1: DLA-AUB
draft1:
reg1: 1
repro1:
addressee2: 6050 Gum Lane
draft2:
reg2:
repro2:
addressee3: Bldg 1225
draft3:
reg3:
repro3:
addressee4: Hill AFB, UT
draft4:
reg4:
repro4:
addressee5: 84056-5820
draft5:
reg5:
repro5:
addressee6: (SEE BLOCK 16)
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8: Landing Gear Office
draft8:
reg8: 1
repro8:
addressee9: 417 SCMS/GUEA
draft9:
reg9:
repro9:
addressee10: 6040 Gum Lane
draft10:
reg10:
repro10:
addressee11: Bldg 1216
draft11:
reg11:
repro11:
addressee12: Hill AFB, UT
draft12:
reg12:
repro12:
addressee13: 84056-5811
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20: WAWF
draft20:
reg20:
repro20:
addressee21: (SEE BLOCK 16)
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 2
total_repro: 0
remarks: Block 2: The SSR indicates the current activities, their status, and plans for the forthcoming milestone, any anticipated problems, and anticipated problems, and estimated completion dates.

Block 4 Changes: 1 - Customer format acceptable, however, as a minimum the report shall include a table summary consisting of milestones, corresponding milestone start dates, completion dates, and percentage completed categories. A short narrative synopsizing key actions, status details and any corrective actions taken to ensure milestones are met shall also be provided.

BLOCKS 7 and 14: The SSR shall be submitted with a signed Letter of Transmittal via email and/or File Transfer Protocol (FTP) to the Hill AFB Landing Gear Office, 417 SCMS/GUEA, Lead Engineer/Program Manager. A copy of the letter of Transmittal shall be sent via email and/or FTP to the DLA Aviation Ogden OO-DLA/AUB contracting point of contact. An invoice shall also be submitted to the Wide Area Workflow (WAWF) at HTTPS://WAWF.EB.MIL.

Block 9: Distribution Statement B: Distribution authorized to U.S. Government agencies only, administrative or operational use, dated 2020/11/01. Other requests for this document shall be referred to OO-ALC/417 SCMS/GUEA, Hill AFB, Utah 84056-5811.

Block 10, 12 and 13:

A. The initial report shall be submitted on the first day of the month following contract award. Subsequent monthly submittals (with updated information/status) shall be delivered on the first day of each month.

Destruction Notice - Destroy by any method that will prevent disclosure of contents or reconstruction of the document

group:
total_price:
prep_name: Michael Schow, 417 SCMS/GUEA
line_item: 0001AS
exhibit: A
xtdp: Off
xtm: Off
othercat: ADMN
system: F-16 Brake Control System
ctr_no: FD20202001103
contr: TBD
remarksb: EXPORT CONTROL WARNING: All technical documents that are determined to contain export-controlled technical data shall be marked: “WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et q.) or the Export Administration of Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.” When it is technically infeasible to use the entire statement, an abbreviated marking may be used, and a copy of the full statement added to the “Notice To Accompany Release of Export Controlled Data” required by DoD Directive 5230.25 (reference (c)).
Page2:
Reset:
2020-10-26T10:50:10-0600
SCHOW.MICHAEL.N.1252332606
prep_date: 20201026
app_by: Ron Montgomery, 417 SCMS/GUEA
2020-10-26T12:06:54-0600
MONTGOMERY.RONALD.L.1243849620
app_date: 20201026
Page: 1
of_pages: 1
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .