This is a Florida Department of Transportation (FDOT) Utility Work Schedule (UWS) document for the Connect Kissimmee Complete Streets Phase 1 project, dated December 14, 2016, involving FDOT and Spectrum as the Utility Agency/Owner (UAO). The project encompasses Broadway Avenue from Orlando to Neptune in Osceola County, Florida, with FDOT plans dated April 25, 2026. The UWS establishes the timeline and requirements for Spectrum to relocate or adjust its utilities in accordance with the roadway improvements, including underground and aerial cable facilities, fiber optic conduits, and associated infrastructure. Spectrum's designated project representatives include Ronald Tynes and David Borras, with contact information provided for coordination purposes. The document outlines that Spectrum must obtain a utility permit and comply with the 2017 Utility Accommodation Manual (UAM) for all work performed under this schedule. The schedule requires Spectrum to provide written notification to FDOT and the contractor prior to starting, stopping, resuming, and completing work activities.

Section B of the UWS specifies special conditions and constraints governing Spectrum's work, including minimum burial depths of 36 inches for underground trenches unless otherwise noted or installed via directional bore, standard conduit specifications for fiber optic and coaxial cable installations, and protocols for coordination with Duke Energy regarding aerial facility relocations. Spectrum requires 48 hours' notice for scheduling unforeseen adjustments and is a member of Sunshine One Call, with UtiliQuest contracted for facility locating services. The document notes utility conflicts with cables identified as unknown owner (2012), Charter/Spectrum disposed (7000), and non-Spectrum owned (8005). Work activities are estimated in consecutive work days with dependencies on other project activities; however, the specific activity details and day allocations in Section C are incomplete in the provided document. The FDOT District Utilities approval was granted by Victor M. Mercado Vazques, PE, City of Kissimmee Project Manager, and the Engineer of Record, Michael S. Phillips, PE, attested to the schedule's compatibility with FDOT plans.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rule 14-46.001 F.A.C

FLORIDA DEPARTMENT OF TRANSPORTATION

UTILITY WORK SCHEDULE

December 14, 2016

Pursuant to Section 337.403 F.S., the UAO and FDOT agree to the UAO’s need for relocation or adjustment to its utilities and FDOT’s need for a schedule for the UAO to effect the relocation or adjustment. This utility work schedule is based on FDOT plans dated in the project information box below. Any deviation by FDOT or its contractor from these plans, may void this utility work schedule. Upon notification by FDOT of a change to these plans, the UAO may negotiate a new utility work schedule. The UAO agrees to notify FDOT and the contractor in writing prior to starting, stopping, resuming, and completing work in accordance with this utility work schedule. The UAO shall obtain a utility permit and comply with requirements of the 2017 Utility Accommodation Manual (UAM) for all work done under this utility work schedule. The UAO is not responsible for events beyond the control of the UAO that could not be reasonably anticipated by the UAO and which could not be avoided by the UAO with exercise of due diligence at the time of the occurrence.

FDOT PROJECT INFORMATION

Financial Project ID: 437472-2-58-01(PH I) Federal Project ID: N/A State Road Number: Broadway Ave from Orlando to Neptune County: Osceola FDOT Plans Dated: 4/25/2026 District Document No.: D521 065 B

UTILITY AGENCY/OWNER (UAO)

Utility Company:

UAO Project Rep: Phone: E-mail:

UAO Field Rep: Phone: E-mail:

UTILITY SIGNATURE

I have reviewed the FDOT plans referenced above and submit this utility work schedule in compliance with UAM Section 5 and agree to be bound by the terms of this utility work schedule.

UAO Rep. Date / / Name Title

ENGINEER OF RECORD SIGNATURE

I attest this utility work schedule is compatible with the FDOT plans referenced above.

EOR. Date / / Name Michael S. Phillips , PE Title Engineer of Record

APPROVAL BY DISTRICT UTILITIES

This utility work schedule is complete and acceptable to FDOT.

FDOT Rep. Date / / Name Victor M. Mercado Vazques, PE Title City of Kissimmee Project Manager

SECTION A: SUMMARY OF UTILITY WORK

The below days are the total numbers of days shown for all activities in Section C of this utility work schedule. The breakdown of how these days are to be incorporated into the FDOT project and the dependence of these days upon the completion of other activities by the UAO or others is shown in Section C.

Days prior to FDOT project construction: Days during FDOT project construction:

P2160732 Text Box Spectrum

P2160732 Text Box Ronald Tynes

P2160732 Text Box David Borras

P2160732 Text Box

(407) 702-9627

P2160732 Text Box David.Borras@spectrum.com

P2160732 Text Box Ronald.Tynes@spectrum.com

P2160732 Text Box

(407) 215-5864

P2160732 Text Box David Borras

P2160732 Text Box Construction Coordinator

P2160732 Text Box 06 06 2026

P2160732 Image

FLORIDA DEPARTMENT OF TRANSPORTATION

UTILITY WORK SCHEDULE

December 14, 2016

Financial Project ID: 437472-2-58-01(PH I) Utility Company:

FDOT Plans Dated: 4/25/2026

SECTION B: UAO SPECIAL CONDITIONS/CONSTRAINTS

P2160732 Text Box (SPE) = Spectrum (UG) = All open trench work to be placed at a minimum of 36" in depth, unless otherwise noted on plan sheets or installed via directional bore as necessary.

(BFO)= Buried Fiber Optic Cable - Buried "Package" Typical is 2" HDPE Conduits. Unless otherwise noted on plan sheets.

(BTV)= Buried Coaxial Cables in conduit. - 1.5" HDPE Conduit Encased w/.875" or .625" cable sizes.

(OTV)= All overhead CATV facilities both fiber or coaxial supported by power poles.

(PB)= Pull box/ Vault location.

(PED)= SPE above ground type pedestal. Sizes vary.

(DE)= Duke Energy - Power Company (SW)= Sidewalk

Reconstruct = Relocate existing facilities both buried or aerial that are in conflict with the upcoming FDOT roadway improvements.

Stake & Clear = FDOT Contractor to clear and grub the ROW as needed, Station Boards installed. Survey layout of all proposed drainage structures, pipe elevations, grades as needed in the particular relocation areas, proposed street light pole and noise wall layout per the approved UWS and Permit.

Activate = Activation of newly place facilities.

Power Co = must be completed with all aerial relocation activities (including removing all dead/inactive conductors) in all applicable locations. Notification to all joint users that poles are now available for framing is required by applicable power company.

Hold in Place = Spectrum contractor will be scheduled to hold or adjust existing facilities to remain in place while FDOT contractor performs scheduled activity. Please see "Special Condition" # 5.

Special Conditions:

1.) Any deviation from the applicable power companies RGB / UWS provided to Spectrum may result in adjustments to our submitted or approved UWS.

2.) SPE does NOT protect old power poles vacated by the applicable power company.

3.) SPE is a member of the Sunshine One Call. UtiliQuest is contracted to locate all SPE facilities.

4.) SPE work during construction is estimated in consecutive work days in the applicable locations.

5.) SPE requires 48 hours notice for scheduling purposes for unforeseen adjustments and or assistance needed by contractor with SPE existing facilities to remain in place.

Utility Conflicts:

2012 Listed as"Unknown Owner" is not a known Spectrum owned cable.

7000 Listed as Charter/Spectrum was disposed as no conflict.

8005 Listed as Charter/Spectrum is not a known Spectrum owned cable.

P2160732

Spectrum

FLORIDA DEPARTMENT OF TRANSPORTATION

UTILITY WORK SCHEDULE

December 14, 2016

Financial Project ID: 437472-2-58-01(PH I) Utility Company:

FDOT Plans Dated: 4/25/2026

SECTION C: UAO’s WORK ACTIVITIES

Act.

No.

Utility Facility (type, size, material, status)

From Station/ Offset

To Station/ Offset

Utility Work Activity Description

Dependent Activity TCP Phase

Consecutive Calendar Days

Prior to During Const. Const.

P2160732

Spectrum