This is Addendum No. 1 to Request for Qualifications (RFQ2026013) issued by the City of Kissimmee, Florida, for Construction Engineering and Inspection (CEI) Services related to the Connect Kissimmee Complete Streets Phase 1 project. The project encompasses improvements along Emmett Street and Broadway from Orlando Avenue to Neptune Road. The anticipated construction start date is July 18, 2027, with a projected construction duration of 29 months. The City has made 90% design plans available to all interested firms through a shared Dropbox link to support proposal development and project understanding. Proposer acknowledgment of this addendum is required as part of the RFQ submission, and all other terms and conditions of the original RFQ remain unchanged.

The project is funded through a combination of federal, local, and utility sources, including the Florida Department of Transportation (FDOT), the City of Kissimmee, and Toho Water Authority. The City will not disclose the anticipated CEI fee during the RFQ process; instead, consultant selection will be based on qualifications in accordance with RFQ requirements, with contract fee negotiations occurring with the highest-ranked firm following selection. A resident compliance specialist is required for this project, which includes federal funding components. Consultant firms must be FDOT pre-qualified under work type 10.0 to be eligible for selection.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

June 10, 2026 Page 1 of 2

Addendum No. 1

Project: Connect Kissimmee Complete Street Phase 1 CEI Services Bid No: RFQ2026013

TO ALL PROPOSERS:

The following items are clarifications, corrections, additions, deletions and / or revisions, which shall take precedence over the original documents.

Question 1: What is the anticipated start construction time?

Answer: The anticipated start of construction is July 18, 2027.

Question 2: What is the anticipated construction duration?

Answer: The anticipated construction duration is 29 months.

Question 3: What is the anticipated CEI fee?

Answer: The City will not disclose the anticipated CEI fee during the RFQ process. Consultant selection will be based on qualifications in accordance with the RFQ requirements. Contract fee negotiations will occur with the highest-ranked firm following selection.

Question 4: What is the construction funding source(s)?

Answer: The project is funded through a combination of federal, local, and utility funding sources, including the Florida Department of Transportation (FDOT), the City of Kissimmee, and Toho Water Authority.

Question 5: Would a resident compliance specialist be required? Usually for federal funding or for HUD funding projects.

Answer: Yes.

Question 6: Does the City have preliminary plans to be shared with the consultant? The plans would be needed for the proposal write-up, constructability review and understanding the scope of the project.

Answer: Yes. The City has 90% design plans available and will make them available to all interested firms through this addendum to support their understanding of the project scope and development of their qualifications package.

https://www.dropbox.com/scl/fo/oj3ascf2j678cnz5jq077/AJhKjDAM7jnWMmJJ2DNuXD4?rlkey= e4jvax663zgm7hbkxl3mpde4g&st=izf2948m&dl=0 https://www.dropbox.com/scl/fo/oj3ascf2j678cnz5jq077/AJhKjDAM7jnWMmJJ2DNuXD4?rlkey=e4jvax663zgm7hbkxl3mpde4g&st=izf2948m&dl=0 https://www.dropbox.com/scl/fo/oj3ascf2j678cnz5jq077/AJhKjDAM7jnWMmJJ2DNuXD4?rlkey=e4jvax663zgm7hbkxl3mpde4g&st=izf2948m&dl=0

A. ACKNOWLEDGMENT OF ADDENDA:

1. The proposer shall acknowledge receipt of this addendum by completing the applicable section in the RFQ. The Proposer shall submit said Form with the proposal.

2. All other terms and conditions of the RFQ remain unchanged.

Brandon Durango Procurement Manager

ACKNOWLEDGMENT OF ADDENDA NO.(S) _________ (IF APPLICABLE)

(Signature)

COMPANY NAME _______________________________________

COMPANY ADDRESS _______________________________________

BY: _________________________ DATE:________________________

(signature)

_____________________________ EMAIL:_______________________

(typed name/title of signer)

File details come from the government source that posted it. Updated .