Centurylink_43747225801_PH_I_100_UWS_06.05.2026.docx

DOCX document 51 KB Posted

Attached to
Connect Kissimmee Complete Streets Phase 1 - Professional Services for Construction Engineering & Inspection (CEI)
Solicitation number
RFQ2026013
Issued by
Polk County, Lake Harbor CDP, Florida

About this file

This is a Scope of Work document for the City of Kissimmee, Florida, establishing requirements for Construction Engineering and Inspection (CEI) services under the Connect Kissimmee Complete Streets Phase 1 project. The project encompasses professional services for construction engineering and inspection along Emmett Street and Broadway, extending from Orlando Avenue to Neptune Road in Kissimmee. The solicitation seeks to hire one Florida Department of Transportation (FDOT) pre-qualified consulting firm under work type 10.0 to provide comprehensive CEI services in accordance with Rule Chapter 14-75, Florida Administrative Code. The document establishes that proposers must be FDOT pre-qualified and instructs consultants to notify the Procurement Services Representative in writing within ten calendar days prior to the proposal closing date if any requirements inadvertently restrict competition or limit the solicitation to a single source. Detailed project information, deliverables, processes, and scope specifications are contained in Exhibit A of the solicitation.

The document does not contain specific pricing information, contract term details, renewal options, site visit schedules, or bidders conference dates within the provided excerpt. The solicitation is structured as a Request for Qualifications (RFQ) format, indicating that evaluation will be based on consultant qualifications and experience rather than competitive pricing. No information regarding set-asides, incumbent contractors, funding sources, or award amounts is included in this file section.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rule 14-46.001 F.A.C

UTILITY WORK SCHEDULE

December 14, 2016 Financial Project ID: Utility Company: CITY Plans Dated:

437472-2-58-01 (PH I)

CenturyLink Communications LLC 4/25/2026

Rule 14-46.001 F.A.C Page 1 of 3 UTILITY WORK SCHEDULE

December 14, 2016

Pursuant to Section 337.403 F.S., the UAO and CITY agree to the UAO’s need for relocation or adjustment to its utilities and CITY’s need for a schedule for the UAO to effect the relocation or adjustment. This utility work schedule is based on CITY plans dated in the project information box below. Any deviation by CITY or its contractor from these plans, may void this utility work schedule. Upon notification by CITY of a change to these plans, the UAO may negotiate a new utility work schedule. The UAO agrees to notify CITY and the contractor in writing prior to starting, stopping, resuming, and completing work in accordance with this utility work schedule. The UAO shall obtain a utility permit and comply with requirements of the 2017 Utility Accommodation Manual (UAM) for all work done under this utility work schedule. The UAO is not responsible for events beyond the control of the UAO that could not be reasonably anticipated by the UAO and which could not be avoided by the UAO with exercise of due diligence at the time of the occurrence.

CITY PROJECT INFORMATION

Financial Project ID: 437472-2-58-01 (PH I)
Federal Project ID: N/A
State Road Number: EMMETT/BROADWAY/MAIN ST
County: OSCEOLA
CITY LAP Plans Dated: 4/25/2026
FAP No.: D521 065 B

UTILITY AGENCY/OWNER (UAO)

Utility Company: CenturyLink Communications LLC

UAO Project Rep: Spencer Hunter
Phone: 352-205-6678
E-mail: spencer.b.hunter@lumen.com
UAO Field Rep: Darryl Ward
Phone: 407.501.2312
E-mail: dward@congruex.com

UTILITY SIGNATURE

I have reviewed the CITY plans referenced above and submit this utility work schedule in compliance with UAM Section 5 and agree to be bound by the terms of this utility work schedule.

UAO Rep. Date 06/ 05/ 2026 Name David Byrnes Title National Implementation Engineer II

ENGINEER OF RECORD SIGNATURE

I attest this utility work schedule is compatible with the CITY plans referenced above.

EOR. Date / / Name Michael S. Phillips, P.E.

Title AECOM Deputy Consultant Project Manager

APPROVAL BY CITY

This utility work schedule is complete and acceptable to CITY.

CITY Rep. Date / / Name Victor M. Mercado Vazques, PE Title Project Manager, City of Kissimmee

SECTION A: SUMMARY OF UTILITY WORK

Days during CITY project construction: 23 Days prior to CITY project construction: 120 The below days are the total numbers of days shown for all activities in Section C of this utility work schedule. The breakdown of how these days are to be incorporated into the CITY project and the dependence of these days upon the completion of other activities by the UAO or others is shown in Section C.

SECTION B: UAO SPECIAL CONDITIONS/CONSTRAINTS

CenturyLink will require notice at least 15 working days prior to fill in order to have the appropriate time to schedule and perform the cable removal and placement. All existing cable and peds are shown on the plans and if noted and drawn as "green" are to remain and will not be adjusted.

Please contact Spencer Hunter (352-205-6678) a minimum of 15 working days prior to any construction activitites.

1) Expose and Protect (if noted) will be via excavation of cable and/or fiber with mini-excavator or vacuum truck. Protection will consist of either moving cable out of direct conflict area and/or addition of split casing around cable and/or fiber line.

2) Expose and protect (if noted) will be via excavation of cable and/or fiber with mini excavator or vacume truck. Protect will consist of either moving cable out of direct area and/or addition of split casing around cable and/or fiber. Coordination with UAO Field Rep. will be necessary.

3) The # of days in section "C" is based on all work can be done in normal business hours and do not include any cutover work. Due to the fact there is fiber and copper that have special data services in them Century Link will have to manage all splicing and cutover work to the compliance of work methods on national service agreements and customer maintenance window. The scheduling will cause an increase to the total # of days to complete and could range the # of days by 30-45 depending on the service plan.

- known policy for this area, fiber cables are interoffice and CTL-Level 3 therefore mandatory of fiber cutover will be conducted between 2am-6am.

- yet to be determined is customer requirements on data services within both copper and fiber cables

4) Centurylink will require a minimum 30 days for permitting.

5) CenturyLink will require 120 days notice prior to construction or order riser for each of the seven (7) locations where mahole lids are to be raised.

SECTION C: UAO’s WORK ACTIVITIES

Act. No.

Utility Facility (type, size, material, status)
From Station/ Offset
To Station/ Offset

Utility Work Activity Description

Dependent Activity

TCP Phase Consecutive Calendar Days Prior to During Const. Const.

BROADWAY AVE

1
EXISTING MH
37+40 RT 8’
37+40 RT 8’
MH CASTING TO BE ADJUSTED TO GRADE
COMPLETE ORDER & RECEIVE MATERIALS IN ACT 12 & LANE CLOSURE BY ROAD CONTRACTOR FOR RAISER PLACEMENT
PH 2 – STAGE 2
0
2
2
EXISTING MH
39+82 RT 5’
39+82 RT 5’
MH CASTING TO BE ADJUSTED TO GRADE
COMPLETE ORDER & RECEIVE MATERIALS IN ACT 12 & LANE CLOSURE BY ROAD CONTRACTOR FOR RAISER PLACEMENT
PH 1 – STAGE 2
0
2
3
EXISTING MH
43+56 RT 5’
43+56 RT 5’
MH CASTING TO BE ADJUSTED TO GRADE
COMPLETE ORDER & RECEIVE MATERIALS IN ACT 12 & LANE CLOSURE BY ROAD CONTRACTOR FOR RAISER PLACEMENT
PH 1 – STAGE 2
0
2
4
EXISTING MH
47+19 RT 5’
47+19 RT 5’
MH CASTING TO BE ADJUSTED TO GRADE
COMPLETE ORDER & RECEIVE MATERIALS IN ACT 12 & LANE CLOSURE BY ROAD CONTRACTOR FOR RAISER PLACEMENT
PH 1 – STAGE 2
0
2
5
EXISTING MH
50+86 RT 7’
50+86 RT 7’
MH CASTING TO BE ADJUSTED TO GRADE
COMPLETE ORDER & RECEIVE MATERIALS IN ACT 12 & LANE CLOSURE BY ROAD CONTRACTOR FOR RAISER PLACEMENT
PH 1 – STAGE 2
0
2
6
EXISTING MH
53+47 RT 7’
53+47 RT 7’
MH CASTING TO BE ADJUSTED TO GRADE
COMPLETE ORDER & RECEIVE MATERIALS IN ACT 12 & LANE CLOSURE BY ROAD CONTRACTOR FOR RAISER PLACEMENT
PH 1 – STAGE 2
0
2

STEWART AVE

7
EXISTING PEDESTAL
33+23 RT 26’
33+23 RT 26’
REMOVE PEDESTAL AND CUT-OFF CABLES BELOW GRADE.
PLACEMENT AND SPLICING OF PROPOSED COPPER CABLE
PH 2 – STAGE 1
0
2
8
EXISTING 100 PR
33+23 RT 26’
33+80 RT 26’
RETIRE IN PLACE
PLACEMENT AND SPLICING OF PROPOSED COPPER CABLE
PH 2 – STAGE 1
0
0
9
PROPOSED PEDESTAL
33+23 RT 24’
33+23 RT 24’
EXPOSE EXISTING CABLE, PLACE PEDESTAL, PULL EXIST AND PROPOSED CABLES INTO PEDESTAL AND SPLICE CABLES.
STAKING OF THE R/W AND ASSOCITED ROAD FACILITIES BY THE ROAD CONTRACTOR
PH 2 – STAGE 1
0
2
10
PROPOSED 25 PR
33+23 RT 32’
33+80 RT 32’
DIRECTIONAL BORE COPPER CABLE
STAKING OF THE R/W AND ASSOCITED ROAD FACILITIES BY THE ROAD CONTRACTOR
PH 2 – STAGE 1
0
5
11
EXISTING MH
33+05 LT 14’
33+05 LT 14’
MH CASTING TO BE ADJUSTED TO GRADE
COMPLETE ORDER & RECEIVE MATERIALS IN ACT 12 & LANE CLOSURE BY ROAD CONTRACTOR FOR RAISER PLACEMENT
PH 2 – STAGE 1
0
2
12
SPECIAL ORDER INDIVIDUAL MANHOLE LID RISERS FOR EACH MANHOLE LID TO BE RAISED
POB
POE
ORDER MATERIAL
NOTIFICATION PRIOR TO CONSTRUCTION START BY THE ROAD AGENCY
NA
120
0