VII_-_Q&As_Shaw_AFB.pdf

PDF 22 KB Posted

Attached to
Bulk Storage Services- Solicitation Federal contract opportunity
Solicitation number
SPE603-18-R-0513
Issued by
Defense Logistics Agency Energy

About this file

VII - Q&As Shaw AFB

View the file

Other files for this federal contract opportunity

Other files attached to Bulk Storage Services- Solicitation, newest first.
File Type Posted
SF30_SPE603-18-R-0513_Amendment_0007.pdf PDF
Shaw_Appendix_AF_-_Apr_10,_2018.pdf PDF
III_-_Q&As_Langley_AFB.pdf PDF
XIII_-_Shaw_AFB_Appendix_AF.pdf PDF
V_-_Q&As_Pope_AFB.pdf PDF
I_-_General_Technical_Q&As.pdf PDF
II_-_Q&As_Dover_AFB.pdf PDF
X_-_McGuire_AFB_Appendix_AF.pdf PDF
XI_-_Pope_AFB_Appendix_AF.pdf PDF
VIII_-_Dover_AFB_Appendix_AF.pdf PDF
VI_-_Q&As_Seymour_Johnson_AFB.pdf PDF
IX_-_Langley_AFB_Appendix_AF.pdf PDF
IV_-_Q&As_McGuire_AFB.pdf PDF
XII_-_SJ_AFB_Appendix_AF.pdf PDF
SF30_SPE603-18-R-0513_Amendment_0006.pdf PDF
Seymour_Johnson_AFB_WD_15-4379.pdf PDF
SF30_SPE60318R0513_Amendment_0005.pdf PDF
Pope_WD_15-4377.pdf PDF
AF_Consolidated_PWS_-_as_of_12_Feb_18.pdf PDF
Appendix_G_CAC_Procedures.pdf PDF
SF30_SPE603-18-R-0513_Amendment_0004_.pdf PDF
SF30_SPE603-18-R-0513_Amendment_0003.pdf PDF
Solicitation_SPE603-18-R-0513_Rev._8_Mar_2018.pdf PDF
SF30_SPE603-18-R-0513_Amendment_0002__.pdf PDF
Final_Solicitation_SPE603-18-R-0513_Amend_0001.pdf PDF
SF30-SPE603-18-R-0513-00001.pdf PDF
Pope_AFB_WD_15-4379.pdf PDF
Pope_AAF_Appendix_AF_FINAL.pdf PDF
ATTACHMENT_II_-__OFFEROR_SUBMISSION_PACKAGE_AF_GOCOs_EAST_FINAL.pdf PDF
Seymour_Johnson_WD_15-4377.pdf PDF
Seymour_Johnson_Appendix_AF_FINAL.pdf PDF
ATTACHMENT_IV_JOINT_VENTURE_CONSENT_FORM_EAST.pdf PDF
Final_Solicitation_SPE603-18-R-0508.pdf PDF
McGuire_Appendix_AF_FINAL.pdf PDF
Shaw_Appendix_AF_FINAL.pdf PDF
Langley_Appendix_AF_FINAL.pdf PDF
McGuire_WD_15-4191.pdf PDF
Final_AF_Consolidated_PWS_-_as_of_21_Nov_17.pdf PDF
Dover_Appendix_AF_FINAL.pdf PDF
Shaw_WD_15-4439.pdf PDF
Langley_WD_15-4341.pdf PDF
Dover_WD_15-4217.pdf PDF
ATTACHMENT_III_-_PAST_PERFORMANCE_QUESTIONAIRE_-_AF_GOCOs_East.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPE603-18-R-0513

East Coast Region

Shaw AFB Questions & Answers

1. Please provide information on nitrogen bottle replacement at Shaw AFB. Number of bottles consumed per year?

Answer: Refer to PWS Appendix AF, Section (4) Base Specific Requirements.

2. Please provide workload information for night time flying at Shaw AFB. How often and number of hours per occurrence?

Answer: Refer to PWS Section C-5.1 Staffing and Appendix AF, Section (4) Base Specific Requirements.

3. Appendix AF for Shaw indicates that the Contractor has been called in 10 times in the last year. Please provide workload information for these call-ins, i.e. number of hours worked.

Answer: Refer to PWS Section C-5.1 Staffing.

4. Does the Fuels Management Flight designate the number of fuels personnel who must be present when off-loading multiple tank trucks simultaneously in their Fuels Operating Instructions? And if so, what does it stipulate?

Answer: Refer to PWS Appendix C.

5. How often does night flying occur?

Answer: Refer to PWS Appendix AF, Section (4) Base Specific Requirements.

6. Please confirm if the Contractor performs return to bulk operations (i.e. R-11 or bowsers).

Answer: Refer to PWS Section C-5.2.2.1.

7. Appendix AF states the contractor was called in 10 times during the last year outside of their normal hours. What is the average amount of time the contractor was required to work during these call ins?

8. The hours of operation state that night flying extends the period of service. Please provide an annual count of days where the service window is extended to 0100.

9. The workload information states that there have been 10 times that the Contractor has been called in outside normal duty hours. Please provide an annual estimate on the number of hours worked beyond normal duty hours.

10. The workload information states that there have been 10 times that the Contractor has been called in outside normal duty hours. Would the Contractor be reimbursed if personnel have to stay after normal duty hours to complete receipts/transfers/issues?

11. The workload information references an emergency generator being in the Contractor's AOR.

Please confirm that a Government entity is responsible for conducting the periodic generator testing and maintenance.

Answer: Refer to PWS Appendix AF Section (3) Workload Information.

12. The workload information references an emergency generator being in the Contractor's AOR.

Please confirm that the Government provides the fuel for this generator in the event that the Contractor is responsible for testing.

Answer: Refer to PWS Appendix AF Section (3) Workload Information.

13. The base specific requirements provide a listing of Government-furnished facilities to be used by the Contractor. Are spill kits to be provided by the Government?

Answer: Refer to PWS Section C-5.8.2 Government Furnished Property (GFP) and Services.

14. There is no listing of furniture included for the Government furnished facilities. Does the Government provide furniture for the Contractor's use?

Answer: COR is currently completing an inventory and we will update the Appendix AF once complete.

15. The workload information states that annual maintenance on GFP is provided by DLA Energy. Please confirm the Contractor is only responsible for operator level inspection.

Answer: Refer to PWS Section 5 Performance Requirements, Sub-Paragraph C-5.3.1 and C- 5.3.2.1.

16. The workload information states that annual maintenance on GFP is provided by DLA Energy. Please confirm the Contractor is only responsible for coordination with CE for maintenance of GFP.

Answer: Refer to Appendix AF Table 2 and PWS Section C-5.3.