II_-_Q&As_Dover_AFB.pdf

PDF 25 KB Posted

Attached to
Bulk Storage Services- Solicitation Federal contract opportunity
Solicitation number
SPE603-18-R-0513
Issued by
Defense Logistics Agency Energy

About this file

II - Q&As Dover AFB

View the file

Other files for this federal contract opportunity

Other files attached to Bulk Storage Services- Solicitation, newest first.
File Type Posted
SF30_SPE603-18-R-0513_Amendment_0007.pdf PDF
Shaw_Appendix_AF_-_Apr_10,_2018.pdf PDF
III_-_Q&As_Langley_AFB.pdf PDF
XIII_-_Shaw_AFB_Appendix_AF.pdf PDF
V_-_Q&As_Pope_AFB.pdf PDF
I_-_General_Technical_Q&As.pdf PDF
X_-_McGuire_AFB_Appendix_AF.pdf PDF
XI_-_Pope_AFB_Appendix_AF.pdf PDF
VIII_-_Dover_AFB_Appendix_AF.pdf PDF
VI_-_Q&As_Seymour_Johnson_AFB.pdf PDF
IX_-_Langley_AFB_Appendix_AF.pdf PDF
IV_-_Q&As_McGuire_AFB.pdf PDF
VII_-_Q&As_Shaw_AFB.pdf PDF
XII_-_SJ_AFB_Appendix_AF.pdf PDF
SF30_SPE603-18-R-0513_Amendment_0006.pdf PDF
Seymour_Johnson_AFB_WD_15-4379.pdf PDF
SF30_SPE60318R0513_Amendment_0005.pdf PDF
Pope_WD_15-4377.pdf PDF
AF_Consolidated_PWS_-_as_of_12_Feb_18.pdf PDF
Appendix_G_CAC_Procedures.pdf PDF
SF30_SPE603-18-R-0513_Amendment_0004_.pdf PDF
SF30_SPE603-18-R-0513_Amendment_0003.pdf PDF
Solicitation_SPE603-18-R-0513_Rev._8_Mar_2018.pdf PDF
SF30_SPE603-18-R-0513_Amendment_0002__.pdf PDF
Final_Solicitation_SPE603-18-R-0513_Amend_0001.pdf PDF
SF30-SPE603-18-R-0513-00001.pdf PDF
Pope_AFB_WD_15-4379.pdf PDF
Pope_AAF_Appendix_AF_FINAL.pdf PDF
ATTACHMENT_II_-__OFFEROR_SUBMISSION_PACKAGE_AF_GOCOs_EAST_FINAL.pdf PDF
Seymour_Johnson_WD_15-4377.pdf PDF
Seymour_Johnson_Appendix_AF_FINAL.pdf PDF
ATTACHMENT_IV_JOINT_VENTURE_CONSENT_FORM_EAST.pdf PDF
Final_Solicitation_SPE603-18-R-0508.pdf PDF
McGuire_Appendix_AF_FINAL.pdf PDF
Shaw_Appendix_AF_FINAL.pdf PDF
Langley_Appendix_AF_FINAL.pdf PDF
McGuire_WD_15-4191.pdf PDF
Final_AF_Consolidated_PWS_-_as_of_21_Nov_17.pdf PDF
Dover_Appendix_AF_FINAL.pdf PDF
Shaw_WD_15-4439.pdf PDF
Langley_WD_15-4341.pdf PDF
Dover_WD_15-4217.pdf PDF
ATTACHMENT_III_-_PAST_PERFORMANCE_QUESTIONAIRE_-_AF_GOCOs_East.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation SPE603-18-R-0513

East Coast Region

Dover AFB Questions & Answers

1. The Dover Appendix AF states hours of 0700-1600, but it states transfers start between 1700 and 1900. Please confirm correct hours for transfers.

Answer: Refer to PWS Appendix AF, Section (2) Hours of Operation & Section (3) Workload Information.

2. Does the contractor have to enter any of the confined spaces at Dover AFB?

Answer: Refer to PWS Appendix AF, Section (3) Workload Information.

3. The Dover Appendix AF states "None. Contractor available 24 hours" for number of times called in after hours. How is this correct if hours are 0700-1600?

Answer: Refer to PWS Section C-5.1 Staffing.

4. Please provide information on nitrogen bottle replacement at Dover AFB. Number of bottles consumed per year?

Answer: There are none to replace.

5. The published hours of operations for Bulk Storage Services at Dover AFB is 0700-1600 per the Dover Appendix AF 10 Jan 17. However, the second page of that same document defines the normal days and times for transfers are Mon-Fri with the transfer starting between 1700 and 1900. How can transfer happen within the Contractor operated areas after the published normal hours of operation?

Answer: Refer to PWS Appendix AF, Section (2) Hours of Operation.

6. Appendix AF shows hours as 0700-1600 M-F; however, during the site visit we were told these would be changed. Please confirm the operational hours at Dover.

Answer: Refer to PWS Appendix AF, Section (2) Hours of Operation.

7. Please confirm that alternate Jet receipt capability is tested quarterly.

8. Please confirm that the average pipeline receipt is 9.5 hours & that pipeline receipts occur approximately 16 times per month. Does the 9.5 hours include set-up and shut-down time?

Referring to question 1, the duration would appear to exceed the normal operating hours more than half the month.

Answer: Refer to PWS Appendix AF, Section (2) Hours of Operation & Section (3) Workload Information.

9. During the site visit it was noted that the Jet Fillstands are required to be manned by a FDSO while in operation despite the fact that they are equipped with Scully High level protection and are deadman operated. This is not the normal procedure established in AFI 23-201.

Please confirm.

Answer: This is not a contractor requirement. The contractors are not required to man the fill stands.

10. Appendix AF states that the contractor was not called in after hours since they are available 24 hours. However, with the new hours listed in appendix AF this is no longer the case.

Please provide how often it is projected the contractor would be required to come in to perform fills or transfers so that we can accurately price the contract.

11. Please include responsibilities for snow and ice removal.

Answer: Refer to PWS Appendix AF, Section (3) Workload Information & PWS Section C-

5.3.4 Buildings and Grounds Maintenance.

12. Reference Appendix AF, Table (6) Petroleum Storage Tanks, please clarify the type of tanks (UST/AST). All tanks are shown as UST but are actually ASTs.

Answer: Refer to PWS Appendix AF, Section (6) Petroleum Storage Tanks.

13. The workload information states that there have been 0 times that the Contractor has been called in outside normal duty hours as Contractors are available 24 hours. Please confirm the Contractor has also not had to have personnel stay after normal duty hours to complete receipts/transfers/issues.

14. The workload information states that there have been 0 times that the Contractor has been called in outside normal duty hours as Contractors are available 24 hours. Would the

Contractor be reimbursed if personnel have to stay after normal duty hours to complete receipts/transfers/issues?

Answer: Refer to PWS Section C-5.1 Staffing and PWS Appendix F.

15. The workload information references two emergency generators being in the Contractor's AOR. Please confirm that a Government entity is responsible for conducting the periodic generator testing and maintenance.

16. The workload information references two emergency generators being in the Contractor's AOR. Please confirm that the Government provides the fuel for this generator in the event that the Contractor is responsible for testing.

17. The base specific requirements provide a listing of Government-furnished facilities to be used by the Contractor. Are spill kits to be provided by the Government?

Answer: Refer to PWS Section C-5.8.2 Government Furnished Property (GFP) and Services.

18. Does the Government pump out low points/pits in the AOR of the Contractor?

19. There is no listing of furniture included for the Government furnished facilities. Does the Government provide furniture for the Contractor's use?

Answer: COR is currently completing an inventory and we will update the Appendix AF once complete.

20. The workload information does not include information on when the Contractor can receive trucks or pipeline receipt. What is the normal window that receipts occur, by conveyance, to the Installation?

21. The workload information states that annual maintenance on GFP is provided by DLA Energy. Please confirm the Contractor is only responsible for coordination with CE for maintenance of GFP.

Answer: Refer to PWS Section C-5.1 and PWS Appendix AF, Section (3) Workload Information.