This document is the JBER Environmental Specifications (Section 01500 and 01600) that establishes mandatory environmental protection and waste management requirements for all contractors performing work at Joint Base Elmendorf-Richardson (JBER) in Alaska.
The specifications require contractors to comply with federal, state, and local environmental regulations including the Clean Air Act, Clean Water Act, RCRA, and Alaska-specific statutes. Contractors must submit an Environmental Protection Plan (EPP) within 15 working days after contract start, describing measures to protect environmental, natural, and cultural resources. Key requirements include: protection of land, water, and biological resources with specific buffer zones for wetlands (15 feet minimum, 100 feet for anadromous systems); noxious species management; tree protection with 10-foot barriers around designated trees; archaeological and cultural resource preservation; compliance with air quality standards including restrictions on diesel engines, volatile organic liquid storage, and fugitive dust control; stormwater management through erosion and sedimentation control plans; hazardous materials tracking and spill prevention with immediate reporting to JBER Fire and Emergency Services; asbestos, lead, and PCB abatement following EPA and AKOSH requirements; and comprehensive hazardous and universal waste management as large quantity generators. Contractors must appoint Primary and Alternate Hazardous Waste Managers, maintain detailed waste determination documentation, manage all waste in approved containers, and arrange third-party transportation to off-base disposal facilities. Non-hazardous waste must be transported to permitted RCRA landfills or recycling facilities. The contractor bears full financial responsibility for all spill cleanup costs, fines, penalties, and natural resource damage claims resulting from their performance. Multiple appendices provide templates for environmental plans, hazardous material tracking forms, spill response procedures, waste management plans, and disposal checklists.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JBER Environmental Specifications v18Feb2026 Page 1 of 58
Section 01500 Environmental Protection on JBER
1. Applicable Laws and Directives
1.1. The Contractor and all subcontractors, in performance of this contract, shall comply with all federal, State of Alaska (SOA), and local laws, regulations, orders and ordinances concerning environmental quality, environmental pollution abatement and control.
1.2. The Contractor shall be responsible for any fine, penalty assessments and/or natural resources damage claims that are brought against JBER for those incidents the Contracting Officer (CO) determines are due to Contractor’s performance or failure to perform during the execution and performance of this contract.
1.3. Technical assistance for complex environmental problems will be coordinated with:
• JBER Environmental Element, 673 CES/CEIEC (request by emailing 673CES.CEIEC.Env.Com@us.af.mil)
• JBER Bioenvironmental Engineering, 673 AMDS/SGPB, 384-3985
1.4. The Contractor shall accomplish scope of work within the guidance and limitations established by the following federal, SOA, and local regulations and statues; as well as, and USAF instruction and policy based on the most current changes and amendments described below.
1.4.1. Code of Federal Regulations (CFR), Titles 29, 44, and 49
Citation Description 29 CFR 1910 Subpart H - Hazardous Materials
Subpart N – Materials Handling and Storage Subpart Z – Toxic and Hazardous Substances with special emphasis on the following sections:
Section 1910.1000 Air Contaminants Section 19.10. 1001 Asbestos Section 1910.1025 Lead Section 1910.1052 Methylene Chloride Section 1910.1200 Hazardous Communication
29 CFR 1946 Safety and Health Regulations for Construction 32 CFR Part 989 Environmental Impact Analysis Process (EIAP) US Air Force 40 CFR 50 National Primary and Secondary Ambient Air Quality
Standards 40 CFR 60 Standards of Performance for New Stationary Sources:
Subpart Dc (Small Industrial-Commercial-Institutional Steam
Generating Units Subpart Kb (Standards of Performance for Volatile Organic
Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After 23 July 1984)
Subpart IIII (Stationary Compression Ignition Internal Combustion Engines)
Subpart JJJJ (Stationary Spark Ignition Internal Combustion Engines)
40 CFR 61 National Emission Standards for Hazardous Air Pollution
JBER Environmental Specifications v18Feb2026 Page 2 of 58
Subpart A (General Provisions) Subpart M (National Emission Standard for Asbestos) 40 CFR 63 National Emission Standards for Hazardous Air Pollution for
Source Categories Subpart ZZZZ (Stationary Reciprocating Internal Combustion
Engines) Subpart CCCCCC (Gasoline Dispensing Facilities) Subpart JJJJJJ (Industrial, Commercial, and Institutional
Boilers Area Sources) 40 CFR 64 Compliance Assurance Monitoring 40 CFR 68 Chemical Accident Prevention Provisions (Risk Management
Program) 40 CFR 82 Protection of Stratospheric Ozone 40 CFR 112 Oil Pollution Prevention 40 CFR 144 Underground Injection Control Program 40 CFR 122.26 Storm Water Discharges (Applicable to Alaska National
Pollutant Discharge Elimination System (NPDES), See section 123.25)
40 CFR 239-299 Guidelines for Disposal of Solid Waste 40 CFR 243 Guidelines for the Storage and Collection of
Residential, Commercial, and Institutional Solid Waste 40 CFR 260 Hazardous Waste Management Systems – General 40 CFR 261 Identification and Listing of Hazardous Waste 40 CFR 262 Standards Applicable to Generators of Hazardous Waste 40 CFR 263 Standards Applicable to Transporters of Hazardous Waste 40 CFR 265 Interim Status Standards for Owners and Operators of
Hazardous Waste Treatment, Storage, and Disposal Facilities 40 CFR 266 Standards for the Management of Specific Hazardous Wastes and Specific Types of Hazardous Waste Management Facilities
40 CFR 268 Land Disposal Restrictions 40 CFR 273 Standards For Universal Waste Management 40 CFR 279 Standards for the Management of Used Oil 40 CFR 300 National Oil and Hazardous Substances Pollution
Contingency Plan 40 CFR 320-324 General Regulations- Wetlands, Waters of the United States 40 CFR 355 Emergency Planning and Notification 40 CFR 403 General Pretreatment Regulations for Existing and New
Sources of Pollution 40 CFR 745 Lead-Based Paint Poisoning Prevention in Certain Residential
Structures 40 CFR 761 Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions 44 CFR 9 Floodplain Management and Protection of Wetlands 44 CFR 60 Criteria for Land Management and Use; Subpart C:
Considerations in Managing Flood Prone, Mud-slide Prone, and Flood Related Erosion Prone Areas
49 CFR 171-178 U.S. Department of Transportation (DOT) Hazardous Materials Regulations
1.4.2. Executive Orders (EO) and United States Code (USC)
JBER Environmental Specifications v18Feb2026 Page 3 of 58
EO 11990 Protection of Wetlands (27 May 1977, as amended by EO 12608, 9 September 1987)
EO 11988 Flood Plain Management (24 May 1977, as amended by EO 13690, 30 January 2015)
42 USC 170001
Section 438
Energy Independence and Security Act of 2007
16 USC 703-771 Migratory Bird Treaty Act 42 USC 300f Safe Drinking Water Act 54 USC 306108 National Historic Preservation Act
1.4.3. State of Alaska Regulations and Statutes
8 AAC 61 Alaska Occupational Safety and Health 18 AAC 34.020 Prohibited and Restricted Noxious Weeds 18 AAC 30 Environmental Sanitation 18 AAC 50 State of Alaska Air Quality Control Regulation 18 AAC 60 Solid Waste Management 18 AAC 62 Hazardous Waste 18 AAC 63 Siting of Hazardous Waste Management Facilities 18 AAC 70 Water Quality Standards 18 AAC 72 Wastewater Disposal 18 AAC 75 Oil and Hazardous Substances Pollution Control 18 AAC 78 Underground Storage Tanks 18 AAC 80 Drinking Water 18 AAC 83 Alaska Pollutant Discharge Elimination System Program 18 AAC 85 Radiation Protection 18 AAC 90 Pesticide Control AS 16.05.871-901 Anadromous Fish Act AS 16.05.841 Fishway Act
1.4.4. USAF and DoD Instructions. Manuals, and Policy Directives
AFI 32-7040 Environmental Restoration Program AFI 32-7001 Environmental Management AFMAN 32-1052 Integrated Pest Management AFMAN 32-7002 Environmental Compliance and Pollution Prevention AFMAN 32-7003 Environmental Conservation AFPD 32-70 Environmental Considerations in Air Force Programs and
Activities DoDI 4715.23 Integrated and Solid Waste Management FED-STD-313F Material Safety Data, Transportation Data and Disposal Data for
Hazardous Materials Furnished to Government Activities
1.4.5. JBER Environmental Program Management Plans
• Integrated Hazardous Material Plan (IHMP)
• Integrated Solid Waste Management Plan (ISWMP)
• Hazardous Waste Management Plan (HWMP)
JBER Environmental Specifications v18Feb2026 Page 4 of 58
• Integrated Pest Management Plan (IPMP)
• Integrated Natural Resources Management Plan (INRMP)
• Integrated Cultural Resources Management Plan (ICRMP)
• Urban Forest Management Plan (UFMP)
• Industrial Wastewater Management Plan (IWMP)
• Asbestos Management and Operating Plan (AMOP)
2. General Environmental Requirements
2.1. Environmental Protection Plan (EPP): The Contractor shall submit an EPP within 15 working days after NTP date. The EPP shall describe the environmental measures taken to be protect environmental, natural, and cultural resources during project execution and to ensure that the stipulations identified during the project planning phase are specifically addressed. The Contractor shall not start work until a signed AF-3000 approving the EPP has been issued.
2.1.1. Contents of EPP: The EPP shall include, but is not limited to, the items listed below.
Contractor shall provide details for each item listed. Contractor shall identify items that are not applicable to the project by using the term “N/A” and indicate why the specific topic(s) do not apply at the beginning of the EPP. For example, projects involving strictly interior work, the Contractor shall indicate the work does not involve exterior work and list the topics that do not apply. For projects that require the Contractor to obtain one or more permits or approvals from a regulatory agency, a brief discussion of the topic covered by the submittal and a cross reference to the permit shall be included in the EPP in lieu of a detailed discussion., Contractor shall also include discussions of any unique environmental issues germane to the work that may not appear in the following list:
a. Introduction
• Project description
• List of required permits by agency
• List of environmental topics (items b-h) that do not apply and rationale
b. Spill Prevention and Control
c. Solid Waste Management and Disposal
• Hazardous Waste
• Non-hazardous Waste
• Asbestos, Lead, and PCB Containing Wastes
d. Water Quality Management
• Stormwater discharges
• Industrial wastewater discharges
e. Ambient Air Pollution Control
f. Historical, Archeological, and Cultural Resources Protection
g. Biological Resources Protection (Wildlife and Vegetation)
• Removal of vegetation
• Re-seeding
• Protection of fish, mammals, and birds
• Invasive Species Management
h. Borrowing Material Use and Management
2.1.2. Appendix of EPP: Contractor shall attach copies of all environmental permits, permit application packages, approvals to construct, notifications, certifications, reports, and termination documents. Contractor shall include a letter signed by appointing an
JBER Environmental Specifications v18Feb2026 Page 5 of 58
Environmental Manager that will be responsible for implementing the environmental requirements described in the contract and the specifications heir in. The appointment letter shall be signed by the Contractor’s authorized representative.
2.1.3. Implementation of EPP: Contractor shall revise the EPP if a changes in site conditions or modifications to task order has potential to affect implementation of environmental practices described in the plan. The Contractor shall submit changes to the EPP for approval to the CO for review by JBER Environmental Element. Approval of the EPP shall not relieve the Contractor of any federal, state, and local environmental protection laws and regulations. The Contractor shall maintain the current version of the EPP at the project work site.
3. Protection of Land, Natural, and Cultural Resources
3.1. General: The Contractor shall furnish all labor, materials and equipment required to protect environmental quality and prevent environmental pollution resulting from work performed in accordance and/or in violation of these specifications. Environmental pollution is defined as any activities, actions or consequences of Contractor activity that produce an undesirable effect on the human environment, including environmental resources such as land, water, air, or sound. The Contractor shall limit changes to land and water resources within the project boundary necessary to execute task order. The Contractor shall restore all other land and water resources within the project boundaries to conditions existing prior to task order execution.
The Contractor shall confine construction activities to areas allowed by the plans and specifications.
3.2. Noxious and Invasive Species: Contractor shall employ best management practices to prevent the new introduction or spread of noxious or invasive species in to or within JBER in accordance with the JBER Noxious or Invasive Species Management Plan, which is included in the Integrated Pest Management Plan. Contractor shall inspect and clean all equipment, tools, vehicles, etc. to ensure they are free of plant fragments, seeds, or other viable propagules prior to mobilizing to JBER. Materials such as gravel, topsoil, and fill sources off installation shall be certified weed-free.
3.3. Landfill Disposal: All non-regulated waste including asbestos containing materials, lead-containing materials, and PCB-containing materials shall be disposed in an off-base state-approved site.
3.4. Waters Including Wetlands: Contractor shall not enter, disturb, destroy, or allow discharge of soil, debris or any other contaminants into waters or wetlands, except as authorized by the contract. Authorization to enter specific waters identified does not relieve the Contractor from any obligation to protect other waters within, adjacent to, or in the vicinity of the construction site and associated boundaries. In accordance with the JBER INRMP, a 15-foot vegetated buffer between project limits and any wetland or waterway must be established. If the wetland or waterway is adjacent to an anadromous system, then the buffer is to be not less than 100 feet.
3.5. Landscape Preservation: The Contractor shall not remove, disturb, injure, or destroy trees, shrubs, or any other surface vegetation without written authority from the CO.
3.5.1. The Contractor shall protect all trees at the project boundary or within the project work area that are not specifically designated for removal on the contract drawings. Protection measures shall include erection of sturdy barriers installed at a minimum distance of 10’ from each tree.
JBER Environmental Specifications v18Feb2026 Page 6 of 58
3.5.2. The Contractor shall maintain all barriers intact until all grading, construction and landscaping work are complete, with exception of contouring upon removal of the barriers.
3.5.3. The Contractor shall contour all slopes by hand digging and hand raking to blend the protected areas into the final grade, after barrier removal. Contractor shall manage construction activities in and around landscaped areas, including installation or replacement of landscape trees in accordance with the Urban Forest Management Plan (UFMP). The Contractor shall only use 100% boreal red fescue for all seeding and re-seeding activities consistent with the most recent version of the JBER INRMP.
3.6. Cultural Resources
3.6.1. Archeological Resources: The JBER Cultural Resources Program Manager shall provide the
Contractor with locations and restrictions if known archaeological resources exist within the work area. The Contractor shall protect these resources and be responsible for their preservation during task order period of performance.
3.6.2. The Contractor shall immediately suspend work if any previously unidentified or unanticipated historical, archaeological, and cultural resources are discovered or found during excavation, prior to tree removal, or other construction activities that may damage or alter such resources.
a. Resources covered by this paragraph include but are not limited to any human skeletal remains or burials; artifacts; shell, midden, bone, charcoal, or other deposits;
rock alignments, structural remains or other constructed features; and any indication of agricultural or other human activities.
b. The Contractor shall immediately notify the CO and JBER Cultural Resources Manager upon such discovery or find to ensure the appropriate authorities can be notified, and a determination made as to their significance and what, if any, special disposition of the finds should be made.
c. The Contractor shall cease all activities that may result in impact to or the destruction of these resources. Contractor shall secure the area and prevent employees or other persons from trespassing on, removing, or otherwise disturbing such resources. The Government retains ownership and control over archaeological resources.
3.6.3. Historical Resources: Cultural Resources Program Manager shall provide locations and restrictions to Contractor if known historical resources exist within the work area.
Contractor shall protect these resources and be responsible for their preservation during the task order performance period.
a. The Contractor shall avoid all activities that may damage or alter these resources unless otherwise specified by Cultural Resources Program Manager. The Contractor shall immediately notify the CO and Cultural Resources Program Manager if a historical resource is damaged or altered to ensure the appropriate authorities may be notified.
b. The Contractor shall cease all activities that may result in impact to or the destruction of these resources. The Contractor shall secure the area and prevent employees or other persons from trespassing on, removing, or otherwise disturbing such resources.
3.7. Biological Resources: The Contractor shall minimize interference with, disturbance to, and damage to fish, wildlife, and plants including their habitat. The protection of threatened and endangered animal and plant species, including their habitat, is the Contractor's responsibility.
The Contractor shall protect all biological resources encountered in and around the project area in accordance with federal, SOA, regional, and local laws, and regulations. The Contractor
JBER Environmental Specifications v18Feb2026 Page 7 of 58 shall adhere to the requirements identified in the JBER INRMP and any specific avoidance or minimization measures identified in the US Air Force Environmental Impact Assessment Process (EIAP).
3.7.1. Migratory Birds: Migratory bird species occurring on JBER are protected under the Migratory Bird Treaty Act (MBTA). The MBTA stipulates that once a bird establishes a nest and lays eggs, it is against federal law to disturb the nest or annoy the birds to get them to abandon the nest.
a. Contractor shall only conduct clearing of grass, scrub land, and forested areas before 1 May or after 15 July to minimize impacts on ground and tree nesting birds.
b. For previously cleared areas where vegetation must be re-established, hydroseeding shall occur between 15 May and 31 July to reduce unnecessary Bird Airfield Strike Hazard (BASH) risk during spring/ fall migrations within the BASH and Wildlife Exclusion Zone (WEZ). JBER Environmental currently recommends re-seeding areas with 100% boreal red fescue. JBER Environmental shall notify the Contractor whether project site is within BASH/WEZ during pre-construction conference.
3.7.2. Bald and Golden Eagles. Bald and Golden Eagles are protected under the Bald and Golden
Eagle Protection Act (BGEPA). Contractor shall comply with this act during the design and construction phases of a project.
3.7.3. The Contractor shall make note of the presence of protected bird species and their nests prior to initiating construction with each new season to ensure compliance with the MBTA and
BGEPA.
a. The non-observance or apparent absence of birds or their nests during the environmental review process does not mean that an area is free of birds or their nests.
b. Contractor shall obtain clearance from the JBER Avian Wildlife Biologist prior to construction. Contractor shall obtain required permit(s) prior to construction.
3.7.4. The Contractor shall be responsible for all, or any delays and charges filed by U.S. Fish and
Wildlife Service and the SOA Department of Public Safety due to its negligence in removing and/or annoying birds or nests protected under the MBTA and BGEPA.
3.7.5. The Contractor shall contact the Avian Wildlife Biologist immediately if any nests are observed within the project area during pre-construction site surveys and once prior to construction has been initiated. The Contractor shall also contact the Avian Wildlife Biologist if potential human-bird conflicts are observed.
3.7.6. Mammals
a. Bats: Contract shall not harass or kill little brown bats (LBB), which are managed as an unclassified game species in the SOA. Bat species cannot be legally harassed or killed, except under the terms of a wildlife nuisance permit issued by the Alaska Department of Fish and Game. Contractor shall contact the Bat Program Manager if bats are discovered since limited information on roosting locations of LBB exist on
JBER.
b. Brown and Black Bears:
i. The Contractor shall take precautions to avoid disturbing or destroying animal dens prior to tree clearing activities particularly between the months of October-May.
Clearing shall be completed prior to typical wildlife denning for winter, prior to October and after May 15 to allow newborn success. The definition of “take” under the Alaska Statute (16.05.940 [35]) means taking, pursuing, hunting, fishing, trapping, or in any manner disturbing, capturing, or killing or attempting to take, JBER Environmental Specifications v18Feb2026 Page 8 of 58 pursue, hunt, fish, trap, or in any manner capture or kill fish and game. The Contractor shall contact the JBER Terrestrial Wildlife Biologist for additional guidance if a suspected denning site is encountered during this time period.
ii. The Contractor shall manage solid waste and materials in a manner that deters wildlife including brown and black bears from creating a nuisance within project area. Such measures include policing construction site for food containers and food wastes regularly, storing trash within a secured structure and ensuring dumpster lids are securely closed.
c. The Contractor shall not harass or haze wildlife. If there are wildlife concerns during any portion of the proposed project, the Contactor shall call Security Forces at their non-emergency number (552-7070) to dispatch the Conservation Law Enforcement Officers.
3.7.7. Fish and Aquatic Species: The Contractor shall contact the JBER Fisheries Biologist if a project has the potential to affect fish and aquatic species. The Contractor shall work with the JBER Fisheries Biologist to obtain all required permits.
4. Military Munitions
4.1. The Contractor shall immediately stop work and notify the CO if military munitions, as defined in 40 CFR 260, are discovered, or uncovered within the project site. The CO will notify the contract when they are permitted to resume work.
5. Protection of Ambient Air Quality
5.1. Stationary Sources: Contractors shall coordinate replacement of existing or installation of new emission sources with the JBER Air Quality Program Manager through the CO. Contractor shall not purchase the proposed equipment until it has been approved by the JBER Air Quality Program Manager and all applicable, pre-construction regulatory and air permitting requirements are met. Emission sources in need of prior approval include, but are not limited to engines (generators, firewater pumps, water pumps, aircraft arrestors, etc.), boilers, heaters, volatile organic storage vessels, paint booths, incinerators, and degreaser/solvent tanks.
5.2. Temporary Field Offices. The Contractor shall notify the CO if it intends to bring one or more fuel-fired generators to provide prime or emergency power to temporary field offices that will remain at the work site for more than 12 consecutive months. The Contractor shall submit a memorandum for record documenting whether an air quality permit is required and the basis for the determination. The Contractor shall provide emission calculations to support the basis for the determination and the permitting thresholds used. If an air permit is required, the Contractor shall obtain the air permit prior to bringing the fuel-fired generator to the temporary field office.
5.3. Rock Crushers and Asphalt Plants. ADEC has issued minor general permits (MGP) for rock crushers (MG9) and asphalt plants (MG3) with rated capacities of at least 5 tons per hour. The Contractor shall prepare and submit a permit application and obtain authorization from ADEC to operate under the applicable MGP prior to bringing the equipment on JBER. The Contractor shall provide a copy of the authorization issued by ADEC to the CO and JBER Air Quality Program Manager.
JBER Environmental Specifications v18Feb2026 Page 9 of 58
5.4. The Contractor shall complete a permit and regulatory applicability determination and provide it to the CO as part of the approval process to ensure all regulatory and permitting requirements are met prior to installation of the emission sources.
5.5. The Contractor shall provide the make, model, model year, fuel input rating, and maximum input rating of each emission source being installed as part of the project. For boilers and heaters, the heat input rating shall be provided in British Thermal Units per hour (Btu/hr). For generators. Contractor shall provide this information for both the engine and the equipment it drives or powers (ex. generator, firewater pump, deluge pump, or crushers). For the engine, the input rating shall be provided in mechanical kilowatts or brake horsepower. Generator rating shall be provided in electric kilowatts and shall be the output rating rather than the input rating.
The length, width, diameter, roof type, and maximum volume shall be provided for volatile organic liquid storage tanks/ vessels.
5.6. Contractor shall ensure all diesel-fired reciprocating internal combustion engines (RICE) to be installed under the task order shall comply with the New Source Performance Standards (NSPS) in 40 CFR 60 Subpart IIII and combust Ultra -Low Sulfur Diesel (ULSD). The Contractor shall only purchase certified, diesel-fired RICE that meet the emission standards to which it is subject as written in 40 CFR 60 Subpart IIII. RICE subject to the NSPS cannot combust JP-8. Projects involving the replacement of existing diesel engines must include provisions to remove low sulfur or high sulfur diesel fuel, or JP-8 from existing storage tanks, clean the tank and replace the fuel with ULSD. If the existing tanks are removed and replaced with new tanks, it/they shall be designed to store ULSD.
5.7. All gasoline-fired and natural gas-fired engines provided as part of the task order shall comply with NSPS in 40 CFR 60 Subpart JJJJ. Contractor shall ensure the engine complies with the applicable rules prior to purchase of equipment.
5.8. All boilers and heaters shall comply with the National Emission Standard for Hazardous Air
Pollutants (NESHAP) for Industrial, Commercial, and Institutional Boilers Area Sources, if applicable. Boilers that have an input greater than or equal to 10 million Btu/hr shall comply with NSPS in 40 CFR 60 Subpart Dc.
5.9. Contractors shall ensure Volatile organic liquid (VOL) storage vessels subject to the NSPS
Subpart Kb comply with requirements in the rule prior to final design approval and construction. VOL storage vessels that are greater than or equal to 75 cubic meters (19,812.9 gallons) and less than 151 cubic meters (39,889.9 gallons) that will store VOLs with a maximum true vapor pressure greater than 15 kilopascals and VOL storage vessels with a storage capacity greater than 151 cubic meters and a maximum true vapor pressure greater than
3.5 kilopascals are subject to the rule.
5.10. Mobile and Non- Road Engine (NRE) Sources: Contractor shall monitor use of NREs, and other mobile sources brought on to JBER in support of a project to ensure that these units do not become classified as stationary sources by remaining at a specific project site for more than 12 consecutive months. Contract shall monitor residency time of its NREs and mobile sources through recordkeeping. Contractor shall maintain a log documenting the date the NRE and mobile sources arrive on and depart from the project site. Contractor shall work with CO to establish temporary connection to power utility for construction projects expected to exceed 12 months at a single site. Connecting to the power utility temporarily will eliminate the need for maintaining portable, primary power generators on site for more than 12 consecutive months or seasonally for more than 3 consecutive months for the duration of the construction project.
Contractor shall contact CO immediately if a NRE or mobile source has the potential to exceed the residency restrictions.
JBER Environmental Specifications v18Feb2026 Page 10 of 58
5.11. Fugitive Dust Emissions: The Contractor shall control fugitive dust emissions consistent with
18 AAC 50.045(d). Fugitive dust emissions (airborne dust generated by vehicles operating on unpaved surfaces, transfer or transport of dust producing materials, etc.). Contractor shall implement fugitive dust control measures at the construction site, along haul routes and at staging areas. The Contractor shall maintain all excavations and excavation activities, embankments, stockpiles, hauling activities and all other work areas free from airborne dust for task performance period. Dust control measures include application of water on roads, entry points, and material stockpiles. Dust suppressants can also be applied in lieu of water.
Approval from and coordination with JBER Water Quality Program Manager and other Program Managers shall be obtained prior to use of dust suppressants.
5.12. Open Burning: The Contractor shall not engage in any open burning activities on JBER controlled properties.
5.13. Asbestos Containing Material (ACM): The Contractor shall prepare and submit any required notifications of intent (NOI) for renovation and demolition work that will disturb ACM and regulated (R) ACM to the EPA Region 10 consistent with notification requirements found in 40 CFR 61 Subparts A and M. Contractor shall manage and dispose of ACM and RACM waste in accordance with 40 CFR 61 Subparts A and M.
5.14. Ozone Depleting Substances and Significant New Alternative Policy (SNAP) Refrigerants:
The DoD has identified select Class I and Class II ODS that must be turned-in to Defense Logistics Agency (DLA) for retention in the DoD strategic stockpile. Contractors shall not remove intact government owned equipment containing these Class I and Class II ODS off base for recovery without approval by the CO in coordination with JBER Shop personnel responsible for managing ODS and the Air Quality Program Manager.
5.14.1. Government owned equipment containing refrigerants including Class I and II ODS are assigned a real property identification number and are affixed with a tag. The Contractor shall identify all government owned equipment containing refrigerants including Class I and Class II ODS during the task order site condition survey or hazardous building material survey (HMBS) performed prior to task order being created.
a. Previously Identified Class I and/or Class II ODS. The CO shall work with JBER personnel to identify whether a certified refrigerant technician employed by the Government shall recover the Class I or II ODS from equipment or if the Contractor shall be responsible for engaging the services of a certified refrigerant technician to recover it. Responsibility for the recovery and final disposition of the Class I or Class II ODS from previously identified equipment will be communicated to the Contractor by the Government.
b. Differing Site Conditions. The Contractor shall submit a request for information
(RFI) to the CO to obtain instructions regarding the recovery and disposition of Class I and II ODS not previously discovered or identified during the task order site condition survey or HMBS.
c. Contractor Recovery and Disposition of Class I and/or Class II ODS. The Contractor designated certified refrigerant technician shall coordinate shipment of recovered or removed Class I and/ Class II ODS containing cylinders through 673 Logistic Readiness Squadron (673 LRS). The 673 LRS shall coordinate turn-in and transportation of these materials with the DLA ODS Reserve by phone at (804) 279- 5004 or by email at AVNODSReserve@dla.mil.The 673 LRS shall provide copies of mailto:AVNODSReserve@dla.mil
JBER Environmental Specifications v18Feb2026 Page 11 of 58 transportation documentation and final record of receipt of the Class I and/or Class II ODS from DLA ODS Reserve for the refrigerant to the CO.
d. Contractor Disposal of the Class I and/or Class II ODS (Waste). The Contractor shall notify the CO if the Class I and/or Class II ODS becomes as classified as waste prior to transportation of the refrigerant to a waste disposal site. The CO shall provide instructions to the Contractor for arranging for the disposal of the Class I and/or Class II ODS. The Contractor shall dispose of the Class I and/or II in accordance with 40 CFR 82 and all other applicable, local, state and federal waste regulations. The Contractor shall provide copies of the manifest, transportation records, and receipt from the site accepting the Class I and/or II ODS waste for incinerator.
5.15. The Class I and II ODS identified by DLA for retention in their strategic stockpile are listed below.
CHEMICAL NAME ODS CLASS
Refrigerants R-11 Trichlorofluromethane CFC, Class I R-12 Dichlorodifluromethane CFC, Class I R-114 Dichlorotetrafluoroethane CFC, Class I R-500 Azeotropic mixture of CFC- 12 and HFC-152A (1,1 Difluroethane)
CFC and HFC, Class I and II
R-502 Azeotropic mixture of CFC- 115 and HCFC-22
CFC and HCFC, Class I and II
R-22 Chlorodifluoromethane HCFC, Class II Fire Suppression Chemicals Halon 1202 Dibromodifluromethane Halon, Class I Halon 1211 Bromochlordifluromethane Halon, Class I Halon 1301 Bromotrifluromethane Halon, Class I Solvents Methyl Chloroform 1,1,1 Trichloroethane Class I CFC-113 Trichlorotrifluoroethane CFC, Class I
5.16. Non-Government ODS and Refrigerant Containing Equipment. The Contractor shall use a certified refrigerant technician authorized to recover and accept refrigerants for resale. The Contractor shall submit records documenting the chemical name, volume, name of the certified refrigerant technician and company accepting the refrigerant to the CO and JBER Air Quality PM. Refrigerant that can longer be used or that is contaminated shall be disposed of in accordance with 40 CFR 82 and local, state, and federal waste regulations. The Contractor shall provide copies of the manifest, transportation records, and receipt from the site accepting the Class I and/or II ODS waste for incinerator.
5.17. The Contractor shall determine if any other Clean Air Act rules apply to the project and provide the JBER Air Quality Program Manager with a copy of their regulatory applicability review summary document.
6. Protection of Water Quality
6.1. Surface and Groundwater:
6.1.1. The Contractor shall not install, alter, or modify any Class V underground injection control wells without prior approval. Contractor must demonstrate that other options are either
JBER Environmental Specifications v18Feb2026 Page 12 of 58 technically cost prohibitive or would adversely impact mission requirements. Contractor shall submit exception documentation to the JBER Water Quality Program Manager before any installation, alterations, of modification may proceed to ensure compliance with the Safe Drinking Water Act, 40 CFR Part 144.
6.1.2. The Contractor shall not operate equipment or machinery in any stream or lake without written permission from the CO.
6.1.3. The Contractor shall prevent the deposition of any materials (including earth fill, vegetative waste, oils, and grease) into any stream or lake. Any such accidental deposit will be immediately reported to the CO.
6.1.4. The Contractor shall not discharge effluent from any process, including water-washing processes, into the sanitary sewer or storm drain system. Effluent and residues shall first be collected, sampled, and tested for compliance with ADEC’s Alaska Pollutant Discharge Elimination System (APDES) regulations for discharge. Disposal shall be made in accordance with APDES requirements based on the test results.
6.2. Wastewater: Anchorage Municipal Code (AMC), Title 26, Chapter 26.50, Part 3, Section 200 requires significant industrial users to have a permit to discharge wastewater into the municipal sewer system. JBER is an indirect discharger of non-domestic wastewater and contributes more than five percent of Anchorage Water and Wastewater Utility (AWWU) total wastewater load per day; thus, JBER is classified as a significant industrial user. As required by AWWU Industrial Wastewater Discharge Permit #11 (JBER AWWU Permit), JBER’s Industrial Wastewater Management Plan describes how activities are managed at JBER to minimize the chance of discharging toxic and/or hazardous pollutants into the municipal sewer system.
6.2.1. The Contractor shall prevent the discharge of any substance that may upset or degrade the municipal sewer system, cause health or safety problems, or exceed JBER AWWU Permit effluent limits. The Contractor shall submit an RFI to the CO to obtain a copy of the JBER AWWU Permit. The CO shall work with the JBER Water Quality Program Manager to obtain a copy of the current permit issued to JBER at the time of task order award and will provide it to the Contractor. The primary applicable regulations that help ensure JBER’s wastewater discharges comply with the permit requirements are:
a. 40 CFR 112 – Oil Pollution Prevention, (2015)
b. 40 CFR 403 – Pretreatment Standards.
c. 18 AAC 75 – Oil and Other Hazardous Substances Pollution Control
d. AMC 26.50.200 – Sewer Service Wastewater Discharge Permits
6.2.2. Notifications: The Contractor shall immediately notify the CO, Construction Inspector, and
JBER Water Quality Program Manager of a discharge in the following situations to meet the reporting requirements within the specified time frames stipulated in the JBER Industrial Wastewater Permit issued by AWWU:
a. Prior Notification: At least 24-hour advanced notification to AWWU required for AFFF discharges for scheduled, routine testing of AFFF systems. Immediate notification required for unscheduled discharge of AFFF.
b. Immediate Notification: Any discharge to the sewer system of substances prohibited by Anchorage Municipal Code (AMC) 26.50.050, or which may endanger public health.
c. Immediate Notification: Any spill of material prohibited by AMC 26.50.050 or slug discharge which may enter the sanitary sewer system. Slug discharges are defined as any substance released at a rate or concentration that could cause a violation of the discharge standards, or any discharge of a non-routine, episodic nature. Slug
JBER Environmental Specifications v18Feb2026 Page 13 of 58 discharges include, but are not limited to, accidental spills or a non-customary batch discharge.
d. Within 24 Hours: Any violation, unanticipated treatment bypass or upset which may exceed effluent limitations listed in the JBER AWWU Permit.
e. The notifications shall include the following: location of the discharge; date and time of discharge; type of material/waste; concentration and volume of discharge; and corrective actions taken.
6.3. Stormwater:
6.3.1. The Contractor shall obtain all permits required by the applicable State of Alaska and federal regulations regarding protection of water resources including coverage under the ADEC APDES General Permit for Discharges from Large and Small Construction Activities (CGP).
6.3.2. Construction projects that disturb less than one acre of soil within the U.S. Bureau of Census-designated Urbanized Area of JBER that have the potential to discharge to JBER’s storm drain system or other waters (e.g., streams, lakes, wetlands) shall operate under an erosion and sediment control plan (ESCP) consistent with the JBER Stormwater Management Plan. The Contractor shall submit the ESCP to the JBER Water Quality Program Manager for review prior to beginning ground disturbance. Contractor shall refer to ADEC Alaska Storm Water Guide (https://dec.alaska.gov/water/wastewater/stormwater/guidance/) for additional information.
The Contractor shall be responsible for the cost of preparing the project specific ESCP. An ESCP Template is available in Appendix A for the Contractor to use to meet this requirement. The template includes a form, sample plan, and sample inspection form.
6.3.3. Construction projects that disturb 1 or more acres of land and have the potential to discharge to JBER’s storm drain system or other waters (e.g., stream, lakes, wetlands) shall operate under ADEC APDES CGP. The Contractor shall submit the following notifications and a Stormwater Pollution Prevention Plan (SWPPP) in conformance with the ADEC APDES
CGP:
a. NOTICE OF INTENT (NOI): The Contractor shall provide the JBER Water Quality
Program Manager and the CO, with an ADEC approved Construction General Permit
NOI.
b. NOTICE OF TERMINATION (NOT): Upon final stabilization and completion of the project work, the Contractor shall provide JBER Water Quality Program Manager and the CO a copy of the NOT.
c. SWPPP: The CGP requires submittal of a SWPPP. The Contractor shall submit the project specific SWPPP for projects less than five acres in size to the JBER Water Quality Program Manager and CO for review prior to beginning construction. The Contractor shall submit SWPPPs for JBER projects that are 5 acres or more in size to the JBER Water Quality Program Manager, CO, and ADEC at the time the NOI is filed. The Contractor shall be responsible for the costs associated with preparation of these documents, any permit fees, and maintaining compliance with the permit authorization. The Contractor shall be responsible for all fines, notices of violation, and/or other enforcement actions issued by ADEC and other regulatory agencies.
7. Management of Toxic Materials
7.1. Hazardous Building Material Surveys (HBMS):
JBER Environmental Specifications v18Feb2026 Page 14 of 58
7.1.1. If existing HBMS results are not included with the FOPR, the Contractor shall complete the HBMS prior to conducting maintenance, abatement, renovation, or demolition activities.
7.1.2. The Contractor shall complete an HBMS to determine the presence or absence of toxic materials including but not limited to Asbestos Containing Material (ACM), Regulated Asbestos Containing Material (RACM), lead (including Lead-based Paint (LBP)), and Polychlorinated Biphenyls (PCBs) that may be disturbed based on the task order. The Contractor shall provide a copy of the HBMS and all sample results to the CO.
7.1.3. If, following the HBMS, the generated waste is determined to be free of toxic and hazardous materials, the Contractor shall provide documentation to the receiving landfill certifying that all material is free of toxic and hazardous building materials.
7.2. Abatement Plan:
7.2.1. If toxic/hazardous materials are discovered during the HBMS, the Contractor shall prepare and submit an abatement plan to the CO for review and approval, including but not limited to: a description of the work, methods of containment and airborne fiber mitigation, management of waste, disposal, and air testing in the abatement plan, worker certifications.
7.3. Abatement:
7.3.1. The Contractor shall submit all required notifications to Alaska Occupational Safety and
Health (AKOSH) and EPA Region 10 prior to starting any applicable renovation, demolition, or asbestos work.
7.3.2. The Contractor shall manage and dispose of ACM and RACM in accordance with 40 CFR 61 Subparts A and M, 29 CFR 1910.1001, 29 CFR 1926.1101, 8 AAC 61, 18 AAC 60, and the JBER Asbestos Management and Operating Plan (AMOP), as applicable.
7.3.3. The Contractor shall manage and dispose of lead-contaminated waste in accordance with 40
CFR 745 and 18 AAC 60. Contractor shall manifest any Resource Conservation and Recovery Act (RCRA) hazardous lead-contaminated waste and provide the manifest to the CO. The management, shipment, and manifesting of RCRA hazardous lead waste must be completed IAW Section 01600 - Management of Hazardous and Solid Waste – JBER.
7.3.4. The Contractor shall manage and dispose of PCB waste in accordance with 40 CFR 761, 29
CFR 1910.120, 8 AAC 61, and local landfill policies and solid waste permits issued to the landfill, as applicable. Contractors are encouraged to contact the landfill to verify local policy for PCB-containing waste. The Contractor shall contact local scrap metal dealers to determine if they accept metal coated with PCB-containing paints and exercise this option when available to avoid disposing of this waste stream outside of Alaska.
7.3.5. The Contractor shall maintain and submit copies of all completed PCB waste shipment/disposal/recycling records that have been signed by the receiving party to the CO.
7.3.6. The Contractor shall submit copies of EPA Region 10 notifications, required under 40 CFR 61.145(a)(1), 61.145(a)(3), and 61.145(b), to the CO. Contractor shall ensure all abatement associated with the project is documented.
7.3.7. The Contractor shall maintain and submit copies of all waste shipment/disposal/recycling records that have been signed by the receiving party, to the CO.
JBER Environmental Specifications v18Feb2026 Page 15 of 58
7.3.8. The Contractor shall supply a final closeout document to the CO that includes but is not limited to; a description of the abatement work, amount and location of hazardous materials removed, copies of all EPA and AKOSH notifications, daily log sheets, air monitoring reports, laboratory results, waste shipment records, and final disposal documentation.
7.3.9. The Contractor shall not use ACM in any project or bring it on JBER.
7.4. Additional Requirements for Lead:
7.4.1. The Contractor shall identify lead-contaminated waste, including LBP prior to conducting maintenance, abatement, renovation, or demolition activities.
7.4.2. The Contractor shall contact local scrap metal dealers to determine if they accept metal coated with LBPs and exercise this option when available. The Contractor shall coordinate recycling metals coated with LBPs above the hazardous waste thresholds with the JBER Hazardous Waste Program Manager prior to contacting local scrap metal dealers to determine if they accept these materials. The JBER Hazardous Waste Program Manager shall perform required notifications for metals containing LBPs above the hazardous waste threshold through local scrap metal dealers.
7.4.3. The Contractor shall maintain waste shipment records for all non-RCRA hazardous lead-contaminated waste and provide the records to the CO.
7.4.4. State of Alaska regulation 18 AAC 60.025 prohibits the disposal of materials that contain a hazardous substance in concentrations that exceed the applicable soil cleanup levels in 18 AAC 75.341 (Table B1 or B2) in unlined landfills. Contact the State of Alaska for details.
7.4.5. The Contractor shall not use paint with a lead content of 0.06 percent or greater in any capacity on JBER unless approved in advance by CO.
7.5. Other Toxic Materials: The Contractor shall properly manage and dispose of all other toxic substances in accordance with the Toxic Substances Control Act (40 CFR, Subchapter R).
8. Management of Hazardous Materials
8.1. References: Contractor will adhere to the hazardous material requirements stipulated in 29
CFR 1910.1200, 49 CFR 171-178, Federal Acquisition Regulation (FAR) clause 52.223-5, Federal Standard 313, AFMAN 32-7002, AFJMAN 23-209, JBERI 32-2001, and the Joint Base Elmendorf Richardson (JBER) Integrated Hazardous Material Plan (IHMP), while performing work on JBER. Contractor will be responsible for identification, proper handling, use, storage, transportation, and disposal of all HAZMAT brought on JBER.
8.2. HAZMAT Definitions: A Hazardous Material or HAZMAT is any material that poses a risk to personnel, equipment, or the environment. The typical identification method is to review the manufacturer Safety Data Sheet (SDS) of the material. Hazards include but at not limited to explosive, flammables, compressed gases, combustibles, water reactive, oxidizers, organic peroxides, poisons, infectious materials, radioactive materials, and corrosives.
8.3. HAZMAT Approval: All HAZMAT must be approved by the CO prior to being brought on
JBER. The CO will coordinate approval of the HAZMAT through the JBER Hazardous
JBER Environmental Specifications v18Feb2026 Page 16 of 58
Material Program Manager. Contractor shall abide by the HAZMAT approval process in the most current version of the JBER IHMP.
8.3.1. The Contractor shall use the HAZMAT Tracking Form referenced in Appendix B to identify HAZMAT it intends to bring on JBER. The Contractor shall submit the completed HAZMAT Tracking Form along with a copy of an SDS for each material on the form to the CO 15 days prior to the materials being brought on base.
8.3.2. The Contractor shall provide an updated HAZMAT Tracking Form and SDS as new materials are identified. The Contractor shall submit a final HAZMAT Tracking Form to the CO with total usage by material at the end of the project.
8.4. HAZMAT Transportation: Contractor will abide by all state and federal regulations to include but not limited to 49 CFR 171-178 DOT Hazardous Materials Regulations and 29 CFR 1910.1200.
8.5. HAZMAT Storage: All HAZMAT will be stored in its original unaltered container or a properly labeled container, suitable to contain the HAZMAT. Containers will remain closed when not in use. Contractor is required to have the correct and most current SDS for all HAZMAT on hand. Contractor will avoid and prevent material release into the environment, unless given permission to do so by their CO. Contractor will store materials with a flash point of 200°F or less, or combustible materials, in a flammable storage cabinet meeting JBERI 32- 2001 requirements. Contractor will separate incompatible materials by 20 feet or with a suitable cabinet or barrier. All HAZMAT will be stored appropriately and, in a manner, to avoid material incompatibility. All HAZMAT stored on JBER will be managed in accordance with AFJMAN 23-209, and the JBER Integrated Hazardous Material Plan. Contractor shall provide, manage, and maintain emergency response items, materials, secondary containment, and spill response materials suitable for the material being used or stored.
8.6. HAZMAT Inspections: The Contractor shall complete monthly inspections using the
HAZMAT Monthly Inspection Form provided in Appendix B.
8.7. Deficiency Correction: The Contractor shall correct all identified deficiencies for improper storage, labeling, and use of HAZMATs under their control or remove the materials within 24 hours of identification of the deficiency.
9. Hazardous Materials Spills
9.1. The Contractor shall comply with the most recent ADEC regulations and guidance pertaining to spill response and cleanup of contaminated sites found in 18 AAC 75 by visiting the ADEC Office of the Commissioner website.
9.2. The Contractor shall submit a Spill Prevention and Control Plan…