This document is the Asbestos Management and Operating Plan (AMOP) for Joint Base Elmendorf-Richardson (JBER) in Alaska, effective February 23, 2021, establishing procedures for identifying, managing, and abating asbestos-containing materials (ACM) across base facilities to minimize personnel exposure and ensure federal, state, and local regulatory compliance.

The plan establishes comprehensive organizational responsibilities and operational procedures across multiple agencies: the 673d Civil Engineer Squadron (Environmental Compliance Section as Office of Primary Responsibility), the 773d Civil Engineer Squadron (operations and maintenance), the 673d Medical Group (Bioenvironmental Engineering for exposure assessments), and the 673d Contracting Squadron. Key personnel include the Asbestos Program Officer (APO) and Asbestos Operations Officer (AOO) who oversee implementation, training compliance, and database management. The plan requires routine biannual inspections of ACM in good condition, immediate response protocols for damaged or deteriorating materials, and mandatory notification to the EPA at least ten working days before renovation or demolition projects affecting ACM. All workers performing asbestos abatement must be EPA-certified, and the plan mandates medical surveillance for personnel exposed above permissible exposure limits (0.1 fibers/cc) for more than 30 days annually. The document includes detailed operational procedures for ACM maintenance, repair, and removal; contracting requirements; training protocols; and notification procedures, with an annual operational budget of approximately $45,500 covering sampling, analysis, training, supplies, and air monitoring activities.

View the file

Other files

File Type Posted
FA500026R0001_AMENDMENT_ 0002 _SF30 Signed.pdf PDF
Attachment 8_2026 JBER MACC Q and A.pdf PDF
JBER MACC Pre-Proposal Conference-20260331_163518UTC-Meeting Recording.mp4 MP4 file
Attachment 1_2026 JBER MACC SOW R1 Amendment 01.pdf PDF
Attachment 5_Self-Scored Worksheet R1 Amendment 01.xlsx XLSX spreadsheet
2026 MACC Pre-Proposal Sign-In Sheet.pdf PDF
Attachment 4_Technical Definitions R1 Amendment 0001.pdf PDF
FA500026R0001_AMENDMENT_0001_SF30 Signed.pdf PDF
Attachment 2_Relevant Experience Project Template R1 Amendment 01.docx DOCX document
FA500026R0001_20260323.pdf PDF
SOW App 002 AF IMT 3064 Progress Schedule.pdf PDF
SOW App 005 DD Form 1354.pdf PDF
SOW App 009 JBER IFS Vol 1. Elmendorf.pdf PDF
SOW App 010 JBER IFS Vol 2. Richardson.pdf PDF
SOW App 012 JBER CAD GIS RECORD DRAWING AS BUILT STANDARD 2024_FINAL.pdf PDF
SOW App 003 AF IMT 3065 Progress Report.pdf PDF
SOW App 006 Dig Permit Custom Map Elmendorf.pdf PDF
SOW App 007 Dig Permit Custom Map Richardson.pdf PDF
SOW App 014 JBER Environmental Protection and Solid Waste Management Specs 18FEB2026.pdf PDF
Attachment 3_Wage Determination_20260102.pdf PDF
Attachment 7_Price Proposal.xlsx XLSX spreadsheet
Attachment 1_2026 JBER MACC SOW.pdf PDF
Attachment 4_Technical Definitions.pdf PDF
Attachment 5_Self-Scored Worksheet Final.xlsx XLSX spreadsheet
SOW App 001 AF IMT 3000 Submittal.pdf PDF
SOW App 004 Contractors Fire Safety Guide Rev 14 September 2017.pdf PDF
SOW App 008 Dig Permit Fillable Template.pdf PDF
SOW App 013 Environmental Precon Checklist 21JAN2025.pdf PDF
SOW App 015 JBER Hazardous Waste Management Plan 26MAR2025.pdf PDF
SOW App 016 JBER Integrated Hazardous Material Plan 31MAY2025.pdf PDF
SOW App 017 JBER Telecom Standards 20AUG2025.pdf PDF
Attachment 2_Relevant Experience Project Template.pdf.docx DOCX document
Attachment 6_NAF Standard Clauses.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

673d AIR BASE WING

UNITED STATES AIR FORCE

JOINT BASE ELMENDORF-RICHARDSON, ALASKA

ASBESTOS MANAGEMENT AND

OPERATING PLAN

23 February 2021

--THIS PAGE INTENTIONALLY BLANK--

i

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS, JOINT BASE ELMENDORF-RICHARDSON

JOINT BASE ELMENDORF- RICHARDSON, ALASKA

MEMORANDUM FOR DISTRIBUTION

FROM: 673 ABW/XP

SUBJECT: JBER Asbestos Management and Operating Plan (AMOP)

1. Attached is the AMOP as required by AFI 32-1001. This plan provides guidance and outlines procedures to reduce the potential for asbestos exposure to facility occupants and workers, and to ensure compliance with federal, state, and local regulations concerning asbestos management.

2. This plan is effective on receipt, and will be used for implementing joint base response to

Asbestos materials on JBER. This plan supersedes AMOP dated 21 July 2016 - Reviewed 11

February 2019 which should be disposed of IAW the Air Force Records Information

Management System (AFRIMS) Records Disposition Schedule (RDS).

3. Asbestos materials are present in buildings located on JBER. Properly managed asbestos materials do not pose a health risk; but these materials can become hazardous if damaged, disturbed, deteriorated, or otherwise mismanaged.

4. The AMOP was coordinated with all tasked organizations. The OPR for this plan is the

Environmental Quality Section (673 CES/CEIEC). If you have questions regarding this plan, please contact the Asbestos Program Officer at (907) 384 67843466. The office of coordinating responsibility (OCR) is 673 ABW/XPX, telephone (907)552-4503.

MICHAEL L. MARTENS, GS-13, DAF

Director, JBER Plans and Programs

Attachment:

JBER AMOP

673 ABW

JBER, AK 99506

ii

SECURITY INSTRUCTIONS/RECORD OF CHANGES

1. Title. The long title of this plan is the JBER Asbestos Management and Operating Plan. The short title is JBER AMOP.

2. Security Considerations. This document is unclassified.

3. Plan OPR. The plan OPR is the 673 CES/CEIEC Environmental Compliance Section.

4. Reproduction: Commanders of all tasked organizations and friendly forces are authorized to reproduce this plan or extract and reproduce any portions that are essential and necessary for planning and operational purposes.

5. Disposition. When superseded or obsolete, dispose of this document IAW the Air Force

Records Information Management System (AFRIMS) Records Disposition Schedule (RDS).

RECORD OF CHANGES

Change No. and Date Date Entered Posted By

Ch-1 01/19/2022 Mrs. Hannah Myers

Ch-2 01/23/2023 Mrs. Hannah Myers

Memo for Distribution 03/13/2025 Ms. Jessica Weikert iii

PLAN SUMMARY

1. Purpose. The purpose of the Asbestos Management and Operating Plan (AMOP) is to minimize exposure of all building occupants to asbestos. The AMOP also references the database of Asbestos Containing Materials (ACM) within installation facilities. The AMOP provides the documentation for all asbestos management efforts and procedures for overseeing the asbestos management program.

2. Conditions For Implementation. Procedures in this plan will be used to comply with state and federal regulations, and Air Force Instructions (AFIs). Plan revisions will reflect changes in these various laws, rules, and regulations.

3. Operations To Be Conducted. This plan establishes procedures for management of asbestos at JBER. The AMOP includes the following operations:

a. Notification. A program to tell workers, tenants, and building occupants where ACM are located and how and why to avoid disturbing the ACM.

b. Surveillance. Action to note, assess, and document any changes in the ACM condition.

c. Controls. Work controls/permit system to control activities which might disturb ACM.

d. Work Practices. Work practices to avoid or minimize fiber release during activities affecting ACM.

e. Recordkeeping. To document operations and maintenance (O&M) activities.

f. Worker Protection. Medical and respiratory protection programs.

g. Training. Asbestos program manager, custodial, and maintenance staff training.

4. Key Assumptions. See Para 1.c. of Base Plan.

5. Limitations. Existing command structure of all military and nonmilitary agencies will remain in effect, except as specifically stipulated in the AMOP. All communications relative to matters outlined in the plan will be directed to the Environmental Coordinator.

6. OPSEC. Normal. Practice OPSEC by protecting critical and sensitive information.

7. Command Relationships.

a. Due to the complex command structure on JBER, it is conceivable that units assigned here may be reporting to several HHQs at the operational-level. The intent of this plan is to cover tactical, base-level operations in a way that would apply universally regardless of which HHQ(s) are being supported by JBER-assigned organizations.

iv

b. For execution of the AMOP, the 673 ABW/CC will be the supported commander.

Regardless of supported and supporting roles, the 673 ABW/CC requires a high degree of inter-wing coordination from units and personnel not under his or her direct operational, tactical or administrative control in order to achieve unity of effort across JBER.

c. All tasked JBER Commanders approve the usage of this plan by concurring/signing the

Staff Summary Sheet. Only JBER Commanders with the potential to fill the supported commander role under this plan approve it for implementation by signing the base plan.

8. Logistics Appraisal. Logistics are sufficient for the anticipated scope and duration of operations covered by this plan.

9. Personnel Appraisal. None v

TABLE OF CONTENTS

CONTENTS ............................................................................................................................ PAGE

Letter of Transmittal ........................................................................................................................ i

Security Instructions and Record of Changes ................................................................................. ii

Plan Summary ................................................................................................................................ iii

Table of Contents ............................................................................................................................. v

BASE PLAN

ANNEX A – TASK ORGANIZATION INFORMATION ............................................................... A-1

ANNEX B – ASBESTOS MANAGEMENT – DATABASE, SURVEY, & INSPECTION .............. B-1

Appendix 1 – Asbestos Database ....................................................................................... B-1-1

Appendix 2 – Asbestos Inspection and Survey .................................................................. B-2-1

Appendix 3 – Asbestos Survey Form ................................................................................. B-3-1

Appendix 4 – ACM Damage and Exposure Assessment ................................................... B-4-1

ANNEX C – OPERATIONS PLAN ...............................................................................................C-1

Appendix 1 – Guidance for Clearing Work Areas ............................................................. C-1-1

Appendix 2 – Worker Exposure Report ............................................................................ C-2-1

Appendix 3 – Asbestos Abatement Report ......................................................................... C-3-1

ANNEX D – CONTRACTING PROCEDURES .......................................................................... D-1

ANNEX E – TRAINING REQUIREMENTS ................................................................................. E-1

ANNEX F – NOTIFICATION PROCEDURES ............................................................................ F-1

Appendix 1 – Informational Handout ................................................................................ F-1-1

ANNEX G - ANNUAL BUDGETING .......................................................................................... G-1

ANNEX H – P Not Used

ANNEX Q - MEDICAL SURVEILLANCE AND PERSONAL PROTECTION ........................... Q-1

ANNEX S – X Not Used

ANNEX Y – ABREVIATIONS/ACRONYMS AND DEFINITIONS............................................... Y-1

ANNEX Z – DISTRIBUTION LIST .............................................................................................. Z-1

BASE PLAN

References: The following references are applicable to this document. As new regulatory guidance is promulgated, it will be incorporated into revisions of this plan. However, the new guidance will be effective immediately upon receipt and supersede any conflicting guidance listed.

a. 18 AAC 60.200 and 60.450 addresses state of Alaska solid waste permits requirements.

b. 8 AAC 61.600-61.790, Asbestos Abatement Certification.

c. 20T-2003, July 1990, EPA Manual for Managing Asbestos in Place.

d. 29 CFR 1910.134, OSHA Respiratory Protection Standard.

e. 29 CFR 1910.1001, Occupational Safety and Health Standards – Asbestos, addresses asbestos exposure in the general industry, cancer, health labeling, occupational safety and health, protective equipment, respiratory protection, signs and symbols.

f. 29 CFR 1926.1101, Safety and Health Regulations for Construction – Asbestos, addresses asbestos exposure in the construction industry, cancer, hazardous materials, health, labeling, occupational safety and health, protective equipment, respiratory protection, signs and symbols.

g. 40 CFR 61.145, Standard for Demolition and Renovation, addresses demolition and renovation, notification requirements, emission control, disposal, and disposal sites.

h. 40 CFR 61 (Subpart M), National Emissions Standards for Asbestos, adopts National

Emission Standards for Hazardous Air Pollutants (NESHAP) and limits release of asbestos to the environment during work with asbestos.

i. 40 CFR 763 (Subpart E), Asbestos-Containing Materials in School. Asbestos Hazard

Emergency Response Act (AHERA) requires management of ACMs in public schools and requires the study of public buildings mandated abatement under Environmental Protection

Agency (EPA) guidelines.

j. 40 CFR Part 763 (Subpart E, Appendix C), Asbestos Model Accreditation Plan, Asbestos

Hazard Emergency Response Act (AHERA).

k. 42 CFR, Part 84, standards that represent the equipment and filtration requirements of the

National Institute of Occupational Safety and Health standard for the activity involved. The standard is based on nine classes of filters with three levels of minimum filtration efficiency and three categories of resistance to the effects of oil aerosols.

l. AFI 32-1001, Chapter 15, Facility Asbestos Management, addresses program development and guidance for Air Force Military Construction Programs (MCP) and Operations &

Maintenance (O&M) projects.

m. AFI 48-137, Respiratory Protection Program.

n. AFI 48-145, Occupational and Environmental Health Program.

o. AFI 90-821, Hazard Communication Program.

p. AFMAN 48-146, Occupational and Environmental Health Program Management.

Task Organization: See Annex A.

1. Situation.

a. Background. The intent of the Joint Base Elmendorf-Richardson (JBER) Asbestos

Management and Operations Plan (AMOP) is to establish management and organizational responsibilities and measures, in compliance with AFI 32-1001, which ensure that no personnel in base facilities are exposed to hazardous levels of airborne asbestos fibers. This AMOP will address organizational roles and responsibilities, data management, program development, operational management, work procedures, and training. This reference guide is to be used by

JBER organizations and Air Force contracted personnel to ensure all asbestos abatement actions are conducted with the intent of preventing asbestos exposure. This plan is divided into two major sections: management and operations.

b. Policy. The USAF, IAW AFI 32-1001, has directed JBER to develop an asbestos management and operations plan. JBER must comply with all federal, state, and local regulations concerning asbestos management. Adherence to this plan will assure compliance with these regulations and prevent asbestos exposure to occupants and workers on base.

c. Assumptions.

(1) As long as ACM is maintained in good condition, it does not require abatement.

(2) Conditions which damage, deteriorate, or render the ACM friable require abatement or encapsulation.

(3) Adequate manpower, equipment, enforcement, and other resources exist at the working level to ensure plan compliance.

2. Mission. JBER AMOP provides guidance for compliance with all applicable regulations and will be the means to properly manage asbestos at JBER. This AMOP will consolidate different organizational guidelines and procedures into one comprehensive base plan. The objectives of the plan are to:

a. Define management requirements, including specific organizational tasks for meeting regulatory requirements and protecting the health of base occupants and workers.

b. Establish a system of identifying, evaluating, and prioritizing asbestos related hazards.

c. Outline a monitoring and maintenance program, which provides a means of ensuring all asbestos containing material (ACM) in base facilities are in good shape and repairs are completed in an expedient manner.

d. Provide procedures for accurate and timely regulatory notifications.

e. Establish a complete and functional asbestos containing material (ACM) database for facilities and procedures to keep the database current.

f. Ensure facility maintenance personnel are trained in the management and removal of

ACM.

g. Establish a safe and effective monitoring and maintenance program.

3. Execution.

a. Concept of Operations.

(1) JBER will comply with all federal and state ACM regulations. JBER is responsible for the development and implementation of the AMOP as a tool for identifying and reducing possible exposure of airborne asbestos fibers to base personnel, families, and contractors.

(2) To have a successful Asbestos Management and Operations Plan, there must be an integrated program, which requires the participation of several organizations. The Commander, 673 CEG has the primary responsibility for developing and implementing an asbestos program.

For public schools on base, the Anchorage School District is the owner and responsible for managing school facilities. In addition, other base organizations must assist the 673 CES/CC in worker protection, sampling programs, quality control, and dissemination of accurate information needed to protect the health of all personnel living or working on Joint Base

Elmendorf-Richardson.

b. Tasks. Tasked unit/staff agencies will take appropriate actions as directed by the AMOP and their unit for prescribing response actions. However, this plan is directed primarily towards the 773d Civil Engineer Squadron, 673d Civil Engineer Squadron Environmental Element, 673d

Contracting Squadron, 673d Bioenvironmental Engineer Flight (BEE), and all JBER Facility

Managers. Responsibilities are as follows:

(1) Base Civil Engineer (BCE):

(a) The BCE works together with base Bioenvironmental Engineering (BE) to accomplish the goals of the asbestos plan.

(b) Develops a base asbestos management plan and maintains an inventory of all facilities with known asbestos-containing materials (ACM) and ensure real property records are properly annotated.

(c) Develops a base asbestos management plan and maintains an inventory of all facilities with known asbestos-containing materials (ACM) and ensure real property records are properly annotated. ACM is any material containing more than one (1) percent asbestos.

(d) Examines ACM in base facilities and decides whether repair, maintenance, or removal of the material is necessary.

(2) Base Bioenvironmental Engineering (BE):

(a) Works directly with the BCE to determine if recommended actions are necessary

(e.g., frequent monitoring, removal of personnel from the area, temporary controls, or other protective measures) in order to protect human health.

(b) With the BCE, conducts direct evaluation of facilities containing ACM, which cannot be reliably maintained, repaired, or isolated and that is likely to become friable or not remain intact. Provides advice to the installation commander regarding health issues associated with "must remove" mandates.

(c) Where there is no mandate to remove asbestos, BE will provide advice to the BCE regarding the health risk to facility occupants.

(3) Commander, 673 CES. Appoints an Asbestos Program Officer (APO) to oversee the implementation of the AMOP.

(4) Asbestos Program Officer (APO), 673 CES/CEIEC.

(a) Office of primary responsibility for asbestos compliance on base is 673

CES/CEIEC

“NOTE: 673 OMRS/SGXB is OPR for exposure assessments for DoD personnel affected by release/potential release of ACM.”

(b) Develops a base AMOP.

(c) Directs implementation and periodic review of this plan.

(d) Maintains data on all asbestos abatement work, which includes survey information, amount removed and its location, and a copy of each EPA notification of demolition and renovation submitted.

(e) Provides a copy of the EPA notification of demolition to Civil Engineer

Operations (CEO) on all asbestos abatement work.

(f) Performs review of CE Service Requests submitted to identify projects with potential exposure of base personnel to ACM.

(g) Responsible for quality assurance checks of survey data, abatement work, and contract specifications.

(h) Coordinates with 673 OMRS/SGXB when asbestos abatement projects are taking place, (i.e. contract, or when asbestos is accidentally disturbed by base agencies).

(i) At a minimum the APO will receive the asbestos inspector course and yearly updates.

(j) Ensures a facility is free of Regulated Asbestos Containing Material (RACM) prior to demolition.

(5) Commander, 773 CES.

(a) Appoints an Asbestos Operations Officer (AOO) to oversee the implementation of the AMOP and worker training.

(b) Ensures civil engineer personnel are trained to perform the requirements set forth in the AMOP.

(c) Ensures a certified laboratory is used to analyze bulk asbestos samples.

(d) Coordinates necessary exposure assessment /air sampling with the 673

OMRS/SGXB or obtains contract lab with coordination with 673 OMRS/SGXB.

(e) As primary certification officer, ensures the job sites of all 773 CES applicable work and job orders are either ACM free or have been surveyed prior to the beginning of work.

(f) Appoints a competent person (as defined by this plan and OSHA) to direct cleanup, repair, or removal of the ACM based upon its type, quantity, location, and condition for non-contract removal actions

(g) Prepares an annual budget for in-house manpower supplies, training, and equipment requirements.

(h) Coordinates for review of all asbestos abatement plans submitted by contractors for on-base work, including Simplified Acquisition of Base Engineer Requirements (SABER) projects to CES/CEIEC.

(6) Asbestos Operations Officer (AOO), 773 CES/CEO-1.

(a) Ensures asbestos training for all 773 CES craftsmen is current. Training will be conducted annually and be a minimum of 2 hours IAW, 29 CFR 1926.1101 (k) (9)(vi).

(b) Assists with the ACM work review process and program management.

(c) Implements essential elements of the AMOP that pertain to 773 CES personnel.

(d) Coordinates with 673 OMRS/SGXB to ensure that the laboratory is certified.

(e) Ensures the facility custodians are informed of known ACM locations within their specific facility.

“NOTE: A copy of the facility asbestos survey is sufficient.”

(f) Ensures ACM is properly packaged, transported, and disposed of.

(g) Responds to reports of suspected damage or deteriorating ACM.

(h) Submits, to 673 CES/CEIEC, asbestos abatement notification, sample results and other pertinent information to be entered into the asbestos data tracking system.

“NOTE: This is to include work plans and disposal documents.”

(7) Human Health Risk Assessor, 673 OMRS/SGXB.

(a) As requested, examines damaged, friable ACM and evaluates the extent and potential for fiber release into the air and determines if abatement action is required. May assign a risk assessment code (RAC) to the action based upon the exposure assessment. The RAC could be used to prioritize actions and funding. The 673 OMRS/SGXB determines if health related precautions, including monitoring, removal of personnel, and protective control measures, are required to protect personnel until recommended actions are completed.

(b) Documents occupational and incidental exposure data (including 773 CES asbestos abatement workers) as available in the Defense Occupational and Environmental Health

Readiness System (DOEHRS) as required by AFI 48-145, AFMAN 48-146, DoDI 6055.05, 29

CFR 1910, and 29 CFR 1926. Note federal exposure records retention requirements specific to asbestos exposure which are satisfied with DOEHRS documentation.

(c) Conducts the initial and annual occupational respirator fit-tests for covered government employees at JBER who require respiratory protection. Administers the JBER

Respiratory Protection (RP) Program. Advises unit RP managers and workplace supervisors in the development of their required workplace-specific RP programs.

(d) Reviews/approves all JBER contracts involving hazardous materials (including asbestos), and associated site-specific Health and Safety Plans (HSPs), upon receipt from 673

CONS as required by AFI 48-145.

(e) Reviews certified clearance results and makes appropriate recommendation to the appropriate base authority to allow re-occupancy.

(f) Assists in development of an informational handout for base residents and facility personnel with APO.

(g) Makes recommendations to appropriate commander or contracting authority to stop work if it is determined a project presents a significant risk to human health or the environment.

(h) When necessary, the Human Health Risk Assessor will recommend vacating the work area until the asbestos hazard is controlled or reduced.

(i) Ensures collection of OSHA-compliant air sampling data required to determine occupational exposure levels for covered government employees at JBER, provided advanced notification regarding the potential for occupational exposure.

(8) Housing Management (673 CES/CEIH).

(a) Determines eligibility for housing residence and provides oversight and coordination of privatized housing managed by Aurora Military Housing (AMH).

(b) Hazard assessments were conducted on all privatized housing units and based on those assessments AMH determined that all of the units are controlled and asbestos, if present is in good condition and does not represent an exposure risk. In the event asbestos is identified within privatized housing, AMH would conduct the appropriate maintenance or abatement action.

(9) Operations Management (773 CES/CEO).

(a) Routes all applicable work orders or CE Service Requests through the AOO, the

APO, and the 673 OMRS/SGXB for an asbestos assessment prior to assigning the work.

(b) Advise shops when work is assigned to consult AOO for sampling information.

(10) Structures Section (773 CES/CEOHS) / 773 CES HVAC Section / WFSM Section.

(a) Directs, inspects, using properly trained and certified personnel, ACM repairs, ACM condition, Class III abatement, encapsulation, and glove bag operations on asbestos containing material IAW 29 CFR 1926.1101(b).

(b) Conducts bulk asbestos sampling utilizing contracted methods, as required, to identify accidentally damaged ACM. The purpose of this sampling is to determine the extent of contamination and potential health risks to personnel/occupants.

(c) Ensures all Section employees maintain required state accreditation.

(d) Maintains a daily logbook for Section asbestos abatement projects.

(e) Submits Section abatement project information to the AOO and APO for notification submittal however, if it requires notification, typically done under contract.

(f) Ensures the participation of a competent person in all Section asbestos inspection and abatement actions as required by 29 CFR 1926.1101.

(g) Responds to emergency calls and initiates actions in accordance with requirements. Coordinates emergencies with the 673 OMRS/SGXB, the APO and, AOO in case of a potential ACM fiber release.

(h) Coordinates air sampling requirements with 673 OMRS/SGXB.

(i) Ensures that all Section workers performing asbestos abatement are respirator fit tested annually by Bioenvironmental Engineering.

(j) Places warning labels on items and/or at the entrance of areas requiring asbestos labeling.

(11) Real Property (673 CES/CEIAP). Coordinates AF Form 300, Facility Disposal

Report, through the APO prior to demolition.

(12) SABER Element (673 CES/CEPM).

(a) Coordinates with the APO, AOO, and 673 OMRS/SGXB prior to finalizing any asbestos contract specifications/plans.

(b) Requires all asbestos abatement contractors to notify the EPA in accordance with

40 CFR 61.145 and 61.146 and the Alaska Department of Labor in accordance with 8 AAC

61.620 prior to beginning work.

(c) Requires all asbestos abatement contractors to notify the APO in writing of all asbestos abatement in accordance with 40 CFR 61 prior to beginning work.

(d) Obtains copies of the abatement notification submittals from the contractor and routes to the APO.

(e) Ensures asbestos abatement costs are designated as a separate contractual line item.

(f) If ambient air monitoring or clearance sampling are performed by a contractor, coordinates a 673 OMRS/SGXB review of contractor’s analytical results and enforces 673

OMRS/ SGXB approval/disapproval of re-occupancy. CEPM shall not allow removal of protective barriers from friable asbestos abatement projects until clearance air sampling results are approved by 673 OMRS/SGXB.

(g) Ensures that contractors take their own asbestos samples for their projects if the

AOO/APO does not have sufficient data on the project in the asbestos database.

(h) Ensures that any asbestos sampling documentation the contractor generates during the course of the project are provided to AOO/APO at project closeout.

(i) Ensures that contractors use their own abatement contract for any abatement work conducted.

(13) Service Contracts (773 CES/CEOES).

(a) Coordinates with the APO, AOO, and 673 OMRS/SGXB prior to finalizing any asbestos contract specifications/plans.

(b) Requires all asbestos abatement contractors to notify the EPA in accordance with

40 CFR 61.145 and 61.146 and the Alaska Department of Labor in accordance with 8 AAC

61.620 prior to beginning work.

(c) Requires all asbestos abatement contractors to notify the APO in writing of all asbestos abatement in accordance with 40 CFR 61 prior to beginning work.

(d) Obtains copies of the abatement notification submittals from the contractor and routes to the APO.

(e) Ensures asbestos abatement costs are designated as a separate contractual line item.

(f) If ambient air monitoring or clearance sampling are performed by a contractor, coordinates 673 OMRS/SGXB review of contractor’s analytical results and enforces 673 OMRS/

SGXB approval/disapproval of re-occupancy. The 773 CES/CEOES shall not allow removal of protective barriers from friable asbestos abatement projects until clearance air sampling results are approved by 673 OMRS/SGXB.

(g) Ensures that third party contractors take asbestos samples for projects if the

AOO/APO does not have sufficient data on the project in the asbestos database. Personnel who conduct asbestos bulk sampling must have the EPA Inspector certification.

(h) Ensures that any asbestos sampling documentation the contractor generates during the course of the project are provided to AOO/APO at project closeout.

(i) Ensures that contractors use their own abatement contract for any abatement work conducted.

(14) Contracting Officer (673 CONS).

(a) Ensures that all documentation regarding asbestos sampling, ACM removal, ACM disposal, asbestos abatement, and air sampling are provided to APO/AOO prior to project closeout.

(b) Ensures that all of the provisions listed in paragraph 3 to Annex D of this plan are followed by the respective contractors.

(c) Has the authority to suspend or terminate contract actions when recommended by

673 CES, 773 CES or 673 OMRS/SGXB.

4. Administration and Logistics. See paragraph 4 of the following annexes.

5. Command and Control. At times, the regulatory agencies, including EPA, OSHA, and State of Alaska representatives, may request access onto JBER for inspection of an asbestos abatement work site, and/or in response to a request for investigation.

KIRSTEN G. AGUILAR

Colonel, USAF

Commander

Annexes:

A – Task Organization

B – Asbestos Management – Database, survey, and Inspection

C – Operations Plan

D – Contracting Procedures

E – Training Requirements

F – Notification Procedures

G – Annual Budgeting

Q – Medical Surveillance and Personal Protection

Y – Abbreviations/Acronyms, and Definitions

Z – Distribution Page

A-1

ANNEX A TO JBER AMOP

TASK ORGANIZATION

1. Supported Command. 673d Air Base Wing.

a. Wing Staff Agencies (WSA)

(1) 673d Air Base Wing Command Section (673 ABW/CC)

(2) 673d Air Base Wing Command Post (673 ABW/CP)

(3) 673d Air Base Wing Military Equal Opportunity (673 ABW/EO)

(4) 673d Air Base Wing Chaplain (673 ABW/HC)

(5) 673d Air Base Wing Staff Judge Advocate (673 ABW/JA)

(6) 673d Air Base Wing Public Affairs (673 ABWW/PA)

(7) 673d Air Base Wing Safety (673 ABW/SE)

(8) 673d Air Base Wing Plans and Programs (673 ABW/XP)

(9) 673d Comptroller Squadron (673 CPTS)

(10) 673d Air Base Wing Information Protection (673 ABW/IP)

(11) 673d Air Base Wing Inspector General (673 ABW/IG)

b. 673d Civil Engineer Group (673 CEG)

(1) 673d Civil Engineer Squadron (673 CES)

(a) Base Civil Engineer (BCE) (673 CES/CC)

(b) Asbestos Program Officer (APO) (673 CES/CEIEC)

(c) Housing Management (673 CES/CEIH)

(d) SABER Element (673 CES/CEPM)

(e) Real Property Office (673 CES/CEIAP)

(2) 773d Civil Engineer Squadron (773 CES)

(a) Operations Management (773 CES/CEO)

A-2

(b) Asbestos Operations Officer (AOO) (773 CES/CEO)

(c) Structures Section (773 CES/CEOHS)

(d) Service Contracts (773 CES/CEOES)

c. 673d Logistics Readiness Group (673 LRG)

(1) 673d Logistics Readiness Squadron (673 LRS)

(2) 773d Logistics Readiness Squadron (773 LRS)

d. 673d Medical Group (673 MDG)

(1) 673d Operational Medical Readiness Squadron (673 OMRS)

(a) Bioenvironmental Engineer Flight (BE) (673 OMRS/SGXB)

(b) Human Health Risk Assessor (673 OMRS/SGXB)

(2) 673d Dental Squadron (673 DS)

(3) 673d Inpatient Operations Squadron (673 IPTS)

(4) 673d Health Care Operations Squadron (673 HCOS)

(5) 673d Medical Support Squadron (673 MDSS)

(6) 673d Surgical Operations Squadron (673 SGCS)

e. 673d Mission Support Group (673 MSG)

(1) 673d Security Forces Squadron (673 SFS)

(2) 673d Contracting Squadron (673 CONS)

(3) 673d Communications Squadron (673 CS)

(4) 673d Force Support Squadron (673 FSS)

2. Supporting Commands.

a. Commander, Alaskan NORAD Region (ANR), Alaskan Command (ALCOM), and 11th

Air Force (11AF)

(1) ANR Staff

A-3

(2) ALCOM Staff

(3) 11 AF Staff

(a) 611th Air Operations Center (611 AOC)

(b) PACAF Regional Support Center (PRSC)

1. 611th Air Support Squadron (611 ASUS)

2. 611th Civil Engineer Squadron (611 CES)

3. 611th Air Communications Squadron (611 ACOMS)

b. Headquarters, US Army 11th Airborne Division (ABN DIV)

(1) 11th ABN DIV Headquarters and Headquarters Detachment (HHD)

(a) HQ, 11th ABN DIV/CG

(2) 17th Combat Sustainment Support Battalion (17 CSSB)

(3) 4th-25 Airborne Brigade Combat Team (4-25 ABCT)

(a) 1st Squadron, 40th Cavalry (1-40 CAV)

(b) 1st Battalion, 501st Airborne (1-501 INF)

(c) 3rd Battalion, 509th Infantry (3-509 INF)

(d) 2nd Battalion, 377th Parachute Field Artillery Regiment (2-377 PFAR)

(e) 725th Brigade Support Battalion (725 SPT BN)

(f) 716 Ordinance Company (EOD)

(g) 6th Brigade Engineer Battalion (6 BEB)

c. 3rd Wing (3 WG)

(1) Wing Staff Agencies (WSA)

(a) 3rd Wing Command Section (3 WG/CC)

(b) 3rd Wing Inspector General (3 WG/IG)

A-4

(c) 3rd Wing Safety (3 WG/SE)

(d) 3rd Wing Advanced Programs (3 WG/CVN)

(2) 3rd Operations Group (3 OG)

(a) 3rd Operations Support Squadron (3 OSS)

(b) 90th Fighter Squadron (90 FS)

(c) 525th Fighter Squadron (525 FS)

(d) 517th Airlift Squadron (517 AS)

(e) 962nd Airborne Air Control Squadron (962 AACS)

(3) 3rd Maintenance Group (3 MXG)

(a) 703d Aircraft Maintenance Squadron (703 AMXS)

(b) 3rd Aircraft Maintenance Squadron (3 AMXS)

(c) 3rd Maintenance Squadron (3 MXS)

(d) 3rd Munitions Squadron (3 MUNS)

d. 176th Wing (176 WG)

(1) Wing Staff Agencies (WSA)

(a) 176th Wing Command Section (176 WG/CC)

(b) 176th Comptroller Flight (176 CPTF)

(2) 176th Operations Group (176 OG)

(a) 144th Airlift Squadron (144 AS)

(b) 249th Airlift Squadron (249 AS)

(c) 210th Rescue Squadron (210 RQS)

(d) 211th Rescue Squadron (211 RQS)

(e) 212th Rescue Squadron (212 RQS)

A-5

(f) 176th Air Defense Squadron (ADS)

(g) 176th Operations Support Squadron (176 OSS)

(3) 176th Maintenance Group (176 MXG)

(a) 176th Maintenance Squadron (176 MXS)

(b) 176th Aircraft Maintenance Squadron (176 AMXS)

(c) 176th Maintenance Operations Flight (176 MOF)

(4) 176th Mission Support Group (176 MSG)

(a) 176th Civil Engineer Squadron (176 CES)

(b) 176th Communications Flight (176 CF)

(c) 176th Security Forces Squadron (176 SFS)

(d) 176th Force Support Flight (176 FSF)

(e) 176th Logistics Readiness Squadron (176 LRS)

(5) 176th Medical Group (176 MDG)

e. 477th Fighter Group (477 FG)

(1) 302d Fighter Squadron

(2) 477th Force Support Squadron

(3) 477th Aircraft Maintenance Squadron

(4) 477th Maintenance Squadron

(5) 477th Aerospace Medical Flight

(6) 477th Operations Support Flight

f. Alaska Army National Guard

(1) JFHQ – AK JDOMS

g. 59th Signal Battalion (59 SIG BN)

A-6

h. Air Force Office of Special Investigations, Detachment 631 (AFOSI Det 631)

i. Army Criminal Investigation Command (CID)

j. 354th Operations Group Detachment 1 (354 OG Det 1)

k. 715th Air Mobility Operations Group (715 AMOG)

(1) 732nd Air Mobility Squadron (732 AMS)

l. Alaska Mission Operations Center (AMOC)

(1) 373 Intelligence Surveillance Reconnaissance Group (373 ISRG)

(a) 301 Intelligence Squadron (301 IS)

(b) 381 Intelligence Squadron (381 IS)

m. Detachment, Military Police Company D, 4th Law Enforcement Battalion, Marine Corps

Reserve Training Center

n. 372d Training Squadron, Detachment 14 (FTD) (372 TRS DET 14)

o. Air Force Audit Agency (AFAA), Northwest Area Audit OFC

p. Defense Logistics Agency – Pacific (DLA-PAC)

q. Defense Information Systems Agency (DISA AK FO)

r. Naval Operations Support Center (NOSC)

s. Civil Air Patrol (CAP)

t. Defense Commissary Agency (DeCA)

u. Army Air Force Exchange Service (AAFES)

v. Missile Defense Agency (MDA)

w. Alaska Resident Office, 500th Military Intelligence Brigade (ARO-JBER)

x. US Army Reserve Center

y. US Coast Guard Sector Anchorage (USCG SEC ANC)

z. 354th Fighter Wing, 3 Air Support Operations Squadron (3 ASOS)

B-1

ANNEX B TO JBER AMOP

ASBESTOS MANAGEMENT – DATABASE, SURVEY, AND INSPECTION

1. Situation.

a. General. JBER has responsibility to effectively manage asbestos containing material to prevent exposure to all base users. Effective management is provided via planning, surveillance, survey, inspection and maintenance. This management plan provides details of the controls implemented at the base to prevent exposure and comply with regulatory requirements.

b. AMOP Change Control. The AMOP will be accurately maintained to reflect all measures the base is taking to control exposure to airborne asbestos fibers. Therefore, whenever any change in policy is required, the plan must be revised accordingly.

2. Mission. See Base Plan.

a. Asbestos Data Management. An asbestos database will be maintained by the APO and the

AOO will ensure updated survey, sampling, and abatement information is supplied to the APO or input into the database. The database will provide a record of asbestos in all facilities, and should be continually updated to accurately show the location, quantity, and condition of ACM on base. Following any abatement activity that may result in the removal of asbestos, an

Asbestos Abatement Report detailing what was removed will be submitted to the APO for an update to the database. See Appendix 1 of this Annex for further information.

(1) ACM previously identified. The following information regarding ACM abatement is needed: the building number, the room number, the amount, type of ACM abated, and laboratory analysis.

(2) Re-inspection of ACM in Mechanical Rooms. Any ACM surveillance will note, assess, and document any changes in the ACM’s condition.

(3) Newly identified ACM. In addition to properly documenting the removal of previously identified ACM, information pertaining to newly discovered ACM will be added to the database.

b. Survey and Inspection. Managing asbestos on base requires identifying building locations that have ACM, ascertaining its condition, determining whether it presents a health hazard, and defining appropriate treatment. This will be a continual process of survey and inspection. See

Appendix 2 to this Annex for further information.

c. Monitoring, Surveillance, and Quality Assurance.

(1) The competent person, as defined in 29 CFR § 1926. 1101, has primary responsibility for environmental compliance at all work sites. In contract abatement operations, the contractor

B-2 is required to supply the competent person. The APO is responsible for quality assurance compliance.

(2) Through coordination by the AOO, 673 OMRS/SGXB will conduct site worker air monitoring for compliance for government personnel or when circumstances warrant (i.e.

unintended release of ACM). For contract abatement operations, the 673 OMRS/SGXB will review and interpret contractor analytical results and make recommendations for re-occupancy.

4. Administration and Logistics.

a. Records Retention. Regulation requires that all asbestos records be retained indefinitely.

b. See appendices for other administrative procedures.

5. Command and Control. Not used.

Appendices:

1 – Asbestos Database

2 – Asbestos Inspection and Survey

3 – Asbestos Survey Form

B-1-1

APPENDIX 1 TO ANNEX B TO JBER AMOP

ASBESTOS DATABASE

1. General. The base will establish and maintain a computerized database of every facility on base, and establish a priority listing of all asbestos projects, including abatement, repair, etc., identified in the initial base survey. Results of any work area air monitoring, including clearance air sampling for abatement efforts will be included in the database.

2. Asbestos Database. An electronic database and facility folders will be maintained by the asbestos office (673 CES/CEIEC) and will include the following information at a minimum:

a. Facility number and usage code (e.g., building number).

b. Quantity (linear and square footage).

c. Asbestos type by location.

d. Condition of the ACM.

e. Date of last survey.

f. Date of the last repair, removal, or maintenance monitoring.

g. Current work orders (CE Service Request or DD Form 1391).

h. Start date of major renovation or demolition projects.

B-2-1

APPENDIX 2 TO ANNEX B TO JBER AMOP

ASBESTOS INSPECTION AND SURVEY

1. Inspection. Managing asbestos in place is consistent with current EPA guidance (see EPA manual, 20T-2003, Jul 90). Accordingly, the base has no plans to systematically remove asbestos from every facility. To effectively manage asbestos in place, 773 CES/CEO has implemented a recurring inspection and maintenance program. The information gathered from these routine inspections is used to update the asbestos survey and database. Upon discovery of exposed friable ACM, maintenance personnel will notify customer service at 552-3726/3727.

Maintenance activity personnel will perform all cleaning and repair actions as required.

2. Pre-Work Requirements. An asbestos investigation will precede all construction, demolition, or renovation actions in buildings suspected or shown to have ACM present during the initial base survey. This will include review of the JBER asbestos database and other records that could possibly contain facility information regarding the presence of asbestos in the facility.

a. Methods utilized to accomplish this include: the review of as-built drawings, interviewing employees knowledgeable of the facility, and researching construction references to determine possible ACM locations.

(1) Sampling. After conducting employee interviews and a thorough document search, sampling would occur if needed. Trained personnel will do the sampling and will perform this task wearing appropriate personal protective equipment and respiratory protection.

“NOTE: Any planned O/M project that includes asbestos should be the responsibility of the project initiator (through a contract mechanism) or 773 CES/CEO.”

(2) The 673 OMRS/SGXB will conduct a health risk assessment for government employees or if contractor actions have the potential to affect government employees. This is generally in the event of an unexpected “find” and especially if there is a fiber release episode where there is uncertainty if the material is asbestos.

b. Any project or work order requiring a CE Service Request or DD Form 1391 that is processed requires an asbestos survey prior to work beginning if insufficient data is available in the asbestos database through the AOO/APO. The maintenance activity will research individual facility folders until the asbestos database is delivered to determine whether or not ACM is present in the construction area.

3. Survey. Managing asbestos on base requires identifying building locations that have ACM, ascertaining its condition, determining whether it presents a health hazard, and defining appropriate treatment. The most effective method for identifying locations that have ACM and determining its condition is through a facility survey. Where complete building surveys are required, surveys will be performed using protocols established by EPA under the Asbestos

Hazard Emergency Response Act (AHERA) and other guidance documents. Surveys will include:

a. The date(s) of the inspection/survey.

B-2-2

b. The name and signature of each accredited person conducting the inspection, collecting samples, and making the assessment. The state of accreditation and if applicable, the accreditation number of each inspector is to be provided in the report.

c. The location of each homogeneous sampling area from which samples were collected, the location of each homogeneous sampling area where suspect ACM was assumed to be ACM, and the location of PACM. Homogeneous sampling area should likewise be clearly identified on drawings and diagrams for future reference. Real or artificially designated area boundaries should likewise be clearly identified.

d. A discussion of the manner used to determine sampling locations. Logic used in choosing sample locations should be presented and defended in writing. Sample locations should be selected for their ability to be representative of selected areas. To enable the samples to be statistically random, a protocol like that provided in the EPA guidance publication “Simplified

Sampling Scheme for Friable Surfacing Materials” EPA 560/5-85-030a, October 1985, should be consulted.

e. A list of identified homogenous sampling areas and their classification as to type of material. All areas are to be identified by material type as either surfacing material, thermal system insulation, or miscellaneous material.

f. Following receipt of the results of laboratory analysis, each sample and each homogeneous sampling should be designated as ACM or non-ACM on the building records.

g. The assessment of the ACM and suspected ACM should be categorized into one of the following categories:

(1) Damaged or significantly damaged thermal system insulation ACM.

(2) Damaged friable surfacing ACM.

(3) Significantly damaged friable surfacing ACM.

(4) Damaged or significantly damaged friable miscellaneous ACM.

(5) ACM with potential for damage.

(6) ACM with potential for significant damage.

(7) Any remaining friable ACM or friable suspected ACM.

h. Survey report should detail the amount of ACM present and estimated abatement cost.

i. Copies of all building surveys will be forwarded to 673 CES/CEIEC and BE. The CEIEC

Asbestos Program Officer (APO) will evaluate the surveys for environmental issues and BE will

B-2-3 evaluate the surveys for base personnel exposure issues. For projects involving limited confirmation sampling, the following information will be forwarded to the CEIEC APO for all samples collected for asbestos analysis:

(1) Building Number

(2) Room and Floor Number

(3) Location in Room

(4) Material Sampled

(5) Date Sampled

(6) Photographs (if needed)

(7) Sample Identification Number [must contain Installation/Facility/Work Order, Project

Number/Julian Date/Sample Number (example:FXSB6326-R6326-21-0001)]

(8) Description of Material Sampled (TSI, surfacing, miscellaneous, Category I, Category

II, Friable, Non-Friable, condition, functional space number, and homogenous number, and potential for disturbance).

(9) A map showing identification numbers and location for all samples collected during the project. The map should have a north arrow and scale. If a map is not available, a hand sketch will work.

(10) The name of the person collecting the sample(s), company name, license number, and phone number

(11) Sample Chain-of-Custody Documentation

(12) Analytical results. Analytical reports shall include the client sample identification number; laboratory sample identification number; analytical technique used; laboratory quality control procedures; physical description of sample(s); types and estimated percentage of asbestos; types and estimated percentage of non-asbestos fibers, types and percentage of other components, date of analysis, and analyst’s signature.

j. All samples will be shipped under chain-of-custody to a laboratory accredited by the

National Voluntary Laboratory Accreditation Program (NVLAP), for analysis using polarized light microscopy (PLM) for bulk samples and phase contrasting microscopy (PCM) for air samples. Laboratory analytical reports will include the signed chain-of-custody, the name and address of the laboratory, the date of the analysis, the name and signature of the person who performed the analyses, and the results of the analyses.

B-2-4

4. Emergency Inspection. These inspections are conducted as needed. This inspection is normally initiated by the occupant or building manager and completed by the maintenance activity.

B-3-1

APPENDIX 3 TO ANNEX B TO JBER AMOP

ASBESTOS SURVEY FORM

SURVEY DATE: __________

Facility/ Surveyor: _______________________________________________

Building Floor Room Sample Type Photo/Description

_____________ ________ _______ ________ A/B _____________________

_____________ ________ ________ ________ A/B _____________________

_____________ ________ ________ _________ A/B _____________________

Dimensions: Length________ Feet/Width________ Feet/Height_______ Feet_______

Ceiling Shape (Circle): Flat - Sloped - Folded Plate - Barrel - Other (Specify):___________.

Type of Ceiling (Circle): Concrete - 3 Coat Plastered System - Suspended Metal Lath - Concrete

Joists and Beams - Tile - Suspended Lay-In Panels - Metal Deck - Corrugated Steel - Steel Beam or Bar Joists - Plasterboard - Other (Specify) _____________Ventilation Ducts Present? Yes No

Type of Wall(s) (Circle): Smooth Concrete - Rough Concrete - Masonry - Plasterboard -

Wood - Other (Specify) ___________________________ Ventilation Ducts Present? Yes No

Type of Floors: Concrete - Tile - Wood - Carpet - Other (Specify): ______________________

_________________________________________________ Ventilation Ducts Present? Yes No

Type of Lighting: Surface Mounted - Suspended - Recessed - Other (Specify) _______________

Type of Heating System: Radiant - Forced Air - Unit Heaters - Other (Specify): ___________

Type of Ventilation System: (Specify Whether Ducted, etc.) _____________________________

Floor Drains/Water Source Present? Yes No

Electrical Power Source Available? Yes No

ACM Coated Areas (Circle): Ceiling/Walls/Structural Members/Above Susp. Ceiling/Pipe

Lagging/Other (Specify): _____________________________________________________.

Location: _________________________________________________________________.

Amount of Material Being Evaluated: ________Sq Ft _______ Ln Ft _______ Hard Fittings

Type of Covering (Circle): Air Cell - Surface - Hard White - Other (Specify):

B-3-2

Pipe Ins Surface Ins

Condition: Factor

I 0 2 5 0 2 5 Condition of Material

II 0 1 2 0 1 2 Water Damage

III 0 1 4 0 1 4 Exposed Surface Area

IV 0 1 4 0 1 4 Accessibility

V 0 1 2 0 1 2 Activity/Movement

VI 0 1 0 1 Direct Air Stream/Plenum

Sum_____________________________________________________________________Sum

VII 0 1 2 3 0 1 2 3 Friability

Product_________________________________________________________________Product

VIII 0 2 3 0 2 3 % Asbestos

Exposure#____________________________________________________________Exposure #

WHAT IS IN CEILING AREAS ABOVE THE ROOM BEING EVALUATED?

WHAT IS IN THE CRAWL SPACE/BASEMENT BENEATH ROOM BEING EVALUATED?

NOTE: Guide Sheet for Using Joint Base Elmendorf-Richardson Asbestos Survey Form 1

CONDITION FACTOR

FACTOR 1: CONDITION OF MATERIAL (fiber release)

0 NO DAMAGE (material intact)

2 MODERATE DAMAGE SMALL AREAS 10% OR LESS (material is breaking)

5 WIDESPREAD SEVER DAMAGE 10% OR MORE (material is damaged)

FACTOR 2: WATER DAMAGE (water stains)

0 NO WATER DAMAGE (no water stains)

1 MINOR WATER DAMAGE 10% OR LESS IN MATERIAL (minor water stains)

2 MODERATE TO MAJOR WATER DAMAGE (material dislodged by water)

FACTOR 3: EXPOSED SURFACE AREA (to people)

0 MATERIAL NOT EXPOSED (not visible without removal of panels)

1 10% OR LESS OF MATERIAL EXPOSED (a few panels removed)

4 10% OR MORE OF MATERIAL EXPOSED

FACTOR 4: ACCESSIBILITY (to building users or maintenance people)

0 NOT ACCESSIBLE (cannot contact the material)

1 RARELY ACCESSIBLE TO MATERIAL (contact by abnormal activity)

4 HIGHLY ACCESSIBLE TO MATERIAL (contacted frequently)

FACTOR 5: ACTIVITY AND MOVEMENT (of people and vibration of equip)

0 NONE OR LOW ACTIVITY (such as offices and libraries)

1 MODERATE ACTIVITY OF PEOPLE (such as corridors and classrooms)

B-3-3

2 HIGH ACTIVITY LEVEL OF PEOPLE (such as gyms, cafeterias, machine rooms)

FACTOR 6: AIR PLENUM OR DIRECT AIR STREAM

0 NO AIR PLENUM OR DIRECT AIR STREAM PRESENT

1 AIR PLENUM OR DIRECT AIR STREAM PRESENT (dust patterns)

FACTOR 7: FRIABILITY

0 NOT FRIABLE (hard and crusty)

1 LOW FRIABILITY (difficult yet possible to damage by…