This is an Environmental Pre-Construction Checklist issued by 673 CES/CEIE (Environmental Management) at Joint Base Elmendorf-Richardson (JBER). The checklist serves as a compliance verification tool that contractors must complete and have signed by both JBER Environmental Element and contractor representatives before commencing work.

The checklist contains 15 compliance items covering environmental, safety, and resource management requirements. Key requirements include: compliance with federal environmental laws (Clean Air Act, Clean Water Act, Resource Conservation and Recovery Act); spill reporting and cleanup procedures to JBER Fire Department and Environmental Management; hazardous materials submission and approval through the Installation HAZMAT Program Manager prior to bringing materials on base; hazardous waste management per 40 CFR Parts 260-273 with documentation provided to the Hazardous Waste Program Manager 10 days before shipment; recycling of 60% of construction and demolition debris; natural resources protection including 100-foot setbacks from anadromous streams and 660-foot buffers around active eagle nests; cultural resources compliance with National Historic Preservation Act Section 106; water quality requirements including Construction General Permits and Storm Water Pollution Prevention Plans for projects disturbing one or more acres; asbestos and lead-based paint inspections for renovation and demolition projects; fugitive dust control measures; ozone-depleting substance prohibitions; Environmental Protection Plan submission 10 days prior to project start; and approval for above-ground storage tanks. The document requires signatures from both JBER Environmental Element and contractor representatives to confirm understanding and compliance with all stated requirements.

View the file

Other files

File Type Posted
FA500026R0001_AMENDMENT_ 0002 _SF30 Signed.pdf PDF
Attachment 1_2026 JBER MACC SOW R1 Amendment 01.pdf PDF
Attachment 5_Self-Scored Worksheet R1 Amendment 01.xlsx XLSX spreadsheet
2026 MACC Pre-Proposal Sign-In Sheet.pdf PDF
Attachment 8_2026 JBER MACC Q and A.pdf PDF
JBER MACC Pre-Proposal Conference-20260331_163518UTC-Meeting Recording.mp4 MP4 file
FA500026R0001_AMENDMENT_0001_SF30 Signed.pdf PDF
Attachment 2_Relevant Experience Project Template R1 Amendment 01.docx DOCX document
Attachment 4_Technical Definitions R1 Amendment 0001.pdf PDF
SOW App 003 AF IMT 3065 Progress Report.pdf PDF
SOW App 006 Dig Permit Custom Map Elmendorf.pdf PDF
SOW App 007 Dig Permit Custom Map Richardson.pdf PDF
SOW App 014 JBER Environmental Protection and Solid Waste Management Specs 18FEB2026.pdf PDF
Attachment 3_Wage Determination_20260102.pdf PDF
Attachment 7_Price Proposal.xlsx XLSX spreadsheet
FA500026R0001_20260323.pdf PDF
SOW App 002 AF IMT 3064 Progress Schedule.pdf PDF
SOW App 005 DD Form 1354.pdf PDF
SOW App 009 JBER IFS Vol 1. Elmendorf.pdf PDF
SOW App 010 JBER IFS Vol 2. Richardson.pdf PDF
SOW App 011 JBER Asbestos Management and Operating Plan 23FEB2021.pdf PDF
SOW App 012 JBER CAD GIS RECORD DRAWING AS BUILT STANDARD 2024_FINAL.pdf PDF
SOW App 001 AF IMT 3000 Submittal.pdf PDF
SOW App 004 Contractors Fire Safety Guide Rev 14 September 2017.pdf PDF
SOW App 008 Dig Permit Fillable Template.pdf PDF
SOW App 015 JBER Hazardous Waste Management Plan 26MAR2025.pdf PDF
SOW App 016 JBER Integrated Hazardous Material Plan 31MAY2025.pdf PDF
SOW App 017 JBER Telecom Standards 20AUG2025.pdf PDF
Attachment 2_Relevant Experience Project Template.pdf.docx DOCX document
Attachment 6_NAF Standard Clauses.pdf PDF
Attachment 1_2026 JBER MACC SOW.pdf PDF
Attachment 4_Technical Definitions.pdf PDF
Attachment 5_Self-Scored Worksheet Final.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Environmental Pre-Con Checklist, 21 Jan 25 Version 1 of 4

673 CES/CEIE (Environmental Management) - Preconstruction Checklist Project Name: OPR: 673 CES/CEIE

Project Number: Date:

# ITEM Yes No N/A 1 GENERAL: Contractor shall comply with all applicable State and Federal environmental laws and regulations; including, but not limited to, the Clean Air Act, the Resource Conservation and Recovery Act, the Clean Water Act, and others. Contractor will obtain all appropriate State and Federal Permits necessary to perform the work on Joint Base Elmendorf-Richardson (JBER). Questions concerning compliance with environmental standards may be directed to Environmental Management at 673CES.CEIEC.EnvCom@us.af.mil

2 SPILL REPORTING & CLEAN UP: In the event of any type of hazardous substance spill or petroleum, oil, or lubricant (POL) spill contact JBER Fire Department at 9-1-1. All spills shall be reported, regardless of quantity or material, to JBER Fire Department via 911 and JBER.Spill.Report@us.af.mil. The contractor is responsible for clean-up of spills. The contractor may be charged for additional cleanup costs if spills are not cleaned up to the Government’s satisfaction. Please contact the JBER Spill Manager for spill reporting poster and requirements at 673CES.CEIEC.EnvCom@us.af.mil.

3 HAZARDOUS MATERIALS (HAZMAT): Contractor shall submit manufacturer-specific Safety Data Sheets (SDS) through the appropriate contracting channels to the Installation HAZMAT Program Manager Bldg. 724, benjamin.kopinski@us.af.mil, along with quantity and size, for approval prior to bringing hazardous materials onto base. Contractor shall maintain SDS for all materials for as long as the materials remain on-base. Contractor must handle and store hazardous materials IAW all local, state, and federal laws and IAW JBER’s current Integrated Hazardous Material Plan (IHMP). Store all bulk liquids in secondary containment.

All equipment (secondary containment, spill kits, fire extinguishers etc.) is the responsibility of the contractor.

4 HAZARDOUS WASTE: Without regard for the quantity of hazardous waste and/or universal waste being generated by contractor personnel, all hazardous waste and/or universal waste generated on Joint Base Elmendorf-Richardson (JBER) must be managed in accordance with the federal regulations applicable to large quantity generators of hazardous waste (40 CFR Part 262 – Standards Applicable to Generators of Hazardous Waste) and/or large quantity handlers of universal waste (40 CFR Part 273 Subpart C - Standards for Large Quantity Handlers of Universal Waste). Contractor shall arrange legal transportation and disposal of all hazardous waste and universal waste generated by contractor personnel in accordance with 40 CFR Part 260 et seq., unless directed otherwise. Only authorized Environmental Compliance personnel will sign Uniform Hazardous Waste Manifests and universal waste shipment records for waste generated on JBER. Copies of all waste determination documentation (i.e.

hazardous waste profile sheet, safety data sheet, laboratory analysis, etc.), Land Disposal Restriction notifications, and shipping documentation (i.e. Uniform Hazardous Waste Manifest, non-hazardous waste manifest, bill of lading, etc.) will be provided to the JBER Hazardous Waste Program Manager for review no later than (10) calendar days prior to a waste shipment via the following organizational E-mail address: 673CES.CEIEC.EnvCom@us.af.mil.

5 RECYCLING: The Contractor shall support JBER’s recycling policy in accordance with Executive Order 13101, whenever feasible. The Contractor is encouraged to segregate recyclable materials and transport them to an off-base recycling facility. Scrap metal must be recycled through a reputable off-base recycler. DoD requires 60% diversion rate for construction and demolition debris. The Contractor shall submit weight tickets to CO/COR monthly or at the end of the project, if lasting less than one month, for all materials recycled or reused.

Environmental Pre-Con Checklist, 21 Jan 25 Version 2 of 4

6 SOLID WASTE: Non-hazardous solid waste shall be disposed of in a permitted off-base landfill in accordance with all applicable local, state, and federal laws. All disposals shall be in accordance with the contractor's Waste Disposal and Recycling Plan which should be included in the Environmental Protection Plan (SEE ITEM 14).

7 NATURAL RESOURCES: The contractor shall not remove, cut, deface, injure, or destroy natural resources including trees, shrubs, or grasses, especially wetlands, without permission from Environmental Management, except as otherwise specified. Wildlife hazing is not allowed, contact Conservation Law Enforcement at 552-8609 or 552-9543 with any concerns.

• Contractor shall not disturb or drive through wetland areas, including riparian corridors.

or floodplains. Wetland impacts may only be executed as authorized.

• Harvest of timber may not be undertaken within 100 feet immediately adjacent to any stream or between 100 and 300 feet from any other waterbody. Necessary harvest of timber must be coordinated with the JBER Forester.

• The following setbacks are required: 100-ft setback from anadromous streams; 85-ft setback from headwaters and tributaries of anadromous streams; 65-ft setback from all other waters.

• Do not disturb eagles: Eagles are protected by the Bald and Golden Eagle Protection Act. Maintain disturbance buffers of 660 feet around active eagle nests. Do not disturb nesting birds – nesting birds are protected under the Migratory Bird Treaty Act.

Minimize vegetation clearing from May 1 –July 15.

• Contact Avian Program Manager for assistance with wildlife/bird conflict issues.

• Contact Bat Program Manager if little brown bats or bat roosts discovered.

• BMPs to prevent the introduction and/or spread of invasive species are required.

• Construction housekeeping BMPs should be used to prevent wildlife attractants.

8 CULTURAL RESOURCES: CULTURAL RESOURCES: All projects must comply with the National Historic Preservation Act.

• This project must either have a NHPA Section 106 consultation letter on file with Environmental Conservation or qualify for an exemption, defined in the JBER Operations and Management Programmatic Agreement.

• If unanticipated cultural resources (cans, bottles, arrowheads, pottery, military items, papers, wooden artifacts, building remains, animal/human bone, etc...) are encountered during ground disturbing activities, work must stop within 100 ft. of the find. Contact Environmental Conservation (384-3467) or Conservation Law Enforcement (552-8609) to review the discovery in accordance with 36 CFR 800.13.

Disturbing or collecting artifacts on federal land is a violation of the Archaeological Resources Protection Act (ARPA) and is punishable by fines and incarceration.

9 WATER QUALITY: A Construction General Permit (CGP) and Storm Water Pollution Prevention Plan (SWPPP) are required for all ground-disturbing activities (e.g., construction, demolition, and certain land clearing activities) that disturb 1 or more acres of land. Prior to submitting a Notice of Intent (NOI) to the AK Department of Environmental Conservation, the construction operator shall submit their SWPPP to the 673 CES/CEIEC Water Quality Program Manager for review. For ground-disturbing projects within JBER’s Urbanized Area that are less than 1 acre in size, the construction operator is responsible for developing and following an Erosion and Sediment Control Plan (ESCP). All ESCPs must be submitted to the 673 CES/CEIEC Water Quality Program Manager for review prior to commencing construction.

Projects within JBER’s Urbanized Area must also comply with Section 438 of the Energy Independence and Security Act (EISA), which states that federal development and redevelopment projects must reduce storm water runoff by implementing green infrastructure/low impact development practices (GI/LID).

To request a copy of JBER’s GI/LID Plan or an ESCP template, visit JBER’s Water Quality website or contact the 673 CES/CEIEC Water Quality Program Manager.

Environmental Pre-Con Checklist, 21 Jan 25 Version 3 of 4

10 ASBESTOS: An asbestos inspection is REQUIRED for all renovation and demolition projects

(40 CFR 61, Subpart M). Contractors shall brief all employees including subcontractors that JBER facilities contain asbestos containing materials (ACM) unless otherwise directed. A copy of the EPA Region 10 notification and waste shipment record must be provided to JBER Environmental Management. ACM shall be managed and disposed of IAW 40 CFR 61 Subpart M, 29 CFR 1910.1001, and 29 CFR 1926.1101, as applicable. ACM can also be encountered in the form of active or abandoned underground water or sewer lines. These lines mayor may not appear on the contractor’s dig permit. All ACM must be disposed of in an approved off-base landfill.

11 LEAD and LEAD BASED PAINTS: Contractor's shall brief all employees including subcontractors that JBER facilities contain lead and lead-based paint unless otherwise directed. If lead work or abatement is required, the contractor shall conform to 40 CFR 745, subpart L; OSHA 1910.1025 and 1926.62. When required, the contractor will file, with EPA Region 10 and JBER Environmental Management, the 5-day notification for lead work. The notification(s) will be sent to both offices simultaneously. Lead containing materials may be considered hazardous waste and will need to be tested to determine proper disposal method.

12 AIR QUALITY: The contractor must take measures to control fugitive emissions (dust particles, aerosols, and gaseous by-products) from construction and demolition activities, processing, and preparation of materials always. Methods for controlling fugitive dust emissions include reducing speed limits, applying water to areas where bare mineral soil is exposed, and using guards at the entrance of construction sites. Open burning without the consent of the COR, Fire & Emergency Services, and Air Quality Program Manager is strictly prohibited.

Replacement or installation of new emission sources must be coordinated through the Air Program Manager, 907-384-1361 or 673CES.CEIEC.EnvCom@us.af.mil prior to purchase of said equipment. Mobilization of rock crushers and/or incinerators must be coordinated with Air Quality Program Manager as well.

13 OZONE DEPLETING SUBSTANCES (ODS)/REFRIGERANTS: Class I ODSs are prohibited.

Also, federal Significant New Alternatives Program (SNAP) approved substitutes for Class II ODSs shall be used whenever feasible. For equipment to be disposed of or recycled, remove ODS in accordance with federal regulations and AFMAN32- 7089 before submitting equipment to an authorized recycler. Equipment containing refrigerants identified by DoD for retention in the strategic reserve must be turned in to DLA for recovery, not taken off base. For real property identified equipment (RPIE) where refrigerant is not purged due to reuse of the equipment, coordination with 773 CES/CEO (HVAC Shop) is required to properly track certified equipment. Complete a Service Order Form for equipment evacuated on base and submit to HVAC Shop. For refrigerant containing equipment that is not designated as real property or RPIE, unit is responsible for having the equipment serviced and/or purged of refrigerant prior to disposal. For RPIE and fire suppression systems, coordinate with Alarms Shop. Contact Fire & Emergency Services for a list of local vendors that can service and purge non-RPIE fire extinguishers and suppression systems, including those containing ODS.

14 ENVIRONMENTAL PROTECTION PLAN (EPP): Has an EPP been submitted and approved for project IAW and as required by contract? Refer to the JBER Environmental Specifications for EPP requirements. EPP is due 10 days prior to the start of the project.

15 ABOVE-GROUND STORAGE TANKS (AST): If above-ground storage tanks (ASTs) of Petroleum, Oils & Lubricants (POLs) will be utilized during the performance of this contract, the contractor is required to obtain prior approval from 673 CES/CEIEC and 673 LRS/LGRF Fuels Management. Underground Storage Tanks (USTs) shall not be installed on JBER.

mailto:673CES.CEIEC.EnvCom@us.af.mil

Environmental Pre-Con Checklist, 21 Jan 25 Version 4 of 4

SIGNATURES

JBER ENVIRONMENTAL ELEMENT SIGNATURE: DATE:

CONTRACTOR’S SIGNATURE: DATE:

Text1:
Text2:
Text3:
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off
Check Box37: Off
Check Box38: Off
Check Box39: Off
Check Box40: Off
Check Box41: Off
Check Box42: Off
Check Box43: Off
Check Box44: Off
Check Box45: Off
Check Box46: Off
Check Box47: Off
Check Box48: Off
Check Box49: Off
Check Box52: Off
Check Box53: Off
Check Box54: Off
Check Box55: Off
Check Box56: Off

File details come from the government source that posted it. Updated .