SOW App 009 JBER IFS Vol 1. Elmendorf.pdf

PDF 42 MB Posted

Attached to
Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
Solicitation number
FA500026R0001
Issued by

About this file

This is an Installation Facilities Standards (IFS) document for Joint Base Elmendorf-Richardson (JBER) Volume 1, establishing comprehensive design and construction standards for the Elmendorf installation. Published January 31, 2019, this document serves as a component plan of the base's Installation Development Plan and applies Air Force Corporate Facilities Standards (AFCFS) across four major categories: Installation Elements, Site Development, Facilities Exteriors, and Facilities Interiors. The IFS applies mandatory compliance requirements per Air Force Instruction (AFI) 32-1023 for all military construction projects and Non-Appropriated Funds (NAF) facilities, covering detailed specifications for street hierarchies (arterial, collector, and local streets with defined dimensions and design standards), intersection design, open space management, and utility infrastructure placement. Standards address climate-specific considerations for Alaska operations, including snow removal integration, permafrost protection, and landscape design using native species and xeriscape principles to minimize water requirements.

The document establishes facility quality standards organized by group numbers (Groups 1-4) with corresponding visual quality requirements, requiring higher-quality materials and finishes for Group 1 facilities along primary routes and reduced maintenance-intensive materials for Group 3-4 industrial areas. Standards specify detailed requirements for site furnishings, exterior and interior signs, lighting systems, parking configurations, stormwater management, sidewalks and bikeways, landscape elements including plant material selection, and building envelope systems. Architectural standards mandate south-to-southeast building orientation for optimal solar gain and passive systems integration, with prescribed materials for walls (flat metal panels, brick veneer, precast concrete, stucco), roof systems (standing seam metal, membrane single-ply, concrete tile), doors and windows, structural systems, and mechanical/electrical/plumbing integration. The base maintained detailed standards for six facility districts with specific architectural character requirements, sustainable design principles emphasizing reduced energy and water consumption, and comprehensive maintenance considerations throughout the 148-page document structured as an editable PDF living document managed by the Base Civil Engineer.

View the file

Other files

File Type Posted
FA500026R0001_AMENDMENT_ 0002 _SF30 Signed.pdf PDF
FA500026R0001_AMENDMENT_0001_SF30 Signed.pdf PDF
Attachment 2_Relevant Experience Project Template R1 Amendment 01.docx DOCX document
Attachment 4_Technical Definitions R1 Amendment 0001.pdf PDF
Attachment 8_2026 JBER MACC Q and A.pdf PDF
JBER MACC Pre-Proposal Conference-20260331_163518UTC-Meeting Recording.mp4 MP4 file
Attachment 1_2026 JBER MACC SOW R1 Amendment 01.pdf PDF
Attachment 5_Self-Scored Worksheet R1 Amendment 01.xlsx XLSX spreadsheet
2026 MACC Pre-Proposal Sign-In Sheet.pdf PDF
SOW App 001 AF IMT 3000 Submittal.pdf PDF
SOW App 004 Contractors Fire Safety Guide Rev 14 September 2017.pdf PDF
SOW App 008 Dig Permit Fillable Template.pdf PDF
SOW App 013 Environmental Precon Checklist 21JAN2025.pdf PDF
SOW App 015 JBER Hazardous Waste Management Plan 26MAR2025.pdf PDF
SOW App 016 JBER Integrated Hazardous Material Plan 31MAY2025.pdf PDF
SOW App 017 JBER Telecom Standards 20AUG2025.pdf PDF
Attachment 2_Relevant Experience Project Template.pdf.docx DOCX document
Attachment 6_NAF Standard Clauses.pdf PDF
Attachment 1_2026 JBER MACC SOW.pdf PDF
Attachment 4_Technical Definitions.pdf PDF
Attachment 5_Self-Scored Worksheet Final.xlsx XLSX spreadsheet
FA500026R0001_20260323.pdf PDF
SOW App 002 AF IMT 3064 Progress Schedule.pdf PDF
SOW App 005 DD Form 1354.pdf PDF
SOW App 010 JBER IFS Vol 2. Richardson.pdf PDF
SOW App 011 JBER Asbestos Management and Operating Plan 23FEB2021.pdf PDF
SOW App 012 JBER CAD GIS RECORD DRAWING AS BUILT STANDARD 2024_FINAL.pdf PDF
SOW App 003 AF IMT 3065 Progress Report.pdf PDF
SOW App 006 Dig Permit Custom Map Elmendorf.pdf PDF
SOW App 007 Dig Permit Custom Map Richardson.pdf PDF
SOW App 014 JBER Environmental Protection and Solid Waste Management Specs 18FEB2026.pdf PDF
Attachment 3_Wage Determination_20260102.pdf PDF
Attachment 7_Price Proposal.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .