Attachment 2_Relevant Experience Project Template.pdf.docx
DOCX document 223 KB Posted
- Solicitation number
- FA500026R0001
About this file
This is a Relevant Experience Project (REP) template for the 2026 JBER Multiple Award Construction Contract (MACC) solicitation. Offerors may submit up to 24 projects across 10 defined categories to demonstrate prior relevant experience as a prime contractor. Each project submission consists of a three-page maximum response, including one page for a project summary table and two pages maximum for narrative explanation with required cross-references to supporting Statement of Work (SOW) documentation provided in Appendix 1. The template does not impose page limits on Appendix 1 SOWs.
The 10 project categories address: (1) IECC-compliant building design, construction, and renovation; (2) electrical distribution, generation, and transmission lines (12.5kV to 34.5kV); (3) HAZMAT abatement including asbestos, hazardous materials, PCB, and lead-based paint; (4) ballistic windows, active vehicle barriers, traffic control houses, and control points for federal facilities; (5) general facility renovation including dorm renovation and fire/seismic upgrades; (6) fire suppression, fire alarm, and mass notification systems; (7) utility systems for electrical, sewer, and water; (8) HVAC systems including CRAC units; (9) controlled space construction per Intelligence Community Standard ICD 705; and (10) special interest projects including environmental, water quality, historical, air quality, and site restoration work. For each project, offerors must identify the location category (continental U.S., Alaska non-military, or Alaska military/north of 60th parallel), complexity level (three, five, or seven or more tasks), and design-build status. Narratives must explicitly cross-reference SOW documentation with specific page numbers and section headings to substantiate all claims, as the government will not consider SOW information that lacks direct narrative cross-references.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 02
RELEVANT EXPERIENCE PROJECT (REP) TEMPLATE
INSTRUCTIONS:
1. This template is to be used for each specific Relevant Experience Project (REP) submitted.
2. The Offeror may submit up to 24 projects. If providing less than the maximum, the contractor may delete unused REP templates.
3. The total page count for each REP is three (3) pages, with one (1) page for the Project Summary Table (provided below), and two (2) pages maximum for the narrative. Any narrative text beyond two (2) pages will not be considered. The maximum total page count for REPs is 72 pages for 24 maximum projects.
4. Appendix 1, Project Specific Statements of Work (SOW) shall contain only SOWs of the submitted REPs. Appendix 1 has no page limit restrictions.
5. Use the narrative block to explain the rationale supporting your claim that the project meets the ATT 04_Volume II_Technical Definitions for the selected category (Section I) and tasks (Section II). Your narrative should include the identification/explanation of the excerpts of documentation that substantiate the self-scored claims. The Offeror shall provide excerpts in the narrative of Contract, Task Order, and/or Award documentation that substantiates the ratings in ATT 05_Volume II_HTRO Self-Scoring Worksheet.
6. The Offeror shall include identification of Appendix 1, SOW references/titles, page number section/paragraph headings in the narrative for cross-referencing purposes. The SOW will only be reviewed for validation purposes if the Offeror cross-references the SOW verbiage, the Government may not review nor consider SOW information that is not in the narrative and directly cross-referenced with the SOW references/titles, page number section/paragraph headings. The cross-referenced text should directly support the narrative assertation, general references to the entirety of the SOW may not be reviewed. If a SOW is attached within Appendix 1 but is not cross-referenced, it may not be considered as substantiating documentation.
7. Do not resubmit this instruction page with Volume II.
CATEGORY 1, PROJECT # 1
Designing, constructing, and/or renovating buildings using regulations given in the International Energy Conservation Code (IECC).
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 1, PROJECT #1: PROJECT NARRATIVE
Designing, constructing, and/or renovating buildings using regulations given in the International Energy Conservations Code (IECC) [Enter narrative here with Appendix 1, Statement of Work cross-references as applicable, maximum of 2 pages] Click or tap here to enter text.
CATEGORY 1, PROJECT # 2
Designing, constructing, and/or renovating buildings using regulations given in the International Energy Conservation Code (IECC).
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 1, PROJECT #2: PROJECT NARRATIVE
Designing, constructing, and/or renovating buildings using regulations given in the International Energy Conservations Code (IECC) [Enter narrative here with Appendix 1, Statement of Work cross-references as applicable, maximum of 2 pages]
CATEGORY 1, PROJECT # 3
Designing, constructing, and/or renovating buildings using regulations given in the International Energy Conservation Code (IECC).
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 1, PROJECT #3: PROJECT NARRATIVE
Designing, constructing, and/or renovating buildings using regulations given in the International Energy Conservations Code (IECC) [Enter narrative here with Appendix 1, Statement of Work cross-references as applicable, maximum of 2 pages]
ATEGORY 2, PROJECT # 1
Electrical Distribution, Generation, and/or Transmission Lines (e.g. electrical lines from 12.5kV to 34.5kV)
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 2, PROJECT #1: PROJECT NARRATIVE
Electrical Distribution, Generation, and/or Transmission Lines (e.g. electrical lines from 12.5kV to 34.5kV)
CATEGORY 2, PROJECT # 2
Electrical Distribution, Generation, and/or Transmission Lines (e.g. electrical lines from 12.5kV to 34.5 kV )
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 2, PROJECT #2: PROJECT NARRATIVE
Electrical Distribution, Generation, and/or Transmission Lines (e.g. electrical lines from 12.5kV to 34.5 kV) [Enter narrative here with Appendix 1, Statement of Work cross-references as applicable, maximum of 2 pages]
CATEGORY 3, PROJECT # 1
HAZMAT Asbestos Abatement, Hazardous Material, PCB and/or Lead-Based Paint Abatement, Contaminated Soil (Incidental is Allowed)
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 3, PROJECT #1: PROJECT NARRATIVE
HAZMAT Asbestos Abatement, Hazardous Material, PCB and/or Lead-Based Paint Abatement, Contaminated Soil (Incidental is Allowed) [Enter narrative here with Appendix 1, Statement of Work cross-references as applicable, maximum of 2 pages]
CATEGORY 3, PROJECT # 2
HAZMAT Asbestos Abatement, Hazardous Material, PCB and/or Lead-Based Paint Abatement, Contaminated Soil (Incidental is Allowed)
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 3, PROJECT #2: PROJECT NARRATIVE
HAZMAT Asbestos Abatement, Hazardous Material, PCB and/or Lead-Based Paint Abatement, Contaminated Soil (Incidental is Allowed) [Enter narrative here with Appendix 1, Statement of Work cross-references as applicable, maximum of 2 pages]
CATEGORY 3, PROJECT # 3
HAZMAT Asbestos Abatement, Hazardous Material, PCB and/or Lead-Based Paint Abatement, Contaminated Soil (Incidental is Allowed)
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 3, PROJECT #3: PROJECT NARRATIVE
HAZMAT Asbestos Abatement, Hazardous Material, PCB and/or Lead-Based Paint Abatement, Contaminated Soil (Incidental is Allowed) [Enter narrative here with Appendix 1, Statement of Work cross-references as applicable, maximum of 2 pages]
CATEGORY 4, PROJECT # 1
Ballistic Windows, Active Vehicle Barriers, Traffic Check Houses, and/or Control Points (for Federal Facilities)
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 4, PROJECT #1: PROJECT NARRATIVE
Ballistic Windows, Active Vehicle Barriers, Traffic Check Houses, and/or Control Points (for Federal Facilities) [Enter narrative here with Appendix 1, Statement of Work cross-references as applicable, maximum of 2 pages] Click or tap here to enter text.
CATEGORY 4, PROJECT # 2
Ballistic Windows, Active Vehicle Barriers, Traffic Check Houses, and/or Control Points (for Federal Facilities)
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 4, PROJECT #2: PROJECT NARRATIVE
Ballistic Windows, Active Vehicle Barriers, Traffic Check Houses, and/or Control Points (for Federal Facilities) [Enter narrative here with Appendix 1, Statement of Work cross-references as applicable, maximum of 2 pages]
CATEGORY 5, PROJECT # 1
General Facility Renovation (e.g. dorm renovation, Lightning Protection Systems, changing room purpose, alterations to a facility which require fire suppression and/or seismic upgrades)
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 5, PROJECT #1: PROJECT NARRATIVE
General Facility Renovation (e.g. dorm renovation, Lightning Protection Systems, changing room purpose, alterations to a facility which require fire suppression and/or seismic upgrades) [Enter narrative here with Appendix 1, Statement of Work cross-references as applicable, maximum of 2 pages]
CATEGORY 5, PROJECT # 2
General Facility Renovation (e.g. dorm renovation, Lightning Protection Systems, changing room purpose, alterations to a facility which require fire suppression and/or seismic upgrades)
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 5, PROJECT #2: PROJECT NARRATIVE
General Facility Renovation (e.g. dorm renovation, Lightning Protection Systems, changing room purpose, alterations to a facility which require fire suppression and/or seismic upgrades) [Enter narrative here with Appendix 1, Statement of Work cross-references as applicable, maximum of 2 pages]
CATEGORY 5, PROJECT # 3
General Facility Renovation (e.g. dorm renovation, Lightning Protection Systems, changing room purpose, alterations to a facility which require fire suppression and/or seismic upgrades)
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 5, PROJECT #3: PROJECT NARRATIVE
General Facility Renovation (e.g. dorm renovation, Lightning Protection Systems, changing room purpose, alterations to a facility which require fire suppression and/or seismic upgrades) [Enter narrative here with Appendix 1, Statement of Work cross-references as applicable, maximum of 2 pages]
CATEGORY 6, PROJECT # 1
Fire Suppression, Fire Alarm and/or Mass Notification Systems Repair, Replacement, Upgrade, or Installation
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 6, PROJECT #1: PROJECT NARRATIVE
Fire Suppression, Fire Alarm and/or Mass Notification Systems Repair, Replacement, Upgrade, or Installation [Enter narrative here with Appendix 1, Statement of Work cross-references as applicable, maximum of 2 pages]
CATEGORY 6, PROJECT # 2
Fire Suppression, Fire Alarm and/or Mass Notification Systems Repair, Replacement, Upgrade, or Installation
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 6, PROJECT #2: PROJECT NARRATIVE
Fire Suppression, Fire Alarm and/or Mass Notification Systems Repair, Replacement, Upgrade, or Installation [Enter narrative here with Appendix 1, Statement of Work cross-references as applicable, maximum of 2 pages]
CATEGORY 7, PROJECT # 1
Utility System (Electrical, Sewer, Water) Repair, Replacement, Upgrade, or Installation minor electrical, comm
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 7, PROJECT #1: PROJECT NARRATIVE
Utility System (Electrical, Sewer, Water) Repair, Replacement, Upgrade, or Installation minor electrical, comm [Enter narrative here with Appendix 1, Statement of Work cross-references as applicable, maximum of 2 pages]
CATEGORY 7, PROJECT # 2
Utility System (Electrical, Sewer, Water) Repair, Replacement, Upgrade, or Installation minor electrical, comm
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 7, PROJECT #2: PROJECT NARRATIVE
Utility System (Electrical, Sewer, Water) Repair, Replacement, Upgrade, or Installation minor electrical, comm [Enter narrative here with Appendix 1, Statement of Work cross-references as applicable, maximum of 2 pages]
CATEGORY 7, PROJECT # 3
Utility System (Electrical, Sewer, Water) Repair, Replacement, Upgrade, or Installation minor electrical, comm
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| SECTION IV: EXPERIENCE AS DESIGN-BUILD PRIME CONTRACTOR (DESIGNED PROJECT IN HOUSE OR HIRED A SUBCONTRACTOR TO DESIGN). |
| Design Build Project (check one): |
| ☐ Yes |
| ☐ No |
CATEGORY 7, PROJECT #3: PROJECT NARRATIVE
Utility System (Electrical, Sewer, Water) Repair, Replacement, Upgrade, or Installation minor electrical, comm [Enter narrative here with Appendix 1, Statement of Work cross-references as applicable, maximum of 2 pages]
CATEGORY 8, PROJECT # 1
Heating, Ventilation, and Air Conditioning (HVAC) System, including Computer Room Air Conditioning (CRAC) Units; Repair, Replacement, Upgrade, or Installation
PROJECT SUMMARY TABLE
| PRIME CONTRACTOR NAME: |
| Click Here and Enter Prime Contractor’s Name |
Click or tap here to enter text.
| CONTRACT NUMBER: |
| Click Here Enter Contract Number |
Click or tap here to enter text.
| ORDER NUMBER: |
| Click Here and Enter Order Number (if applicable) |
Click or tap here to enter text.
| PROJECT TITLE: |
| Click Here and Enter Project Title |
Click or tap here to enter text.
| PROJECT LOCATION: |
| Click Here to Enter the Project City/Military Installation & State |
Click or tap here to enter text.
| CUSTOMER: |
| Click Here and Enter Project Customer Agency/Base/Company Name |
Click or tap here to enter text.
| CUSTOMER POINT OF CONTACT: |
| Click Here and Enter Project Customer Point of Contact |
Click or tap here to enter text.
| CUSTOMER PHONE: |
| Click Here and Enter Project Customer Phone |
Click or tap here to enter text.
| CUSTOMER EMAIL ADDRESS: |
| Click Here and Enter Project Customer Email |
Click or tap here to enter text.
| TOTAL PERIOD OF PERFORMANCE (WITH OPTIONS): |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TO |
| Click Here and Enter a Date |
Click or tap to enter a date.
| TOTAL PROJECT VALUE: |
| Click Here and Enter Total Project Value |
Click or tap here to enter text.
| APPENDIX 1, SOW: PAGE NUMBERS |
| Click Here and Enter the Page Numbers for the SOW (Start– End) |
Click or tap here to enter text.
SECTION II: NUMBER OF PROJECTS AS A PRIME CONTRACTOR
Select ONLY ONE
| ☐ Projects on a Military Base/Federal Government Facility in the United States (excluding Alaska) |
| ☐ Projects in Alaska but not on a Military Base/Federal Government Facility. |
☐ Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel
SECTION III: EXPERIENCE IN COMPLEX PROJECTS AS PRIME CONTRACTOR
| ☒ Three (3) Tasks |
| ☐ Five (5) Tasks |
| ☐ Seven (7) or More Tasks |
Select Tasks from the Drop-Down Selections that Apply to this Project (refer to Attachment 2, Technical Definitions, Section II)
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
| Choose an item. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .