Attachment 5_Self-Scored Worksheet R1 Amendment 01.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
Solicitation number
FA500026R0001
Issued by

About this file

This is a self-scoring worksheet template for offerors responding to the 2026 JBER MACC solicitation. The worksheet is a blank template designed for contractors to complete and submit as part of their proposal. The template requires offerors to enter their company name and includes fields for listing the number of projects, bonding capacity (with "YES" as a response option), and bonding amount, with a baseline example showing $60M in bonding capacity.

The worksheet is associated with Amendment 001 to solicitation FA500026R0001, issued April 13, 2026, which extended the proposal due date to April 24, 2026 at 1:00 P.M. AKDT. This competitive 8(a) set-aside solicitation seeks a Multiple Award Construction Contract (MACC) for the Department of the Air Force Pacific Air Forces to perform construction, facility repair/alteration, and real property repair/alteration projects at Joint Base Elmendorf-Richardson, Alaska. The contract involves multiple general construction disciplines for on-base facilities. The NAICS code is 236220 with a $45M size standard. Offerors must complete this self-scoring worksheet as part of their evaluation package per the RFO and R-DFARS procedures outlined in the solicitation.

View the file

Other files

File Type Posted
FA500026R0001_AMENDMENT_ 0002 _SF30 Signed.pdf PDF
Attachment 1_2026 JBER MACC SOW R1 Amendment 01.pdf PDF
2026 MACC Pre-Proposal Sign-In Sheet.pdf PDF
Attachment 4_Technical Definitions R1 Amendment 0001.pdf PDF
Attachment 8_2026 JBER MACC Q and A.pdf PDF
JBER MACC Pre-Proposal Conference-20260331_163518UTC-Meeting Recording.mp4 MP4 file
FA500026R0001_AMENDMENT_0001_SF30 Signed.pdf PDF
Attachment 2_Relevant Experience Project Template R1 Amendment 01.docx DOCX document
SOW App 003 AF IMT 3065 Progress Report.pdf PDF
SOW App 006 Dig Permit Custom Map Elmendorf.pdf PDF
SOW App 007 Dig Permit Custom Map Richardson.pdf PDF
SOW App 014 JBER Environmental Protection and Solid Waste Management Specs 18FEB2026.pdf PDF
Attachment 3_Wage Determination_20260102.pdf PDF
Attachment 7_Price Proposal.xlsx XLSX spreadsheet
Attachment 1_2026 JBER MACC SOW.pdf PDF
Attachment 4_Technical Definitions.pdf PDF
Attachment 5_Self-Scored Worksheet Final.xlsx XLSX spreadsheet
FA500026R0001_20260323.pdf PDF
SOW App 002 AF IMT 3064 Progress Schedule.pdf PDF
SOW App 005 DD Form 1354.pdf PDF
SOW App 009 JBER IFS Vol 1. Elmendorf.pdf PDF
SOW App 010 JBER IFS Vol 2. Richardson.pdf PDF
SOW App 011 JBER Asbestos Management and Operating Plan 23FEB2021.pdf PDF
SOW App 012 JBER CAD GIS RECORD DRAWING AS BUILT STANDARD 2024_FINAL.pdf PDF
SOW App 001 AF IMT 3000 Submittal.pdf PDF
SOW App 004 Contractors Fire Safety Guide Rev 14 September 2017.pdf PDF
SOW App 008 Dig Permit Fillable Template.pdf PDF
SOW App 013 Environmental Precon Checklist 21JAN2025.pdf PDF
SOW App 015 JBER Hazardous Waste Management Plan 26MAR2025.pdf PDF
SOW App 016 JBER Integrated Hazardous Material Plan 31MAY2025.pdf PDF
SOW App 017 JBER Telecom Standards 20AUG2025.pdf PDF
Attachment 2_Relevant Experience Project Template.pdf.docx DOCX document
Attachment 6_NAF Standard Clauses.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SELF-SCORING WORKSHEET - REVISION 1 (changes in red text)ListsNumber ProjectsBonding
OFFEROR NAME: [FILL IN OFFEROR NAME HERE]YES0$60M - <$75M
Note: See Solicitation FA500026R0001 Sections L and M for Additional InformationNO1$75M - <$90M
Note: Offerors only fill in the orange shaded blocks throughout. Offerors shall not alter any other rows, columns, or forumlas within the Self-Scoring Worksheet.2Over $90M
3
Solicitation ReferenceCategoryPoint ValueSelect the appropriate response for each question as applicableOfferor's Self-ScoreValidated Score (Government Use Only)4
Section L, Paragraph L-2 Subparagraph 1.8.1.4.1I. Relevant Experience Projects as Prime Contractor (24 projects maximum): Project is defined in Attachment 4 Volume II, Technical Definitions (Max Allowable Score 24,000 points):5
1. Designing, constructing, and/or renovating buildings using regulations given in the International Energy Conservation Code (IECC).6
Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]100007
Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]100008
Project 3: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]100009
2. Electrical Distribution, Generation, and/or Transmission Lines (e.g. electrical lines from 12 12.5kV to 35 34.5kV)10
Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]1000011
Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]1000012
3. HAZMAT Asbestos Abatement, Hazardous Material, PCB and/or Lead-Based Paint Abatement, Contaminated Soil (Incidental is Allowed)13
Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]1000014
Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]1000015
Project 3: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]1000016
4.Ballistic windows, Active Vehicle Barriers, Traffic Check Houses, and/or Control Points (for Federal Facilities)17
Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]1000018
Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]1000019
5. General Facility Renovation (e.g. dorm renovation, Lightning Protection Systems, changing room purpose, alterations to a facility which require fire suppression and/or seismic upgrades)20
Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]1000021
Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]1000022
Project 3: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]1000023
6. Fire Suppresion, Fire Alarm and/or Mass Notification Systems Repair, Replacement, Upgrade, or Installation24
Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]10000
Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]10000
7. Utility System (Electrical, Sewer, Water) Repair, Replacement, Upgrade, or Installation minor electrical, comm
Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]10000
Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]10000
Project 3: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]10000
8. Heating, Ventilation, and Air Conditioning (HVAC) System, including Computer Room Air Conditioning (CRAC) Units; Repair, Replacement, Upgrade, or Installation
Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]10000
Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]10000
9. Controlled Space Construction in accordance with Intelligence Community Standard (ICD) 705 Specifications
Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]10000
Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]10000
10. Special Interest Project (Environmental, Water Quality, Historical, Air Quality, Site Restoration, Cultural, etc.) (Incidental is allowed)
Project 1: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]10000
Project 2: [Fill in Contract Number (including Task Order Number if applicable) and Page Number in Volume]10000
SUBTOTAL SCORE:00
Section L, Paragraph L-2 Subparagraph 1.8.1.4.2II. Number of Projects as Prime Contractor (Max Allowable Score 12,000 points):
Projects on a Military Base/Federal Government Facility in the United States south of the 60th parallel (excluding Alaska)1000
Projects in Alaska and north of above the 60th parallel, but not on a Military Base/Federal Government Facility3000
Projects on a Military Base/Federal Government Facility in Alaska and north of the 60th Parallel5000
SUBTOTAL SCORE:00
Section L, Paragraph L-2 Subparagraph 1.8.1.4.3III. Experience in Complex Projects as Prime Contractor (Max Allowable Score 9,600 points):
With 3 tasks1000
With 5 tasks2000
With 7 or more tasks4000
SUBTOTAL SCORE:00
Section L, Paragraph L-2 Subparagraph 1.8.1.4.4IV. Experience as Design-Build Prime Contractor, designed project in house or hired a subcontractor to design (Max Allowable Score 12,000 points):
Prime contractor on a design-build project. (Prime responsible for both the design and construction of the project)5000
SUBTOTAL SCORE:00

TOTAL POINTS SCORED: 0

File details come from the government source that posted it. Updated .