About this file

This solicitation requests proposals for the construction of new aboveground storage tanks and associated infrastructure at the Manchester Fuel Depot in Manchester, Washington. The Navy seeks the design and construction of new multi-product storage tanks within secondary containment that will be connected to JP-5 and F-76 fuel systems. The work includes site preparation, installation of tanks and secondary containment, roadwork, and ensuring compliance with standards for aboveground storage facilities. Proposals are due by December 15, 2020. Award will be made to the responsible offeror submitting the lowest priced technically acceptable proposal evaluated using a lowest price technically acceptable source selection process. The work must be completed within 971 calendar days of award. Options to provide additional CCTV and automatic tank gauging systems may also be awarded.

View the file

Other files

File Type Posted
Amendment 0013.pdf PDF
Amendment 0012.pdf PDF
Amendment 0012.pdf PDF
Amendment 0011.pdf PDF
Amendment 0010.pdf PDF
PPI Responses 10.pdf PDF
Revised Wage Determination.pdf PDF
Amendment 0009.pdf PDF
PPI Responses 9.pdf PDF
Amendment 0009.pdf PDF
Amendment 0008.pdf PDF
PPI Responses 7.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
Amendment 0007.pdf PDF
Attachment Contractor Environmental and Safety Guide January 2020.pdf PDF
PPI Responses 6.pdf PDF
Attachment Chemical Analytical Data Report.pdf PDF
Attachment Merchantable Timber Requirements.pdf PDF
Attachment MFD Contractor Dig Permit.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
PPI Responses 5.pdf PDF
Picture 2 Pole 13 Photo.pdf PDF
Picture 1 Junction Box Photo.pdf PDF
Attachment N SECNAV 5512 Form.pdf PDF
Amendment 0004.pdf PDF
PPI Responses 0004.pdf PDF
Attachment J Base Access Request Form 2.xls XLS spreadsheet
PPI Responses.pdf PDF
Amendment 0003.pdf PDF
Site Visit Sign In Sheet.pdf PDF
Amendment 0002.pdf PDF
Attachment 0001 SECNAV 5512 Form.pdf PDF
Amendment 0001.pdf PDF
Attachment M COVID-19 Screening Questionnaire.pdf PDF
Attachment H Construction Wage Determination.pdf PDF
Attachment K Small Business Subcontracting Record.docx DOCX document
Attachments A-B-C-D-E-F-G-H-I.docx DOCX document
Attachment J Base Access Request Form.xls XLS spreadsheet
Attachment I EXAMPLE Overhead Forms.xlsx XLSX spreadsheet
Attachment L Small Business Participation and Commitment Strategy.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MCON P856 MANCHESTER TANK FARM IMPROVEMENTS, MANCHESTER FUEL DEPOT, FLEET LOGISTICS CENTER PUGET SOUND (FLCPS), MANCHESTER, WA

NAICS 237120 / Associated Small Business Size Standard $39.5M

Magntude of Construction: Betw een $25M and $100M

This procurement is an unrestricted full and open competition. In accordance w ith FAR Part 19.703 Large Businesses must submit an acceptable subcontracting plan.

A pre-proposal conference and site visit w ill be held, see Section 00100.

RONALD P. SMITH 360-396-1857

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

30-Oct-2020

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________971 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________15 Dec 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All of fers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVFAC NORTHWEST

1101 TAUTOG CIRCLE

SILVERDALE WA 98315-1101

N44255

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

N4425521R2000 72

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specified below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

N4425521R2000

Section 00010 - Solicitation Contract Form

SCHEDULE OF PRICES

N44255-21-R-2000

SCHEDULE OF PRICES

Page 3 of SF 1442

CLIN DESCRIPTION

0001 Base – Construction

Firm-Fixed-Price for all labor, material, equipment, and associated costs in accordance with the RFP documents for Defense Energy Support Center (DESC), Manchester Tank Farm Improvements, including any associated costs in accordance with the RFP documents.

0001AA Sub-Line Item

Firm-Fixed-Price for all labor, material, equipment, and associated costs in accordance with the RFP documents for the Manchester Tank Farm Improvements, but not including work specified in any other CLIN.

0001AB Sub-Line Item

Firm-Fixed-Price for all labor, material, equipment, and associated costs in accordance with the RFP for steel tanks 801 and 802, but not including work specified in any other CLIN.

0001AC Sub-Line Item

Firm-Fixed-Price for all labor, material, equipment, and associated costs in accordance with the RFP documents for the construction of concrete foundations, impervious liner, sand fill, cathodic protection, leak detection under steel tanks 801 and 802, but not including work specified in any other CLIN.

The Government reserves the right to verify the total price calculation in the Schedule of Prices. In the event an error is found in the contractor’s calculation, the Government will use the amounts entered on the CLINs to determine Total Price.

0001AD Sub-Line Item

Firm-Fixed-Price for all labor, material, equipment, and associated costs in accordance with the RFP documents including but not limited to barge(s), and associated costs to furnish clean water for hydrostatic pressure test for steel tanks 801 and 802., but not including work specified in any other CLIN.

OPTION CLINS 0002 and 0003: The Government has the unilateral right to exercise the below Option CLINs within 365 days from contract award in accordance with 52.217-7 OPTION FOR INCREASED QUANTITY – SEPARATELY PRICED LINE ITEM (MAR 1989), see Section 00700, Contract Clauses.

Options may be awarded at the same time, separately or not at all.

0002 Option Item A – CCTV System

Firm-Fixed-Price for all labor, material, equipment, program, and associated costs in accordance with the RFP for CCTV System (cameras, monitor, recorder, programming, and accessories), but not including work specified in any other CLIN.

0003 Option Item B – Automatic Tank Gauging (ATG)

Firm-Fixed-Price for all labor, material, equipment, program, and associated costs in accordance with the RFP for the Automatic Tank Gauging (ATG) system, but not including work identified on any other CLIN.

Total Price CLINs 0001 through 0003

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Base Bid

FFP

Firm-Fixed-Price for all labor, material, equipment, and associated costs in accordance with the RFP documents for Defense Energy Support Center (DESC), Manchester Tank Farm Improvements, including any associated costs in accordance with the RFP documents.

NET AMT

0001AA 1 Each Sub CLIN

FFP

Firm-Fixed-Price for all labor, material, equipment, and associated costs in accordance with the RFP documents for the Manchester Tank Farm Improvements, but not including work specified in any other CLIN.

FOB: Destination

0001AB 1 Each Sub CLIN

FFP

Firm-Fixed-Price for all labor, material, equipment, and associated costs in accordance with the RFP for steel tanks 801 and 802, but not including work specified in any other CLIN.

0001AC

Sub CLIN

FFP

Firm-Fixed-Price for all labor, material, equipment, and associated costs in accordance with the RFP documents for the construction of concrete foundations, impervious liner, sand fill, cathodic protection, leak detection under steel tanks 801 and 802, but not including work specified in any other CLIN.

0001AD 1 Each Sub CLIN

FFP

Firm-Fixed-Price for all labor, material, equipment, and associated costs in accordance with the RFP documents including but not limited to barge(s), and associated costs to furnish clean water for hydrostatic pressure test for steel tanks 801 and 802, but not including work specified in any other CLIN.

0002 1 Each Option Item A CCTV System

FFP

Firm-Fixed-Price for all labor, material, equipment, program, and associated costs in accordance with the RFP for CCTV System (cameras, monitor, recorder, programming, and accessories), but not including work specified in any other

CLIN.

0003 1 Each Option Item B Automatic Tank Gauging

FFP

Firm-Fixed-Price for all labor, material, equipment, program, and associated costs in accordance with the RFP for the Automatic Tank Gauging (ATG) system, but not including work identified on any other CLIN.

Section 00100 - Bidding Schedule/Instructions to Bidders

PROPOSAL INSTRUCTIONS

Proposal Information

Pre-Proposal Inquiries. Offerors who determine that the technical and/or contractual requirements of this RFP require clarification shall submit all questions in writing. The pre-proposal inquiry format is provided as Attachment A, Pre Proposal Inquiry Form. Pre-Proposal Inquiries shall be submitted via email to ronald.p.smith@navy.mil with a copy to mariana.reyes2@navy.mil. Pre proposal inquiries during will be accepted up to 15 days prior to solicitation due date unless specified otherwise via amendment.

Solicitation Information. It is the sole responsibility of the Offeror to obtain the solicitation files, along with any amendments, from Contract Opportunities (www.beta.sam.gov). Unprotected editable electronic file copies of the solicitation documents, including Word, Excel, and/or Adobe files will not be provided. Please plan accordingly.

Pre-Proposal Conference and Site Visit. A pre-proposal conference / site visit will be conducted, see Section 00100 FAR 52.236-27 Site Visit (Construction) (FEB 1995) – Alternate I (FEB 1995) for site visit information.

Intent to award without discussions. The Government fully intends to evaluate proposals and award the contract without discussions with offerors. However, the Government reserves the right to clarify certain aspects of the proposals or conduct discussions providing an opportunity for the offeror to revise proposals. Therefore, each initial offer should contain the offeror’s best terms and conditions from a technical and price standpoint. Offerors should not assume that they would be contacted or afforded an opportunity to qualify, discuss, or revise their proposals.

No alternate or multiple proposals. No alternate or multiple proposal variations or options, nor alternate or alternative proposals will be considered in the evaluation.

All Or None Offers. Offers are solicited on an “all or none” basis and FAR 52.215-1, INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISITION in Section 00100, is hereby modified. Failure to submit offers for all line items listed shall be cause for rejection of the offer.

Incurred Expenses. The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.

Penalty for false statements and proposal qualifications. Proposals must be set forth full, accurate, and complete information as required by this request for proposal (including attachments). The penalty for making false statements in proposals is prescribed n 18 U.S.C. 1001.

Proposals that contain qualifications, conditions, express unilateral interpretations of the minimum contract requirements, or exceed stated budget limitations may be excluded from the competitive range or be considered ineligible for award.

Proposal Due Date, Submission, and format. The proposal due date is as stated in Block 13 of the Standard Form (SF) 1442, Solicitation, Offer and Award.

Proposals shall be submitted as follows:

Naval Facilities Engineering Command (NAVFAC), Northwest Attn: Ron Smith, Code ACQ31

Using the DoD Secure Access File Exchange Services (SAFE), Drop-off feature in DoD SAFE (https://safe.apps.mil). Only DoD SAFE is authorized for the submission of proposals in response to this solicitation. Instructions for use of DoD SAFE are provided below:

*Using DoD SAFE Drop-off. Upon determining that you will submit a proposal in response to this solicitation, the offeror shall submit their point of contact (POC) name and email address to the assigned Contract Specialist and Contracting Officer via email to ronald.p.smith@navy.mil with a copy to mariana.reyes2@navy.mil. It is important that the POC information remains valid throughout the lifetime of the solicitation. Upon receipt of this information, the Contract Specialist or Contracting Officer will “Request a Drop-Off” procedure in DoD SAFE, obtain a “Request Code” and provide the Request Code to the offeror’s POC email address. Only the identified POC will be able to drop-off proposals or proposal revisions in DOD SAFE. Failure to provide accurate POC information will preclude the offeror from using DoD SAFE.

To submit the proposal, the offeror will log into DoD SAFE at https://safe.apps.mil, click Drop-off and enter the Request Code that was provided by the Contract Specialist or Contracting Officer. The system will allow for inclusion of a short note to the Recipient and then the offeror will click to add files or drag and drop them. Click “Drop-Off Files” to send the files to the recipient. The file(s) are uploaded and an email will be sent to the recipient notifying them of the “drop-off”. [Additional details can be viewed in the DoD SAFE User Guide available at https://safe.apps.mil]. Note that the submission of any proposal must be completed no later than the time indicated above. The DoD SAFE system will record the date and time of package submittal. The date and time of package submittal recorded in DoD SAFE shall govern the timeliness of any proposal submission.

Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened, or are otherwise missing the required content are the responsibility of offerors.

Whenever required by the factors, use the factor mandated attachments. For narratives aside from the required forms, the paper dimension shall be 8 ½ x 11”. The font size shall be no smaller than 11 pitch.

System for Award Management (SAM). All Offerors, including Joint Ventures, must be registered in SAM prior to submitting a proposal and shall continue to be registered during contract performance and through final payment of this contract. Offeror’s not registered in SAM may be considered non-responsive. For additional information, including how to register, please go to www.beta.sam.gov.

Small Business Subcontracting Plan. In accordance with FAR 19.703, large businesses are required to submit an acceptable small business subcontracting plan that meets the requirements of FAR 19.704 prior to award utilizing the format provided in Attachment C. The subcontracting plan (if applicable) shall be submitted electronically via email to ronald.p.smith@navy.mil with a copy to mariana.reyes2@navy.mil no later than 2:00 pm PST two business days after the due date for submitting the price proposal.

Small businesses identified by name in offeror’s proposals/participation and commitment strategies and considered in the evaluation shall be listed in small business subcontracting plans submitted pursuant to FAR 52.219-9 in order to facilitate compliance with DFARS 252.219-7003(e).

NOTICE OF BONDING REQUIREMENTS. Within 10 days after receipt of award, the bidder/offeror to whom the award is made shall furnish the bonds required by FAR Clause 52.228-15.

Bidders/offerors are hereby notified that the contract time for purposes of fixing the completion date, default, and liquidated damages will be as stated in FAR Clause 52.211-10 Commencement, Prosecution, and Completion of Work, regardless of when performance and payment bonds or deposits in lieu of surety are executed.

BASIS OF AWARD AND EVALUATION FACTORS

A. BASIS FOR AWARD

1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the lowest priced, technically acceptable offer.

2. As stated in the solicitation, the Government intends to evaluate proposal(s) and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary; procedures in FAR

15.306 shall be followed. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

3. The LPTA process is selected as appropriate for this acquisition because the best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price. The number of proposals to be evaluated for technical acceptability will be limited to the lowest priced offer. If the lowest priced proposal is not found to be technically acceptable then the next lowest price proposal shall be evaluated. If that proposal is also not found to be technically acceptable, then the process described will be conducted again as many times as necessary, until such time as the Government identifies a technically acceptable proposal.

4. An overall non-price factors rating must be “ACCEPTABLE” in order to be eligible for award. An “UNACCEPTABLE” rating in any factor results in the overall non-price factors proposal being rated “UNACCEPTABLE” unless corrected through discussions. An overall non-price factors rating of “UNACCEPTABLE” makes a proposal ineligible for award.

B. EVALUATION FACTORS FOR AWARD

1. The solicitation requires the evaluation of price and the following non-price factors:

Factor 1 – Experience Factor 2 – Safety Factor 3 – Past Performance Factor 4 – Technical Approach

The distinction between corporate experience and past performance is corporate experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

2. Basis of Evaluation and Submittal Requirements for Each Factor.

(a) Price:

(1) Solicitation Submittal Requirements: The offeror’s price proposal shall be separate from the technical proposal. The price proposal shall include the following:

(i) Cover Sheet in accordance with FAR 52.215-1 Instructions to Offerors – Competitive Acquisition (JAN 2017) that includes:

a. Solicitation Number;

b. Name, Address, Telephone and Facsimile, and Email addresses of the offeror;

c. Names, titles, telephone and facsimile numbers, electronic addresses of persons authorized to negotiate on the offeror’s behalf; and

d. Name, title, and signature of person authorized to sign the proposal.

Proposals signed by an agent shall be accompanied by evidence of that authority.

e. Company DUNS and Cage Code numbers;

(iii) Standard Form 1442 (Solicitation, Offer, and Award)-Blocks 14 through 20c to include acknowledgement of all solicitation amendments;

(iv) Completed Representations and Certifications, including the supplemental certifications provided in Section 00600 of the solicitation, are current and posted in SAM;

(v) Executed Bid Bond in accordance with FAR 52.228-1 (submitted electronically as authorized by FAR Deviation 2020-O0016); and a copy of the agent’s authority to sign bonds for the surety company shall accompany the bid bond;

(vi) Completed Financial Responsibility Questionnaire from Financial Institution and Surety; and, if a Large Business

(vii) Large Business Offerors shall submit an acceptable Small Business Subcontracting Plan with their proposal. The Small Business Subcontracting Plan shall include small business subcontracting goals that meet or exceed the minimum small business subcontracting targets stated below. The Small Business Subcontracting Plan template is provided as a solicitation attachment.

The minimum subcontracting targets for Fiscal Year (FY) 2021 are:

• Small Business (SB) 40%

• HUBZone Small Business (HUBZone) 3%

• Service-Disabled Veteran-Owned Small Business (SDVOSB) 3%

• Small Disadvantaged Business (SDB) 5%

• Women Owned Small Business (WOSB) 9%

It is the policy of the Government to provide maximum practicable opportunities in its acquisitions to Small Business (SB) concerns, including Historically Underutilized Business Zone SB (HUBZone SB), Woman-Owned SB (WOSB), Small Disadvantaged Business (SDB), Veteran-Owned SB (VOSB), Service-Disabled SB (SDVOSB), and other small business concerns. Further, it is the policy of the Government that such concerns will have the maximum practicable opportunity to participate in contract performance consistent with its efficient performance.

Large Business Proposals that fail to provide an acceptable subcontracting plan will not be eligible for contract award. The small business subcontracting plan may be submitted no later than 2PM PST two business days after submission of the price proposal.

(2) Basis of Evaluation:

The Government will evaluate price based on the total price. Total price consists of Base Contract Line Item Number (CLIN) 0001 (Sub-CLINs 0001AA through 0001AD) and Option CLINS 0002-0003 in accordance with FAR 52.217-5, Evaluation of Options (JUL 1990). Evaluation of options does not obligate the Government to exercise the options. In accordance with FAR 15.404-1, Proposal Analysis Techniques, analysis may be performed by one or more of the following techniques to ensure a fair and reasonable price:

(i) Comparison of proposed prices received in response to the RFP

(ii) Comparison of proposed prices with the IGCE

(iii) Comparison of proposed prices with available historical information

(iv) Comparison of market survey results

Proposals that contain qualifications, conditions, express unilateral interpretations of the minimum contract requirements, or exceed budget limitations may be considered ineligible for award.

(b) Technical Factors:

(1) Factor 1 – Experience:

(a) Solicitation Submittal Requirements:

The Offeror shall submit the following information:

Submit a minimum of two (2) and a maximum of five (5) construction projects for the Offeror that best demonstrates its experience on relevant projects that are similar in size, scope, and complexity to the RFP. The Government will only review five (5) construction projects. Any projects submitted in excess of the five (5) will not be considered. Every project shall meet at least one scope element, and the corresponding minimum size (i.e. tank capacity). Failure to meet all of the stated criteria will result in in an unacceptable rating.

For purposes of this evaluation, a relevant project is further defined as:

Scope:

Construction of above ground fuel storage facilities with transfer pipelines for liquid fuel with minimum individual tank storage volume (capacity) of 50,000 barrels of fuel storage.

Construction of fuel tank secondary containment structures.

Demolition and removal of underground fuel storage tanks with individual volumes no less than 35,000 barrels.

Cathodic protection of field erected aboveground tanks and associated constructed fuel systems.

Automatic Tank Gauging (ATG) & Automatic Fuel Handling Equipment (AFHE) System installation with instrumentation and controls integration.

Complexity: Planning and multidisciplinary construction of an above ground storage facility while integrating with an active fuel depot that will remain operational during the construction process.

Projects submitted for the Offeror shall be substantially completed (85%) within the past ten (10) years preceding the original date of issuance of this solicitation.

A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project;

rather Offerors shall submit the work performed under a task order as a project.

The attached Construction Experience Project Data Sheet (Attachment A -DBB) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods).

If the offeror is a Joint Venture (JV), partnership, or mentor protégé, recent and relevant project experience should be submitted for projects completed by the JV, partnership, or mentor protégé entity. If the JV, partnership, or mentor protégé does not have shared experience, projects may be submitted for the JV, partnership, or mentor protégé members. At least one recent and relevant project shall be submitted for each JV, partnership, or mentor protégé member. Offerors who fail to submit experience for all JV, partnership, or mentor protégé members may be rated unacceptable. Offerors are still limited to five (5) projects combined. In addition, the offeror shall submit a signed copy of a JV agreement, partnership agreement, or approved mentor protégé agreement (MPA) for each member of the offeror’s JV team.

If the offeror's proposal presents the experience, past performance, or safety data of any entity with a Data Universal Numbering System (DUNs) or CAGE code that differs from that in the SF 1442 such as affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the information will not be considered unless the offeror establishes a basis for imputing the other entity's data to the offeror. The offeror must clearly explain why another entity's experience, past performance, or safety record is relevant to or indicative of the offeror's ability to perform this contract. A mere statement describing a corporate affiliation is insufficient; the offeror must also establish how the connection or nexus between it and the other entity relates to the offeror's qualifications. The explanation must be included in the solicitation attachment “Construction Experience Project Data Sheet”, required under Factor 1 - Experience (Construction). An offeror's failure to adequately justify a basis for crediting it with another entity's experience, past performance, or safety data may result in a deficiency, thereby making the offeror ineligible for award without discussions. Any projects submitted in excess of the five (5) will not be considered.

(b) Basis of Evaluation:

The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP.

(2) Factor 2 – Safety:

Solicitation Submittal Requirements:

The Offeror shall submit the following information: The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five (5) Calendar Years (CY), as well as a safety narrative, as described below. For a partnership or joint venture, the Offeror shall submit separate DART and TCR rates for the specified five (5) CY for each contractor who is part of the partnership/joint venture; however, only one safety narrative is required. Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions.

NOTE: DART and TCR shall not be submitted for subcontractors

1. DART Rate: Submit five (5) previous complete calendar years’ CY2019, CY2018, CY2017, CY2016, and CY2015 worth of data (not an overall average). If the Offeror has no DART rate, for any year, affirmatively state so and explain why.

a. DART cases include injuries or illnesses resulting in death, days away from work, and/or restricted work or transfer to another job days beyond the day of injury/illness.

b. Calculation of DART rate: Multiply the total number of DART cases by 200,000, and then divide by the number of employee labor hours worked

DART RATE = Number of DART incidents x 200,000 Total Number of Employee Labor Hours Worked

2. TCR Rate: Submit five (5) previous complete calendar CY2019, CY2018, CY2017, CY2016, and CY2015 worth of data (not an overall average). If the Offeror has no TCR rate, for any year, affirmatively state so and explain why.

a. TCR cases include injuries or illnesses resulting in death, days away from work, restricted work or transfer to another job days beyond the day of injury/illness, medical treatment beyond first aid, or loss of consciousness.

b. Calculation of TCR rate: Multiply the total number of TCR incidents by 200,000, and then divide by the number of employee labor hours worked

TCR RATE = Number of TCR Incidents x 200,000 Total Number of Employee Labor Hours Worked

3. Technical Approach to Safety: Submit a narrative that addresses the following:

a. Describe the Offeror’s approach to implementing and executing a Safety Management System (SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.

b. Describe the evaluation process used to select potential subcontractors.

c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout performance of the contract (to include the Offeror’s own in-house workforce).

d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page. Font shall be no smaller than 11 pitch.

4. The Government reserves the right to review other available sources (public/Government internal) of information.

These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.

Basis of Evaluation:

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. To meet the minimum requirements, the Offeror must demonstrate the following:

1. DART rates at or below 2.99

2. TCR Rates at or below 4.49

3. Technical Approach to Safety

a. Offeror describes a viable SMS that addresses elements; such as Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.

b. Offeror describes a methodical process of evaluating subcontractor’s safety performance in their selection process.

c. Offeror describes a logical management plan to hold both themselves and their subcontractors accountable for adhering to the safety requirements of the contract.

4. The Government reserves the right to review other available sources (public/Government internal) of information. These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.

(3) Factor 3 – Past Performance:

(i) Solicitation Submittal Requirements:

IF A COMPLETED CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM

(CPARS) EVALUATION IS AVAILABLE, IT SHALL BE SUBMITTED WITH THE PROPOSAL. IF THERE IS NOT A COMPLETED CPARS EVALUATION, the Past Performance Questionnaire (PPQ) included in the solicitation, Attachment C, is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1 – Experience (Construction and Design). If the past performance is for a project submitted by a subcontractor under Factor 1 – Experience (Construction and Design), the PPQ must be completed by the end user (not the construction company who was awarded the project). AN OFFEROR SHALL

NOT SUBMIT A PPQ WHEN A COMPLETED CPARS IS AVAILABLE.

IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment C), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Ron Smith, via email at Ronald.smith@navy.mil with a copy to Mariana.reyes.navy.mil and prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/Entity Identifier numbers of team members (partnership, joint venture, teaming arrangement, or parent company/ subsidiary/ affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.”

(ii) Basis of Evaluation: The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering:

- A pattern of successful completion of tasks;

- A pattern of deliverables that are timely and of good quality;

- A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.); and

- Recency of tasks performed that are identical to, similar to, or related to the task at hand

This evaluation focuses on how well the Offeror performed on the relevant projects submitted under Factor 1 – Experience and past performance on other projects currently documented in known sources. Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown.

The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination.

In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the

Offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the Offeror shall be determined to have unknown past performance will receive “no rating”.

Offeror shall have a minimum average rating of “Satisfactory” in the most recent Past Performance Evaluation in each of the project submitted to be considered acceptable.

(4) Factor 4 – Technical Approach:

(a) Solicitation Submittal Requirements:

Provide a narrative not to exceed two (2) double-sided pages (or four (4) single-sided pages) describing the construction approach. Pages exceeding this amount will not be considered. Font shall be no smaller than 11 pitch.

The submission shall be in narrative form only. A project schedule in any form (e.g. Gantt Charts, Critical Path Method (CPM) schedules, etc.) will not be evaluated. The narrative shall include the following:

A description of the Offeror’s approach to accomplishing the project’s goals and requirements for completing the project within the required timeframe. The narrative shall account for: construction period (clearly identify the number of calendar days), inspection and testing, administrative submittals, construction sequencing, and any critical path items including those submittals that must be accepted/ approved before demolition and construction work can begin.

The Offeror shall include a discussion of its Mitigation Plan that addresses anticipated project challenges that may negatively impact the critical path including potential removal and disposal of contaminated soils, weather, and anticipated site constraints including traffic and site topography. Include what measures will be taken to mitigate impacts to time and resources.

(b) Basis of Evaluation:

Evaluation of this factor will be a subjective assessment of the Offeror’s approach to accomplishing the project’s goals and requirements for completing the project within the required timeframe to determine if it is realistic and demonstrates the ability to properly accomplish the requirements of the project. Failure to address any of the submission requirements may result in an unacceptable rating.

Nothing in the submitted narrative will be considered an approved contract modification in the event there are elements of the narrative that are not in accordance with either the drawings or the specifications.

ATTACHMENTS

Attachment A – Pre-Proposal Inquiry Form Attachment B – Construction and Design Experience Project Data Sheet Attachment C – Individual Small Business Subcontracting Plan Attachment D – Past Performance Questionnaire, Construction and Design Attachment E – Projects Past Performance Worksheet for Safety Attachment F – Definitions Attachment G – Financial Questionnaire Attachment H – Construction Wage Determination Attachment I – Example Overhead and NAVFAC 4330 Attachment J – Base Access Request Form Attachment K – Small Business Subcontracting Record Attachment L - Small Business Participation and Commitment Strategy Attachment M – Covid 19 Screening Questionnaire

CLAUSES INCORPORATED BY REFERENCE

52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.215-16 Facilities Capital Cost of Money JUN 2003 52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

52.252-5 Authorized Deviations In Provisions APR 1984 252.215-7008 Only One Offer JUL 2019 252.215-7010 Alt I Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data (JUL 2019) - Alternate I

JUL 2019

252.225-7052 Restriction on the Acquisition of Certain Magnets and Tungsten.

DEC 2019

CLAUSES INCORPORATED BY FULL TEXT

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

(a) Definitions. As used in this provision--

Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.

Registered in the System for Award Management (SAM) means that--

(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into SAM;

(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in SAM;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record ``Active''.

Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.

(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in SAM.

(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:

(1) Company legal business name.

(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(3) Company physical street address, city, state, and Zip Code.

(4) Company mailing address, city, state and Zip Code (if separate from physical).

(5) Company telephone number.

(6) Date the company was started.

(7) Number of employees at your location.

(8) Chief executive officer/key manager.

(9) Line of business (industry).

(10) Company headquarters name and address (reporting relationship within your entity).

(d) Processing time should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation. See https://www.sam.gov for information on registration.

(End of Provision)

52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

Any contract awarded as a result of this solicitation will be DX rated order; X DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation. [Contracting Officer check appropriate box.]

(End of provision)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a firm-fixed-price contract resulting from this solicitation.

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

6.1% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Kitsap County, Manchester, WA..

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .