Attachment Chemical Analytical Data Report.pdf
PDF 11 MB Posted
- Solicitation number
- N44255-21-R-2000
About this file
This federal contract opportunity solicitation requests design and construction services for new aboveground storage tanks at the Manchester Fuel Depot in Manchester, Washington. The Navy seeks a contractor to construct new multi-product storage tanks within a secondary containment system, designed per UFC 3-460-01 standards. The fixed-roof tanks will connect to JP-5 and F-76 piping systems while avoiding mapped seismic fault lines. Some secondary containment and roadwork will be in potentially contaminated areas. The solicitation number is N44255-21-R-2000 and was issued by the Naval Facilities Engineering Command for the MCON P856 Manchester Tank Farm Improvements project. The contract will require tank design, construction, labor, materials, equipment, supervision and all associated costs.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chemical Analytical Data Report Geotechnical Site Investigation
P-856 Manchester Tank Farm Improvements Fleet Logistics Center Puget Sound Manchester, Washington N44255-18-D-2000 Task Order N4425518F4257 for The United States Navy and Burns & McDonnell
December 4, 2020
P-856 Manchester Tank Farm Improvements Fleet Logistics Center Puget Sound Manchester, Washington N44255-18-D-2000 Task Order N4425518F4257 for The United States Navy and Burns & McDonnell
December 4, 2020
17425 NE Union Hill Road, Suite 250 Redmond, Washington 425.861.6000
P-856 Manchester Tank Farm Improvements Fleet Logistics Center Puget Sound
Manchester, Washington N44255-18-D-2000
Task Order N4425518F4257 File No. 0144-418-03
December 4, 2020
Prepared for:
The United States Navy c/o Burns & McDonnell 9400 Ward Parkway Kansas City, Missouri 64114
Attention: Robert S. Kulash, PE
Prepared by:
GeoEngineers, Inc.
17425 NE Union Hill Road, Suite 250 Redmond, Washington 98052 425.861.6000
Aaron J. Hartvigsen, PE Senior Geotechnical Engineer
Matthew W. Smith, PE Senior Principal
AJH:MWS:nld
Disclaimer: Any electronic form, facsimile or hard copy of the original document (email, text, table, and/or figure), if provided, and any attachments are only a copy of the original document. The original document is stored by GeoEngineers, Inc. and will serve as the official document of record.
December 4, 2020 | Page i File No. 0144-418-03
Table of Contents
INTRODUCTION
SOIL SAMPLING AND SOIL CHEMICAL ANALYTICAL RESULTS
General Soil and Water Sampling Sample Analytical Results
LIMITATIONS
LIST OF FIGURES
Figure 1. Vicinity Map Figure 2. Site Plan
APPENDICES
Appendix A. Field Explorations Figure A-1. Key to Exploration Logs Figures A-2 through A-17. Log of Borings Figures A-18 through A-23. Log of Test Pits
Appendix B. Chemical Analytical Data Appendix C. Report Limitations and Guidelines For Use
December 4, 2020 | Page 1
INTRODUCTION
This data report presents the chemical analytical results for soil samples collected during GeoEngineers, Inc.’s (GeoEngineers’) geotechnical site investigation for the P-856 Manchester Tank Farm Improvements project at Fleet Logistics Center Puget Sound (FLCPS), in Manchester, Washington. The project site is shown relative to surrounding physical features on the Vicinity Map, Figure 1, and the Site Plan, Figure 2.
GeoEngineers’ services were completed in general accordance with the professional services agreement, between Burns & McDonnell Engineering Company, Inc and GeoEngineers for contract N44255-18-D-2000, Task Order N4425518F4257 dated, July 10, 2018. GeoEngineers’ specific scope of services included:
■ Completing a subsurface investigation, including 16 borings and six test pits;
■ Completing two fault trenches;
■ Completing environmental field screening and chemical testing of samples obtained from the test pits, borings, and fault trenches (presented in this report); and
■ Preparing this report.
This chemical analytical data report presents the field screening and chemical testing results for the samples obtained from the borings, test pits and fault trenches. Please see GeoEngineers’ Geotechnical Engineering Report dated July 24, 2019 for geotechnical recommendations.
SOIL SAMPLING AND SOIL CHEMICAL ANALYTICAL RESULTS
General
The subsurface conditions at the site have been evaluated by GeoEngineers by completing a subsurface exploration program from September 12, 2018 to October 10, 2018 that included six test pits, 16 geotechnical soil borings, and two fault trenches. Field screening during the explorations consisted of visual examination, water sheen testing, and photo-ionization detector (headspace vapor) methods. The test pit, geotechnical soil boring, and fault trench locations were surveyed by AHBL, Inc. The locations of the test pits, geotechnical soil borings, and fault trenches are shown on Figures 2, Site Plan. Exploration field procedures (including exploration logs and field screening methods) are described in Appendix A.
Soil and Water Sampling
Soil samples were obtained during completion of each of the test pits, borings, and fault trenches. Selected soil samples from the test pits, borings and fault trenches were submitted to Onsite Environmental Inc. in Redmond, Washington for chemical analysis. The samples collected were analyzed for the following:
■ Northwest Total Petroleum Hydrocarbon (NWTPH)-Hydrocarbon Identification (HCID); and
■ Total lead by United States Environmental Protection Agency (EPA) Method 6010D.
Sample Analytical Results
The chemical analytical results for the samples collected during our site investigation are included in Appendix B, Chemical Analytical Data.
December 4, 2020 | Page 2
Based on chemical analytical results, the following analytes were detected above the laboratory reporting limits in one or more of the samples analyzed:
■ Lude Oil range TPH (detected in the NWTPH-HCID soil analysis in one sample but not in the subsequent NWTPH-Dx analysis); and
■ Total lead.
The soil analytical results were compared to the applicable Washington State Department of Ecology (Ecology) Model Toxics Control Act (MTCA) cleanup levels. None of the detected concentrations are greater than the MTCA cleanup levels.
LIMITATIONS
This chemical analytical data report has been prepared for use by The United States Navy, Burns & McDonnell, and their authorized agents. GeoEngineers has prepared this chemical analytical data report for the Manchester Tank Farm Improvements project located at FLCPS in Manchester, Washington, in general accordance with the professional services agreement, between Burns & McDonnell Engineering Company, Inc. and GeoEngineers dated, July 10, 2018.
Within the limitations of scope, schedule and budget, our services have been executed in accordance with the generally accepted environmental science practices for environmental studies in this area at the time this report was prepared. No warranty or other conditions, express or implied, should be understood.
Please refer to Appendix C titled “Report Limitations and Guidelines for Use” for additional information pertaining to use of this report.
FIG
U
R E
S μ
SITE
Vicinity Map
Figure 1
Manchester Tank Farm Improvements Fleet Logistics Center Puget Sound
Manchester, Washington
2,000 2,0000
Feet
Data Source: Mapbox Open Street Map, 2018
Notes:
1. The locations of all features shown are approximate.
2. This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers, Inc.
cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the official record of this communication.
Projection: NAD 1983 UTM Zone 10N
P:
\0
\0
\G
IS
\m xd \0
_F
_V ic in ity
M ap
.m xd
D at e E xp or te d:
/2 4/ b y cc he lf
CONTAMINATED
RIPRAP
8" CONC
IE=86.77
LIGHT REMOVED
W
ELECTRICAL
CABINET
MONITORING
WELL
MONITORING
WELL (TYP)
8" VENT
VAULT W/
ACCESS LID
CONTROL
PANEL
6" PVC
BOTTOM=85.13
VAULT W/
ACCESS LID
CONTROL PANEL
LEVEL
GAUGE
8" VENT
VAULT W/
ACCESS
HATCH
CONDUIT
ELECTRICAL
CABINET
BASKETBALL
HOOP
8" VENT
VAULT W/
ACCESS HATCH
8" VENT
VAULT W/
ACCESS HATCH
TEST STATION
10" CONC
IE=89.62
END SIGNAL
END SIGNAL
END SIGNAL
ELECTRICAL
SWITCH
ELECTRICAL
CONDUIT
W/ ALARM
15 MPH
ELECTRICAL
CABINET
VAULT W/
ACCESS LID
8" VENT
VAULT W/
ACCESS HATCH
8" VENT
TANK 24
8" VENT
LEVEL
GAUGE
VAULT W/
ACCESS HATCH
VAULT W/
ACCESS LID
VAULT
ELECTRICAL
PANEL
ELECTRICAL
CABINET
ELECTRICAL
CABINET
PUMP
ALARM
6" CPP
IE=50.70
12" CPP
TOP=60.04
18" CPP
IE=72.33
12" CPP
IE=51.61
6" CPP
TOP=63.04
METAL
STAIRS
RAMP
LADDER
PUMP
CONTROLS
10" CONC
IE=90.10
VAULT W/
ACCESS HATCH
8" VENT
8" VENT
VAULT W/
ACCESS LID
VAULT W/
ACCESS LID
VAULT W/
ACCESS HATCH
VAULT W/
ACCESS LID
CONTROL PANEL
ELECTRICAL CABINET
LEVEL
GUAGE
VAULT
VAULT W/
ACCESS LID
P
ELECTRICAL
PANEL
ELECTRICAL
CABINET
CONTAMINATED
YIELD
ELECTRICAL
CABINET
VAULT W/
ACCESS HATCH
8" VENT
8" VENT
VAULT W/
ACCESS LID
VAULT W/
ACCESS LID
VAULT W/
ACCESS LID
8" VENT
ELECTRICAL CONTROLS
ELECTRICAL PANEL
VAULT W/
ACCESS LID
ACCESS
MANHOLE
TANK 39JP-5
ELECTRICAL CABNITES
ELECTRICAL PANEL
8" VENT
VAULT W/
ACCESS LID
4" IRON PIPE
STCB 5880 RIM=91.82
6" PVC SW IE=90.16
STCB 5900 RIM=92.29
24" CONC NE IE=86.90
12" PVC SE IE=86.44
NO LADDER
STMH 5901 RIM=92.92
12" PIPES SW-W
UNABLE TO DIP
DOUBLE STACKED
BOTTOM=67.15
LADDER N
STCB 1800 RIM=88.84
24" CONC N-S
CENTER CHANNEL=56.60
STMH 6465 RIM=98.40
12" CMP OVERFLOW SE
TOP=96.20 TOP 10" LATERAL=92.35
12" CONC NW IE=91.65
LADDER NW
12" IP
IE=158.23
12" IP
IE=157.23
8" VENT
VAULT W/
ACCESS LIDS
VAULT W/
ACCESS LIDS
VAULT
VAULT W/
ACCESS LID
ELECTRICAL
SWITCH ELECTRICAL
PANEL
ELECTRICAL PANELS
SWITCH
GR
AV
EL
4" IP
IE=156.61
4" IP
TOP=157.11
6' CHAIN LINK/BABED WIRE
18 METAL TUBE
5.3' HIGH
8" CONC
IE=133.80
8" VENT
VAULT W/
ACCESS LID
VAULT W/
ACCESS LID
8" VENT
ELECTRICAL
PANEL
12" CONC
IE=130.64
12" CONC
IE=129.26
VAULT W/
ACCESS LIDS
LEVEL
GAUGE
ELECTRICAL PANEL
3 ELECTRICAL CABINETS
HAND RAIL
18" CONC
IE=114.02
ELECTRICAL CABINET
VAULT W/
ACCESS LID
8" VENT
VAULT W/
ACCESS HATCH
VAULT W/
ACCESS HATCH
LEVEL GAUGE
8" VENT
VAULT W/
ACCESS LID
8" VENT
STREETS
TANK 30
15,PH
CONTROL PANEL
CAMERA POLE
VAULT W/
ACCESS LID
8" VENT
VAULT W/
ACCESS LID
VAULT W/
ACCESS LID
CONTROL PANEL
VAULT W/
ACCESS HATCH
LEVEL
GAUGE
8" VENT
8" VENT
TENT OVER VAULT
ELECTRICAL
CABINET
6" IP
IE=101.00
8" CONC
IE=135.10
W
TEST STATION
12" CONC
IE=183.68
8" VENT
VAULT W/
ACCESS LID
TANKS 29-29
YIELD
DO NOT
ENTER
CONTAMINATED
8" VENT
VAULT W/
ACCESS LID
VAULT W/
ACCESS LID
LEVEL
GAUGE
CONTROL PANEL
8" VENT
VAULT W/
ACCESS LID
18" CONC
IE=117.55
18" CONC
IE=126.22
24" CONC
IE=135.03
12" CONC
IE=182.97
8" VENT
VAULT W/
ACCESS LID
CONTAMINATED
ELECTRICAL
CABINET
TREE PLANTING
VAULT W/
ACCESS LID
8" VENT
VAULT W/
ACCESS LID
VAULT W/
ACCESS LIDS
LEVEL GAUGE
8" VENT ELECTRICAL
CABINET
CONTROL PANEL
VAULT W/
ACCESS LID
24" CONC
IE=136.35
8" VENT
GRAVEL
VAULT W/
ACCESS LID
8" VENT
VAULT W/
ACCESS LID
VAULT W/
ACCESS LID
8" VENT
LEVEL GAUGE
CONTROL
PANEL
VAULT W/
ACCESS LID
VAULT W/
ACCESS LID
VAULT W/
ACCESS LIDS
8" VENT
LEVEL GAUGE
ELECTRICAL
CABINET
CONTROL
PANEL
8" VENT
8" VENT
6" CONC
IE=156.06
10" CONC
IE=154.47
10" CONC
IE=157.43
STCB 1409 RIM=86.17
4" IP N IE=85.01
CULVERT BURIED
STCB 6883 RIM=93.30
4" IP N CAP TOP=92.84
4" IP N IE=91.60
STCB 6884 RIM=93.05
4" IP S CAP TOP=92.09
4" IP S IE=91.39
STCB 9882 RIM=93.16
4" IP S CAP TOP=92.01
4" IP S IE=91.34
STCB 6885 RIM=91.97
6" PVC E IE=89.82
6" PVC NW IE=89.72
STCB 6886 RIM=92.35
6" IP SW IE=90.88
STMH 5943 RIM=71.41
4" PVC SE IE=66.55
MECHANICAL SYSTEM ON W
SIDE OF STRUCTURE
LADDER E
STMH 5985 RIM=65.04
4" IP DROP N TOP=59.93
LADDER NW
STCB 6160 RIM=97.09
2" IP SE IE=93.79
4" CLAY SW IE=93.54
STCB 6281 RIM=91.03
18" CONC SE IE=86.63
4" CLAY NW IE=86.68
STCB 1396 RIM=88.71
8" IP SE IE=86.18
8" CONC SW IE=86.14
STORM VAULT RIM=52.87
24x8 OPENING N IE=51.57
24X8 OPENING E IE=51.57
24X8 OPENING W IE=51.55
STORM VAULT RIM=52.90
24X9 OPENING N IE=51.61
24X9 OPENING E IE=51.65
24X9 OPENING W IE=51.66
STCB 5673 RIM=90.22
3" PVC E IE=89.37
STCB 1408 RIM=90.05
6" PVC SW IE=86.05
3" PVC SW IE=86.79
4" PVC NW IE=86.45
STCB 1450 RIM=86.20
4" PVC N IE=83.62
6" IP E IE=83.42
TANKS 3233,40-43
ECOLOGY BLOCK STORAGE BINS
CONTAMINATED
YIELD
MONITORING
WELL (TYP)
MONITORING
WELL (TYP)
CONTAMINATED SOIL
YIELD
5 MPH
PINE ROAD
RESTRICTED
AREA
TO TANKS
31,39,16,17
100105110115
120125130
100100
758085
Olympic Drive
TP-1
TP-2
TP-5
B-1
TP-4
TP-6
B-3
TP-3
B-6
B-8
B-9
B-7
B-11
B-10
B-12
B-2
B-13
B-14
B-15
B-4
B-16
B-5
T2A
T2B
T1A
Figure 2
Site Plan
W E
N
S
Legend
P:
\0
\0
\C
AD
\0 3\
CA
D at a
Re po rt\
_F
_S ite
P la n.
dw g
TA
B:
F0
D at e
Ex po rte d:
0/
/1
- 1
5:
b y hm ar a
Notes:
1. The locations of all features shown are approximate.
2. This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document.
GeoEngineers, Inc. cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the official record of this communication.
Data Source: Site Survey from Burns & McDonald, received on 10/12/18.
Projection: WA State Plane, North Zone, NAD83, US Foot
Feet
0120 120
Boring by GeoEngineers, 2018
Test Pit by GeoEngineers, 2018
Trench Area
Manchester Tank Farm Improvements Fleet Logistics Center Puget Sound
Manchester, Washington
B-1
TP-1
A P
P E
N D
IC
E
S
APPENDIX A
Exploration Logs
December 4, 2020 | Page A-1
APPENDIX A
EXPLORATION LOGS
Subsurface conditions were explored at the site by completing six test pits (TP-1 through TP-6), 16 geotechnical borings (B-1 through B-16), and two fault trenches (T2A/T2B and T1A). The test pits were completed to a depth of approximately 10 feet below existing site grades by Rivers Edge Environmental Services through subcontract with GeoEngineers, Inc. (GeoEngineers). The fault trenches were completed to depths of up to 20 feet below existing site grades by Rivers Edge Environmental Services. The borings were completed to depths of approximately 31 to 31.5 feet below existing site grades. The borings were completed by Advance Drill Technologies, LLC subcontracted to GeoEngineers on October 1 through October 4, 2018.
The locations and elevations of the explorations were surveyed by AHBL Inc. The exploration locations are shown on the Site Plan, Figure 2.
Test Pits
Test pits (TP-1 through TP-6) were completed on September 12 and 19, 2018 at the locations shown on the Site Plan, Figure 2. The test pits were excavated to a depth of 10 feet below existing site grades. The test pits were completed using a Takeuchi TB235 mini-track excavator owned and operated by Rivers Edge Environmental Services.
The test pits were continuously monitored by a geotechnical engineer from our firm who examined and classified the soil encountered, obtained a representative soil sample and prepared a detailed log of each test pit. The soils encountered in the test pits were generally sampled at 2-foot vertical intervals to a depth of approximately 10 feet below existing grades. Disturbed samples of representative soil types were obtained from the excavator bucket at representative depths.
Borings
The borings were completed using a track-mounted, continuous-flight, hollow-stem auger drilling equipment. The borings were continuously monitoring by a geotechnical engineer from our firm who examined and classified the soil encountered, obtained representative soil samples, observed groundwater conditions and prepared a detailed log of each exploration.
The soils encountered in the borings were generally sampled at 5-foot vertical intervals to a depth of approximately 30 feet with a 2-inch outside-diameter split-barrel standard penetration test (SPT) sampler in general accordance with ASTM D1586. Samples were also collected by 3.5-inch outside diameter, thick wall, split-barrel sampler at selected locations to enhance sample recovery. The disturbed samples were obtained by driving the sampler 18 inches into the soil with a 140-pound auto-hammer free-falling 30 inches. The number of blows required for each increment of 6 inches of penetration was recorded. The blow count (“N-value”) of the soil was calculated as the number of blows required for the final 12 inches of penetration. This resistance, or N-value, provides a measure of the relative density of granular soils and the relative consistency of cohesive soils. Where very dense soil conditions precluded driving the full 18 inches, the penetration resistance for the partial penetration was entered on the logs. The blow counts are shown on the boring logs at the respective sample depths.
December 4, 2020 | Page A-2
Sample Classification
Soils encountered in the explorations were visually classified in general accordance with the classification system described in Figure A-1. A key to the exploration log symbols is presented in Figure A-1. The logs of the borings are presented in Figures A-2 through A-17. The logs of the test pits are presented in Figures A-18 through A-23. The boring and test pit logs are based on our interpretation of the field and laboratory data and indicate the various types of soils and groundwater conditions encountered. The logs also indicate the depths at which these soils or their characteristics change, although the change may actually be gradual.
If the change occurred between samples, it was interpreted. The densities noted on the boring logs are based on the blow count data obtained in the borings and judgment based on the conditions encountered.
Observations of groundwater conditions were made during drilling. The groundwater conditions encountered during drilling are presented on the boring logs. Groundwater conditions observed during drilling represent a short-term condition and may or may not be representative of the long-term groundwater conditions at the site. Groundwater conditions observed during drilling should be considered approximate.
Field Screening of Soil Samples
Soil samples obtained from the borings, test pits, and fault trenches were screened in the field for evidence of contamination using: (1) visual examination; (2) sheen screening; and/or (3) or photo-ionization detector (PID). The results of headspace and sheen screening are included in the boring and test pit logs.
Visual screening consists of inspecting the soil for stains indicative of petroleum-related contamination.
Visual screening is generally more effective when contamination is related to heavy petroleum hydrocarbons, such as motor oil or hydraulic oil, or when hydrocarbon concentrations are high. Sheen screening and headspace vapor screening are more sensitive methods that have been effective in detecting contamination at concentrations less than regulatory cleanup guidelines. Sheen screening involves placing soil in a pan of water and observing the water surface for signs of sheen. Sheen classifications are as follows:
No Sheen (NS) No visible sheen on water surface.
Slight Sheen (SS) Light, colorless, dull sheen; spread is irregular, not rapid; sheen dissipates rapidly.
Moderate Sheen (MS) Light to heavy sheen, may have some color/iridescence; spread is irregular to flowing; few remaining areas of no sheen on water surface.
Heavy Sheen (HS) Heavy sheen with color/iridescence; spread is rapid; entire water surface may be covered with sheen.
Headspace vapor screening involves placing a soil sample in a plastic sample bag. Air is captured in the bag and the bag is shaken to expose the soil to the air trapped in the bag. The probe of a PID is inserted in the bag and the instrument measures the concentration of combustible vapor in the air removed from the sample headspace. The PID measures concentrations in parts per million (ppm) and is calibrated to isobutylene. The PID is designed to quantify combustible gas and organic vapor concentrations up to 2,500 ppm. A lower threshold of significance of 10 ppm was used in this application. Field screening results are site-specific and vary with soil type, soil moisture content, temperature and type of contaminant.
Measured groundwater level in exploration, well, or piezometer
Measured free product in well or piezometer
Distinct contact between soil strata
Approximate contact between soil strata
Contact between geologic units
SYMBOLS TYPICAL
DESCRIPTIONS
GW
GP
SW
SP
SM
FINE
GRAINED
SOILS
SILTS AND
CLAYS
NOTE: Multiple symbols are used to indicate borderline or dual soil classifications
MORE THAN 50%
RETAINED ON
NO. 200 SIEVE
MORE THAN 50%
PASSING
NO. 200 SIEVE
GRAVEL
AND
GRAVELLY
SOILS
SC
LIQUID LIMIT
LESS THAN 50
(APPRECIABLE AMOUNT
OF FINES)
(APPRECIABLE AMOUNT
OF FINES)
COARSE
GRAINED
SOILS
MAJOR DIVISIONS
GRAPH LETTER
GM
GC
ML
CL
OL
SILTS AND
CLAYS
SANDS WITH
FINES
SAND
AND
SANDY
SOILS
MH
CH
OH
PT
(LITTLE OR NO FINES)
CLEAN SANDS
GRAVELS WITH
FINES
CLEAN GRAVELS
(LITTLE OR NO FINES)
WELL-GRADED GRAVELS, GRAVEL -
SAND MIXTURES
CLAYEY GRAVELS, GRAVEL - SAND -
CLAY MIXTURES
WELL-GRADED SANDS, GRAVELLY
SANDS
POORLY-GRADED SANDS, GRAVELLY
SAND
SILTY SANDS, SAND - SILT MIXTURES
CLAYEY SANDS, SAND - CLAY
MIXTURES
INORGANIC SILTS, ROCK FLOUR,
CLAYEY SILTS WITH SLIGHT
PLASTICITY
INORGANIC CLAYS OF LOW TO
MEDIUM PLASTICITY, GRAVELLY
CLAYS, SANDY CLAYS, SILTY CLAYS,
LEAN CLAYS
ORGANIC SILTS AND ORGANIC SILTY
CLAYS OF LOW PLASTICITY
INORGANIC SILTS, MICACEOUS OR
DIATOMACEOUS SILTY SOILS
INORGANIC CLAYS OF HIGH
PLASTICITY
ORGANIC CLAYS AND SILTS OF
MEDIUM TO HIGH PLASTICITY
PEAT, HUMUS, SWAMP SOILS WITH
HIGH ORGANIC CONTENTSHIGHLY ORGANIC SOILS
SOIL CLASSIFICATION CHART
MORE THAN 50%
OF COARSE
FRACTION RETAINED
ON NO. 4 SIEVE
MORE THAN 50%
OF COARSE
FRACTION PASSING
ON NO. 4 SIEVE
SILTY GRAVELS, GRAVEL - SAND -
SILT MIXTURES
POORLY-GRADED GRAVELS,
GRAVEL - SAND MIXTURES
LIQUID LIMIT GREATER
THAN 50
Continuous Coring
Bulk or grab
Direct-Push
Piston
Shelby tube
Standard Penetration Test (SPT)
2.4-inch I.D. split barrel
Contact between soil of the same geologic unit
Material Description Contact
Graphic Log Contact
NOTE: The reader must refer to the discussion in the report text and the logs of explorations for a proper understanding of subsurface conditions.
Descriptions on the logs apply only at the specific exploration locations and at the time the explorations were made; they are not warranted to be representative of subsurface conditions at other locations or times.
Groundwater Contact
Blow count is recorded for driven samplers as the number of blows required to advance sampler 12 inches (or distance noted).
See exploration log for hammer weight and drop.
"P" indicates sampler pushed using the weight of the drill rig.
"WOH" indicates sampler pushed using the weight of the hammer.
Key to Exploration Logs
Figure A-1
Sampler Symbol Descriptions
ADDITIONAL MATERIAL SYMBOLS
NS
SS
MS
HS
No Visible Sheen Slight Sheen Moderate Sheen Heavy Sheen
Sheen Classification
SYMBOLS
Asphalt Concrete
Cement Concrete
Crushed Rock/ Quarry Spalls
Topsoil
GRAPH LETTER
AC
CC
SOD Sod/Forest Duff
CR
DESCRIPTIONS
TYPICAL
TS
Laboratory / Field Tests %F %G
AL
CA
CP
CS
DD
DS
HA
MC
MD
Mohs
OC
PM
PI
PP
SA
TX
UC
VS
Percent fines Percent gravel Atterberg limits Chemical analysis Laboratory compaction test Consolidation test Dry density Direct shear Hydrometer analysis Moisture content Moisture content and dry density Mohs hardness scale Organic content Permeability or hydraulic conductivity Plasticity index Pocket penetrometer Sieve analysis Triaxial compression Unconfined compression Vane shear tnash Typewritten Text Rev 06/2017
Hammer slug driving mechanism broke; hammer initially driven 12 inches prior to slug failure
Vegetated surface/grass Brown silty fine to medium sand with occasional gravel
(very loose to loose, moist) (fill)
Grades with gravel; trace silt lenses
Grades to with occasional gravel and trace sandstone fragments
Brown silty fine to medium sand; trace silt lenses (dense to very dense, moist) (glacially consolidated soils)
Grades to without silt lenses; less fines
%F
MC
%F
%F
SOD
SM
SM
Notes:
Density based on autohammer efficiency of 80% Environmental screening performed; no sheen or headspace vapor concentration greater than 10 ppm observed, unless otherwise noted
10/1/2018 10/1/2018 31.5
CAH
MAG Advance Drill Technologies, Inc. Hollow-stem Auger
Diedrich D-50 turboDrilling Equipment
Automatic 140 (lbs) / 30 (in) Drop
WA State Plane North NAD83 (feet)
1219083 210393
NAVD88
Easting (X) Northing (Y)
Surface Elevation (ft) Vertical Datum
Drilled Start End Total
Depth (ft) Logged By Checked By
Hammer Data
System Datum
Driller Drilling Method
Groundwater not observed at time of exploration
Note: See Figure A-1 for explanation of symbols.
Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Locational Survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Manchester, Washington
0144-418-03
Log of Boring B-1 Manchester Tank Farm Improvements
Figure A-2
D at e:
/2
/1
P at h:
W
PR
O
JE
C
TS
\0
\0
\0
\G
IN
T\
.G
PJ
D
B Li br ar y/ Li br ar y:
G
EO
EN
G
IN
EE
R
S _D
F_ S
TD
_U
S _J
U N
E_
.G
LB
/G
EI
_G
EO
TE
C
H _S
TA
N
D
AR
D
F_ N
O _G
W
REMARKS
M oi st ur e C on te nt
Fi ne s C on te nt
FIELD DATA
MATERIAL
DESCRIPTION
S am pl e
N am e Te st in g
R ec ov er ed (i n)
In te rv al
B lo w s/ fo ot
C ol le ct ed S am pl e
D ep th (f ee t)
G ra ph ic
L og
G ro up C la ss ifi ca tio n
El ev at io n (f ee t)
AL (LL = 44; PI = 19)
4 inches asphalt concrete pavement Brown silty fine to coarse sand with gravel (moist) (fill)
Brown and tan sandy silt (medium stiff, moist)
Brown lean clay with occasional sand (medium stiff to stiff, moist)
Grades to with occasional sand and trace organic matter
Gray silty fine to coarse sand with gravel (loose to medium dense, moist)
Becomes brown; grades to with trace fragments of burnt wood and sandstone; oxidation staining
Gray silty fine to coarse sand with gravel (very dense, moist) (glacially consolidated soils)
%F
MC
AL
SA
%F
MC
%F
50/5"
AC
SM
ML
CL
SM
SM
Notes:
Density based on autohammer efficiency of 80% Environmental screening performed; no sheen or headspace vapor concentration greater than 10 ppm observed, unless otherwise noted
10/4/2018 10/4/2018 31
CAH
MAG Advance Drill Technologies, Inc. Hollow-stem Auger
Diedrich D-50 turboDrilling Equipment
Automatic 140 (lbs) / 30 (in) Drop
WA State Plane North NAD83 (feet)
1218987 210177
NAVD88
Easting (X) Northing (Y)
Surface Elevation (ft) Vertical Datum
Drilled Start End Total
Depth (ft) Logged By Checked By
Hammer Data
System Datum
Driller Drilling Method
Groundwater not observed at time of exploration
Note: See Figure A-1 for explanation of symbols.
Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Locational Survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Manchester, Washington
0144-418-03
Log of Boring B-2 Manchester Tank Farm Improvements
Figure A-3
D at e:
/2
/1
P at h:
W
PR
O
JE
C
TS
\0
\0
\0
\G
IN
T\
.G
PJ
D
B Li br ar y/ Li br ar y:
G
EO
EN
G
IN
EE
R
S _D
F_ S
TD
_U
S _J
U N
E_
.G
LB
/G
EI
_G
EO
TE
C
H _S
TA
N
D
AR
D
F_ N
O _G
W
REMARKS
M oi st ur e C on te nt
Fi ne s C on te nt
FIELD DATA
MATERIAL
DESCRIPTION
S am pl e
N am e Te st in g
R ec ov er ed (i n)
In te rv al
B lo w s/ fo ot
C ol le ct ed S am pl e
D ep th (f ee t)
G ra ph ic
L og
G ro up C la ss ifi ca tio n
El ev at io n (f ee t)
Driller noted perched groundwater observed at 20 feet at time of drilling
AL (LL = 35; PI = 15)
Vegetated surface/grass Light brown silty fine to medium sand with gravel
(moist) (fill)
Brown silty fine to coarse sand with occasional gravel;
pockets of silt (loose to medium dense, moist)
Becomes gray and wet; grades to without pockets of silt
Becomes moist to wet; grades to with trace gravel
Becomes brown and wet; grades to with occasional gravel
Brown lean clay with gravel; pockets of silty sand (stiff, moist to wet)
Dark brown silty fine sand (very dense, moist) (glacially consolidated soils)
MC
%F
%F
%F
AL
%F
SOD
SM
SM
CL
SM
Notes:
Density based on autohammer efficiency of 80% Environmental screening performed; no sheen or headspace vapor concentration greater than 10 ppm observed, unless otherwise noted
10/1/2018 10/1/2018 31.5
CAH
MAG Advance Drill Technologies, Inc. Hollow-stem Auger
Diedrich D-50 turboDrilling Equipment
Automatic 140 (lbs) / 30 (in) Drop
WA State Plane North NAD83 (feet)
1218902 210504
94.5
NAVD88
Easting (X) Northing (Y)
Surface Elevation (ft) Vertical Datum
Drilled Start End Total
Depth (ft) Logged By Checked By
Hammer Data
System Datum
Driller Drilling Method
See "Remarks" section for groundwater observed
Note: See Figure A-1 for explanation of symbols.
Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Locational Survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Manchester, Washington
0144-418-03
Log of Boring B-3 Manchester Tank Farm Improvements
Figure A-4
D at e:
/2
/1
P at h:
W
PR
O
JE
C
TS
\0
\0
\0
\G
IN
T\
.G
PJ
D
B Li br ar y/ Li br ar y:
G
EO
EN
G
IN
EE
R
S _D
F_ S
TD
_U
S _J
U N
E_
.G
LB
/G
EI
_G
EO
TE
C
H _S
TA
N
D
AR
D
F_ N
O _G
W
REMARKS
M oi st ur e C on te nt
Fi ne s C on te nt
FIELD DATA
MATERIAL
DESCRIPTION
S am pl e
N am e Te st in g
R ec ov er ed (i n)
In te rv al
B lo w s/ fo ot
C ol le ct ed S am pl e
D ep th (f ee t)
G ra ph ic
L og
G ro up C la ss ifi ca tio n
El ev at io n (f ee t)
Poor sample recovery; California sampler used to obtain additional sample
Vegetated surface/grass Brown silty fine to medium sand with gravel (medium dense, moist) (fill)
Grades to with trace wood debris; silt lenses
Dark brown silty fine to coarse sand with gravel and wood debris (loose, moist)
Gray silty fine to medium sand with gravel (medium dense to dense, moist)
Becomes brown; grades to with occasional wood debris; sandy silt interbeds
Brown sandy silt; oxidation staining (hard, moist)
Gray silty fine to coarse sand with gravel (very dense, moist) (glacially consolidated soils)
Grades to with oxidation staining
MC
%F
%F
6A %F 6B
%F
SOD
SM
SM
SM
ML
SM
Notes:
Density based on autohammer efficiency of 80% Environmental screening performed; no sheen or headspace vapor concentration greater than 10 ppm observed, unless otherwise noted
10/3/2018 10/3/2018 31.5
CAH
MAG Advance Drill Technologies, Inc. Hollow-stem Auger
Diedrich D-50 turboDrilling Equipment
Automatic 140 (lbs) / 30 (in) Drop
WA State Plane North NAD83 (feet)
1218721 210396
117.5
NAVD88
Easting (X) Northing (Y)
Surface Elevation (ft) Vertical Datum
Drilled Start End Total
Depth (ft) Logged By Checked By
Hammer Data
System Datum
Driller Drilling Method
Groundwater not observed at time of exploration
Note: See Figure A-1 for explanation of symbols.
Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Locational Survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Manchester, Washington
0144-418-03
Log of Boring B-4 Manchester Tank Farm Improvements
Figure A-5
D at e:
/2
/1
P at h:
W
PR
O
JE
C
TS
\0
\0
\0
\G
IN
T\
.G
PJ
D
B Li br ar y/ Li br ar y:
G
EO
EN
G
IN
EE
R
S _D
F_ S
TD
_U
S _J
U N
E_
.G
LB
/G
EI
_G
EO
TE
C
H _S
TA
N
D
AR
D
F_ N
O _G
W
REMARKS
M oi st ur e C on te nt
Fi ne s C on te nt
FIELD DATA
MATERIAL
DESCRIPTION
S am pl e
N am e Te st in g
R ec ov er ed (i n)
In te rv al
B lo w s/ fo ot
C ol le ct ed S am pl e
D ep th (f ee t)
G ra ph ic
L og
G ro up C la ss ifi ca tio n
El ev at io n (f ee t)
Poor sample recovery; California sampler used to obtain additional sample Driller noted hard drilling
Rock in cuttings Poor sample recovery; California sampler used to obtain additional sample
Vegetated surface/grass Brown silty fine sand with occasional gravel (moist) (fill)
Brown silty fine to medium sand with occasional gravel;
oxidation staining (medium dense, moist)
Grades to with gravel
Gray fine to coarse gravel with silt and sand (very dense, moist) (glacially consolidated soils)
Gray silty fine to coarse sand with gravel (very dense, moist)
Grades to with occasional gravel; less fines
Grades to without occasional gravel
MC
%F
SA
%F
%F
50/5"
50/5"
50/5"
SOD
SM
SM
GP-GM
SM
Notes:
Density based on autohammer efficiency of 80% Environmental screening performed; no sheen or headspace vapor concentration greater than 10 ppm observed, unless otherwise noted
10/3/2018 10/3/2018 31.5
CAH
MAG Advance Drill Technologies, Inc. Hollow-stem Auger
Diedrich D-50 turboDrilling Equipment
Automatic 140 (lbs) / 30 (in) Drop
WA State Plane North NAD83 (feet)
1218850 210702
NAVD88
Easting (X) Northing (Y)
Surface Elevation (ft) Vertical Datum
Drilled Start End Total
Depth (ft) Logged By Checked By
Hammer Data
System Datum
Driller Drilling Method
Groundwater not observed at time of exploration
Note: See Figure A-1 for explanation of symbols.
Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Locational Survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Manchester, Washington
0144-418-03
Log of Boring B-5 Manchester Tank Farm Improvements
Figure A-6
D at e:
/2
/1
P at h:
W
PR
O
JE
C
TS
\0
\0
\0
\G
IN
T\
.G
PJ
D
B Li br ar y/ Li br ar y:
G
EO
EN
G
IN
EE
R
S _D
F_ S
TD
_U
S _J
U N
E_
.G
LB
/G
EI
_G
EO
TE
C
H _S
TA
N
D
AR
D
F_ N
O _G
W
REMARKS
M oi st ur e C on te nt
Fi ne s C on te nt
FIELD DATA
MATERIAL
DESCRIPTION
S am pl e
N am e Te st in g
R ec ov er ed (i n)
In te rv al
B lo w s/ fo ot
C ol le ct ed S am pl e
D ep th (f ee t)
G ra ph ic
L og
G ro up C la ss ifi ca tio n
El ev at io n (f ee t)
*Blow counts may not be representative; rock stuck in sampler shoe
Vegetated surface/grass Light brown silty fine sand with trace gravel and organic matter (grass and roots) (moist) (fill)
Brown fine to coarse sand with silt and gravel (very dense, moist) (glacially consolidated soils)
Brown silty fine to coarse sand with gravel (very dense, moist)
Brown silty fine to medium sand with occasional gravel (very dense, moist)
Grades to with trace gravel
%F
%F
SA
%F
%F
42*
50/3"
SOD
SM
SP-SM
SM
SM
Notes:
Density based on autohammer efficiency of 80% Environmental screening performed; no sheen or headspace vapor concentration greater than 10 ppm observed, unless otherwise noted
10/2/2018 10/2/2018 30.75
CAH
MAG Advance Drill Technologies, Inc. Hollow-stem Auger
Diedrich D-50 turboDrilling Equipment
Automatic 140 (lbs) / 30 (in) Drop
WA State Plane North NAD83 (feet)
1218609 210596
132.5
NAVD88
Easting (X) Northing (Y)
Surface Elevation (ft) Vertical Datum
Drilled Start End Total
Depth (ft) Logged By Checked By
Hammer Data
System Datum
Driller Drilling Method
Groundwater not observed at time of exploration
Note: See Figure A-1 for explanation of symbols.
Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Locational Survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Manchester, Washington
0144-418-03
Log of Boring B-6 Manchester Tank Farm Improvements
Figure A-7
D at e:
/2
/1
P at h:
W
PR
O
JE
C
TS
\0
\0
\0
\G
IN
T\
.G
PJ
D
B Li br ar y/ Li br ar y:
G
EO
EN
G
IN
EE
R
S _D
F_ S
TD
_U
S _J
U N
E_
.G
LB
/G
EI
_G
EO
TE
C
H _S
TA
N
D
AR
D
F_ N
O _G
W
REMARKS
M oi st ur e C on te nt
Fi ne s C on te nt
FIELD DATA
MATERIAL
DESCRIPTION
S am pl e
N am e Te st in g
R ec ov er ed (i n)
In te rv al
B lo w s/ fo ot
C ol le ct ed S am pl e
D ep th (f ee t)
G ra ph ic
L og
G ro up C la ss ifi ca tio n
El ev at io n (f ee t)
*Blow counts may not be representative, rock fragments in sampler shoe
Poor sample recovery; California sampler used to obtain additional sample
Poor sample recovery; California sampler used to obtain additional sample
Vegetated surface/grass Light brown silty fine sand with gravel (moist) (fill)
Dark gray silty fine to coarse sand with occasional gravel; trace wood debris (loose to medium dense, moist)
Grades to with trace gravel and wood debris
Wood fragments observed in cuttings
Becomes wet
Gray sandy silt (stiff, moist)
Gray silt with organic matter; slickensided; massive (hard, moist) (glacially consolidated soils)
%F
MC
%F
MC
MC
%F
16*
SOD
SM
SM
ML
ML
Notes:
Density based on autohammer efficiency of 80% Environmental screening performed; no sheen or headspace vapor concentration greater than 10 ppm observed, unless otherwise noted
10/1/2018 10/1/2018 31.5
CAH
MAG Advance Drill Technologies, Inc. Hollow-stem Auger
Diedrich D-50 turboDrilling Equipment
Automatic 140 (lbs) / 30 (in) Drop
WA State Plane North NAD83 (feet)
1218691 210191
96.5
NAVD88
Easting (X) Northing (Y)
Surface Elevation (ft) Vertical Datum
Drilled Start End Total
Depth (ft) Logged By Checked By
Hammer Data
System Datum
Driller Drilling Method
Groundwater not observed at time of exploration
Note: See Figure A-1 for explanation of symbols.
Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Locational Survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Manchester, Washington
0144-418-03
Log of Boring B-7 Manchester Tank Farm Improvements
Figure A-8
D at e:
/2
/1
P at h:
W
PR
O
JE
C
TS
\0
\0
\0
\G
IN
T\
.G
PJ
D
B Li br ar y/ Li br ar y:
G
EO
EN
G
IN
EE
R
S _D
F_ S
TD
_U
S _J
U N
E_
.G
LB
/G
EI
_G
EO
TE
C
H _S
TA
N
D
AR
D
F_ N
O _G
W
REMARKS
M oi st ur e C on te nt
Fi ne s C on te nt
FIELD DATA
MATERIAL
DESCRIPTION
S am pl e
N am e Te st in g
R ec ov er ed (i n)
In te rv al
B lo w s/ fo ot
C ol le ct ed S am pl e
D ep th (f ee t)
G ra ph ic
L og
G ro up C la ss ifi ca tio n
El ev at io n (f ee t)
Rock fragments in sampler shoe
Vegetated surface/grass Light brown silt with sand and trace gravel (moist) (fill)
Dark brown silty fine to medium sand with occasional gravel (loose, moist)
Brown silty fine to medium sand with occasional gravel and trace wood debris (loose, moist)
Brown silty fine to coarse sand with occasional gravel (very dense, moist) (glacially consolidated soils)
Grades to without occasional gravel
Brown sandy silt (hard, moist)
Brown silty fine to coarse sand (very dense, moist)
%F
MC
%F
%F
%F
90/11"
SOD
ML
SM
SM
SM
ML
SM
Notes:
Density based on autohammer efficiency of 80% Environmental screening performed; no sheen or headspace vapor concentration greater than 10 ppm observed, unless otherwise noted
10/2/2018 10/2/2018 31.5
CAH
MAG Advance Drill Technologies, Inc. Hollow-stem Auger
Diedrich D-50 turboDrilling Equipment
Automatic 140 (lbs) / 30 (in) Drop
WA State Plane North NAD83 (feet)
1218460 210367
109.5
NAVD88
Easting (X) Northing (Y)
Surface Elevation (ft) Vertical Datum
Drilled Start End Total
Depth (ft) Logged By Checked By
Hammer Data
System Datum
Driller Drilling Method
Groundwater not observed at time of exploration
Note: See Figure A-1 for explanation of symbols.
Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Locational Survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Manchester, Washington
0144-418-03
Log of Boring B-8 Manchester Tank Farm Improvements
Figure A-9
D at e:
/2
/1
P at h:
W
PR
O
JE
C
TS
\0
\0
\0
\G
IN
T\
.G
PJ
D
B Li br ar y/ Li br ar y:
G
EO
EN
G
IN
EE
R
S _D
F_ S
TD
_U
S _J
U N
E_
.G
LB
/G
EI
_G
EO
TE
C
H _S
TA
N
D
AR
D
F_ N
O _G
W
REMARKS
M oi st ur e C on te nt
Fi ne s C on te nt
FIELD DATA
MATERIAL
DESCRIPTION
S am pl e
N am e Te st in g
R ec ov er ed (i n)
In te rv al
B lo w s/ fo ot
C ol le ct ed S am pl e
D ep th (f ee t)
G ra ph ic
L og
G ro up C la ss ifi ca tio n
El ev at io n (f ee t)
Easy drilling
Rock fragments in cuttings
Vegetated surface/grass Light brown silty fine sand with gravel (moist) (fill)
Brown silty fine to coarse sand with trace gravel;
oxidation staining (loose to medium dense, moist)
Gray silty fine sand (dense to very dense, moist) (glacially consolidated soils)
MC
%F
%F
4A
4B
SA
%F
SOD
SM
SM
SM
Notes:
Density based on autohammer efficiency of 80% Environmental screening performed; no sheen or headspace vapor concentration greater than 10 ppm observed, unless otherwise noted
10/2/2018 10/2/2018 31.5
CAH
MAG Advance Drill Technologies, Inc. Hollow-stem Auger
Diedrich D-50 turboDrilling Equipment
Automatic 140 (lbs) / 30 (in) Drop
WA State Plane North NAD83 (feet)
1218353 210315
NAVD88
Easting (X) Northing (Y)
Surface Elevation (ft) Vertical Datum
Drilled Start End Total
Depth (ft) Logged By Checked By
Hammer Data
System Datum
Driller Drilling Method
Groundwater not observed at time of exploration
Note: See Figure A-1 for explanation of symbols.
Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Locational Survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Manchester, Washington
0144-418-03
Log of Boring B-9 Manchester Tank Farm Improvements
Figure A-10
D at e:
/2
/1
P at h:
W
PR
O
JE
C
TS
\0
\0
\0
\G
IN
T\
.G
PJ
D
B Li br ar y/ Li br ar y:
G
EO
EN
G
IN
EE
R
S _D
F_ S
TD
_U
S _J
U N
E_
.G
LB
/G
EI
_G
EO
TE
C
H _S
TA
N
D
AR
D
F_ N
O _G
W
REMARKS
M oi st ur e C on te nt
Fi ne s C on te nt
FIELD DATA
MATERIAL
DESCRIPTION
S am pl e
N am e Te st in g
R ec ov er ed (i n)
In te rv al
B lo w s/ fo ot
C ol le ct ed S am pl e
D ep th (f ee t)
G ra ph ic
L og
G ro up C la ss ifi ca tio n
El ev at io n (f ee t)
Siltier material in sampler shoe
Vegetated surface/grass Light brown silty fine sand with trace gravel (medium dense, moist) (fill)
Gray silty fine sand; oxidation staining (medium dense, moist)
Brown silty fine to medium sand (very dense, moist)
Brown silty fine to coarse sand and trace gravel (very dense, moist) (glacially consolidated soils)
Brown silty fine sand (very dense, moist)
Grades to with sandy silt interbeds
%F
MC
%F
4A
4B
SA
%F
SOD
SM
SM
SM
SM
SM
Notes:
Density based on autohammer efficiency of 80% Environmental screening performed; no sheen or headspace vapor concentration greater than 10 ppm observed, unless otherwise noted
10/4/2018 10/4/2018 31.5
CAH
MAG Advance Drill Technologies, Inc. Hollow-stem Auger
Diedrich D-50 turboDrilling Equipment
Automatic 140 (lbs) / 30 (in) Drop
WA State Plane North NAD83 (feet)
1218400 210547
129.5
NAVD88
Easting (X) Northing (Y)
Surface Elevation (ft) Vertical Datum
Drilled Start End Total
Depth (ft) Logged By Checked By
Hammer Data
System Datum
Driller Drilling Method
Groundwater not observed at time of exploration
Note: See Figure A-1 for explanation of symbols.
Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Locational Survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Manchester, Washington
0144-418-03
Log of Boring B-10 Manchester Tank Farm Improvements
Figure A-11
D at e:
/2
/1
P at h:
W
PR
O
JE
C
TS
\0
\0
\0
\G
IN
T\
.G
PJ
D
B Li br ar y/ Li br ar y:
G
EO
EN
G
IN
EE
R
S _D
F_ S
TD
_U
S _J
U N
E_
.G
LB
/G
EI
_G
EO
TE
C
H _S
TA
N
D
AR
D
F_ N
O _G
W
REMARKS
M oi st ur e C on te nt
Fi ne s C on te nt
FIELD DATA
MATERIAL
DESCRIPTION
S am pl e
N am e Te st in g
R ec ov er ed (i n)
In te rv al
B lo w s/ fo ot
C ol le ct ed S am pl e
D ep th (f ee t)
G ra ph ic
L og
G ro up C la ss ifi ca tio n
El ev at io n (f ee t)
Harder drilling at 13 feet
Vegetated surface/grass Light brown silty fine sand (moist) (fill)
Brown silty fine to coarse sand with trace gravel and occasional organic matter (roots and wood) (loose, moist)
Brown silty fine to medium sand with trace gravel (very loose to loose, moist to wet)
Brown silty fine to medium sand (dense to very dense, moist) (glacially consolidated soils)
Becomes dark brown
MC
%F
MC
%F
%F
%F
50/6"
50/6"
SOD
SM
SM
SM
SM
Notes:
Density based on autohammer efficiency of 80% Environmental screening performed; no sheen or headspace vapor concentration greater than 10 ppm observed, unless otherwise noted
10/2/2018 10/2/2018 31
CAH
MAG Advance Drill Technologies, Inc. Hollow-stem Auger
Diedrich D-50 turboDrilling Equipment
Automatic 140 (lbs) / 30 (in) Drop
WA State Plane North NAD83 (feet)
1218501 210735
140.5
NAVD88
Easting (X) Northing (Y)
Surface Elevation (ft) Vertical Datum
Drilled Start End Total
Depth (ft) Logged By Checked By
Hammer Data
System Datum
Driller Drilling Method
Groundwater not observed at time of exploration
Note: See Figure A-1 for explanation of symbols.
Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Locational Survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Manchester, Washington
0144-418-03
Log of Boring B-11 Manchester Tank Farm Improvements
Figure A-12
D at e:
/2
/1
P at h:
W
PR
O
JE
C
TS
\0
\0
\0
\G
IN
T\
.G
PJ
D
B Li br ar y/ Li br ar y:
G
EO
EN
G
IN
EE
R
S _D
F_ S
TD
_U
S _J
U N
E_
.G
LB
/G
EI
_G
EO
TE
C
H _S
TA
N
D
AR
D
F_ N
O _G
W
REMARKS
M oi st ur e C on te nt
Fi ne s C on te nt
FIELD DATA
MATERIAL
DESCRIPTION
S am pl e
N am e Te st in g
R ec ov er ed (i n)
In te rv al
B lo w s/ fo ot
C ol le ct ed S am pl e
D ep th (f ee t)
G ra ph ic
L og
G ro up C la ss ifi ca tio n
El ev at io n (f ee t)
Vegetated surface/grass Light brown silty fine sand with trace gravel (medium dense, moist) (fill)
Becomes brown; grades to with organic matter (roots) Brown silty fine to medium sand; oxidation staining
(medium dense to dense, moist) (glacially consolidated soils)
Grades to without oxidation staining Gray silty fine to medium sand with trace gravel (dense, moist)
Gray silt with sand (hard, moist)
Gray silty fine sand (dense to very dense, moist)
Grades to with oxidation staining; increased fines content
MC
%F
%F
%F
5A
5B
%F
SOD
SM
SM
SM
ML
SM
Notes:
Density based on autohammer efficiency of 80% Environmental screening performed; no sheen or headspace vapor concentration greater than 10 ppm observed, unless otherwise noted
10/3/2018 10/3/2018 31.5
CAH
MAG Advance Drill Technologies, Inc. Hollow-stem Auger
Diedrich D-50 turboDrilling Equipment
Automatic 140 (lbs) / 30 (in) Drop
WA State Plane North NAD83 (feet)
1218230 210534
NAVD88
Easting (X) Northing (Y)
Surface Elevation (ft) Vertical Datum
Drilled Start End Total
Depth (ft) Logged By Checked By
Hammer Data
System Datum
Driller Drilling Method
Groundwater not observed at time of exploration
Note: See Figure A-1 for explanation of symbols.
Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Locational Survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Manchester, Washington
0144-418-03
Log of Boring B-12 Manchester Tank Farm Improvements
Figure A-13
D at e:
/2
/1
P at h:
W
PR
O
JE
C
TS
\0
\0
\0
\G
IN
T\
.G
PJ
D
B Li br ar y/ Li br ar y:
G
EO
EN
G
IN
EE
R
S _D
F_ S
TD
_U
S _J
U N
E_
.G
LB
/G
EI
_G
EO
TE
C
H _S
TA
N
D
AR
D
F_ N
O _G
W
REMARKS
M oi st ur e C on te nt
Fi ne s C on te nt
FIELD DATA
MATERIAL
DESCRIPTION
S am pl e
N am e Te st in g
R ec ov er ed (i n)
In te rv al
B lo w s/ fo ot
C ol le ct ed S am pl e
D ep th (f ee t)
G ra ph ic
L og
G ro up C la ss ifi ca tio n
El ev at io n (f ee t)
Hard drilling
*Blow count may not be representative
*Blow count may not be representative Poor sample recovery; California sampler used to obtain additional sample
AL (LL = 62; PI = 31)
Vegetated surface/grass Brown silty fine sand with trace gravel (moist) (fill)
Gray silty fine to medium sand with trace gravel and organic matter (wood debris); oxidation staining (medium dense, moist)
Gray silty fine to medium sand (medium dense, moist) (glacially consolidated soils)
Dark gray fat clay; occasional sand lenses, trace oxidation staining (very stiff to hard, moist)
Grades to without trace oxidation staining
Brown silt with sand (hard, moist)
Glacially consolidated peat and organic matter (hard, moist)
Grades to with wood debris Gray silty fine to coarse sand with gravel (very dense, moist)
%F
%F
MC
AL
%F
%F
22*
25*
50/4"
SOD
SM
SM
SM
CH
ML
PT
SM
Notes:
Density based on autohammer efficiency of 80% Environmental screening performed; no sheen or headspace vapor concentration greater than 10 ppm observed, unless otherwise noted
10/3/2018 10/3/2018 31
CAH
MAG Advance Drill Technologies, Inc. Hollow-stem Auger
Diedrich D-50 turboDrilling Equipment
Automatic 140 (lbs) / 30 (in) Drop
WA State Plane North NAD83 (feet)
1218059 210523
NAVD88
Easting (X) Northing (Y)
Surface Elevation (ft) Vertical Datum
Drilled Start End Total
Depth (ft) Logged By Checked By
Hammer Data
System Datum
Driller Drilling Method
Groundwater not observed at time of exploration
Note: See Figure A-1 for explanation of symbols.
Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Locational Survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Manchester, Washington
0144-418-03
Log of Boring B-13 Manchester Tank Farm Improvements
Figure A-14
D at e:
/2
/1
P at h:
W
PR
O
JE
C
TS
\0
\0
\0
\G
IN
T\
.G
PJ
D
B Li br ar y/ Li br ar y:
G
EO
EN
G
IN
EE
R
S _D
F_ S
TD
_U
S _J
U N
E_
.G
LB
/G
EI
_G
EO
TE
C
H _S
TA
N
D
AR
D
F_ N
O _G
W
REMARKS
M oi st ur e C on te nt
Fi ne s C on te nt
FIELD DATA
MATERIAL
DESCRIPTION
S am pl e
N am e Te st in g
R ec ov er ed (i n)
In te rv al
B lo w s/ fo ot
C ol le ct ed S am pl e
D ep th (f ee t)
G ra ph ic
L og
G ro up C la ss ifi ca tio n
El ev at io n (f ee t)
Vegetated surface/grass Light brown silty fine to medium sand with gravel
(medium dense, moist) (fill)
Becomes brown; oxidation staining
Gray sandy silt with occasional gravel (hard, moist) (glacially consolidated soils)
Gray silty fine to medium sand (very dense, moist)
Gray silty fine to coarse sand (very dense, moist)
MC
%F
SA
%F
%F
50/3"
50/6"
50/6"
50/5"
SOD
SM
ML
SM
SM
Notes:
Density based on autohammer efficiency of 80% Environmental screening performed; no sheen or headspace vapor concentration greater than 10 ppm observed, unless otherwise noted
10/4/2018 10/4/2018 31
CAH
MAG Advance Drill Technologies, Inc. Hollow-stem Auger
Diedrich D-50 turboDrilling Equipment
Automatic 140 (lbs) / 30 (in) Drop
WA State Plane North NAD83 (feet)
1218152 210698
122.5
NAVD88
Easting (X) Northing (Y)
Surface Elevation (ft) Vertical Datum
Drilled Start End Total
Depth (ft) Logged By Checked By
Hammer Data
System Datum
Driller Drilling Method
Groundwater not observed at time of exploration
Note: See Figure A-1 for explanation of symbols.
Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Locational Survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Manchester, Washington
0144-418-03
Log of Boring B-14 Manchester Tank Farm Improvements
Figure A-15
D at e:
/2
/1
P at h:
W
PR
O
JE
C
TS
\0
\0
\0
\G
IN
T\
.G
PJ
D
B Li br ar y/ Li br ar y:
G
EO
EN
G
IN
EE
R
S _D
F_ S
TD
_U
S _J
U N
E_
.G
LB
/G
EI
_G
EO
TE
C
H _S
TA
N
D
AR
D
F_ N
O _G
W
REMARKS
M oi st ur e C on te nt
Fi ne s C on te nt
FIELD DATA
MATERIAL
DESCRIPTION
S am pl e
N am e Te st in g
R ec ov er ed (i n)
In te rv al
B lo w s/ fo ot
C ol le ct ed S am pl e
D ep th (f ee t)
G ra ph ic
L og
G ro up C la ss ifi ca tio n
El ev at io n (f ee t)
Vegetated surface/grass Brown silty fine to coarse sand with occasional gravel
(moist) (fill)
Brown sandy silt; oxidation staining (very stiff to hard, moist) (glacially consolidated soils)
Brown silty fine to medium sand (very dense, moist)
Gray silt with sand (hard, moist)
Gray silty fine sand (very dense, moist)
MC
SA
%F
%F
%F
SOD
SM
ML
SM
ML
SM
Notes:
Density based on autohammer efficiency of 80% Environmental screening performed; no sheen or headspace vapor concentration greater than 10 ppm observed, unless otherwise noted
10/4/2018 10/4/2018 31.5
CAH
MAG Advance Drill Technologies, Inc. Hollow-stem Auger
Diedrich D-50 turboDrilling Equipment
Automatic 140 (lbs) / 30 (in) Drop
WA State Plane North NAD83 (feet)
1218161 210866
NAVD88
Easting (X) Northing (Y)
Surface Elevation (ft) Vertical Datum
Drilled Start End Total
Depth (ft) Logged By Checked By
Hammer Data
System Datum
Driller Drilling Method
Groundwater not observed at time of exploration
Note: See Figure A-1 for explanation of symbols.
Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Locational Survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Manchester, Washington
0144-418-03
Log of Boring B-15 Manchester Tank Farm Improvements
Figure A-16
D at e:
/2
/1
P at h:
W
PR
O
JE
C
TS
\0
\0
\0
\G
IN
T\
.G
PJ
D
B Li br ar y/ Li br ar y:
G
EO
EN
G
IN
EE
R
S _D
F_ S
TD
_U
S _J
U N
E_
.G
LB
/G
EI
_G
EO
TE
C
H _S
TA
N
D
AR
D
F_ N
O _G
W
REMARKS
M oi st ur e C on te nt
Fi ne s C on te nt
FIELD DATA
MATERIAL
DESCRIPTION
S am pl e
N am e Te st in g
R ec ov er ed (i n)
In te rv al
B lo w s/ fo ot
C ol le ct ed S am pl e
D ep th (f ee t)
G ra ph ic
L og
G ro up C la ss ifi ca tio n
El ev at io n (f ee t)
Driller noted possible perched groundwater observed at 16 feet at time of drilling
Vegetated surface/grass Brown silty fine sand with gravel and organic matter
(grass and roots) (moist) (fill)
Brown silty fine to coarse sand (medium dense, moist)
Gray silty fine to medium sand with gravel (loose to medium dense, moist)
Becomes moist to wet; grades to with occasional gravel and trace organic matter
Becomes moist; grades to with trace gravel; oxidation staining
Becomes moist to wet; grades to with gravel
Gray silty fine sand (very dense, moist) (glacially consolidated soils)
MC
%F
%F
%F
7A 7B
SOD
SM
SM
SM
SM
Notes:
Density based on autohammer efficiency of 80% Environmental screening performed; no sheen or headspace vapor concentration…
This is the start of the file's text. The full file is on GovTribe.