This document is an amendment to a solicitation for a construction contract. The Navy is seeking proposals to construct new aboveground storage tanks and associated secondary containment and roadways at the Manchester Fuel Depot in Manchester, Washington. The required work includes design, repair, labor, materials and equipment to build new multi-product fixed-cone roof tanks that are 100% internally coated and connected to JP-5 and F-76 piping systems, while avoiding mapped seismic fault lines. Some work will be located in potentially contaminated areas. The proposal due date was extended from December 15, 2020 to January 4, 2021 in response to inquiries. Details on prior site visits and responses to questions are appended.

View the file

Other files

File Type Posted
Amendment 0013.pdf PDF
Amendment 0012.pdf PDF
Amendment 0012.pdf PDF
Amendment 0011.pdf PDF
Amendment 0010.pdf PDF
PPI Responses 10.pdf PDF
Revised Wage Determination.pdf PDF
Amendment 0009.pdf PDF
PPI Responses 9.pdf PDF
Amendment 0009.pdf PDF
Amendment 0008.pdf PDF
PPI Responses 7.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
Amendment 0007.pdf PDF
Attachment Contractor Environmental and Safety Guide January 2020.pdf PDF
PPI Responses 6.pdf PDF
Attachment Chemical Analytical Data Report.pdf PDF
Attachment Merchantable Timber Requirements.pdf PDF
Attachment MFD Contractor Dig Permit.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
PPI Responses 5.pdf PDF
Picture 2 Pole 13 Photo.pdf PDF
Picture 1 Junction Box Photo.pdf PDF
Attachment N SECNAV 5512 Form.pdf PDF
Amendment 0004.pdf PDF
PPI Responses 0004.pdf PDF
Attachment J Base Access Request Form 2.xls XLS spreadsheet
PPI Responses.pdf PDF
Site Visit Sign In Sheet.pdf PDF
Amendment 0002.pdf PDF
Attachment 0001 SECNAV 5512 Form.pdf PDF
Amendment 0001.pdf PDF
Solicitation_N44255-21-R-2000.pdf PDF
Attachment M COVID-19 Screening Questionnaire.pdf PDF
Attachment H Construction Wage Determination.pdf PDF
Attachment K Small Business Subcontracting Record.docx DOCX document
Attachments A-B-C-D-E-F-G-H-I.docx DOCX document
Attachment J Base Access Request Form.xls XLS spreadsheet
Attachment I EXAMPLE Overhead Forms.xlsx XLSX spreadsheet
Attachment L Small Business Participation and Commitment Strategy.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

P856 Manchester Tank Farm Improvements, Manchester, WA

See page tw o for description of amendment.

1. CONTRACT ID CODE PAGE OF PAGES

1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Nov-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4425521R2000

X 9B. DATED (SEE ITEM 11)

19-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Nov-2020

CODE

NAVFAC NORTHWEST

1101 TAUTOG CIRCLE

SILVERDALE WA 98315-1101

N44255 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4425521R2000

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

CHANGE SUMMARY

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003

The following items is applicable to this modification:

a. Proposal due date changed.

b. Responses to Pre-Proposal Inquiries (PPI’s). See attachment.

c. Site-visit check-in sheet. See attachment.

a. SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 15-Dec-2020 02:00 PM to 4-Jan-2021 02:00 PM.

Pre-proposal inquiries during will be accepted up to 15 days prior to solicitation due date unless specified otherwise via amendment.

SECTION 00600 - REPRESENTATIONS & CERTIFICATIONS

The following have been added by full text:

52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)

The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services-- Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and Certifications- Commercial Items. The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the Offeror has represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26, or in paragraph (v)(2)(ii) of the provision at 52.212-3.

(a) Definitions. As used in this provision-

Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

(b) Prohibition.

(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.

115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to--

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.

115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to--

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services."

(d) Representations. The Offeror represents that--

(1) It [] will, [] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and

(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that--

It [] does, [] does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.

(e) Disclosures.

(1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:

(i) For covered equipment--

(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);

(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and

(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.

(ii) For covered services--

(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or

(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.

(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:

(i) For covered equipment--

(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);

(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and

(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.

(ii) For covered services--

(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or

(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.

(End of provision)

52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION (OCT

2020)

(a) Definitions. As used in this provision, “covered telecommunications equipment or services” and "reasonable inquiry" have the meaning provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

(b) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for “covered telecommunications equipment or services”.

(c) Representations.

(1) The Offeror represents that it [ ___ ] does, [ ___ ] does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument.

(2) After conducting a reasonable inquiry for purposes of this representation, the offeror represents that it [ ___ ] does, [ ___ ] does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services.

(End of provision)

The following have been deleted:

52.204-24 Representation Regarding Certain Telecommunications and

Video Surveillance Services or Equipment.

AUG 2020

52.204-26 Covered Telecommunications Equipment or Services-- Representation.

DEC 2019

SECTION 00700 - CONTRACT CLAUSES

The following have been added by reference:

52.222-50 Combating Trafficking in Persons OCT 2020

The following have been added by full text:

252.215-7997 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN

CERTIFIED COST OR PRICING DATA—MODIFICATIONS—SECTION 890 PILOT PROGRAM (DEVIATION

2020-O0020) (AUG 2020)

This deviation clause is only applicable to contract modifications that have been approved by the Director, Defense Pricing and Contracting (DPC)/Pricing and Contracting Initiatives (PCI) for participation in the pilot program implementing section 890 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2019 (Pub. L. 115-232), as amended by section 825 of the NDAA for FY 2020 (Pub. L. 116-92). The intent of this pilot program is to test the efficacy of basing price reasonableness determinations primarily on actual costs of performance for prior purchases of the same or similar products for the Department of Defense.

(a) Exceptions from certified cost or pricing data.

(1) In lieu of submitting certified cost or pricing data for modifications under this contract, for price adjustments expected to exceed the threshold set forth in Federal Acquisition Regulation (FAR) 15.403-4(a)(1) on the date of the agreement on price or the date of the award, whichever is later, the Contractor may submit a written request for exception by submitting the information described in paragraphs (a)(1)(i) and (ii) of this clause. If the threshold for submission of certified cost or pricing data specified in FAR 15.403-4(a)(1) is adjusted for inflation as set forth in FAR 1.109(a), then pursuant to FAR 1.109(d) the changed threshold applies throughout the remaining term of the contract, unless there is a subsequent threshold adjustment. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable—

(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.

(ii) Information on modifications of contracts or subcontracts for commercial items.

(A) If—

(1) The original contract or subcontract was granted an exception from certified cost or pricing data requirements because the price agreed upon was based on adequate price competition or prices set by law or regulation, or was a contract or subcontract for the acquisition of a commercial item; and

(2) The modification (to the contract or subcontract) is not exempted based on one of these exceptions, then the Contractor may provide information to establish that the modification would not change the contract or subcontract from a contract or subcontract for the acquisition of a commercial item to a contract or subcontract for the acquisition of an item other than a commercial item.

(B) For a commercial item exception, the Contractor shall provide, at a minimum, information on prices at which the same item or similar items have previously been sold that is adequate for evaluating the reasonableness of the price of the modification. Such information may include—

(1) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities.

(2) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market.

(3) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.

(2) The Contractor grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this clause, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the Contractor’s determination of the prices to be offered in the catalog or marketplace.

(b) Requirements for certified cost or pricing data. If the Contractor is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:

(1) In lieu of providing complete cost or pricing data in accordance with the clause at FAR 52.215-21 of this contract, the Contractor shall submit a subset of cost or pricing data, data other than certified cost or pricing data, and supporting attachments as specified by the Contracting Officer in the request for proposal for the modification. The Contracting Officer will list the specific cost or pricing data deemed necessary to stablish price reasonableness for this contract modification, and describe the required submission format for each type of data. At a minimum, the Contracting Officer will identify the specific prior DoD purchases of the same or similar products for which the contractor is required to submit the actual cost of performance. The Contractor is not required to submit cost or pricing data that is not listed within the request for proposal for the modification. If the Contracting Officer finds that additional cost or pricing data are needed in order to determine that the price is fair and reasonable, the Contracting Officer will issue an amendment to the request for proposal, and the Contractor will be required to submit the additional data.

(2)(i) As soon as practicable after agreement on price, but before award (except for unpriced actions), the Contractor shall submit a Certificate of Current Cost or Pricing Data, using the following language:

Certificate of Current Cost or Pricing Data for Contract Modifications Accomplished under the Authority of Section 890 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2019, as amended by Section 825 of the NDAA for

FY 2020

This is to certify that, to the best of my knowledge and belief, the cost or pricing data required for this contract modification, in accordance with the request for proposal for this contract modification and the deviation clause at 252.215-7997, Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data—Modifications— Section 890 Pilot Program (DEVIATION 2020-O0020), and submitted either actually or by specific identification in writing, to the Contracting Officer or to the Contracting Officer's Representative in support of ________* are accurate, complete, and current as of ________**. This certification includes the cost or pricing data supporting any advance agreements and forward pricing rate agreements between the Contractor and the Government that are part of the proposal.

Firm _____________________________________________

Signature _________________________________________

Name ____________________________________________

Title _____________________________________________

Date of execution***________________________________

* Identify the proposal involved, giving the appropriate identifying number (e.g., RFP No.).

** Insert the day, month, and year when price negotiations were concluded and price agreement was reached or, if applicable, an earlier date agreed upon between the parties that is as close as practicable to the date of agreement on price.

*** Insert the day, month, and year of signing, which should be as close as practicable to the date when the price negotiations were concluded and the contract price was agreed to.

(ii) The certificate does not constitute a representation as to the accuracy of the Contractor’s judgment on the estimate of future costs or projections. It applies to the data upon which the judgment or estimate was based. This distinction between fact and judgment should be clearly understood. With respect to the certified cost or pricing data required by paragraphs (b) or (d) of this clause, if the Contractor had information reasonably available at the time of agreement showing that the negotiated price was not based on accurate, complete, and current data, the Contractor’s responsibility is not limited by any lack of personal knowledge of the information on the part of its negotiators.

(iii) The Contracting Officer and Contractor are encouraged to reach a prior agreement on criteria for establishing closing or cutoff dates when appropriate in order to minimize delays associated with proposal updates. Closing or cutoff dates applicable to the certified cost or pricing data required by paragraphs (b)(1) or (d) of this clause should be included as part of the data submitted with the proposal and, before agreement on price, data should be updated by the contractor to the latest closing or cutoff dates for which the data are available. Use of cutoff dates coinciding with reports is acceptable, as certain data may not be reasonably available before normal periodic closing dates (e.g., actual indirect costs). Data within the Contractor’s or a subcontractor’s organization on matters significant to contractor management and to the Government will be treated as reasonably available, if that data was required to be submitted by paragraph (b)(1) or (d)(1) and (d)(2) of this clause. What is significant depends upon the circumstances of each acquisition.

(iv) Possession of a Certificate of Current Cost or Pricing Data is not a substitute for examining and analyzing the Contractor’s proposal.

(v) If certified cost or pricing data are requested by the Government and submitted by the Contractor, but an exception is later found to apply, the data shall not be considered certified cost or pricing data and shall not be certified in accordance with this subsection.

(3) The Contractor is responsible for determining whether a subcontractor qualifies for an exception from the requirement for submission of certified cost or pricing data on the basis of adequate price competition, i.e., two or more responsible offerors, competing independently, submit priced offers that satisfy the Government's expressed requirement in accordance with FAR 15.403-1(c)(1).

(c) Requirements for data other than certified cost or pricing data.

(1) Data other than certified cost or pricing data submitted in accordance with this clause shall include all data necessary to permit a determination that the proposed price is fair and reasonable, to include the requirements in Defense Federal Acquisition Regulation Supplement (DFARS) 215.402(a)(i) and 215.404-1(b).

(2) In cases in which uncertified cost data is required, the information shall be provided in the form in which it is regularly maintained by the Contractor or prospective subcontractor in its business operations.

(3) The Contractor shall provide information described as follows: [Insert description of the data and the format that are required, including access to records necessary to permit an adequate evaluation of the proposed price in accordance with

FAR 15.403-3].

(4) Within 10 days of a written request from the Contracting Officer for additional information to support proposal analysis, the Contractor shall provide either the requested information, or a written explanation for the inability to fully comply.

(5) Subcontract price evaluation.

(i) The Contractor shall obtain from subcontractors the information necessary to support a determination of price reasonableness, as described in FAR part 15 and DFARS part 215.

(ii) No cost information may be required from a prospective subcontractor in any case in which there are sufficient non- Government sales of the same item to establish reasonableness of price.

(iii) If the Contractor relies on relevant sales data for similar items to determine the price is reasonable, the Contractor shall obtain only that technical information necessary—

(A) To support the conclusion that items are technically similar; and

(B) To explain any technical differences that account for variances between the proposed prices and the sales data presented.

(d) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (d), but excluding paragraph (b), in all subcontracts exceeding the simplified acquisition threshold defined in FAR part 2.

(1) For subcontracts above the threshold for submission of certified cost or pricing data in FAR 15.403-4 to which the authority of the Section 890 pilot has been flowed down, in lieu of the requirements in paragraphs (a) and (b) of the clause at 52.215-13, Subcontractor Certified Cost or Pricing Data—Modifications, of this contract, the Contractor shall require the subcontractor to submit a subset of cost or pricing data (actually or by specific identification in writing) as specified in the request for proposal for the modification.

(i) The Contracting Officer will add paragraphs in the request for proposal as necessary to identify each first-tier subcontract to which the authority of the Section 890 pilot has been flowed down, and the specific certified cost or pricing data required for each subcontract. Contracting Officer will list the specific cost or pricing data deemed necessary to determine that the price is fair and reasonable for each subcontract, and describe the required submission format for each type of data. The type and extent of data required may differ based on the dollar value of the subcontract proposal, or other appropriate considerations. At a minimum, the Contracting Officer will identify the specific prior subcontracts awarded in support of the DoD purchases of the same or similar products for which the subcontractor is required to submit the actual cost of performance. The Contracting Officer will specify whether the authority of the Section 890 pilot is further flowed down to any lower-tier subcontract pertaining to each first-tier subcontract. Where the pilot authority is flowed down to lower-tier subcontracts, the Contracting Officer will describe the specific certified cost or pricing data that is to be provided by each affected lower-tier subcontractor. The subcontractor and lower tier subcontractors to which the pilot authority is flowed down are not required to submit certified cost or pricing data that is not listed within the request for proposal.

(ii) In the event a subcontractor denies the Contractor access to the data described in paragraph (d)(1)(i) of this clause, the data may be provided directly to the Contracting Officer.

(iii) If a subcontractor is unable to provide the extent of historical actual cost experience required by paragraph (d)(1)(i), then the Contractor shall require the subcontractor to provide certified cost or pricing data in accordance with paragraph (d)(2) of this clause.

(iv) The Contractor shall require the subcontractor to certify in substantially the form prescribed in paragraph (b)(2) of this clause that, to the best of its knowledge and belief, the data submitted under paragraph (d)(1)(i) of this clause were accurate, complete, and current as of the date of agreement on the negotiated price of the subcontract or subcontract modification.

(2) For subcontracts above the threshold for submission of certified cost or pricing data in FAR 15.403-4 to which the authority of the Section 890 pilot has not been flowed down, the Contractor shall require the subcontractor to provide certified cost or pricing data in accordance with the clause at 52.215-13, Subcontractor Certified Cost or Pricing Data– Modifications, of this contract and shall require the subcontractor to certify in substantially the form prescribed in FAR 15.406-2 that, to the best of its knowledge and belief, the data submitted under paragraph (a) of this clause were accurate, complete, and current as of the date of agreement on the negotiated price of the subcontract or subcontract modification.

(End of clause)

252.215-7998 PILOT PROGRAM TO ACCELERATE CONTRACTING AND PRICING PROCESSES

(DEVIATION 2020-O0020) (AUG 2020)

(a) One or more contract actions under this acquisition is accomplished under the authority of section 890 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2019 (Pub. L. 115-232), as amended by section 825 of the NDAA for FY 2020 (Pub. L. 116-92). The intent of this pilot program is to test the efficacy of basing price reasonableness determinations primarily on actual costs of performance for prior purchases of the same or similar products for the Department of Defense.

(b) As a condition of participating in this pilot program, the Contractor shall submit to the Contracting Officer the following:

(1) Verifiable data documenting any proposal preparation and negotiation support savings (time and money) achieved as a result of this pilot program. This data shall be provided—

(i) For contracts that are subject to the pilot program, within 3 months after contract award; or

(ii) For contract modifications that are subject to the pilot program, within 3 months after execution of the modification.

(2) The actual cost of performance for the contract action that was subject to the pilot program. This information shall be provided within 3 months after completion of performance of the part of the contract action that was subject to the pilot program.

(End of clause)

The following have been deleted:

52.222-50 Combating Trafficking in Persons JAN 2019 252.215-7998 (Dev) Pilot Program to Accelerate Contracting and Pricing

Processes (DEVIATION 2019-O0008)

APR 2019