Attachment L Small Business Participation and Commitment Strategy.docx

DOCX document 20 KB Posted

Attached to
MCON P856, Manchester Tank Farm Improvements, Manchester Fuel Depot, Fleet Logistics Center Puget Sound (FLCPS), Manchester, Washington
Solicitation number
N44255-21-R-2000
Issued by

About this file

This document is an Attachment L Small Business Participation and Commitment Strategy related to solicitation number N44255-21-R-2000 for MCON P856, Manchester Tank Farm Improvements at the Manchester Fuel Depot of the Fleet Logistics Center Puget Sound in Manchester, Washington. The contract requirements include the design, repair, labor, materials, equipment, and supervision to construct new aboveground storage tanks within a secondary containment system designed according to UFC 3-460-01. The tanks will be multi-product, internally coated, with fixed cone roofs, and connected to JP-5 and F-76 piping systems while avoiding mapped seismic fault lines. Portions of the associated secondary containment and perimeter roadways will be located within potentially contaminated sites. The Attachment L details the offeror's estimated subcontracting values and commitments to small businesses including small disadvantaged businesses, women-owned small businesses, HUBZone concerns, veteran-owned small businesses, and service-disabled veteran-owned small businesses.

View the file

Other files

File Type Posted
Amendment 0013.pdf PDF
Amendment 0012.pdf PDF
Amendment 0012.pdf PDF
Amendment 0011.pdf PDF
Amendment 0010.pdf PDF
PPI Responses 10.pdf PDF
Revised Wage Determination.pdf PDF
Amendment 0009.pdf PDF
PPI Responses 9.pdf PDF
Amendment 0009.pdf PDF
Amendment 0008.pdf PDF
PPI Responses 7.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
Amendment 0007.pdf PDF
Attachment Contractor Environmental and Safety Guide January 2020.pdf PDF
PPI Responses 6.pdf PDF
Attachment Chemical Analytical Data Report.pdf PDF
Attachment Merchantable Timber Requirements.pdf PDF
Attachment MFD Contractor Dig Permit.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
PPI Responses 5.pdf PDF
Picture 2 Pole 13 Photo.pdf PDF
Picture 1 Junction Box Photo.pdf PDF
Attachment N SECNAV 5512 Form.pdf PDF
Amendment 0004.pdf PDF
PPI Responses 0004.pdf PDF
Attachment J Base Access Request Form 2.xls XLS spreadsheet
PPI Responses.pdf PDF
Amendment 0003.pdf PDF
Site Visit Sign In Sheet.pdf PDF
Amendment 0002.pdf PDF
Attachment 0001 SECNAV 5512 Form.pdf PDF
Amendment 0001.pdf PDF
Solicitation_N44255-21-R-2000.pdf PDF
Attachment M COVID-19 Screening Questionnaire.pdf PDF
Attachment H Construction Wage Determination.pdf PDF
Attachment K Small Business Subcontracting Record.docx DOCX document
Attachments A-B-C-D-E-F-G-H-I.docx DOCX document
Attachment J Base Access Request Form.xls XLS spreadsheet
Attachment I EXAMPLE Overhead Forms.xlsx XLSX spreadsheet
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT L

SMALL BUSINESS PARTICIPATION AND COMMITMENT STRATEGY

(OFFEROR’S NAME)

(ADDRESS)

Solicitation or Contract Number (Title of the Project) (Location) (Date Prepared)

INSERT INTRODUCTION/EXECUTIVE SUMMARY (Up to 2 pages maximum)

SMALL BUSINESS PARTICIPATION AND COMMITMENT STRATEGY – (Base and Option Years)

1. Estimated value of all planned subcontracting$________________
____% of contract
2. Estimated value of all work to be self-performed$________________
____% of contract
3. Total value of the proposal (sum of 1. and 2. above)$________________
100% of contract

4. Subcontracts for products and services to be awarded under this project.

1. Self-Performed Work:

TYPE OF SERVICE/PRODUCT $ VALUE OF WORK

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) _________%

If the Offeror is a small business, the Government will add self-performed work to the appropriate category(ies) in c. (1) through c. (6) below to calculate overall small business participation rates.

1. Other Than Small (OTS) Business Subcontracts**

NAME OF COMPANY* TYPE OF SERVICE/PRODUCT $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) ________%

1. Small Business (SB) Subcontracts

NAME OF COMPANY* TYPE OF SERVICE/PRODUCT $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) ________%

(1) SMALL DISADVANTAGED BUSINESSES: (SDB)

NAME OF COMPANY* TYPE OF SERVICE/PRODUCT $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) ________%

(2) WOMEN-OWNED SMALL BUSINESSES: (WOSB)

NAME OF COMPANY* TYPE OF SERVICE/PRODUCT $ VALUE OF SUBCONTRACT

TOTAL: $_______________
PERCENTAGE OF CONTRACT VALUE (line 3) ________%

(3) HISTORICALLY UNDERUTILIZED BUSINESS ZONE (HUBZone) CONCERN:

NAME OF COMPANY* TYPE OF SERVICES $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) _________%

(4) VETERAN OWNED SMALL BUSINESS: (VOSB)

NAME OF COMPANY* TYPE OF SERVICES $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) __________%

(5) SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS: (SDVOSB)

NAME OF COMPANY* TYPE OF SERVICES $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) ________%

(6) ABILITYONE PROGRAM ORGANIZATIONS

NAME OF ORG* TYPE OF SERVICES $ VALUE OF SUBCONTRACT

TOTAL: $________________
PERCENTAGE OF CONTRACT VALUE (line 3) _________%

* For each company/organization listed, describe the nature of commitment to subcontract and whether or not it is legally binding. If unknown/to be determined, so indicate.

** Include any subcontracts to Historically Black Colleges and Universities/Minority Institutions (HBCU/MI) in the OTS Business listing.

NOTES:

1. The dollar sum of lines 4.b and 4.c (excluding (1)-(6)) must equal line 1.

2. Lines 4.c. (1) through 4.c. (6) identify various subcategories of small businesses. Subcontracts to companies that qualify in multiple categories must be reported under each category. For example: A $100,000 subcontract to ABC, a woman-owned, small disadvantaged business that is also a certified HUBZone concern, will be reported as $100,000 on line 4.c., SB, line 4.c. (1), SDB, line 4.c. (2), WOSB and line 4.c.(3), HUBZone concern.

3. Subcontracts to qualified nonprofit agencies participating in the AbilityOne Program are considered small business subcontracts for the purposes of this strategy and any associated small business subcontracting plan.

INSERT SUPPLEMENTAL NARRATIVES (limited to five pages) TO ADDRESS JOINT VENTURE PARTICULARS AND OTHER STRATEGY ELEMENTS SUCH AS THE NATURE OF COMMITMENTS/AGREEMENTS COVERING POST AWARD ROLES, SPECIFIC INITIATIVES AND TOOLS TO ENHANCE SMALL BUSINESS PARTICIPATION AND CAPABILITIES AND HOW SMALL BUSINESS PARTICIPATION RATES WERE DETERMINED.

CONTRACT LEVEL PERFORMANCE SUMMARY

This document summarizes participation (total contract performance, including self-performance and subcontracted efforts) by type of business entity in terms of both dollar value and percentage of total contract value.

Base

Option 1

Option 2

TOTAL

DOLLARS

Total contract value

OTS Business*

SB*

SDB

WOSB

HUBZone SB

VOSB

SDVOSB

ABILITYONE

PERCENTAGES (of total contract value)

OTS Business*

SB*

OTSB + SB

100
%
100
%
100
%
100
%

SDB

WOSB

HUBZone SB

VOSB

SDVOSB

ABILITYONE

Include additional option years if applicable

* The sums of the “OTS Business” and “SB” dollars lines (excluding subcategories) must equal the associated dollar values on the “Total dollar value of this contract” line. The sum of “OTS Business” and “SB” percentage lines (again, excluding subcategories) must equal 100% and represent all work to be performed under the contract.

File details come from the government source that posted it. Updated .