This document contains an excavation permit application and details of a related federal contract opportunity. The excavation permit application provides information on the location and purpose of excavation work, including confirming it is not structural, that the excavation limits have been marked and drawings reviewed. It also notes the competent person overseeing the work, that dewatering and backfill plans and testing requirements have been addressed, and utility locates completed. Environmental and maintenance approvals are indicated along with confirming excavation will not proceed until fully approved.

The related federal contract opportunity is a solicitation to construct new aboveground storage tanks and associated secondary containment systems at the Manchester Fuel Depot in Washington. The contract requirements include design, repair, labor, materials, equipment, supervision and all associated costs. The tanks will be multi-product, internally coated and connected to JP-5 and F-76 piping systems while avoiding mapped seismic fault lines. Portions of secondary containment and roadways will be in potentially contaminated areas. The soliciting agency is the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
Amendment 0013.pdf PDF
Amendment 0012.pdf PDF
Amendment 0012.pdf PDF
Amendment 0011.pdf PDF
Amendment 0010.pdf PDF
PPI Responses 10.pdf PDF
Revised Wage Determination.pdf PDF
Amendment 0009.pdf PDF
PPI Responses 9.pdf PDF
Amendment 0009.pdf PDF
Amendment 0008.pdf PDF
PPI Responses 7.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
Amendment 0007.pdf PDF
Attachment Contractor Environmental and Safety Guide January 2020.pdf PDF
PPI Responses 6.pdf PDF
Attachment Chemical Analytical Data Report.pdf PDF
Attachment Merchantable Timber Requirements.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
PPI Responses 5.pdf PDF
Picture 2 Pole 13 Photo.pdf PDF
Picture 1 Junction Box Photo.pdf PDF
Attachment N SECNAV 5512 Form.pdf PDF
Amendment 0004.pdf PDF
PPI Responses 0004.pdf PDF
Attachment J Base Access Request Form 2.xls XLS spreadsheet
PPI Responses.pdf PDF
Amendment 0003.pdf PDF
Site Visit Sign In Sheet.pdf PDF
Amendment 0002.pdf PDF
Attachment 0001 SECNAV 5512 Form.pdf PDF
Amendment 0001.pdf PDF
Solicitation_N44255-21-R-2000.pdf PDF
Attachment M COVID-19 Screening Questionnaire.pdf PDF
Attachment H Construction Wage Determination.pdf PDF
Attachment K Small Business Subcontracting Record.docx DOCX document
Attachments A-B-C-D-E-F-G-H-I.docx DOCX document
Attachment J Base Access Request Form.xls XLS spreadsheet
Attachment I EXAMPLE Overhead Forms.xlsx XLSX spreadsheet
Attachment L Small Business Participation and Commitment Strategy.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Permit Number: Date Received:

Designer/Design Manager Contract # Task Order #

Construction Contact Phone/Cell/Fax # SPM Work Order

Requester: (Name, Company Name, Phone/Cell/Fax #, Date)

Phone #

Purpose/Location of Excavation (Attach Plot Plan)

Please state yes or no if structural. Approximate SF of Excavation:

Method of Excavation and Depth:

Will soil be used as backfill?

Dewatering Plan

Testing Required Name of Competent Person:

Site Survey Complete and Excavation Limits Marked?

Drawing File Search Complete?

(Locator/Contractor)

Utility Location Service?

(Government Project Manager or Engineer)

Locate Complete?

(Locator) Locate Service(s) Name?

Site Restoration Plan Complete?

(Government Contract Coordinator)

Maintenance Dept (Maintenance Dept Head)

Utility Outage Recommended?

System(s):

Environmental Review (MFD Environmental)

Soil Disposal Process:

Excavation Permit Approved:

(Excavation Coordinator)

Utility Outage Required:

Not Approved/Reason:

EXCAVATION PERMIT – Naval Base Kitsap at Manchester

ET

Excavation will not proceed until this permit is completed/approved. Do not proceed until all of the steps below are completed and signed off. If your signature is not legible please print your name near your signature.

(Signature/Date)

(Signature/Date)

(Signature/Date)

(Signature/Date)

(Government Project Manager or Engineer) (Signature/Date)

(Signature/Date)

(Signature/Date)

(Signature/Date) timothy.willett1 Typewritten Text No timothy.willett1 Typewritten Text Yes timothy.willett1 Typewritten Text No timothy.willett1 Typewritten Text No timothy.willett1 Typewritten Text Yes, See Attached timothy.willett1 Typewritten Text Yes, See attached Results timothy.willett1 Typewritten Text No timothy.willett1 Typewritten Text Yes timothy.willett1 Typewritten Text No timothy.willett1 Typewritten Text Yes timothy.willett1 Typewritten Text No timothy.willett1 Typewritten Text Yes

Sheet1

undefined:
undefined_2:
DesignerDesign Manager:
undefined_3:
Construction Contact:
PhoneCellFax:
Approximate SF of Excavation:
Name of Competent Person:
Locate Services Name:
Systems:
Soil Disposal Process 1:
Not ApprovedReason 1:
Text1:
Text2:
Text3:
ET:
ET Phone #:
Text6:
Text7:
Backfill: Off
Dewatering: Choice1
Testing: Choice1
Outage: Choice1
Approved: Choice1
Structural: Off