About this file

This document outlines the facility components and equipment requirements for the FDA San Juan Operations and Maintenance Facility Services solicitation. The contractor shall be fully responsible for operations, maintenance, repairs, and service calls for all exterior and interior building structures, systems, and equipment. This includes parking lots, storm drainage, chilled water, HVAC controls, electrical power, emergency lighting, fire alarm and suppression, heating, HVAC, overhead doors, plumbing, sanitary sewage, kitchen equipment, tanks, and other items listed. The contractor is not responsible for laboratory equipment, office furniture, office machines, paper pulpers, personally owned appliances, security systems, or mail handling equipment.

The related federal contract opportunity is solicitation number 75F40123Q00016 for FDA San Juan Operations and Maintenance Facility Services from the Department of Health and Human Services Food and Drug Administration Office of Acquisition and Grant Services. The document provides requirements for facility components and equipment the contractor will be responsible for under the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to FDA San Juan Operations and Maintenance Facility Services, newest first.
File Type Posted
A0003.pdf PDF
Q and R.pdf PDF
A0002 SF 30.pdf PDF
SJDO_TE-4 Facility Equipment and Components (rev 1).pdf PDF
A0002.pdf PDF
BUILDING 1 WEST WING.docx DOCX document
SJDO_TE-5 PM Equipment Listing (rev 1.1).xlsx XLSX spreadsheet
PricingSchedule 75F40123Q00016 A0002.xlsx XLSX spreadsheet
Air Conditioning Filters.docx DOCX document
Site Visit Photos.pdf PDF
SJDO_TE-2 DELIVERABLES-(rev 1.1).xlsx XLSX spreadsheet
SJDO_TE-18 Federal Requirements.docx DOCX document
SJDO_TE-22 Building Square Footage.pdf PDF
75F40123Q00016 A0001.pdf PDF
Pricing Schedule 75F40123Q00016.xlsx XLSX spreadsheet
SJDO_TE-1 DEFINITIONS.pdf PDF
SJDO_TE-5 PM Equipment Listing.pdf PDF
SJDO_TE-18 Federal Requireme.pdf PDF
SJDO_TE-12 Energy and Water Efficiency Use Plan Template.pdf PDF
75F40123Q00016.pdf PDF
Task Order 1 Statement of Work.pdf PDF
SJDO_TE-6 GSA PBS Preventive Maintenance Guide 2022.pdf PDF
SJDO_TE-7 MWRA Sewer Use Discharge Permit.pdf PDF
SJDO_TE-8 Building Operating Plan.pdf PDF
SJDO_TE-16 Water Treatment Guide.pdf PDF
Past Performance Questionnaire .docx DOCX document
SJDO_TE-2 DELIVERABLES.xlsx XLSX spreadsheet
SJDO_TE-3 SITE INFORMATION.pdf PDF
SJDO_TE-9 GSA National CMMS Policy Desk Guide.pdf PDF
SJDO_TE-10 Monthly Report Template.pdf PDF
SJDO_TE-13 Energy and Water Efficiency Monthly Report.pdf PDF
SJDO_TE-15 Quality Def. Insp. Report Custodial Grounds Maint.pdf PDF
SJDO_TE-17 Solid Waste and Recycling Report.pdf PDF
Technical Exhibit 19.pdf PDF
Technical Exhibit 20.pdf PDF
SJDO_TE-11 Energy and Water Operational Performance Targets.pdf PDF
SJDO_TE-14 Annual Energy and Water Efficiency Report.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SJDO Building Delegations Performance Work Statement

TECHNICAL EXHIBIT TE-4

FACILITY COMPONENTS AND EQUIPMENT

The Contractor shall be fully responsible for all operations, maintenance, repairs, service calls, etc. for all building equipment and systems including but not limited to the following:

Exterior of Structure: Structural components including, but not limited to, exterior walls, roofing, flashing, skylights, chimneys, ventilators (and other items that pierce the roof), gutters, downspouts, splash blocks, overhangs, windows, swing doors, overhead doors, sliding doors, revolving doors, hardware closures, hinges, locking devices, lightning protection systems, and exterior stairways.

Interior of Structure: Structural components including, but not limited to, interior walls, soundproofing, crawl spaces, floor coverings, hardwood flooring, window blinds, motorized window blinds, window draperies, screening, insulation, drywall, interior signage, carpeting, ceramic tile, interior stairways, ceilings and ceiling tiles, doors, door hardware, raised flooring, mechanical/electrical/key card locks, windows, glass, and mirrors.

Parking Lots and Appurtenances: Structural components including, but not limited to, sidewalks, driveways, roads, curbing, parking areas, signage, patios, picnic benches, canopies, covered walkways, fencing, gates, barriers, barrier arms, entrances, flagpoles, fire hydrants, lighting and retaining walls. Work includes snow removal parking areas and entrance drives.

Storm Drainage Systems: Complete including, but not limited to, storm-water tank, manholes, roof drains, sump pumps, and exterior grates Chilled Water Systems: Complete chilled water systems including, but not limited to, all computer room A/C units, central chilled water units, and all associated insulation and piping, water treatment, valves, gauges, thermometers, pumps, switches, and controls. Associated water and glycol condenser systems including: exterior cooling towers, piping loops, exterior air-cooled condensing units, piping hangars, valves, pumps, expansion tanks, controls, switches, structural system platforms, makeup valves, and back-flow preventers.

HVAC Controls: HVAC controls including, but not limited to, electronic and compressed control air systems including air compressors.

Electrical Power Systems: All electrical power, interior and exterior related lighting systems, and apparatus includes, but is not limited to: Rotary Uninterrupted Power Supply (RUPS) units, controls, batteries, transfer switches, diesel/motor generators, switchboards, switchgear, breaker panels, conduits, hangers, receptacles, lighting switches, and circuit breakers. Also, all buildings electrical distribution equipment including, but not limited to, motors, motor controls center and breakers, high- voltage transformers and switchgear, individual circuits, valves, heaters, heat pumps, electric gate operators, and central clock system.

Emergency Light Systems: Emergency lighting systems complete including, but not limited to, individual units w/battery backup, wiring, breaker panels, special dock spotlights, controls, and emergency lighting generators. Including parking lot lighting Fire Alarm/Suppression Systems: The complete fire alarm system including but not limited to control panels, alarms, horns, pull stations, smoke detectors, heat detectors, fire doors, fire dampers, all supervisory signaling devices on equipment as alarm check valves, dry pipe deluge and pre-action valves, flame detectors, fire suppression systems including wet pipe and dry pipe sprinkler systems, and all types of fire extinguishers. Including fire hydrants.

Fire Pumps: Complete fire sprinkler pumping system and all associated equipment.

Heating Systems: Heating systems including, but not limited to, low pressure hot water boilers, heating elements, controls, circulating pumps, hot water heaters and coils, unit heaters, HVAC unit coils, control valves, pressure regulating valves, pressure relief valves, heat exchangers, reheat coils, steam systems, vacuum pumps, and heating control systems.

HVAC Systems: HVAC system complete including, but not limited to, air handlers, return air fans, controls, heat pumps, Energy Management Systems, cooling towers, glycol dry coolers, VAV and mixing boxes, central systems BAS controls, chillers, motors, filters, duct work, insulation, balancing dampers, fire dampers and curtains, thermostats, gauges, thermometers, balancing

SJDO Building Delegations Performance Work Statement

TECHNICAL EXHIBIT TE-4

valves, control valves, cutoff valves, under floor leak detection systems, compressed air control systems and strainers.

Overhead Doors: Overhead doors include, but not limited to, automatic motorized overhead doors, PVC transparent overlapping door panels, dock bumper/plates, platforms, and air curtains.

Plumbing: Building Plumbing system complete including, but not limited to: all piping, insulation, valves, meters, gauges, check valves, back-flow preventers, sump pumps, sewage ejection pumps, steam regulating valves, manual valves, check valves, hot water regulating valves, unit heaters, vacuum/condensate steam traps, radiator, hot water pumps, domestic hot water heaters, strainers, condensation drains, water fountains, sinks, sensor controlled fixtures, sink faucets, urinals, commodes, rest room fixtures, and rest room partitions Sanitary Sewage System: Complete building(s) to city connection including but not limited to:

ejectors, controls, valves, piping, floor drains, fixture seals, and grease traps.

Kitchen Equipment: Kitchen equipment includes but not limited to installed icemakers, ranges, grills, refrigeration units, freezer units, kettles, drink dispensers, coffee pots, and vented exhaust hoods.

Tanks: Tanks include but not limited to water and fuel tanks, that may be above or underground and all associated monitoring systems, refrigeration tanks, and air tanks.

New Equipment: One unclogging industrial piping machine similar to Rigid K-50; one drain cleaning snake auger drum machine with auto feed and 3/4 in similar to Rigid K-50; one-all terrain vehicle (ATV) with towing and hauling capabilities and plastic cargo box; one-wet pressure jet sand blasting machine; one-heavy duty battery rotary hammer drill, including its battery; two (2) industrial air blower with their hoses for confine spaces; one-inverter welding plasma machine (200 amps); one-extended multi-position heavy duty aluminum ladder (22 feet); one-6 feet aluminum ladder; one-portable battery charger with engine start (200 amps); one-industrial heavy duty stripping and waxing floor machine; one-chain saw 20 inches; one-industrial backpack leaf blower; one-heavy duty industrial lawn trimmer (minimum 30 cc and 2 hp); one-new dinghy (boat) with a minimum capacity of 4 persons, 12' long minimum, side console, 35 hp as minimum (motor), aluminum trailer and 4 new life guards, one-silence inverter generator with a minimum capacity of 4,000 W.

The Service Provider is not responsible for operation, maintenance, or repair of any of the equipment named below in any building(s) in this contract.

• Laboratory equipment

• Office furniture

• Office machines

• Paper pulpers

• Personally, owned appliances

• Security systems

• Mail handling equipment

FACILITY COMPONENTS AND EQUIPMENT
The Contractor shall be fully responsible for all operations, maintenance, repairs, service calls, etc. for all building equipment and systems including but not limited to the following: