SJDO_TE-5 PM Equipment Listing (rev 1.1).xlsx

XLSX spreadsheet 23 KB Posted

Attached to
FDA San Juan Operations and Maintenance Facility Services Federal contract opportunity
Solicitation number
75F40123Q00016
Issued by
Department of Health and Human Services Food and Drug Administration Office of Acquisition and Grant Services

About this file

This document is a technical exhibit listing equipment at a San Juan Operations and Maintenance Facility. It includes 88 line items of equipment at the facility with details on manufacturer, model, serial number, and location. The key equipment includes air handling units, electrical panels, fire alarm panels, a generator, pumps, tanks, and a sprinkler system.

The related federal contract opportunity is for operations and maintenance facility services at the same location. It is a solicitation issued by the Department of Health and Human Services Food and Drug Administration Office of Acquisition and Grant Services with number 75F40123Q00016 for FDA San Juan Operations and Maintenance Facility Services. The response is for contracted facility management and upkeep of the equipment detailed in the technical exhibit.

View the file

Other files for this federal contract opportunity

Other files attached to FDA San Juan Operations and Maintenance Facility Services, newest first.
File Type Posted
Q and R.pdf PDF
A0003.pdf PDF
A0002.pdf PDF
BUILDING 1 WEST WING.docx DOCX document
A0002 SF 30.pdf PDF
SJDO_TE-4 Facility Equipment and Components (rev 1).pdf PDF
PricingSchedule 75F40123Q00016 A0002.xlsx XLSX spreadsheet
Air Conditioning Filters.docx DOCX document
Site Visit Photos.pdf PDF
SJDO_TE-2 DELIVERABLES-(rev 1.1).xlsx XLSX spreadsheet
SJDO_TE-18 Federal Requirements.docx DOCX document
SJDO_TE-22 Building Square Footage.pdf PDF
75F40123Q00016 A0001.pdf PDF
75F40123Q00016.pdf PDF
Task Order 1 Statement of Work.pdf PDF
SJDO_TE-6 GSA PBS Preventive Maintenance Guide 2022.pdf PDF
SJDO_TE-7 MWRA Sewer Use Discharge Permit.pdf PDF
SJDO_TE-8 Building Operating Plan.pdf PDF
SJDO_TE-16 Water Treatment Guide.pdf PDF
Past Performance Questionnaire .docx DOCX document
SJDO_TE-2 DELIVERABLES.xlsx XLSX spreadsheet
SJDO_TE-3 SITE INFORMATION.pdf PDF
SJDO_TE-9 GSA National CMMS Policy Desk Guide.pdf PDF
SJDO_TE-10 Monthly Report Template.pdf PDF
SJDO_TE-13 Energy and Water Efficiency Monthly Report.pdf PDF
SJDO_TE-15 Quality Def. Insp. Report Custodial Grounds Maint.pdf PDF
SJDO_TE-17 Solid Waste and Recycling Report.pdf PDF
Technical Exhibit 19.pdf PDF
Technical Exhibit 20.pdf PDF
Pricing Schedule 75F40123Q00016.xlsx XLSX spreadsheet
SJDO_TE-1 DEFINITIONS.pdf PDF
SJDO_TE-4 Facility Equipment and Components.pdf PDF
SJDO_TE-5 PM Equipment Listing.pdf PDF
SJDO_TE-18 Federal Requireme.pdf PDF
SJDO_TE-12 Energy and Water Efficiency Use Plan Template.pdf PDF
SJDO_TE-11 Energy and Water Operational Performance Targets.pdf PDF
SJDO_TE-14 Annual Energy and Water Efficiency Report.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

TECHNICAL EXHIBIT TE-5 EQUIPMENT LISTING
NOTE: INFORMATION FROM SUBMITTALS PRESENTED TO FDA AS OFSeptember 12, 2023, CONTRACTOR IS RESPONSIBLE FOR GETTING THE COMPLETE LIST
ITEM #EQUIP #DESCRIPTION/STANDARDMFGRMODELS/NEQUIPMENT LOCATIONSERVICE FREQUENCY
1Condenser Unit 3 TonLennox1347CX-048-230-171912E12885B-1 Laboratory, S.E./Launch RoomS/A
2Handling Unit 3 TonLennoxCBX26UH-048.230-260142E43602B-1 Laboratory, S.E./Launch RoomS/A
3Fume Exahust FanSolv. RoomM
4Water DistillerBarnsteadA1016-D495088521B-1 Laboratory, Wash RoomS/A
510-Water CoolerOASISBLF1All BuildingsS/A
6Water HeaterBradford WhiteMI50S5DS13TG6216156B-1 Laboratory, Utility RoomS/A
7Water Pump SystemSyncroflo6DM154PROD. 952099GroundsS/A
8Air CompressorIngersoll-RandT.30B-1 Laboratory, Utility RoomS/A
9Vacuum Pump ControlNEMA 1 INDOORHDN321SNB-1 Laboratory, Utility RoomS/A
10Emergency GeneratorKohler 750DL6B-1 Laboratory, Utility RoomS/A
11Fuel PumpMc Gally EdisonB-1 Laboratory, Utility RoomM
12Transfer SwitchCuttler HammerOT11B-1 Laboratory, Utility RoomM
13Electric Junction BoxB-1 Laboratory, Utility RoomM
14Electric Junction PanelB-1 Laboratory, Utility RoomM
15Air DryerSpeedair3Z530B-1 Laboratory, Utility RoomM
16Vacuum Pump Water FilterB-1 Laboratory, Utility RoomM
17Disconnect SwitchCuttler Hammer277/480 V,3PH 400AMPMDPAB-1 Laboratory, Utility RoomS/A
18Electric PanelboardCuttler Hammer120/208 V.3PH 600 AMPMDPAB-1 Laboratory, Electrical RoomS/A
19Electric PanelboardCuttler Hammer277/480 V,3PH 800AMP400A Safety to Panel PB-1 Laboratory, Electrical RoomS/A
20Electric PanelboardCuttler Hammer120/240 V.3PH 800 AMPPDB-1 Laboratory, Electrical RoomS/A
21Electric PanelboardCuttler Hammer120/208 V.3PH 225 AMPPC-BB-1 Laboratory, Electrical RoomS/A
22Electric PanelboardCuttler Hammer120/208 V.3PH 255 AMPPC-AB-1 Laboratory, Electrical RoomS/A
23Electric PanelboardCuttler Hammer277/480 V,3PH 100 AMPLPB-1 Laboratory, Electrical RoomS/A
24Electric Junction BoxB-1 Laboratory, Electrical RoomS/A
25Fire Extinguisher/ABC (26) CO2 (1)ABC & CO2B-1 Laboratory, Electrical RoomM
26Fire Hydrant W/Hose (2)All BuildingsM
27Fire Extinguisher (1)East/WestM
28General Lighting FixtureSolv. RoomM
29Special Lighting FixtureAll BuildingsM
30Outside Lighting FixtureB-1 LaboratoryM
31Dilution TankGroundsM
32Sanitary Pit - 2 pumpsGroundsS/A
33Manhoes (8)Grounds/ Behind B-1 LaboratoryS/A
34Downspouts & GuttersGroundsM
35Loading Ramps (2)All BuildingsS/A
36Glas DoorsB-1 Laboratory, E./N. Side EntranceM
37Reserve Water Tanks4,000 GALB-1 Laboratory & B-8 FacilitiesM
38Electric PanelboardSquare-D150 AMP 480V 3PHP-LGroundsM
39Electric PanelboardSquare-D350 AMP 120/208V 3PHLP-11B-8 FacilitiesM
40Electric PanelboardGE225 AMP 120/208V 3PHLP-4B-8 FacilitiesM
41Electric PanelboardSquare-D100 AMP 120/208V 1PHPP2B-11 MaintenanceM
42Electric PanelboardCuttler Hammer600 AMP 208/120V 1PHB-11 MaintenanceM
43Exhaust Fan59-12-FED 3B-7 Boat HouseM
44Day TankPrycsGenerator Building
45Day Tank PumpPrycsBuilding Grounds
46Fuel Tank (3,000) DieselFireguardE1300330438Building Grounds
47Evaporating UnitMIDEA 3tonsGuard Booth
48Breaker PanelSquare-DS01
49Exit ArmDKS1601-0804-07-128Guard Booth
50Entrance ArmDKS1601-0804-07-127Guard Booth
51Air SeparatorNew Building, Penthouse
52Chilled Water Storage TankAmericanNew Building, Penthouse
53Air Handler UnitTraneMCC80250A080UAF04050826New Building, Penthouse
54Exhaust FanXB20004C960801New Building, Penthouse
55Transient Surge SuppressorSurgelogicTVS4HWAl2XNew Building, Penthouse
56Disconnects electrical Panel (4)Square-DNew Building, Electrical Room
57VFDSiemensVBE3100120XNew Building, Electrical Room
58Alarm Check ValveNew Building, Penthouse
59Tamper SwitchNew Building, Penthouse
60Tamper SwitchNew Building, Penthouse
61Back Flow PreventerNew Building, Penthouse
62Fire Alarm PanelSiemensPYROTRONICS MXL-IQP/N 575-293628-12New Building, Penthouse
63Fire Alarm PanelFire-LiteMS-2New Building
64Fire Alarm PanelCerberusPYROTRONICSB-8 Facilities
65Electrical PanelCuttler Hammer120/240/03PH 60 AMPB-1 Laboratory, Reception Area
66Electrical PanelCuttler Hammer120/240/03PH 60 AMPUtility Room
67Electrical PanelCuttler Hammer120/240/03PH 225 AMPUtility Room
68Electrical PanelCuttler Hammer120/240/225 AMPB-1 Laboratory
69Electrical PanelCuttler Hammer120/240/225 AMPB-1 Laboratory, Center Main Hall
70Electrical PanelCuttler Hammer120/240/3PH OW 400 AMPB-1 Laboratory, Center Main Hall/File R.
71Exit Lights (12)B-1 Laboratory, West End Main Hall
72Exit Lights (2)B-1 Laboratory
73Exit Lights (2)B-8 Facilities
74Exit Lights (14)B-10 Conf. Room
75Air Handler UnitTrane4MYW5618A1000ANew Building
76Barrier Arm-MotorEliteCSW 200UL32906N1826Main Gate Entrance
77Ultraviolet Disinfection UnitAquafineNO-CSL-4RIS 07/09 119Main Gate Entrance
78Water Treatment TanksCulliganTO7578117Grounds, Water Pump
79Water Treatment TanksCulliganTO7579822Grounds, Water Pump
80Sprinkler SystemTycoAV-1New Building, Surrounding
81Sprinkler System 4 Clean ValveGEMF2001 175 PSIB-1 Laboratory, New Building Closet
82Electrical PanelCuttler Hammer48V/100ampN. Lab Solvent Room
83Electrical PanelCuttler Hammer240V/30 AMPSB-1 Laboratory, Wash Room
84Electrical PanelCuttler Hammer600V/100 AMPSB-1 Laboratory, Wash Room
85Electrical Panel (4 Spares)Cuttler HammerB-1 Laboratory, Wash Room
86Smart Water MeterElster Amco4" T 400023139636New Building VOIP Room
87Condensing Unit 18,000 BTUTGMMRVT18ASGrounds, Water Pump
88Evaporator UnitTGMMWVT18ASB-1 Laboratory, Balance Room

File details come from the government source that posted it. Updated .