SJDO_TE-12 Energy and Water Efficiency Use Plan Template.pdf

PDF 128 KB Posted

Attached to
FDA San Juan Operations and Maintenance Facility Services Federal contract opportunity
Solicitation number
75F40123Q00016
Issued by
Department of Health and Human Services Food and Drug Administration Office of Acquisition and Grant Services

About this file

This document contains a template for an energy and water efficiency use plan for a federal facility operations and maintenance contract. The template requires the contractor to provide quarterly utility use data along with recommendations for improving energy and water efficiency at the facility for the following year. The contractor must identify any support needed from the Department of Health and Human Services' Food and Drug Administration and San Juan District Office to assist with efficiency efforts. The property manager is to review the contractor's report and provide any necessary comments.

The related federal contract opportunity is for operations and maintenance facility services at the FDA's San Juan facility. The solicitation number is 75F40123Q00016 and is being issued by the Department of Health and Human Services Food and Drug Administration Office of Acquisition and Grant Services.

View the file

Other files for this federal contract opportunity

Other files attached to FDA San Juan Operations and Maintenance Facility Services, newest first.
File Type Posted
A0003.pdf PDF
Q and R.pdf PDF
A0002 SF 30.pdf PDF
SJDO_TE-4 Facility Equipment and Components (rev 1).pdf PDF
A0002.pdf PDF
BUILDING 1 WEST WING.docx DOCX document
SJDO_TE-5 PM Equipment Listing (rev 1.1).xlsx XLSX spreadsheet
PricingSchedule 75F40123Q00016 A0002.xlsx XLSX spreadsheet
Air Conditioning Filters.docx DOCX document
Site Visit Photos.pdf PDF
SJDO_TE-2 DELIVERABLES-(rev 1.1).xlsx XLSX spreadsheet
SJDO_TE-18 Federal Requirements.docx DOCX document
SJDO_TE-22 Building Square Footage.pdf PDF
75F40123Q00016 A0001.pdf PDF
Pricing Schedule 75F40123Q00016.xlsx XLSX spreadsheet
SJDO_TE-1 DEFINITIONS.pdf PDF
SJDO_TE-4 Facility Equipment and Components.pdf PDF
SJDO_TE-5 PM Equipment Listing.pdf PDF
SJDO_TE-18 Federal Requireme.pdf PDF
75F40123Q00016.pdf PDF
Task Order 1 Statement of Work.pdf PDF
SJDO_TE-6 GSA PBS Preventive Maintenance Guide 2022.pdf PDF
SJDO_TE-7 MWRA Sewer Use Discharge Permit.pdf PDF
SJDO_TE-8 Building Operating Plan.pdf PDF
SJDO_TE-16 Water Treatment Guide.pdf PDF
Past Performance Questionnaire .docx DOCX document
SJDO_TE-2 DELIVERABLES.xlsx XLSX spreadsheet
SJDO_TE-3 SITE INFORMATION.pdf PDF
SJDO_TE-9 GSA National CMMS Policy Desk Guide.pdf PDF
SJDO_TE-10 Monthly Report Template.pdf PDF
SJDO_TE-13 Energy and Water Efficiency Monthly Report.pdf PDF
SJDO_TE-15 Quality Def. Insp. Report Custodial Grounds Maint.pdf PDF
SJDO_TE-17 Solid Waste and Recycling Report.pdf PDF
Technical Exhibit 19.pdf PDF
Technical Exhibit 20.pdf PDF
SJDO_TE-11 Energy and Water Operational Performance Targets.pdf PDF
SJDO_TE-14 Annual Energy and Water Efficiency Report.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE-10 – Energy and Water Efficiency Use Plan Template

CONTRACT INFORMATION – to be completed by Contractor in fields provided

Contract umber:

Building number, name and address:

Building annual energy performance target: Btu/GSF

Building annual water performance target: Gal/GSF Dates covered in this report:

Report submitted by (name of Contractor, name of individual responsible for follow-up actions):

Date submitted:

CONTRACTOR REPORTING ELEMENTS – to be completed by Contractor in fields provided

1. Use by resource – For each purchased utility resource, provide the use for the most recent EUAS reporting period for each utility, and the corresponding reporting period from the previous year in the table below.

Resource (please note units)

Billing Period (enter dates for the most recent EUAS billing for the corresponding utility)

Yearly Use Previous Contract Year

Target Use Current Contract Year

Electricity (kWh) Water (kgal) Steam (mmBtu) Natural gas (CCF) Total Energy (KBtu)

2. Significant energy and water efficiency actions/measures completed in the last year that should be considered for the current year.

a. Identify previous overtime utility requests and verify current year

b. request

3. Additional recommendations for improvement in the next Contract year

– with con- sideration to the following

a. Changes to operations practices such as

i. Equipment and/or buildings scheduling

ii. Set points

iii. Trend report assessments

b. Plant or equipment changes for

i. Low-cost/site funded measures

ii. Project funding

c. Contractor/Property Manager coordination and communication

4. Identify support actions needed from HHS/FDA/SJDO to assist in the energy and water efficiency efforts.

HHS/FDA/SJDO REVIEW AND RESPONSE ELEMENTS – to be completed by property manager in the fields provided

1. Re viewing official:

2. Date reviewed by GSA:

3. Comments to Contractor:

File details come from the government source that posted it. Updated .