This document provides site information for the Food and Drug Administration San Juan District Office facility in San Juan, Puerto Rico. It details the building and site areas, floor materials, restrooms, windows, blinds, doors, parking areas, and other site features for the main building and various support structures. Required maintenance practices are outlined for asbestos-containing flooring found in the main building, including avoiding dry stripping, proper training, following work practices, keeping floors wet during stripping, running machines at slow speeds, selecting the least abrasive pads, and not overstripping floors.
The related federal contract opportunity is for operations and maintenance facility services at this FDA site. Solicitation number 75F40123Q00016 was issued by the Department of Health and Human Services Food and Drug Administration Office of Acquisition and Grant Services.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Exhibit 3 - Building and Site Information for the FDA San Juan District Office
Name and Location: Food and Drug Administration, San Juan District Office, 466 Fernandez Juncos Ave.
San Juan PR 00907; 18.4618, -66.0902
Building/ Site
Area m2
Floor Restrooms Exterior Windows
Window Blinds
Interior Doors
Parking Lot Area m2 Material Area m2 No. Fixtures
B-1 Laboratory 1, 403.74 Vinyl 1216.47
5 16 75 13 47 610 Ceramic 95.05
B-2 Andres Toro 677.57 Vinyl 677.57 2 13 30 0 20 1,100
B-2 Andres Toro Annex 1st Floor 572.65 Vinyl 572.65 2 4 20 20 19
B-2 Andres Toro Annex 2nd Floor 572.65 Vinyl 572.65 2 4 20 20 26
B-7 Boathouse 203.45 Ceramic 203.45 2 6 18 5 12 950
B-8 Facilities 255.62 Vinyl 255.62
2 7 16 16 11 750 Ceramic 21.21
B-10 Conference 222.67 Ceramic 179.5 3 4 13 13 8 250
B-11 Maintenance 234.11 Vinyl 234.11 2 3 2 0 3 500
S-Guard House 6.96 Metal 6.96 N/A N/A N/A N/A N/A N/A
S-Domestic Water Pumping Station 80 Cement 80 N/A N/A N/A N/A N/A N/A
S-Electrical Transformer and Switch N/A Cement N/A N/A N/A N/A N/A N/A N/A
B-Generator Building 70 Cement 70 N/A N/A N/A N/A N/A N/A
S-Diesel Tank 25 N/A 25 N/A N/A N/A N/A N/A N/A
S-Sanitary Station 150 Cement 150 N/A N/A N/A N/A N/A N/A
S-Hazmat 110 Cement 110 N/A N/A N/A N/A N/A N/A
S-Electrical Room 25 Cement 25 N/A N/A N/A N/A N/A N/A
S-Manholes and Waste Water, Drains N/A N/A N/A N/A N/A N/A N/A N/A N/A
S-Fire Hydrant N/A N/A N/A N/A N/A N/A N/A N/A N/A
S-Laundry Room 9.29 Cement 9.29 N/A N/A 2 N/A N/A N/A
S-Dock Slip 150 N/A 150 N/A N/A N/A N/A N/A N/A
Totals 4,768.71 N/A 4,655.53 20 57 194 87 146 4,160
BUILDING 2
ANNEX
Electrical Room
Sanitary Station
Diesel Tank
Generator Building
Fire Hydrant
Laundry Room
Hazmat
Fire Hydrant Drain
Manholes
Dock Slip
Water Pump
Requirements for Maintenance of Asbestos-Containing Floor Coverage Found in the Main Building
1. AVOID STRIPPING FLOORS. Stripping of floors should be done as infrequently as possible—perhaps once or twice or less per year depending on circumstances. The frequency should be carefully considered as floor maintenance schedules are developed.
2. PROPERLY TRAIN STAFF. Custodial or maintenance staff who strip floors should be trained to operate properly and safely the machines, pads, and floor care chemicals used at the facility.
REQUIRED TRAINING: Contractor employees are required to have asbestos awareness training or provide a certificate stating the employee has already taken this training. Contractor will provide employees with Hazard Communication training and Material Safety Data sheets for chemicals used by employees in the course of their work – per OSHA 29 CFR 1910.1200
3. FOLLOW APPROPRIATE WORK PRACTICE. Custodial or maintenance staff who strip floors should follow appropriate work practices, such as those recommended here, under informed supervision.
Directions from floor tile and floor wax products manufacturers on proper maintenance procedures should be consulted.
4. STRIP FLOOR WHILE WET. The floors should be kept adequately wet during the stripping operation.
Do NOT perform dry stripping. Prior to machine operation, an emulsion of chemical stripper in water is commonly applied to the floor with a mop to soften the wax or finish coat. After stripping and before application of the new wax, the floor should be thoroughly cleaned while wet.
5. RUN MACHINE AT SLOW SPEED. If the machine used to remove the wax or finish coat has variable speeds, it should be run at slow speeds (about 175-190 rpm’s) during the stripping operation. Also, run the machine at this slow speed for buffing the floors.
6. SELECT THE LEAST ABRASIVE PAD POSSIBLE. EPA recommends that the machine be equipped with the least abrasive pad possible to strip wax or finish coat from asbestos-containing floors.
7. DO NOT OVERSTRIP FLOORS. Stop stripping when the old surface coat is removed. Overstripping can damage the floor and may cause the release of asbestos fibers. Do NOT operate a floor machine with an abrasive pad on unwaxed or unfinished floors.
REMEMBER: Improperly removing asbestos-containing floor covering could result in the release of high levels of asbestos. EPA recommends that you leave asbestos-containing floor covering in place, provided the material is in good condition. However, proper maintenance procedures, such as those outlined above, should always be followed.
File details come from the government source that posted it. Updated .