SF330 ATT - SOW ATT 1 - VHA Required Div 01 Specification Section Template.docx

Standard Form DOCX document 69 KB Posted

Attached to
C1DA--544-355 Construct Behavioral Health Center of Excellence Columbia, SC
Solicitation number
36C77624R0009
Issued by

About this file

This document contains a master specifications table of contents for the Department of Veterans Affairs VHA construction projects. It lists over 100 specification sections across multiple divisions related to general requirements, existing conditions, concrete, masonry, metals, wood, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, communications, electronic safety and security, earthwork, exterior improvements, utilities, transportation, electrical power generation, and integrated automation. Key specifications addressed include cast-in-place concrete, masonry, structural and cold-formed metal framing, roofing, waterproofing, doors and windows, finishes, laboratory equipment, elevators, fire suppression, plumbing, HVAC systems and equipment, electrical distributions and low-voltage power, communications structured cabling, security systems, site utilities, and solar or wind power generation.

The related federal contract opportunity is for the pre-solicitation phase of constructing a new Behavioral Health Center of Excellence in Columbia, South Carolina. The solicitation will be issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other versions and copies of SF 330

File Revision Posted Attached to
12 - GSA Standard Form 330 - Architect Engineer Qualifications.pdf Revision not stated X1DB--Macon GA Health Care Clinic HCC 168,332 ANSI/BOMA
SF330-21b.pdf Revision not stated HUD Emerg. Grant: Water Line Design-Build RFQ A&E
SF330-21b.pdf Revision not stated HUD Emerg. Grant: Water Line Design-Build RFQ A&E
1-Standard Form 330 Part II.pdf.pdf Revision not stated Waters Avenue Force Main Replacement CEI Services
Standard_Form_330-21b_-_Architect-Engineering_Qualifications.pdf Revision not stated Cooper City Stormwater Master Plan (H1470 | 4673-305-P14)
SF330-21b.pdf Revision not stated PARAMARIBO: A&E Services, MSGR
15. Exhibit M - SF330 - Architect-Engineer Qualifications_VA-GP.pdf Revision not stated Request for Lease Proposals (RLP) for Olympia, WA CBOC
1-Standard Form 330 Part II.pdf.pdf Revision not stated Miscellaneous Subsurface Investigation & Testing
1-Standard Form 330 Part II.pdf.pdf Revision not stated Miscellaneous Construction Engineering and Inspection (CEI) Services - CDBG-DR
1-Standard Form 330 Part II.pdf.pdf Revision not stated Misc. Professional Stormwater Services
SF-330 AE Qualifications.pdf Revision not stated IDIQ For Architect Engineer (A/E) Services for Central Office
Appendix-4-AE-Qualifications-SF-330-Forms.pdf Revision not stated Construction Management for the 30th Street WestCatenary Replacement Project – Phase 1A
HR001126RE008 Public Announcement Attachment 2 - SF 330.pdf Revision not stated DARPA Modernization Project: Request for Qualifications for A&E Services
SF 330 Instructions.pdf Revision not stated DARPA Modernization Project: Request for Qualifications for A&E Services
SF330 21AE FILLABLE.pdf Revision not stated DOC Architect and Engineering IDIQ
Attachment 1b - ArchitectEngineerQualifications (SF330-FAA 4400-37).docx Revision not stated Architecture and Engineering Services - MMAC
EXHIBIT M_SF330 - Architect-Engineer Qualifications.pdf Revision not stated Request for Lease Proposal (RLP): Las Vegas, NV Medical Facility
Attachment 5 - Standard Form 330 (SF330) - Architect-Engineer Qualifications.pdf Revision not stated FY 27 A-E IDIQ Solicitation
SF330-21a.pdf Revision not stated Architect & Engineering Services CFAC FY26 QA1
SF330-21a.pdf Revision not stated CC-623-250-001 BCCC Nursing Building Renovation and Addition
Show all 20

Who attaches SF 330

State Files
Florida 97
Maryland 41
Pennsylvania 23
Washington 21
Texas 19

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07-01-14 03-01-23

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO.
DIVISION AND SECTION TITLES
DATE

DIVISION 00 SPECIAL SECTIONS

00 01 15
List of Drawing Sheets
05-20
00 11 21
Request for Proposal to Design Build
09-21

DIVISION 01 GENERAL REQUIREMENTS

01 00 00
General Requirements
11-21
01 32 16.01
Architectural and Engineering CPM Schedules
03-20
01 32 16.13
Network Analysis Schedules – Major Construction Project Design-Bid-Build
05-22
01 32 16.15
Project Schedules (Small Projects – Design/Bid/Build
11-21
01 32 16.16
Network Analysis Schedules (Design-Build Only)
05-22
01 32 16.17
Network Analysis Schedules – Major Design/Build Projects
06-19
01 33 23
Shop Drawings, Product Data, and Samples
02-23
01 35 26
Safety Requirements
10-22
01 42 19
Reference Standards
11-20
01 45 00
Quality Control
02-21
01 45 29
Testing Laboratory Services
11-18
01 45 35
Special Inspections
06-21
01 57 19
Temporary Environmental Controls
01-21
01 58 16
Temporary Interior Signage
07-15
01 74 19
Construction Waste Management
04-22
01 81 13
Sustainable Construction Requirements
10-17
01 81 13.02
Sustainability Certification Requirements – LEED NC V4
01-21
01 81 13.21
Sustainability Certification Requirements – GREEN GLOBES
01-21
01 91 00
General Commissioning Requirements
04-22
01 91 00.01
DVA/USACE Projects General Commissioning Requirements
08-19

DIVISION 02 – EXISTING CONDITIONS

02 21 13
Site Surveys
01-21
02 41 00
Demolition
08-17
02 65 00
Underground Storage Tank Removal
01-21
02 82 11
Traditional Asbestos Abatement
01-21
02 82 13.13
Glovebag Asbestos Abatement
01-21
02 82 13.19
Asbestos Floor Tile and Mastic Abatement
01-21
02 82 13.21
Asbestos Roofing Abatement
01-21
02 82 13.31
Asbestos Transite Abatement
01-21
02 82 13.41
Asbestos Abatement for Total Demolition Project
01-21
02 83 33.13
Lead-Based Paint Removal and Disposal
01-21

DIVISION 03 – CONCRETE

03 23 00
Stressing Tendons
01-21
03 30 00
Cast-in-Place Concrete
01-21
03 30 53
(Short-Form) Cast-in-Place Concrete
01-21
03 37 13
Shotcrete
01-21
03 41 13
Precast Concrete Hollow Core Planks
01-21
03 41 33
Precast Structural Pretensioned Concrete
01-21
03 45 00
Precast Architectural Concrete
01-21
03 51 13
Cementitious Wood Fiber Decks
01-21
03 51 16
Gypsum Concrete Roof Decks
01-21
03 52 00
Lightweight Concrete Roof Insulation
01-21
03 55 11
Gypsum Concrete Floor Decks
01-21

DIVISION 04 – MASONRY

04 01 00
Maintenance of Masonry
01-21
04 05 13
Masonry Mortaring
10-17
04 05 16
Masonry Grouting
01-21
04 20 00
Unit Masonry
08-17
04 72 00
Cast Stone Masonry
01-21

DIVISION 05 – METALS

05 12 00
Structural Steel Framing
11-18
05 21 00
Steel Joist Framing
11-18
05 31 00
Steel Decking
01-21
05 36 00
Composite Metal Decking
01-21
05 40 00
Cold-Formed Metal Framing
01-21
05 50 00
Metal Fabrications
08-18
05 51 00
Metal Stairs
01-21

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00
Rough Carpentry
10-17
06 16 63
Cementitious Sheathing
01-21
06 20 00
Finish Carpentry
01-21

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 01 50.19
Preparation for Re-Roofing
01-21
07 08 00
Facility Exterior Closure Commissioning
01-21
07 08 00.01
DVA/USACE Projects Facility Exterior Closure Commissioning
08-19
07 11 13
Bituminous Dampproofing
01-21
07 12 00
Built-Up Bituminous Waterproofing
01-21
07 13 00
Sheet Waterproofing
01-21
07 13 52
Modified Bituminous Sheet Waterproofing
01-21
07 14 21
Latex Mastic Deck Covering
01-21
07 18 13
Pedestrian Traffic Coatings
01-21
07 21 13
Thermal Insulation
01-21
07 21 23
Loose-Fill Insulation
01-21
07 22 00
Roof and Deck Insulation
01-21
07 24 00
Exterior Insulation and Finish Systems
01-21
07 27 26
Fluid-Applied Membrane Air Barrier, Vapor Permeable
01-21
07 27 27
Fluid-Applied Membrane Air Barrier, Vapor Retarding
01-21
07 31 13
Asphalt Shingles
02-21
07 31 26
Slate Shingles
01-21
07 31 29.13
Wood Shingles
01-21
07 32 13
Clay Roof Tiles
01-21
07 40 00
Roofing and Siding Panels
01-21
07 51 00
Built-Up Bituminous Roofing
12-21
07 51 13.11
Hot-Applied Built-Up Asphalt Roofing
12-21
07 51 13.13
Cold-Applied Built-Up Asphalt Roofing
12-21
07 52 16.11
Cold Adhesive Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing
12-21
07 52 16.12
Hot-Mopped Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing
12-21
07 53 23
Ethylene-Propylene-Diene-Monomer Roofing
01-21
07 54 16
Ethylene Interpolymer (KEE) Roofing
01-21
07 54 19
Polyvinyl-Chloride (PVC) Roofing
12-18
07 54 23
Thermoplastic Polyolefin (TPO) Roofing
01-21
07 56 00
Fluid-Applied Roofing
01-21
07 57 13
Sprayed Polyurethane Foam Roofing
12-21
07 60 00
Flashing and Sheet Metal
01-21
07 61 16
Batten Seam Copper Roofing
01-21
07 71 00
Roof Specialties
01-21
07 72 00
Roof Accessories
01-21
07 81 00
Applied Fireproofing
10-17
07 84 00
Firestopping
01-21
07 92 00
Joint Sealants
04-22
07 95 13
Expansion Joint Cover Assemblies
01-21

DIVISION 08 OPENINGS

08 11 13
Hollow Metal Doors and Frames
01-21
08 11 73
Sliding Metal Fire Doors
01-21
08 14 00
Interior Wood Doors
01-21
08 17 10
Integrated Door Assemblies
01-21
08 31 13
Access Doors and Frames
04-22
08 32 13
ICU Sliding Glass Doors
01-21
08 33 00
Coiling Doors and Grilles
01-21
08 33 13
Coiling Counter Doors
01-21
08 34 53
Security Doors and Frames
01-21
08 34 59
Vault Doors and Day Gates
01-21
08 35 13.13
Accordion Folding Doors
01-21
08 36 13
Sectional Doors
01-21
08 38 16
Flexible Traffic Doors
01-21
08 41 13
Aluminum-Framed Entrances and Storefronts
01-21
08 42 33
Revolving Door Entrances
01-21
08 44 13
Glazed Aluminum Curtain Walls
04-20
08 51 13
Aluminum Windows
01-21
08 51 13.11
Side-Hinged Aluminum Windows
01-21
08 51 23
Steel Windows
01-21
08 51 69.11
Aluminum Storm Windows
01-21
08 56 19
Pass Windows
01-21
08 56 53
Blast Resistant Windows
01-21
08 56 59
Service and Teller Window Units
01-21
08 56 66
Detention Window Screens
01-21
08 63 00
Metal-Framed Skylights
01-21
08 71 00
Door Hardware
05-22
08 71 13
Automatic Door Operators
01-21
08 71 13.11
Low Energy Power Assist Door Operators
01-21
08 80 00
Glazing
01-21
08 90 00
Louvers and Vents
01-21

DIVISION 09 – FINISHES

09 05 16
Subsurface Preparation for Floor Finishes
01-21
09 06 00
Schedule for Finishes
01-21
09 22 16
Non-Structural Metal Framing
06-18
09 23 00
Gypsum Plastering
01-21
09 24 00
Portland Cement Plastering
01-21
09 26 00
Veneer Plastering
01-21
09 29 00
Gypsum Board
04-20
09 30 13
Ceramic/Porcelain Tiling
01-21
09 51 00
Acoustical Ceilings
12-18
09 54 23
Linear Metal Ceilings
01-21
09 63 13
Brick Flooring
01-21
09 63 40
Stone Flooring
01-21
09 65 13
Resilient Base and Accessories
01-21
09 65 16
Resilient Sheet Flooring
06-22
09 65 19
Resilient Tile Flooring
05-18
09 66 13
Portland Cement Terrazzo Flooring
01-21
09 66 16
Terrazzo Floor Tile
01-21
09 67 23.20
Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2)
12-21
09 67 23.30
Resinous (Epoxy Resin Composition) Mortar Flooring (RES-3)
01-21
09.67.23.40
Resinous Poured In Place Resilient Flooring (RES-4)
01-21
09 67 23.50
Resinous Terrazzo Flooring (RES-5)
01-21
09 67 23.60
Resinous Urethane and Epoxy Mortar Flooring (RES-6A and RES 6B)
01-21
09 68 00
Carpeting
01-21
09 68 21
Athletic Carpeting
01-21
09 69 00
Access Flooring
01-21
09 72 16
Vinyl-Coated Fabric Wall Covering
01-21
09 72 31
Polypropylene Fabric Wall Covering
01-21
09 78 23
Phenolic Interior Wall Paneling
01-21
09 84 33
Sound-Absorbing Wall Units
01-21
09 91 00
Painting
01-21
09 94 19
Multicolor Interior Finishing
01-21
09 96 59
Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU (RES-W1, RES-W2)
01-21

DIVISION 10 – SPECIALTIES

10 11 13
Chalkboards and Markerboards
01-21
10 11 23
Tackboards
01-21
10 11 33
Glassboards (Magnetic & Non-Magnetic)
01-21
10 13 00
Directories
01-21
10 14 00
Signage
01-21
10 21 13
Toilet Compartments
01-21
10 21 16
Shower and Dressing Compartments
01-21
10 21 23
Cubicle Curtain Tracks
01-21
10 22 13
Wire Mesh Partitions
01-21
10 22 19
Demountable Partitions
01-21
10 22 26.13
Accordion Folding Partitions
01-21
10 25 13
Patient Bed Service Walls
01-20
10 26 00
Wall and Door Protection
01-21
10 28 00
Toilet, Bath, and Laundry Accessories
01-21
10 44 13
Fire Extinguisher Cabinets
08-18
10 75 00
Flagpoles
01-21

DIVISION 11 – EQUIPMENT

11 05 12
General Motor Requirements for Equipment
01-21
11 12 00
Parking Control Equipment
01-21
11 17 36
Package Transfer Units
01-21
11 26 00
Unit Kitchens
01-21
11 40 11
Custom Fabricated Food Service Equipment
01-21
11 40 21
Food Service Equipment-Utility Distribution System
01-21
11 41 00
Food Storage Equipment
01-21
11 41 21
Walk-In Coolers and Freezers
01-21
11 44 00
Food Cooking Equipment
01-21
11 48 00
Cleaning and Disposal Equipment
01-21
11 53 13
Laboratory Fume Hoods
01-21
11 53 23
Laboratory Refrigerators
01-21
11 53 53
Biological Safety Cabinets Laminar Airflow Stations
01-21
11 53 61
Custom Fabricated Laboratory Equipment
01-21
11 53 71
Solution Warming Cabinets
01-21
11 71 01
Medical Washing and Sterilizing Equipment
01-21
11 71 02
Laboratory Washing and Sterilizing Equipment
01-21
11 73 00
Ceiling Mounted Patient Lift System
08-20
11 78 00
Mortuary Equipment
01-21
11 78 13
Mortuary Refrigerators
01-21
11 79 13
Hydrotherapy Equipment
01-21
11 82 19
Packaged Incinerators
01-21

DIVISION 12 – FURNISHINGS

12 22 16
Drapery Track and Accessories
01-21
12 24 00
Window Shades
08-17
12 24 21
Lightproof Shades
01-21
12 31 00
Manufactured Metal Casework
01-21
12 32 00
Manufactured Wood Casework
01-21
12 34 00
Manufactured Plastic Casework
01-21
12 35 70.21
Medication Cabinet
01-21
12 36 00
Countertops
12-18
12 56 70.11
Suspended Table
01-21

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41
Seismic Restraint Requirements for Non-Structural Components
01-21
13 17 23
Therapeutic Pools
01-21
13 17 23.11
Therapeutic Pool Accessories
01-21
13 19 13
Kennel Enclosures and Gates
01-21
13 21 29
Constant Temperature Rooms
01-21
13 21 49
Audiology Booth
01-21
13 34 19
Metal Building Systems
01-21
13 49 00
Radiation Protection
01-21

DIVISION 14– CONVEYING EQUIPEMENT

14 12 11
Traction and Winding Drum Dumbwaiter
11-20
14 21 00
New Traction Elevator
08-20
14 21 10
Modernization of Traction Elevator
08-20
14 21 11
Traction Cartlift
03-20
14 24 00
New Hydraulic Elevator
08-20
14 24 10
Modernization of Hydraulic Elevator
08-20
14 24 11
Hydraulic Cartlift
03-20
14 24 24
Renovation Hydraulic Elevator (Custom Written by VACO)
14 26 26
Renovation Traction Elevator (Custom Written by VACO)
14 91 33
Gravity Soiled Linen Chutes
08-20
14 91 82
Gravity Trash Chutes
03-20

DIVISION 21- FIRE SUPPRESSION

21 08 00
Commissioning of Fire Suppression System
11-16
21 08 00.01
DVA/USACE Projects Commissioning of Fire Suppression Systems
08-19
21 12 00
Manual Dry Standpipe Systems
06-15
21 13 13
Wet-Pipe Sprinkler Systems
06-15
21 13 16
Dry-Pipe Sprinkler Systems
01-15
21-22-00
Clean Agent Fire Suppression Systems
05-15
21-30-13
Electric-Driven, Fire Pumps
05-15
21-30-16
Diesel-Driven, Fire Pumps
05-15

DIVISION 22 – PLUMBING

22 05 11
Common Work Results for Plumbing
01-23
22 05 12
General Motor Requirements for Plumbing Equipment
09-20
22 05 19
Meters and Gages for Plumbing Piping
09-20
22 05 23
General-Duty Valves for Plumbing Piping
09-20
22 05 33
Heat Tracing for Plumbing Piping
09-20
22 07 11
Plumbing Insulation
09-19
22 08 00
Commissioning of Plumbing Systems
11-16
22 08 00.01
DVA/USACE Projects Commissioning of Plumbing Systems
08-19
22 11 00
Facility Water Distribution
05-21
22 11 23
Domestic Water Pumps
09-15
22 12 16
Facility Elevated, Potable-Water Storage Tanks
09-15
22 13 00
Facility Sanitary and Vent Piping
09-20
22 13 23
Sanitary Waste Interceptors
09-20
22 13 29
Sanitary Sewerage Pumps
09-20
22 13 29.13
Wet-Pit Mounted, Vertical Sewerage Pumps
09-20
22 13 33
Packaged, Submersible Sewerage Pump Units
09-20
22 14 00
Facility Storm Drainage
09-15
22 14 29
Sump Pumps
09-15
22 14 33
Packaged, Pedestal Drainage Pump Units
09-15
22 14 36
Packaged, Submersible, Drainage Pump Units
09-15
22 15 00
General Service Compressed-Air Systems
09-20
22 31 11
Water Softeners
09-15
22 33 00
Electric Domestic Water Heaters
09-20
22 34 00
Fuel-Fired Domestic Water Heaters
09-20
22 35 00
Domestic Water Heat Exchangers
09-20
22 40 00
Plumbing Fixtures
12-22
22 42 26
Commercial Disposers
09-15
22 61 13.74
Dental Compressed-Air Piping
09-20
22 61 19.74
Dental Compressed-Air Equipment
09-20
22 62 00
Vacuum Systems for Laboratory and Healthcare Facilities
09-15
22 62 19.74
Dental Vacuum and Evacuation Equipment
09-15
22 63 00
Gas Systems for Laboratory and Healthcare Facilities
09-15
22 66 00
Chemical-Waste Systems for Laboratory and Healthcare Facilities
09-20
22 67 19.16
Reverse-Osmosis Water Equipment
09-15
22 67 21
Water Dealkalizing System
09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 10
Common Work Results for Boiler Plant and Steam Generation
04-20
23 05 11
Common Work Results for HVAC
03-23
23 05 12
General Motor Requirements for HVAC and Steam Generation Equipment
03-23
23 05 41
Noise and Vibration Control for HVAC Piping and Equipment
03-23
23 05 51
Noise and Vibration Control for Boiler Plant
03-22
23 05 93
Testing, Adjusting, and Balancing for HVAC
03-23
23 05 93.01
DVA/USACE Projects Testing, Adjusting, and Balancing for HVAC
11-21
23 07 11
HVAC and Boiler Plant Insulation
02-20
23 08 00
Commissioning of HVAC Systems
03-23
23 08 00.01
DVA/USACE Projects Commissioning of HVAC Systems
08-19
23 08 11
Demonstrations and Tests for Boiler Plant
04-20
23 09 11
Instrumentation and Control for Boiler Plant
03-22
23 09 23
Direct-Digital Control System for HVAC
03-23
23 10 00
Facility Fuel Systems
04-20
23 11 23
Facility Natural-Gas Piping
04-20
23 21 11
Boiler Plant Piping Systems
09-22
23 21 13
Hydronic Piping
03-23
23 21 23
Hydronic Pumps
03-23
23 22 13
Steam and Condensate Heating Piping
10-22
23 22 23
Steam Condensate Pumps
04-20
23 23 00
Refrigerant Piping
03-23
23 25 00
HVAC Water Treatment
03-23
23 31 00
HVAC Ducts and Casings
03-23
23 34 00
HVAC Fans
03-23
23 36 00
Air Terminal Units
03-23
23 37 00
Air Outlets and Inlets
03-23
23 38 13
Commercial-Kitchen Hoods
03-23
23 40 00
HVAC Air Cleaning Devices
03-23
23 50 11
Boiler Plant Mechanical Equipment
03-22
23 51 00
Breechings, Chimneys, and Stacks
04-20
23 52 25
Low-Pressure Water Heating Boilers
11-21
23 52 28
Low-Pressure Steam Boilers
03-23
23 52 33
Water Tube Boilers
03-23
23 52 39
Fire Tube Boilers
03-23
23 56 00
Solar Energy Heating System
03-23
23 57 33
Geothermal Energy – Direct Use
03-23
23 64 00
Packaged Water Chillers
03-23
23 65 00
Cooling Towers
03-23
23 72 00
Air-to-Air Energy Recovery Equipment
03-23
23 73 00
Indoor Central-Station Air-Handling Units
03-23
23 74 13
Packaged, Outdoor, Central-Station Air-Handling Units
03-23
23 81 00
Decentralized Unitary HVAC Equipment
03-23
23 81 23
Computer-Room Air-Conditioners
03-23
23 81 43
Air-Source Unitary Heat Pumps
03-23
23 81 46
Water-Source Unitary Heat Pumps
03-23
23 81 49
Ground-Source Heat Pump
03-23
23 82 00
Convection Heating and Cooling Units
03-23
23 82 16
Air Coils
03-23
23 84 00
Humidity Control Equipment
03-23

DIVISION 25 – INTEGRATED AUTOMATION

25 10 10
Advanced Utility Metering System
02-10

DIVISION 26 – ELECTRICAL

26 05 11
Requirements for Electrical Installations
11-22
26 05 13
Medium-Voltage Cables
11-22
26 05 19
Low-Voltage Electrical Power Conductors and Cables
11-22
26 05 26
Grounding and Bonding for Electrical Systems
11-22
26 05 33
Raceway and Boxes for Electrical Systems
11-22
26 05 36
Wireways for Radiology Equipment
11-22
26 05 39
Underfloor Raceways for Electrical Systems
11-22
26 05 41
Underground Electrical Construction
11-22
26 05 73
Overcurrent Protective Device Coordination Study
11-22
26 08 00
Commissioning of Electrical Systems
11-22
26 08 00.01
DVA/USACE Projects Commissioning of Electrical Systems
08-19
26 09 23
Lighting Controls
11-22
26 11 16
Secondary Unit Substations
11-22
26 12 19
Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers
11-22
26 13 13
Medium-Voltage Circuit Breaker Switchgear
11-22
26 13 16
Medium-Voltage Fusible Interrupter Switches
11-22
26 20 11
Isolated Power Systems
11-22
26 22 00
Low-Voltage Transformers
11-22
26 23 00
Low-Voltage Switchgear
11-22
26 23 13
Generator Paralleling Controls
11-22
26 24 13
Distribution Switchboards
11-22
26 24 16
Panelboards
11-22
26 24 19
Motor Control Centers
11-22
26 25 11
Busways
11-22
26 26 00
Power Distribution Units for Static Uninterruptible Power Systems
11-22
26 27 26
Wiring Devices
11-22
26 29 11
Motor Controllers
11-22
26 29 21
Enclosed Switches and Circuit Breakers
11-22
26 32 13
Engine Generators
11-22
26 33 53
Static Uninterruptible Power Supply
11-22
26 35 26
Harmonic Filters
11-22
26 36 23
Automatic Transfer Switches
11-22
26 41 00
Facility Lightning Protection
11-22
26 42 00
Cathodic Protection
11-22
26 43 13
Surge Protective Devices
11-22
26 51 00
Interior Lighting
11-22
26 55 71
Medical and Surgical Lighting Fixtures
11-22
26 56 00
Exterior Lighting
11-22

DIVISION 27 – COMMUNICATIONS

27 05 11
Requirements for Communications Installations
09-19
27 05 26
Grounding and Bonding for Communications Systems
06-15
27 05 33
Raceways and Boxes for Communications Systems
10-18
27 05 61
Leased Space, Communication Equipment and Systems
06-15
27 08 00
Commissioning of Communications Systems
11-16
27 08 00.01
DVA/USACE Projects Commissioning of Communications Systems
08-19
27 10 00
Control, Communication and Signal Wiring
06-15
27 11 00
Communications Equipment Room Fittings
06-15
27 15 00
Communications Structured Cabling
01-16
27 31 00
Voice Communications Switching and Routing Equipment
06-15
27 31 31
Voice Communications Switching and Routing Equipment - Extension
06-15
27 32 41
Two-Way Radio Equipment and Systems
10-18
27 41 31
Master Antenna Television Equipment and Systems
06-15
27 51 16
Public Address and Mass Notification Systems
11-22
27 51 23
Intercommunications and Program Systems
06-15
27 52 23
Nurse Call and Code Blue Systems
10-18
27 52 41
Miscellaneous Medical Systems
06-15
27 53 19
Distributed Radio Antenna (Within Building) Equipment and System
10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00
Common Work Results for Electronic Safety and Security
04-18
28 05 13
Conductors and Cables for Electronic Safety and Security
10-18
28 05 26
Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33
Conduits and Backboxes for Electronic Safety and Security
09-11
28 08 00
Commissioning of Electronic Safety and Security Systems
11-16
28 08 00.01
DVA/USACE Projects Commissioning of Electronic Safety and Security Systems
08-19
28 13 00
Physical Access Control System
10-11
28 13 16
Physical Access Control System and Database Management
09-11
28 13 53
Security Access Detection
09-11
28 16 00
Intrusion Detection System
10-11
28 23 00
Video Surveillance
09-11
28 26 00
Electronic Personal Protection System
09-11
28 31 00
Fire Detection and Alarm
10-11
28 52 31
Emergency Call System
06-15

DIVISION 31 – EARTHWORK

31 20 00
Earthwork
07-16
31 20 11
Earthwork (Short Form)
10-12
31 23 19
Dewatering
10-12
31 23 23.33
Flowable Fill
10-12
31 32 23
Pressure Grouting Soil Stabilization
10-12
31 62 00
Driven Piles
10-12
31 63 16
Auger Cast Grout Piles
10-12
31 63 26
Drilled Caissons
10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23
Cement and Concrete for Exterior Improvements
08-16
32 12 16
Asphalt Paving
09-15
32 14 16
Brick Unit Paving
08-16
32 17 23
Pavement Markings
08-16
32 31 13
Chain Link Fences and Gates
06-18
32 31 40
High Security Fences and Gates
08-16
32 84 00
Planting Irrigation
08-16
32 90 00
Planting
08-16

DIVISION 33 – UTILITIES

33 08 00
Commissioning of Site Utility Systems
11-16
33 08 00.01
DVA/USACE Projects Commissioning of Site Utility Systems
08-19
33 10 00
Water Utilities
03-17
33 30 00
Sanitary Sewer Utilities
06-13
33 40 00
Storm Sewer Utilities
12-17
33 46 13
Foundation Drainage
10-11
33 51 00
Natural-Gas Distribution
10-11
33 63 00
Steam Energy Distribution
09-17

DIVISION 34 – TRANSPORTATION

34 71 13
Passive Vehicle Barriers
04-18
34 75 13.13
Active Vehicle Barriers
08-16

DIVISION 48 – Electrical Power Generation

48 14 00
Solar Energy Electrical Power Generation System
10-17
48 15 00
Wind Energy Electrical Power Generation System
10-17
48 16 23
Geothermal Energy Electrical Power Generation System
10-17

00 01 10-1

File details come from the government source that posted it. Updated .