SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting)_1_Page.pdf

Standard Form PDF 70 KB Posted

Attached to
NEW REQ ROOF REPLACEMENT COTTONWOOD DS
Solicitation number
140A2325R0030
Issued by

About this file

The Standard Form 1413 (SF-1413) is a Statement and Acknowledgment form used to document details of a subcontract in relation to a prime federal contract, specifically for construction or labor-related work. The form captures critical information about the prime contractor, subcontractor, contract details, and ensures compliance with various labor standards clauses including Contract Work Hours and Safety Standards Act, Construction Wage Rate Requirements, and Copeland Act Requirements.

This particular form is associated with a roof replacement project (Solicitation Number 140A2325R0030) for the Cottonwood DS, issued by the Department of the Interior's Bureau of Indian Affairs Bureau of Indian Education. The form is designed to formally acknowledge the subcontracting arrangement and ensure that specific labor standards and regulatory requirements are incorporated into the subcontract, with sections for both the prime contractor and subcontractor to complete and sign, validating their understanding and agreement to the specified contractual terms.

View the file

Other versions and copies of SF 1413

File Revision Posted Attached to
B2_DRAFT_08.3_Sec_J_SF1413_exp_05-2027.pdf May 2027 SLAC Job Order Contract
SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf Revision not stated Irrigation Canal Lining Maintenance and Repair for
Exhibit F - Statement of Acknowledgment (SF-1413).pdf Revision not stated KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS
S02_Attachment - SF 1413 updated.pdf Revision not stated Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies
SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf Revision not stated IE181 - WHS Greenhouse Construction
SF 1413-23A - Statement and Acknowledgment.pdf Revision not stated 70Z03026QCLEV0106 - USCG STA/ANT BUFFALO GENERATOR MAINTENANCE
B08_Attachment_9_Subcontractor_Ack_SF1413-23a_upon_award.pdf Revision not stated EROS Removal and replacement of chilled and conden
Exhibit I - Statement of Acknowledgment (SF-1413).pdf Revision not stated Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
S02_Attachment - Standard Form 1413.pdf Revision not stated Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies
S02_Attachment - Standard Form 1413.pdf Revision not stated CAMP NELSON NATIONAL CEMETERY, KY 833CM3030 – CORRECT FCA DEFICIENCIES
Exhibit K - SF1413.pdf Revision not stated Fire Sprinkler Repair_XGal_IB2A_Lab1_MI50
SF 1413-23A - Statement and Acknowledgment (2).pdf Revision not stated 70Z03026QCLEV0100 - GROUND MAINTENANCE AND SNOW REMOVAL FOR USCG STATION ST. IGNACE
SF 1413-23A - Statement and Acknowledgment (2).pdf Revision not stated 70Z03026QCLEV0101 - GROUND MAINTENANCE AND SNOW REMOVAL FOR SECTOR NORTHERN GRREAT LAKES
SF 1413 - Statement and Acknowledgment.pdf Revision not stated 70Z03026QCLEV0071 - USCG STA LORAIN SECURITY SYSTEM WITH CCTV PROJECT
Exhibit I SF1413_fill-ins.pdf Revision not stated MINOS High Bay Roof Replacement & Masonry Wall Repair
SF 1413 - Statement and Acknowledgment.pdf Revision not stated 70Z03026QCLEV0099 Replacement HVAC Station Building at STA Sodus Point
S02_Attachment - Standard Form 1413.pdf Revision not stated Leavenworth National Cemetery, Gravesite Expansion
SF 1413 - Statement and Acknowledgment.pdf Revision not stated 70Z03026QCLEV0097 - U. S. Coast Guard Station Lorain Gate Replacement
B08_Attachment_7_Subcontractor_Statement_and_Acknowledgment_SF1413-23a.pdf Revision not stated DREDGING OF SEDIMENT POND & CONTACT POOL
SF 1413-23A - Statement and Acknowledgment (1) (1).pdf Revision not stated 70Z03026QCLEV0053- USCG STATION ST. IGNACE REPLACEMENT SHOWER STALL
Show all 20

Who attaches SF 1413

State Files
Florida 3
Colorado 1

Other files

File Type Posted
Sol_140A2325R0030_Amd_0008.pdf PDF
Sol_140A2325R0030_Amd_0007.pdf PDF
Sol_140A2325R0030_Amd_0006.pdf PDF
Sol_140A2325R0030_Amd_0005.pdf PDF
Sol_140A2325R0030_Amd_0004.pdf PDF
Sol_140A2325R0030_Amd_0003.pdf PDF
Sol_140A2325R0030_Amd_0002.pdf PDF
Sol_140A2325R0030_Amd_0001.pdf PDF
B08_Questions_and_Answers_Log.xlsx XLSX spreadsheet
SF_24_Bid_Bond_4_Pages.pdf PDF
SF25_Performance_Bond_2_Pages.pdf PDF
Sol_140A2325R0030.pdf PDF
Plans_FILE0041.pdf PDF
SF25A_Payment_Bond_2_Pages.pdf PDF
Health___Safety_Codes_4_Pages.pdf PDF
A04_SOW.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT AND ACKNOWLEDGMENT OMB Control Number: 9000-0066 Expiration Date: 5/31/2025

PART I - STATEMENT OF PRIME CONTRACTOR

1. PRIME CONTRACT NUMBER 2. DATE SUBCONTRACT

AWARDED

3. SUBCONTRACT NUMBER

15b. TITLE OF PERSON SIGNING

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1413 (REV. 4/2013)

Prescribed by GSA/FAR (48 CFR) 53.222(e)

4. PRIME CONTRACTOR 5. SUBCONTRACTOR

a. NAME a. NAME

b. STREET ADDRESS b. STREET ADDRESS

c. CITY d. STATE e. ZIP CODE c. CITY d. STATE e. ZIP CODE

6. The prime contract does, does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation."

7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in item 5 by the following firm:

a. NAME OF AWARDING FIRM

b. DESCRIPTION OF WORK BY SUBCONTRACTOR

8. PROJECT 9. LOCATION

10a. NAME OF PERSON SIGNING 11. BY (Signature) 12. DATE SIGNED

10b. TITLE OF PERSON SIGNING

PART II - ACKNOWLEDGMENT OF SUBCONTRACTOR

13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract:

Contract Work Hours and Safety Standards Act - Overtime Compensation (If included in prime contract see Block 6) Payrolls and Basic Records Withholding of Funds Disputes Concerning Labor Standards Compliance with Construction Wage Rate Requirements and Related Regulations

Construction Wage Rate Requirements Apprentices and Trainees Compliance with Copeland Act Requirements Subcontracts (Labor Standards) Contract Termination - Debarment Certification of Eligibility

14. NAME(S) OF ANY INTERMEDIATE SUBCONTRACTORS, IF ANY

A C

B D

15a. NAME OF PERSON SIGNING 16. BY (Signature) 17. DATE SIGNED

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number.

The OMB control number for this collection is 9000-0066. We estimate that it will take .05 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

File details come from the government source that posted it. Updated .