This document contains the pre-proposal meeting minutes for the SDN1501E-ES1 Norfolk Sheriff's Office Energy Project in Dedham, Massachusetts, which is being procured by the Division of Capital Asset Management and Maintenance (DCAMM) under Chapter 25A. The project involves the design, installation, and commissioning of various energy conservation measures (ECMs) across three buildings, including LED lighting upgrades, water controls, HVAC control upgrades, VFD upgrades, ozone laundry system, kitchen hood controls, solar photovoltaics (alternative), combined heat and power (CHP), and other building improvements. The pre-proposal meeting reviewed the project scope, schedule, and key deadlines, including additional site visits on July 13 and 19, 2016, a question submission deadline of July 27, 2016, and a proposal submission deadline of August 10, 2016 at 2:00 PM. DCAMM certification is required for this project, but subcontractor certification is not.
The project is not a low-bid procurement, and all written questions must be submitted electronically through Commbuys.com, with responses posted on the same platform. Attachment A outlines the required proposal submission forms, while Attachment B details the scope of work. Attachment C provides facility profiles, and Attachment E covers the energy services agreement. Procedures and requirements are included in Attachments D, F, G, H, and I.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEETING NOTES
Pre-Proposal Conference and Site Visit
SDN1501E-ES1 Norfolk Sheriff’s Office Energy Project 200 West Street, Dedham, MA 02026
June 22, 2016
10:00 AM
Introduction:
Mike Reinhardt introduced the project team members and briefly reviewed the scope of the project, the three (3) buildings included in the project (Main Jail, DAC and Vehicle Maintenance) and the RFP schedule of dates.
Contact Information:
Mike Reinhardt, Project Manager, DCAMM, 857-204-1234, michael.reinhardt@state.ma.us (primary contact for all information in the RFP).
Jim Freeley, Program Manager, DCAMM, 857-204-1239, james.a.freeley@state.ma.us (secondary contact).
Al Weisz, Project Engineer, DCAMM, 857-204-1451, al.weisz@state.ma.us Steve Randall, Deputy Superintendent, srandall@norfolksheriffma.org
Relevant Deadlines:
Additional site visits will be held on Wednesday, July 13, 2016 and Tuesday, July 19, 2016 at 10:00 AM.
CORI checks will be run prior to each visit and the Security Clearance Request Form included as Attachment I to the RFP on Commbuys must be submitted to Steve Randall for each person expected to attend at least two days ahead of the site visit.
Deadline for written questions due by Wednesday, July 27, 2016.
Deadline for proposal submission is: August 10, 2016 at 2:00 P.M.
RFP Specific:
This project is procured under MGL Chapter 25A; it is not a low bid project.
All written questions must be submitted electronically thru Commbuys.com with responses also posted on Commbuys. Other RFP related information will be posted as necessary on Commbuys.
DCAMM certification is required for this project. Sub-contractor certification is thru the prime and is not required.
Minimum threshold requirements – Proposals received by due date and time, current certificate of eligibility, update statement, Forms A-F completed, the TCV does not exceed Single or Aggregate Project limit. Attention should be given to compiling an experienced team.
Attachment A has all forms for proposal submission an overview of the checklist, cover letter, Form B’s, Form E tables, and Form F questions was given.
Attachment B – Scope of work was presented by WSP, DCAMM’s technical advisor on the project, with a review of the intent of each measure.
Attachment C – Facility Profile was reviewed and it was noted that a plans CD will be available with the submission of the DCAMM File Release Form which will be added to the RFP on Commbuys through an addendum.
Attachment E – ESA was reviewed and it was noted that permitted work hours are listed in Table B-2 of the
ESA.
Procedures and Requirements as included in Attachments D, F, G, H, and I were reviewed.
mailto:michael.reinhardt@state.ma.us mailto:james.a.freeley@state.ma.us mailto:al.weisz@state.ma.us mailto:srandall@norfolksheriffma.org
Questions and Answers:
1. Will there be a Building Automation System in place to tie into?
Answer: There will be a BAS which is being installed through the current chiller replacement and BAS project. Additional information about the Chiller and BAS upgrades are available in Attachment C of the RFP. If additional information is necessary it will be posted on Commbuys as an addendum to the RFP.
2. Is the CHP measure expected to provide an induction or a synchronous generator?
Answer: This is not specified in the BOD. Either approach will be considered.
3. Is there a piping design for the CHP measure tie-in to the DHW system?
Answer: There isn’t a piping diagram included in the BOD as the expectation is for the CHP to tie in directly with the existing DHW systems. Refer to drawing P-001 and M-007 for Cogeneration Mechanical Flow Diagram.
4. Why isn’t the space heating load included in the design of the CHP?
Answer: The CHP measure was designed to serve just the DHW load in order to maximize its runtime. It is acceptable for proposers to include additional alternative CHP ECMs with different sizing if they feel it is technically and economically justifiable.
Tour of the facility included a housing unit, air handler and boiler mechanical rooms, laundry, and the central kitchen.