SDN1501Pre-proposal Minutes.pdf

PDF 234 KB Posted

Attached to
SDN1501E ES1 Norfolk Sheriff Office Energy Project Dedham
Solicitation number
BD-16-1019-DCP08-ENR01-00000008759
Issued by
Norfolk County, Massachusetts

About this file

This document contains the pre-proposal meeting minutes for the SDN1501E-ES1 Norfolk Sheriff's Office Energy Project in Dedham, Massachusetts, which is being procured by the Division of Capital Asset Management and Maintenance (DCAMM) under Chapter 25A. The project involves the design, installation, and commissioning of various energy conservation measures (ECMs) across three buildings, including LED lighting upgrades, water controls, HVAC control upgrades, VFD upgrades, ozone laundry system, kitchen hood controls, solar photovoltaics (alternative), combined heat and power (CHP), and other building improvements. The pre-proposal meeting reviewed the project scope, schedule, and key deadlines, including additional site visits on July 13 and 19, 2016, a question submission deadline of July 27, 2016, and a proposal submission deadline of August 10, 2016 at 2:00 PM. DCAMM certification is required for this project, but subcontractor certification is not.

The project is not a low-bid procurement, and all written questions must be submitted electronically through Commbuys.com, with responses posted on the same platform. Attachment A outlines the required proposal submission forms, while Attachment B details the scope of work. Attachment C provides facility profiles, and Attachment E covers the energy services agreement. Procedures and requirements are included in Attachments D, F, G, H, and I.

View the file

Other files

File Type Posted
SDN1501E ES1 Forms BCD.xlsx XLSX spreadsheet
AEP Audit Template SDN1501E-ES1.xlsm XLSM spreadsheet
SDN1501E FormE.xlsx XLSX spreadsheet
N.C.S.O. CORI Security Clearance Request Form.pdf PDF
SDN1501E-ES1 RFP Final~1.pdf PDF
SDN1501E ES1 Main HOC Toilet Locations.pdf PDF
SDN1501E-ES1 3rd Site Visit Sign In 7-19-16.pdf PDF
SDN1501E ES1 Conditions Assessment.pdf PDF
SMRT Chiller EMS Study-Pg 57-61.pdf PDF
SMRT Chiller EMS Study-Pg 51-56.pdf PDF
SDN1501E ES1 Proposals Received.pdf PDF
SDN1501E-ES1 Pre-Proposal Sign-In.pdf PDF
SDN1501E ES1 BOD.pdf PDF
SDN1501E-ES1 Addnedum 1.pdf PDF
SDN1501 Preproposal AGENDA 6-22-16.pdf PDF
SDN1501E FormE - Rev 1.xlsx XLSX spreadsheet
SMRT Chiller EMS Study-Pg 48-50.pdf PDF
SDN1501E ES1_ListFinalQ-A.pdf PDF
SDN1501E ES1 BOD Plumb 0-3.pdf PDF
SDN1501E ES1 ASHRAE Level I and II Report.pdf PDF
SDN1501E ES1 Forms BCD - Rev 1.xlsx XLSX spreadsheet
SDN1501E ES1 DCAMM File Release Form.pdf PDF
SDN1501E ES1 PV Addenda to BOD.pdf PDF
SDN1501E-ES1 Addendum 3.pdf PDF
SDN1501E ES1 BOD Plumb-4-7.pdf PDF
SDN1501E ES1 BOD body.pdf PDF
SDN1501 Pre-Proposal Presentation 6-22-16.ppt PPT presentation
SDN1501E-ES1 2nd Site Visit Sign in 7-13-16.pdf PDF
SMRT Chiller EMS Study-Pg 43-47.pdf PDF
SMRT Chiller EMS Study-Body.pdf PDF
SMRT Chiller Draft CDs.pdf PDF
SDN1501E-EC1 - ESA for RFP Final.pdf PDF
SDN1501E ES1 Accessible Toilet Room Report.pdf PDF
SDO Certified MWBE Subcontractors.xlsx XLSX spreadsheet
SDN1501E ES1 PV Array Layout Plan.pdf PDF
SDN1501E-ES1 Addendum 2.pdf PDF
SDN1501E ES1 Prevailing Wage Rates.pdf PDF
SDN1501E ES1 BOD Mech and Elec.pdf PDF
SDN1501E ES1 BOD Plumb-8-12.pdf PDF
SDN1501E ES1 Building Facility Description.pdf PDF
SMRT Chiller EMS Study.pdf PDF
SDN1501E-ES1 Form F.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEETING NOTES

Pre-Proposal Conference and Site Visit

SDN1501E-ES1 Norfolk Sheriff’s Office Energy Project 200 West Street, Dedham, MA 02026

June 22, 2016

10:00 AM

Introduction:

Mike Reinhardt introduced the project team members and briefly reviewed the scope of the project, the three (3) buildings included in the project (Main Jail, DAC and Vehicle Maintenance) and the RFP schedule of dates.

Contact Information:

Mike Reinhardt, Project Manager, DCAMM, 857-204-1234, michael.reinhardt@state.ma.us (primary contact for all information in the RFP).

Jim Freeley, Program Manager, DCAMM, 857-204-1239, james.a.freeley@state.ma.us (secondary contact).

Al Weisz, Project Engineer, DCAMM, 857-204-1451, al.weisz@state.ma.us Steve Randall, Deputy Superintendent, srandall@norfolksheriffma.org

Relevant Deadlines:

Additional site visits will be held on Wednesday, July 13, 2016 and Tuesday, July 19, 2016 at 10:00 AM.

CORI checks will be run prior to each visit and the Security Clearance Request Form included as Attachment I to the RFP on Commbuys must be submitted to Steve Randall for each person expected to attend at least two days ahead of the site visit.

Deadline for written questions due by Wednesday, July 27, 2016.

Deadline for proposal submission is: August 10, 2016 at 2:00 P.M.

RFP Specific:

This project is procured under MGL Chapter 25A; it is not a low bid project.

All written questions must be submitted electronically thru Commbuys.com with responses also posted on Commbuys. Other RFP related information will be posted as necessary on Commbuys.

DCAMM certification is required for this project. Sub-contractor certification is thru the prime and is not required.

Minimum threshold requirements – Proposals received by due date and time, current certificate of eligibility, update statement, Forms A-F completed, the TCV does not exceed Single or Aggregate Project limit. Attention should be given to compiling an experienced team.

Attachment A has all forms for proposal submission an overview of the checklist, cover letter, Form B’s, Form E tables, and Form F questions was given.

Attachment B – Scope of work was presented by WSP, DCAMM’s technical advisor on the project, with a review of the intent of each measure.

Attachment C – Facility Profile was reviewed and it was noted that a plans CD will be available with the submission of the DCAMM File Release Form which will be added to the RFP on Commbuys through an addendum.

Attachment E – ESA was reviewed and it was noted that permitted work hours are listed in Table B-2 of the

ESA.

Procedures and Requirements as included in Attachments D, F, G, H, and I were reviewed.

mailto:michael.reinhardt@state.ma.us mailto:james.a.freeley@state.ma.us mailto:al.weisz@state.ma.us mailto:srandall@norfolksheriffma.org

Questions and Answers:

1. Will there be a Building Automation System in place to tie into?

Answer: There will be a BAS which is being installed through the current chiller replacement and BAS project. Additional information about the Chiller and BAS upgrades are available in Attachment C of the RFP. If additional information is necessary it will be posted on Commbuys as an addendum to the RFP.

2. Is the CHP measure expected to provide an induction or a synchronous generator?

Answer: This is not specified in the BOD. Either approach will be considered.

3. Is there a piping design for the CHP measure tie-in to the DHW system?

Answer: There isn’t a piping diagram included in the BOD as the expectation is for the CHP to tie in directly with the existing DHW systems. Refer to drawing P-001 and M-007 for Cogeneration Mechanical Flow Diagram.

4. Why isn’t the space heating load included in the design of the CHP?

Answer: The CHP measure was designed to serve just the DHW load in order to maximize its runtime. It is acceptable for proposers to include additional alternative CHP ECMs with different sizing if they feel it is technically and economically justifiable.

Tour of the facility included a housing unit, air handler and boiler mechanical rooms, laundry, and the central kitchen.