SDN1501E ES1 BOD Plumb-8-12.pdf
PDF 13 MB Posted
- Solicitation number
- BD-16-1019-DCP08-ENR01-00000008759
- Issued by
- Norfolk County, Massachusetts
About this file
The document is an attachment for the SDN1501E ES1 Norfolk Sheriff Office Energy Project in Dedham, Massachusetts. The document outlines a Request for Proposals (RFP) issued under Chapter 25A 11c for an energy design-build contract to finalize design, install, and commission various energy conservation measures (ECMs) at the Norfolk Sheriff's Office facility. The ECMs include LED lighting upgrades, water controls, HVAC control upgrades, VFD upgrades, ozone laundry system, kitchen hood controls, solar photovoltaics (alternative), CHP, and other building improvements. The RFP was posted on COMMBUYS on June 8, 2016, with responses due.
The contract will be awarded to the successful bidder to perform the requested services. The document does not provide details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient financial information.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLUMBING KEY NOTES (ECM-5.02a):
REMOVE EXISTING FAUCETS AND REPLACE WITH NEW LOW FLOW FAUCETS (ECM-5.02a).
REMOVE EXISTING WATER CLOSETS AND REPLACE WITH NEW LOW FLOW WATER CLOSETS (ECM-5.02a).2
Project Name:
DCAMM Project Number
NORFOLK COUNTY SHERIFF'S OFFICE
(NCSO): NORFOLK COUNTY
SDN1501E-ES1
Project Location
Project Architect
Site Number:
CAMIS Number:
Building Number:
Secretariat:
Original Issue Date
01 - 22 - 2016
Revisions
No. Description Date
Plan Name:
Drawing Number:
Project Consultant
Office of Planning
Design and Construction
McCormack Building
One Ashburton Place
Boston MA 02108
617 727 4050 www.mass.gov/cam
88 Black Falcon Ave., Suite 210
Boston, MA 02210
(617) 210-1600 www.wspgroup.com/usa
MA STATE PROJECT #: SDN1501E-ES1
Ja n 2
1, 3:4 7p m P
:\B
\B
0.0
_N
CC
C_
_M
EP
_B id_ Pa ck ag e\C
AD
\P
LB
G\
SH
EE
TS
\N
CC
C B1
_P
-0
.dw g
Us er
: u sb k0
WSP PROJECT NO. B1504600.000
N
CORRECTIONAL CENTER
DEDHAM, MA 02027
200 WEST STREET
P-008
PLUMBING KEY NOTES (ECM-5.02a & ECM-5.02b):
REMOVE EXISTING PUSH BUTTON FLUSH FOR WATER CLOSET & REPLACE WITH NEW FLUSH VALVE (ECM-5.02b).
REMOVE EXISTING DUAL LAVATORY MANIFOLD AND REPLACE WITH NEW MANIFOLD (ECM-5.02b).
CONTROL MODULE FOR SHOWERS WIRED BACK TO
CONTROLLER MODULE WIRED BACK TO
WATER CONSERVATION CONTROL SYSTEM (TO BE INTEGRATED WITH EXISTING SECURITY SYSTEM).
REPLACE 8 SHOWER HEADS AND CONTROL WITH LOW FLOW SHOWER HEADS (ECM-5.02b).
PROVIDE NEW SHOWER CONTROL MODULE WIRED BACK TO GUARD STATION ON FIRST FLOOR.
REMOVE EXISTING WATER CLOSET AND REPLACE WITH LOW FLOW WATER CLOSET (ECM-5.02a).
REMOVE EXISTING FAUCET AND REPLACE WITH LOW FLOW FAUCET (ECM05.02a).
P-009
(TYPICAL)
P-009
(TYPICAL)
P-009
(TYPICAL)
P-009
(TYPICAL)
CEILING WORK NOTES:
1. CEILINGS: TYPICAL CEILINGS SHALL MATCH EXISTING.
AFFECTED AREAS WITH SUSPENDED CEILING SHALL BE
PATCHED,RECONSTRUCTED AND REFINISHED TO MATCH
EXISTING PAINTED DRYWALL OR ACOUSTICAL LAY-IN
CEILING SYSTEMS WHERE APPLICABLE. PLEASE REFER TO
SPECIFICATION SECTIONS:
- 092116 -- GYPSUM BOARD ASSEMBLIES
- 095113 -- ACOUSTICAL PANEL CEILINGS
- 099000 -- PAINTING AND COATING
2. WALLS: TYPICAL WALLS SHALL BE SIMILAR TO EXISTING
WITH PAINT TO MATCH EXISTING. NEW WALLS RUN FULL
HEIGHT FROM TOP OF SLAB TO UNDERSIDE OF DECK
ABOVE. AFFECTED AREAS WITH PAINTED DRYWALL
CONSTRUCTION SHALL BE PATCHED, RECONSTRUCTED AND
REFINISHED TO MATCH EXISTING. PLEASE REFER TO
SPECIFICATION SECTIONS:
- 092116 -- GYPSUM BOARD ASSEMBLIES
- 095113 -- ACOUSTICAL PANEL CEILINGS
- 099000 -- PAINTING AND COATING
P-009
(TYPICAL)
Project Name:
DCAMM Project Number
NORFOLK COUNTY SHERIFF'S OFFICE
(NCSO): NORFOLK COUNTY
SDN1501E-ES1
Project Location
Project Architect
Site Number:
CAMIS Number:
Building Number:
Secretariat:
Original Issue Date
01 - 22 - 2016
Revisions
No. Description Date
Plan Name:
Drawing Number:
Project Consultant
Office of Planning
Design and Construction
McCormack Building
One Ashburton Place
Boston MA 02108
617 727 4050 www.mass.gov/cam
88 Black Falcon Ave., Suite 210
Boston, MA 02210
(617) 210-1600 www.wspgroup.com/usa
MA STATE PROJECT #: SDN1501E-ES1
Ja n 2
1, 3:4 7p m P
:\B
\B
0.0
_N
CC
C_
_M
EP
_B id_ Pa ck ag e\C
AD
\P
LB
G\
SH
EE
TS
\N
CC
C B1
_P
-0
.dw g
Us er
: u sb k0
WSP PROJECT NO. B1504600.000
N
CORRECTIONAL CENTER
DEDHAM, MA 02027
200 WEST STREET
P-009
TYPICAL CELL RETRO FIT AND CONTROL MODULE
NTS1
TYPICAL CELL RETRO FIT AND CONTROL MODULE
NTS2 TYPICAL SHOWER RETRO FIT
NTS3
PLUMBING KEY NOTES (ECM-5.02b):
REMOVE EXISTING PUSH BUTTON FLUSH FOR WATER CLOSET & REPLACE WITH NEW FLUSH VALVE (ECM-5.02b)
REMOVE EXISTING DUAL LAVATORY MANIFOLD AND REPLACE WITH NEW MANIFOLD (ECM-5.02b).
CONTROL MODULE FOR SHOWERS WIRED BACK TO WATER CONSERVATION CONTROL SYSTEM WIRED
ON THE FIRST FLOOR. (TO BE INTEGRATED WITH EXISTING SECURITY SYSTEM).
CONTROLLER MODULE WIRED BACK TO WATER CONSERVATION CONTROL SYSTEM WIRED ON
THE FIRST FLOOR (TO BE INTEGRATED WITH EXISTING SECURITY SYSTEM).
P-010
(TYPICAL)
P-010
(TYPICAL)
P-010
(TYPICAL)
P-010
(TYPICAL)
CEILING WORK NOTES:
1. CEILINGS: TYPICAL CEILINGS SHALL MATCH EXISTING.
AFFECTED AREAS WITH SUSPENDED CEILING SHALL BE
PATCHED,RECONSTRUCTED AND REFINISHED TO MATCH
EXISTING PAINTED DRYWALL OR ACOUSTICAL LAY-IN
CEILING SYSTEMS WHERE APPLICABLE. PLEASE REFER TO
SPECIFICATION SECTIONS:
- 092116 -- GYPSUM BOARD ASSEMBLIES
- 095113 -- ACOUSTICAL PANEL CEILINGS
- 099000 -- PAINTING AND COATING
2. WALLS: TYPICAL WALLS SHALL BE SIMILAR TO EXISTING
WITH PAINT TO MATCH EXISTING. NEW WALLS RUN FULL
HEIGHT FROM TOP OF SLAB TO UNDERSIDE OF DECK
ABOVE. AFFECTED AREAS WITH PAINTED DRYWALL
CONSTRUCTION SHALL BE PATCHED, RECONSTRUCTED AND
REFINISHED TO MATCH EXISTING. PLEASE REFER TO
SPECIFICATION SECTIONS:
- 092116 -- GYPSUM BOARD ASSEMBLIES
- 095113 -- ACOUSTICAL PANEL CEILINGS
- 099000 -- PAINTING AND COATING
Project Name:
DCAMM Project Number
NORFOLK COUNTY SHERIFF'S OFFICE
(NCSO): NORFOLK COUNTY
SDN1501E-ES1
Project Location
Project Architect
Site Number:
CAMIS Number:
Building Number:
Secretariat:
Original Issue Date
01 - 22 - 2016
Revisions
No. Description Date
Plan Name:
Drawing Number:
Project Consultant
Office of Planning
Design and Construction
McCormack Building
One Ashburton Place
Boston MA 02108
617 727 4050 www.mass.gov/cam
88 Black Falcon Ave., Suite 210
Boston, MA 02210
(617) 210-1600 www.wspgroup.com/usa
MA STATE PROJECT #: SDN1501E-ES1
Ja n 2
1, 3:4 7p m P
:\B
\B
0.0
_N
CC
C_
_M
EP
_B id_ Pa ck ag e\C
AD
\P
LB
G\
SH
EE
TS
\N
CC
C B1
_P
-0
.dw g
Us er
: u sb k0
WSP PROJECT NO. B1504600.000
N
CORRECTIONAL CENTER
DEDHAM, MA 02027
200 WEST STREET
P-010
TYPICAL CELL RETRO FIT AND CONTROL MODULE
NTS1
TYPICAL CELL RETRO FIT AND CONTROL MODULE
NTS2
PLUMBING KEY NOTES (ECM-5.02a & ECM-5.02b):
REMOVE EXISTING PUSH BUTTON FLUSH FOR WATER CLOSET & REPLACE WITH NEW FLUSH VALVE (ECM-5.02b).
REMOVE EXISTING DUAL LAVATORY MANIFOLD AND REPLACE WITH NEW MANIFOLD (ECM-5.02b).
CONTROL MODULE FOR SHOWERS WIRED BACK TO
CONTROLLER MODULE WIRED BACK TO
WATER CONSERVATION CONTROL SYSTEM (TO BE INTEGRATED WITH EXISTING SECURITY SYSTEM).
REPLACE 8 SHOWER HEADS AND CONTROL WITH LOW FLOW SHOWER HEADS (ECM-5.02b).
PROVIDE SHOWER CONTROL MODULE WIRED BACK TO GUARD STATION ON FIRST FLOOR.
REMOVE EXISTING WATER CLOSET AND REPLACE WITH LOW FLOW WATER CLOSET (ECM-5.02a).
REMOVE EXISTING FAUCET AND REPLACE WITH LOW FLOW FAUCET (ECM-5.02a).
REPLACE SHOWER HEAD AND CONTROL WITH LOW FLOW SHOWER HEAD (ECM-5.02b).
P-011
(TYPICAL)
P-011
(TYPICAL)
P-011
(TYPICAL)
P-011
(TYPICAL)
CEILING WORK NOTES:
1. CEILINGS: TYPICAL CEILINGS SHALL MATCH EXISTING.
AFFECTED AREAS WITH SUSPENDED CEILING SHALL BE
PATCHED,RECONSTRUCTED AND REFINISHED TO MATCH
EXISTING PAINTED DRYWALL OR ACOUSTICAL LAY-IN
CEILING SYSTEMS WHERE APPLICABLE. PLEASE REFER TO
SPECIFICATION SECTIONS:
- 092116 -- GYPSUM BOARD ASSEMBLIES
- 095113 -- ACOUSTICAL PANEL CEILINGS
- 099000 -- PAINTING AND COATING
2. WALLS: TYPICAL WALLS SHALL BE SIMILAR TO EXISTING
WITH PAINT TO MATCH EXISTING. NEW WALLS RUN FULL
HEIGHT FROM TOP OF SLAB TO UNDERSIDE OF DECK
ABOVE. AFFECTED AREAS WITH PAINTED DRYWALL
CONSTRUCTION SHALL BE PATCHED, RECONSTRUCTED AND
REFINISHED TO MATCH EXISTING. PLEASE REFER TO
SPECIFICATION SECTIONS:
- 092116 -- GYPSUM BOARD ASSEMBLIES
- 095113 -- ACOUSTICAL PANEL CEILINGS
- 099000 -- PAINTING AND COATING
P-011
(TYPICAL)
2 1
Project Name:
DCAMM Project Number
NORFOLK COUNTY SHERIFF'S OFFICE
(NCSO): NORFOLK COUNTY
SDN1501E-ES1
Project Location
Project Architect
Site Number:
CAMIS Number:
Building Number:
Secretariat:
Original Issue Date
01 - 22 - 2016
Revisions
No. Description Date
Plan Name:
Drawing Number:
Project Consultant
Office of Planning
Design and Construction
McCormack Building
One Ashburton Place
Boston MA 02108
617 727 4050 www.mass.gov/cam
88 Black Falcon Ave., Suite 210
Boston, MA 02210
(617) 210-1600 www.wspgroup.com/usa
MA STATE PROJECT #: SDN1501E-ES1
Ja n 2
1, 3:4 7p m P
:\B
\B
0.0
_N
CC
C_
_M
EP
_B id_ Pa ck ag e\C
AD
\P
LB
G\
SH
EE
TS
\N
CC
C B1
_P
-0
.dw g
Us er
: u sb k0
WSP PROJECT NO. B1504600.000
N
CORRECTIONAL CENTER
DEDHAM, MA 02027
200 WEST STREET
P-011
TYPICAL CELL RETRO FIT AND CONTROL MODULE
NTS1
TYPICAL CELL RETRO FIT AND CONTROL MODULE
NTS2
TYPICAL SHOWER RETRO FIT
NTS3
PLUMBING KEY NOTES (ECM-5.02b):
REMOVE EXISTING PUSH BUTTON FLUSH FOR WATER CLOSET & REPLACE WITH NEW FLUSH VALVE (ECM-5.02b).
REMOVE EXISTING DUAL LAVATORY MANIFOLD AND REPLACE WITH NEW MANIFOLD (ECM-5.02b).
CONTROL MODULE FOR SHOWERS WIRED BACK TO WATER CONSERVATION CONTROL SYSTEM WIRED
ON THE FIRST FLOOR. (TO BE INTEGRATED WITH EXISTING SECURITY SYSTEM).
CONTROLLER MODULE WIRED BACK TO WATER CONSERVATION CONTROL SYSTEM WIRED ON THE FIRST FLOOR.
(TO BE INTEGRATED WITH EXISTING SECURITY SYSTEM).
P-012
(TYPICAL)
P-012
(TYPICAL)
P-012
(TYPICAL)
P-012
(TYPICAL)
CEILING WORK NOTES:
1. CEILINGS: TYPICAL CEILINGS SHALL MATCH EXISTING.
AFFECTED AREAS WITH SUSPENDED CEILING SHALL BE
PATCHED,RECONSTRUCTED AND REFINISHED TO MATCH
EXISTING PAINTED DRYWALL OR ACOUSTICAL LAY-IN
CEILING SYSTEMS WHERE APPLICABLE. PLEASE REFER TO
SPECIFICATION SECTIONS:
- 092116 -- GYPSUM BOARD ASSEMBLIES
- 095113 -- ACOUSTICAL PANEL CEILINGS
- 099000 -- PAINTING AND COATING
2. WALLS: TYPICAL WALLS SHALL BE SIMILAR TO EXISTING
WITH PAINT TO MATCH EXISTING. NEW WALLS RUN FULL
HEIGHT FROM TOP OF SLAB TO UNDERSIDE OF DECK
ABOVE. AFFECTED AREAS WITH PAINTED DRYWALL
CONSTRUCTION SHALL BE PATCHED, RECONSTRUCTED AND
REFINISHED TO MATCH EXISTING. PLEASE REFER TO
SPECIFICATION SECTIONS:
- 092116 -- GYPSUM BOARD ASSEMBLIES
- 095113 -- ACOUSTICAL PANEL CEILINGS
- 099000 -- PAINTING AND COATING
Project Name:
DCAMM Project Number
NORFOLK COUNTY SHERIFF'S OFFICE
(NCSO): NORFOLK COUNTY
SDN1501E-ES1
Project Location
Project Architect
Site Number:
CAMIS Number:
Building Number:
Secretariat:
Original Issue Date
01 - 22 - 2016
Revisions
No. Description Date
Plan Name:
Drawing Number:
Project Consultant
Office of Planning
Design and Construction
McCormack Building
One Ashburton Place
Boston MA 02108
617 727 4050 www.mass.gov/cam
88 Black Falcon Ave., Suite 210
Boston, MA 02210
(617) 210-1600 www.wspgroup.com/usa
MA STATE PROJECT #: SDN1501E-ES1
Ja n 2
1, 3:4 8p m P
:\B
\B
0.0
_N
CC
C_
_M
EP
_B id_ Pa ck ag e\C
AD
\P
LB
G\
SH
EE
TS
\N
CC
C B1
_P
-0
.dw g
Us er
: u sb k0
WSP PROJECT NO. B1504600.000
N
CORRECTIONAL CENTER
DEDHAM, MA 02027
200 WEST STREET
P-012
TYPICAL CELL RETRO FIT AND CONTROL MODULE
NTS1
TYPICAL CELL RETRO FIT AND CONTROL MODULE
NTS2
File details come from the government source that posted it. Updated .