SDN1501 Preproposal AGENDA 6-22-16.pdf

PDF 199 KB Posted

Attached to
SDN1501E ES1 Norfolk Sheriff Office Energy Project Dedham
Solicitation number
BD-16-1019-DCP08-ENR01-00000008759
Issued by
Norfolk County, Massachusetts

About this file

This document is an agenda for a pre-proposal conference for the SDN1501E-ES1 Norfolk Sheriff's Office Energy Project in Dedham, Massachusetts. The project involves finalized design, installation, and commissioning of various energy conservation measures (ECMs) such as LED lighting upgrades, water controls, HVAC control upgrades, VFD upgrades, ozone laundry system, kitchen hood controls, solar photovoltaics (alternative), and CHP. The project is being procured under MGL Ch. 25A 11C, with the RFP posted on COMMBUYS. The pre-proposal conference covers the project schedule, which includes site visits on June 22, July 13, and July 19, 2016, a deadline for written questions on July 27, 2016, and a proposal submission deadline of August 10, 2016 at 2:00 PM. The project is funded through the Clean Energy Investment Program (CEIP) borrowing. The agenda also details how DCAMM evaluates submittals, including reviewing the completeness of Attachment A, the financials in Forms B-F, the scope of services in Attachment B, and the evaluation criteria in Attachment H.

The project has a number of ECMs that include lighting, HVAC, plumbing, and electrical system upgrades. Proposers must be DCAMM certified, and all communication must go through the DCAMM project manager. The project has alternative ECMs, including a solar photovoltaic system, toilet room accessibility upgrades, and maintenance options for the ozone laundry system, cogeneration system, and PV system. The project is funded through the Clean Energy Investment Program (CEIP) borrowing.

View the file

Other files

File Type Posted
SDN1501E ES1 Forms BCD.xlsx XLSX spreadsheet
AEP Audit Template SDN1501E-ES1.xlsm XLSM spreadsheet
SDN1501E FormE.xlsx XLSX spreadsheet
N.C.S.O. CORI Security Clearance Request Form.pdf PDF
SDN1501E-ES1 RFP Final~1.pdf PDF
SDN1501E ES1 Main HOC Toilet Locations.pdf PDF
SDN1501E-ES1 3rd Site Visit Sign In 7-19-16.pdf PDF
SDN1501E ES1 Conditions Assessment.pdf PDF
SMRT Chiller EMS Study-Pg 57-61.pdf PDF
SMRT Chiller EMS Study-Pg 51-56.pdf PDF
SDN1501E ES1 Proposals Received.pdf PDF
SDN1501E-ES1 Pre-Proposal Sign-In.pdf PDF
SDN1501E ES1 BOD.pdf PDF
SDN1501E-ES1 Addnedum 1.pdf PDF
SDN1501E FormE - Rev 1.xlsx XLSX spreadsheet
SMRT Chiller EMS Study-Pg 48-50.pdf PDF
SDN1501E ES1_ListFinalQ-A.pdf PDF
SDN1501E ES1 BOD Plumb 0-3.pdf PDF
SDN1501E ES1 ASHRAE Level I and II Report.pdf PDF
SDN1501E ES1 Forms BCD - Rev 1.xlsx XLSX spreadsheet
SDN1501E ES1 DCAMM File Release Form.pdf PDF
SDN1501E ES1 PV Addenda to BOD.pdf PDF
SDN1501E-ES1 Addendum 3.pdf PDF
SDN1501E ES1 BOD Plumb-4-7.pdf PDF
SDN1501E ES1 BOD body.pdf PDF
SDN1501 Pre-Proposal Presentation 6-22-16.ppt PPT presentation
SDN1501E-ES1 2nd Site Visit Sign in 7-13-16.pdf PDF
SMRT Chiller EMS Study-Pg 43-47.pdf PDF
SMRT Chiller EMS Study-Body.pdf PDF
SMRT Chiller Draft CDs.pdf PDF
SDN1501E-EC1 - ESA for RFP Final.pdf PDF
SDN1501E ES1 Accessible Toilet Room Report.pdf PDF
SDO Certified MWBE Subcontractors.xlsx XLSX spreadsheet
SDN1501E ES1 PV Array Layout Plan.pdf PDF
SDN1501E-ES1 Addendum 2.pdf PDF
SDN1501E ES1 Prevailing Wage Rates.pdf PDF
SDN1501Pre-proposal Minutes.pdf PDF
SDN1501E ES1 BOD Mech and Elec.pdf PDF
SDN1501E ES1 BOD Plumb-8-12.pdf PDF
SDN1501E ES1 Building Facility Description.pdf PDF
SMRT Chiller EMS Study.pdf PDF
SDN1501E-ES1 Form F.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AGENDA

Pre-Proposal Conference

Project #SDN1501E-ES1 Norfolk Sheriff’s Office

Energy Project 200 West St, Dedham, MA June 22, 2016 10:00 AM

I. Introductions

Norfolk Sheriff’s Office: Stephen Randall, Director of Facilities Mike Shaughnessy, Facilities

DCAMM: Michael Reinhardt, Project Manager, OFMM Al Weisz, Project Engineer, OPDC

WSP: Scott Petit, VP Commissioning Anurag Goel, Commissioning

II. Facility

Overview of facility

Protocol for site visits

Parking

Key contacts

III. Project Schedule

RFP Deadlines:

Site Visits: June 22, July 13, and 19, 2016 at 10:00 AM

Deadline for written questions: July 27, 2016

Proposal Submission Deadline: August 10, 2016, 2:00 PM DCAMM Bid Room.

IV. RFP Review

Procured Under MGL Ch. 25A 11C

RFP posted on www.commbuys.com

All Project Communication - All communication must go through DCAMM project manager, Michael Reinhardt. Written questions must be submitted through www.commbuys.com. Please do not contact the facility directly.

All prime contractors must be DCAMM certified.

Project Funding – provided by Clean Energy Investment Program (CEIP) borrowing.

Minimum Threshold Requirements http://www.commbuys.com/

V. How the RFP is Put Together – How DCAMM Evaluates Submittals

Attachment A

Be sure to submit a complete proposal – Attachment A, Part I. DCAMM reviews this checklist to verify all parts of every proposal is complete.

Financials: Form B, C, D – a key component of the project package.

Complete and double check Form E Tables and that they relate to Attachment A, Part III.

Form F: Respond clearly and completely to all questions – Attachment A, Part III, Form F. DCAMM evaluates the responses carefully in making the contractor selection.

Attachment B: Scope of Services

Part I – Energy Audit, MAAB Accessibility Report

Part II – Basis of Design (BOD) - governs, not the energy study.

Part III – Data Acquisition & Reporting (Attachment B, Part III) – two metering measures identified

Attachment C: Facility Profile

Attachment E: Energy Services Agreement (Contract)

Additional Program Procedures and Requirements

Attachment D – M/WBE

Attachment F – Payment Terms

Attachment G – Contractor Certification

Attachment H – Evaluation Criteria

Attachment I – Security Clearance Request Form

VI. Stay updated on all project changes issued by DCAMM

Meeting minutes from the pre-proposal meeting, Q&A, and addenda will be posted on Commbuys: www.commbuys.com as soon as they are available.

Proposers are strongly encouraged to visit the web site regularly for the most recent up to date information.

VII. Tour of site

Energy Conservation Measures for SDN1501E-ES1 Energy Design Build Project

ECM # ECM Description Type

1.01 Retrofit Interior Lighting Fixtures with LED and Install Lighting Control Sensors Lighting

1.07 Retrofit Exterior Lighting Fixtures with LED Lighting

4.10 Convert ACU’s 1 through 4 to Full DDC Actuation & Control and Optimize System

HVAC

4.13(a) Integrate ACU-7 and ACU-8 Operation with Occupancy Schedule HVAC

4.13(b) Integrate HV-2 Operation with Occupancy Schedule HVAC

4.14(a) Interlock Dishwasher Exhaust Fan with Dishwasher Operation HVAC

4.14(b) Integrate Laundry Exhaust Fan LX-1 and Heating Ventilation Unit HV-3 with Occupancy Schedule

HVAC

4.14(c ) Install Demand Controlled Ventilation/Exhaust Controls for Kitchen Exhaust Fan KX-1 and Heating Ventilation Unit HV-1

HVAC

5.02(b) Install a Computerized Water Conservation System for the Combi-Units and Showers Serving Inmates. Replace Inmate Showerheads with New Low-Flow Showerheads

Plumbing

7.01 Ozone Laundry System Plumbing

9.00 Convert Multizone Units AC-1 through AC-4 to Variable Volume Units HVAC

9.01 Install VFD's on Secondary HW Glycol Pumps P-3A & P-3B and Convert the Existing HW Boiler System to DDC and Connect to the new BMS

HVAC

16.00 Install Cogeneration System for Domestic Hot Water

Plumbing /

HVAC

17.00(a) Replace Unit Heater Thermostats with new DDC Thermostats HVAC

17.00(b) Optimize Fin Tube Radiation Heating System Control HVAC

23.00(a) Walk-in Refrigerator / Freezer Controls Refrigeration

Add Alt ECM 21.00 Install PV System on Main Building Roof Electrical

Add Alt ECM 24.00 Design Toilet Room Accessibility Upgrades Architectural

Add Alt ECM 5.02(a) Install Low Flow / Ultra Low Flow Fixtures for Water Closets, Faucets, Urinals, and Showerheads serving Admin/Staff Areas

Plumbing

Maint. Alt ECM 7.01 Maintenance of ECM 7.01 Ozone Laundry System 5yr

Maint. Alt ECM 16.00

Maintenance of ECM 16 Cogeneration System for Domestic Hot Water 5yr

Maint. Alt ECM 21.00

Maintenance of PV System on Main Building Roof 5yr

File details come from the government source that posted it. Updated .