This document is a project plan for energy conservation measures at the Norfolk County Sheriff's Office in Dedham, Massachusetts as part of a state and local contract opportunity. The key details include replacing existing water closets, faucets, urinals, and shower heads with new low-flow fixtures as well as installing an ozone laundry system. Ceiling and wall work is also specified to match existing finishes. The state project number is SDN1501E-ES1 and the contract is being managed by the Commonwealth of Massachusetts' Division of Capital Asset Management and Maintenance (DCAMM).
The state and local contract opportunity, identified as SDN1501E ES1 Norfolk Sheriff Office Energy Project Dedham, was posted on COMMBUYS on June 8, 2016 as an Energy Design Build RFP pursuant to Chapter 25A 11c. The contract scope includes finalizing design, installation, and commissioning of various energy conservation measures such as LED lighting upgrades, water controls, HVAC control upgrades, VFD upgrades, ozone laundry system, kitchen hood controls, solar photovoltaics (alternative), CHP and other building improvements at the Norfolk County Sheriff's Office in Dedham, Massachusetts.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLUMBING KEY NOTES (ECM-5.02a & ECM-7.01):
REMOVE ALL EXISTING WATER CLOSETS AND REPLACE WITH NEW LOW FLOW WATER CLOSETS (ECM-5.02a).
REMOVE ALL EXISTING FAUCETS AND REPLACE WITH NEW LOW FLOW FAUCETS (ECM-5.02a).
REMOVE ALL EXISTING URINALS AND REPLACE WITH NEW LOW FLOW URINALS (ECM-5.02a).
OZONE LAUNDRY EQUIPMENT: AQUAWING OZONE INJECTION SYSTEM TOWER.
1 UNIT PER 4 WASHERS. AF-TOWER SERIES (ECM-7.01).
CEILING WORK NOTES:
1. CEILINGS: TYPICAL CEILINGS SHALL MATCH EXISTING.
AFFECTED AREAS WITH SUSPENDED CEILING SHALL BE
PATCHED,RECONSTRUCTED AND REFINISHED TO MATCH
EXISTING PAINTED DRYWALL OR ACOUSTICAL LAY-IN
CEILING SYSTEMS WHERE APPLICABLE. PLEASE REFER TO
SPECIFICATION SECTIONS:
- 092116 -- GYPSUM BOARD ASSEMBLIES
- 095113 -- ACOUSTICAL PANEL CEILINGS
- 099000 -- PAINTING AND COATING
2. WALLS: TYPICAL WALLS SHALL BE SIMILAR TO EXISTING
WITH PAINT TO MATCH EXISTING. NEW WALLS RUN FULL
HEIGHT FROM TOP OF SLAB TO UNDERSIDE OF DECK
ABOVE. AFFECTED AREAS WITH PAINTED DRYWALL
CONSTRUCTION SHALL BE PATCHED, RECONSTRUCTED AND
REFINISHED TO MATCH EXISTING. PLEASE REFER TO
SPECIFICATION SECTIONS:
- 092116 -- GYPSUM BOARD ASSEMBLIES
- 095113 -- ACOUSTICAL PANEL CEILINGS
- 099000 -- PAINTING AND COATING
OZONE LAUNDRY PART PLAN
NTS1
P-007
OZONE LAUNDRY - ECM-7.01
Project Name:
DCAMM Project Number
NORFOLK COUNTY SHERIFF'S OFFICE
(NCSO): NORFOLK COUNTY
SDN1501E-ES1
Project Location
Project Architect
Site Number:
CAMIS Number:
Building Number:
Secretariat:
Original Issue Date
01 - 22 - 2016
Revisions No. Description Date
Plan Name:
Drawing Number:
Project Consultant
Office of Planning Design and Construction
McCormack Building One Ashburton Place
Boston MA 02108 617 727 4050 www.mass.gov/cam
88 Black Falcon Ave., Suite 210 Boston, MA 02210
(617) 210-1600 www.wspgroup.com/usa
MA STATE PROJECT #: SDN1501E-ES1
WSP PROJECT NO. B1504600.000
N
CORRECTIONAL CENTER
DEDHAM, MA 02027
200 WEST STREET
P-007 itdlocal Typewritten Text A itdlocal Typewritten Text B itdlocal Typewritten Text C itdlocal Typewritten Text D itdlocal Typewritten Text E itdlocal Typewritten Text F itdlocal Typewritten Text G itdlocal Typewritten Text H itdlocal Typewritten Text I itdlocal Typewritten Text J itdlocal Typewritten Text K itdlocal Typewritten Text L itdlocal Typewritten Text M itdlocal Typewritten Text N itdlocal Typewritten Text
CC.
cbecker Rectangle
PLUMBING KEY NOTES (ECM-5.02a & ECM-5.02b):
REMOVE EXISTING PUSH BUTTON FLUSH FOR COMBI UNIT & REPLACE WITH NEW FLUSH VALVE (ECM-5.02b).
REMOVE EXISTING DUAL LAVATORY MANIFOLD AND REPLACE WITH NEW MANIFOLD (ECM-5.02b).
CONTROL MODULE WIRED BACK TO
CONTROLLER MODULE WIRED BACK TO
WATER CONSERVATION CONTROL SYSTEM (TO BE INTEGRATED WITH EXISTING SECURITY SYSTEM).
REMOVE ALL EXISTING WATER CLOSETS AND REPLACE WITH NEW LOW FLOW WATER CLOSETS (ECM-5.02a).
REMOVE ALL EXISTING FAUCETS AND REPLACE WITH NEW LOW FLOW FAUCETS (ECM-5.02a)
REMOVE ALL EXISTING URINALS AND REPLACE WITH NEW LOW FLOW URINALS (ECM-5.02a)
REMOVE ALL EXISTING SHOWER HEADS WITH NEW LOW FLOW WATER SHOWER HEADS (ECM-5.02a).
PROVIDE WATER CONSERVATION CONTROL SYSTEM AT NURSE'S STATION .
CONTROLLER MODULE WIRED BACK TO
(TYPICAL)
P-006
(TYPICAL)
CEILING WORK NOTES:
1. CEILINGS: TYPICAL CEILINGS SHALL MATCH EXISTING.
AFFECTED AREAS WITH SUSPENDED CEILING SHALL BE
PATCHED,RECONSTRUCTED AND REFINISHED TO MATCH
EXISTING PAINTED DRYWALL OR ACOUSTICAL LAY-IN
CEILING SYSTEMS WHERE APPLICABLE. PLEASE REFER TO
SPECIFICATION SECTIONS:
- 092116 -- GYPSUM BOARD ASSEMBLIES
- 095113 -- ACOUSTICAL PANEL CEILINGS
- 099000 -- PAINTING AND COATING
2. WALLS: TYPICAL WALLS SHALL BE SIMILAR TO EXISTING
WITH PAINT TO MATCH EXISTING. NEW WALLS RUN FULL
HEIGHT FROM TOP OF SLAB TO UNDERSIDE OF DECK
ABOVE. AFFECTED AREAS WITH PAINTED DRYWALL
CONSTRUCTION SHALL BE PATCHED, RECONSTRUCTED AND
REFINISHED TO MATCH EXISTING. PLEASE REFER TO
SPECIFICATION SECTIONS:
- 092116 -- GYPSUM BOARD ASSEMBLIES
- 095113 -- ACOUSTICAL PANEL CEILINGS
- 099000 -- PAINTING AND COATING
(TYPICAL)
P-006
P-006
11 10
Project Name:
DCAMM Project Number
NORFOLK COUNTY SHERIFF'S OFFICE
(NCSO): NORFOLK COUNTY
SDN1501E-ES1
Project Location
Project Architect
Site Number:
CAMIS Number:
Building Number:
Secretariat:
Original Issue Date
01 - 22 - 2016
Revisions No. Description Date
Plan Name:
Drawing Number:
Project Consultant
Office of Planning Design and Construction
McCormack Building One Ashburton Place
Boston MA 02108 617 727 4050 www.mass.gov/cam
88 Black Falcon Ave., Suite 210 Boston, MA 02210
(617) 210-1600 www.wspgroup.com/usa
MA STATE PROJECT #: SDN1501E-ES1
WSP PROJECT NO. B1504600.000
N
CORRECTIONAL CENTER
DEDHAM, MA 02027
200 WEST STREET
P-006
TYPICAL CELL RETRO FIT & CONTROL MODULE
NTS1
TYPICAL STAFF BATHROOM RETRO FIT
NTS2
itdlocal Typewritten Text L itdlocal Typewritten Text M itdlocal Typewritten Text N itdlocal Typewritten Text O itdlocal Typewritten Text P itdlocal Typewritten Text Q itdlocal Typewritten Text R itdlocal Typewritten Text S itdlocal Typewritten Text T itdlocal Typewritten Text U itdlocal Typewritten Text V itdlocal Typewritten Text X itdlocal Typewritten Text W cbecker Rectangle itdlocal Typewritten Text
AA.
cbecker Rectangle itdlocal Typewritten Text
BB.
PLUMBING KEY NOTES (ECM-5.02a):
REMOVE EXISTING FAUCETS AND REPLACE WITH NEW LOW FLOW FAUCETS (ECM-5.02a).
REMOVE EXISTING WATER CLOSETS AND REPLACE WITH NEW LOW FLOW WATER CLOSETS (ECM-5.02a).2
Project Name:
DCAMM Project Number
NORFOLK COUNTY SHERIFF'S OFFICE
(NCSO): NORFOLK COUNTY
SDN1501E-ES1
Project Location
Project Architect
Site Number:
CAMIS Number:
Building Number:
Secretariat:
Original Issue Date
01 - 22 - 2016
Revisions No. Description Date
Plan Name:
Drawing Number:
Project Consultant
Office of Planning Design and Construction
McCormack Building One Ashburton Place
Boston MA 02108 617 727 4050 www.mass.gov/cam
88 Black Falcon Ave., Suite 210 Boston, MA 02210
(617) 210-1600 www.wspgroup.com/usa
MA STATE PROJECT #: SDN1501E-ES1
WSP PROJECT NO. B1504600.000
N
CORRECTIONAL CENTER
DEDHAM, MA 02027
200 WEST STREET
P-008 itdlocal Typewritten Text Z itdlocal Typewritten Text Y