SDN1501E ES1 Main HOC Toilet Locations.pdf

PDF 5 MB Posted

Attached to
SDN1501E ES1 Norfolk Sheriff Office Energy Project Dedham
Solicitation number
BD-16-1019-DCP08-ENR01-00000008759
Issued by
Norfolk County, Massachusetts

About this file

This document is a project plan for energy conservation measures at the Norfolk County Sheriff's Office in Dedham, Massachusetts as part of a state and local contract opportunity. The key details include replacing existing water closets, faucets, urinals, and shower heads with new low-flow fixtures as well as installing an ozone laundry system. Ceiling and wall work is also specified to match existing finishes. The state project number is SDN1501E-ES1 and the contract is being managed by the Commonwealth of Massachusetts' Division of Capital Asset Management and Maintenance (DCAMM).

The state and local contract opportunity, identified as SDN1501E ES1 Norfolk Sheriff Office Energy Project Dedham, was posted on COMMBUYS on June 8, 2016 as an Energy Design Build RFP pursuant to Chapter 25A 11c. The contract scope includes finalizing design, installation, and commissioning of various energy conservation measures such as LED lighting upgrades, water controls, HVAC control upgrades, VFD upgrades, ozone laundry system, kitchen hood controls, solar photovoltaics (alternative), CHP and other building improvements at the Norfolk County Sheriff's Office in Dedham, Massachusetts.

View the file

Other files

File Type Posted
SDN1501E ES1 Forms BCD.xlsx XLSX spreadsheet
AEP Audit Template SDN1501E-ES1.xlsm XLSM spreadsheet
SDN1501E FormE.xlsx XLSX spreadsheet
N.C.S.O. CORI Security Clearance Request Form.pdf PDF
SDN1501E-ES1 RFP Final~1.pdf PDF
SDN1501E-ES1 3rd Site Visit Sign In 7-19-16.pdf PDF
SDN1501E ES1 Conditions Assessment.pdf PDF
SMRT Chiller EMS Study-Pg 57-61.pdf PDF
SMRT Chiller EMS Study-Pg 51-56.pdf PDF
SDN1501E ES1 Proposals Received.pdf PDF
SDN1501E-ES1 Pre-Proposal Sign-In.pdf PDF
SDN1501E ES1 BOD.pdf PDF
SDN1501E-ES1 Addnedum 1.pdf PDF
SDN1501 Preproposal AGENDA 6-22-16.pdf PDF
SDN1501E FormE - Rev 1.xlsx XLSX spreadsheet
SMRT Chiller EMS Study-Pg 48-50.pdf PDF
SDN1501E ES1_ListFinalQ-A.pdf PDF
SDN1501E ES1 BOD Plumb 0-3.pdf PDF
SDN1501E ES1 ASHRAE Level I and II Report.pdf PDF
SDN1501E ES1 Forms BCD - Rev 1.xlsx XLSX spreadsheet
SDN1501E ES1 DCAMM File Release Form.pdf PDF
SDN1501E ES1 PV Addenda to BOD.pdf PDF
SDN1501E-ES1 Addendum 3.pdf PDF
SDN1501E ES1 BOD Plumb-4-7.pdf PDF
SDN1501E ES1 BOD body.pdf PDF
SDN1501 Pre-Proposal Presentation 6-22-16.ppt PPT presentation
SDN1501E-ES1 2nd Site Visit Sign in 7-13-16.pdf PDF
SMRT Chiller EMS Study-Pg 43-47.pdf PDF
SMRT Chiller EMS Study-Body.pdf PDF
SMRT Chiller Draft CDs.pdf PDF
SDN1501E-EC1 - ESA for RFP Final.pdf PDF
SDN1501E ES1 Accessible Toilet Room Report.pdf PDF
SDO Certified MWBE Subcontractors.xlsx XLSX spreadsheet
SDN1501E ES1 PV Array Layout Plan.pdf PDF
SDN1501E-ES1 Addendum 2.pdf PDF
SDN1501E ES1 Prevailing Wage Rates.pdf PDF
SDN1501Pre-proposal Minutes.pdf PDF
SDN1501E ES1 BOD Mech and Elec.pdf PDF
SDN1501E ES1 BOD Plumb-8-12.pdf PDF
SDN1501E ES1 Building Facility Description.pdf PDF
SMRT Chiller EMS Study.pdf PDF
SDN1501E-ES1 Form F.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLUMBING KEY NOTES (ECM-5.02a & ECM-7.01):

REMOVE ALL EXISTING WATER CLOSETS AND REPLACE WITH NEW LOW FLOW WATER CLOSETS (ECM-5.02a).

REMOVE ALL EXISTING FAUCETS AND REPLACE WITH NEW LOW FLOW FAUCETS (ECM-5.02a).

REMOVE ALL EXISTING URINALS AND REPLACE WITH NEW LOW FLOW URINALS (ECM-5.02a).

OZONE LAUNDRY EQUIPMENT: AQUAWING OZONE INJECTION SYSTEM TOWER.

1 UNIT PER 4 WASHERS. AF-TOWER SERIES (ECM-7.01).

CEILING WORK NOTES:

1. CEILINGS: TYPICAL CEILINGS SHALL MATCH EXISTING.

AFFECTED AREAS WITH SUSPENDED CEILING SHALL BE

PATCHED,RECONSTRUCTED AND REFINISHED TO MATCH

EXISTING PAINTED DRYWALL OR ACOUSTICAL LAY-IN

CEILING SYSTEMS WHERE APPLICABLE. PLEASE REFER TO

SPECIFICATION SECTIONS:

- 092116 -- GYPSUM BOARD ASSEMBLIES

- 095113 -- ACOUSTICAL PANEL CEILINGS

- 099000 -- PAINTING AND COATING

2. WALLS: TYPICAL WALLS SHALL BE SIMILAR TO EXISTING

WITH PAINT TO MATCH EXISTING. NEW WALLS RUN FULL

HEIGHT FROM TOP OF SLAB TO UNDERSIDE OF DECK

ABOVE. AFFECTED AREAS WITH PAINTED DRYWALL

CONSTRUCTION SHALL BE PATCHED, RECONSTRUCTED AND

REFINISHED TO MATCH EXISTING. PLEASE REFER TO

SPECIFICATION SECTIONS:

- 092116 -- GYPSUM BOARD ASSEMBLIES

- 095113 -- ACOUSTICAL PANEL CEILINGS

- 099000 -- PAINTING AND COATING

OZONE LAUNDRY PART PLAN

NTS1

P-007

OZONE LAUNDRY - ECM-7.01

Project Name:

DCAMM Project Number

NORFOLK COUNTY SHERIFF'S OFFICE

(NCSO): NORFOLK COUNTY

SDN1501E-ES1

Project Location

Project Architect

Site Number:

CAMIS Number:

Building Number:

Secretariat:

Original Issue Date

01 - 22 - 2016

Revisions No. Description Date

Plan Name:

Drawing Number:

Project Consultant

Office of Planning Design and Construction

McCormack Building One Ashburton Place

Boston MA 02108 617 727 4050 www.mass.gov/cam

88 Black Falcon Ave., Suite 210 Boston, MA 02210

(617) 210-1600 www.wspgroup.com/usa

MA STATE PROJECT #: SDN1501E-ES1

WSP PROJECT NO. B1504600.000

N

CORRECTIONAL CENTER

DEDHAM, MA 02027

200 WEST STREET

P-007 itdlocal Typewritten Text A itdlocal Typewritten Text B itdlocal Typewritten Text C itdlocal Typewritten Text D itdlocal Typewritten Text E itdlocal Typewritten Text F itdlocal Typewritten Text G itdlocal Typewritten Text H itdlocal Typewritten Text I itdlocal Typewritten Text J itdlocal Typewritten Text K itdlocal Typewritten Text L itdlocal Typewritten Text M itdlocal Typewritten Text N itdlocal Typewritten Text

CC.

cbecker Rectangle

PLUMBING KEY NOTES (ECM-5.02a & ECM-5.02b):

REMOVE EXISTING PUSH BUTTON FLUSH FOR COMBI UNIT & REPLACE WITH NEW FLUSH VALVE (ECM-5.02b).

REMOVE EXISTING DUAL LAVATORY MANIFOLD AND REPLACE WITH NEW MANIFOLD (ECM-5.02b).

CONTROL MODULE WIRED BACK TO

CONTROLLER MODULE WIRED BACK TO

WATER CONSERVATION CONTROL SYSTEM (TO BE INTEGRATED WITH EXISTING SECURITY SYSTEM).

REMOVE ALL EXISTING WATER CLOSETS AND REPLACE WITH NEW LOW FLOW WATER CLOSETS (ECM-5.02a).

REMOVE ALL EXISTING FAUCETS AND REPLACE WITH NEW LOW FLOW FAUCETS (ECM-5.02a)

REMOVE ALL EXISTING URINALS AND REPLACE WITH NEW LOW FLOW URINALS (ECM-5.02a)

REMOVE ALL EXISTING SHOWER HEADS WITH NEW LOW FLOW WATER SHOWER HEADS (ECM-5.02a).

PROVIDE WATER CONSERVATION CONTROL SYSTEM AT NURSE'S STATION .

CONTROLLER MODULE WIRED BACK TO

(TYPICAL)

P-006

(TYPICAL)

CEILING WORK NOTES:

1. CEILINGS: TYPICAL CEILINGS SHALL MATCH EXISTING.

AFFECTED AREAS WITH SUSPENDED CEILING SHALL BE

PATCHED,RECONSTRUCTED AND REFINISHED TO MATCH

EXISTING PAINTED DRYWALL OR ACOUSTICAL LAY-IN

CEILING SYSTEMS WHERE APPLICABLE. PLEASE REFER TO

SPECIFICATION SECTIONS:

- 092116 -- GYPSUM BOARD ASSEMBLIES

- 095113 -- ACOUSTICAL PANEL CEILINGS

- 099000 -- PAINTING AND COATING

2. WALLS: TYPICAL WALLS SHALL BE SIMILAR TO EXISTING

WITH PAINT TO MATCH EXISTING. NEW WALLS RUN FULL

HEIGHT FROM TOP OF SLAB TO UNDERSIDE OF DECK

ABOVE. AFFECTED AREAS WITH PAINTED DRYWALL

CONSTRUCTION SHALL BE PATCHED, RECONSTRUCTED AND

REFINISHED TO MATCH EXISTING. PLEASE REFER TO

SPECIFICATION SECTIONS:

- 092116 -- GYPSUM BOARD ASSEMBLIES

- 095113 -- ACOUSTICAL PANEL CEILINGS

- 099000 -- PAINTING AND COATING

(TYPICAL)

P-006

P-006

11 10

Project Name:

DCAMM Project Number

NORFOLK COUNTY SHERIFF'S OFFICE

(NCSO): NORFOLK COUNTY

SDN1501E-ES1

Project Location

Project Architect

Site Number:

CAMIS Number:

Building Number:

Secretariat:

Original Issue Date

01 - 22 - 2016

Revisions No. Description Date

Plan Name:

Drawing Number:

Project Consultant

Office of Planning Design and Construction

McCormack Building One Ashburton Place

Boston MA 02108 617 727 4050 www.mass.gov/cam

88 Black Falcon Ave., Suite 210 Boston, MA 02210

(617) 210-1600 www.wspgroup.com/usa

MA STATE PROJECT #: SDN1501E-ES1

WSP PROJECT NO. B1504600.000

N

CORRECTIONAL CENTER

DEDHAM, MA 02027

200 WEST STREET

P-006

TYPICAL CELL RETRO FIT & CONTROL MODULE

NTS1

TYPICAL STAFF BATHROOM RETRO FIT

NTS2

itdlocal Typewritten Text L itdlocal Typewritten Text M itdlocal Typewritten Text N itdlocal Typewritten Text O itdlocal Typewritten Text P itdlocal Typewritten Text Q itdlocal Typewritten Text R itdlocal Typewritten Text S itdlocal Typewritten Text T itdlocal Typewritten Text U itdlocal Typewritten Text V itdlocal Typewritten Text X itdlocal Typewritten Text W cbecker Rectangle itdlocal Typewritten Text

AA.

cbecker Rectangle itdlocal Typewritten Text

BB.

PLUMBING KEY NOTES (ECM-5.02a):

REMOVE EXISTING FAUCETS AND REPLACE WITH NEW LOW FLOW FAUCETS (ECM-5.02a).

REMOVE EXISTING WATER CLOSETS AND REPLACE WITH NEW LOW FLOW WATER CLOSETS (ECM-5.02a).2

Project Name:

DCAMM Project Number

NORFOLK COUNTY SHERIFF'S OFFICE

(NCSO): NORFOLK COUNTY

SDN1501E-ES1

Project Location

Project Architect

Site Number:

CAMIS Number:

Building Number:

Secretariat:

Original Issue Date

01 - 22 - 2016

Revisions No. Description Date

Plan Name:

Drawing Number:

Project Consultant

Office of Planning Design and Construction

McCormack Building One Ashburton Place

Boston MA 02108 617 727 4050 www.mass.gov/cam

88 Black Falcon Ave., Suite 210 Boston, MA 02210

(617) 210-1600 www.wspgroup.com/usa

MA STATE PROJECT #: SDN1501E-ES1

WSP PROJECT NO. B1504600.000

N

CORRECTIONAL CENTER

DEDHAM, MA 02027

200 WEST STREET

P-008 itdlocal Typewritten Text Z itdlocal Typewritten Text Y

File details come from the government source that posted it. Updated .