SDN1501E ES1 PV Array Layout Plan.pdf
PDF 986 KB Posted
- Solicitation number
- BD-16-1019-DCP08-ENR01-00000008759
- Issued by
- Norfolk County, Massachusetts
About this file
The document provided is a plan for a solar photovoltaic (PV) array layout for the Norfolk Sheriff's Office energy project in Dedham, Massachusetts. The project is being procured through an energy design-build Request for Proposals (RFP) posted on COMMBUYS, the Massachusetts procurement website, on June 8, 2016. The RFP seeks a contractor to finalize the design, install, and commission various energy conservation measures (ECMs) for the facility, including LED lighting upgrades, water controls, HVAC control upgrades, variable frequency drive (VFD) upgrades, an ozone laundry system, kitchen hood controls, and a solar photovoltaic system as an alternative.
The PV array layout plan shows the roof areas with the capacity to receive the PV arrays, including the square footage of each area. The plan also identifies restrictive strips of the roof where the irregular spacing of the roof joists may make it impractical to install PV arrays. The project is located in Norfolk County, Massachusetts, and is being procured by the Norfolk Sheriff's Office.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXP. JOINT
8" NWC TWO-WAY SLAB, #5@9B, #5@12T (TYP)
8" NWC ONE-WAY SLAB, #5@12B, #4@12T (TYP)
10" NWC TWO-WAY SLAB, #5@12B, #6@12T (TYP)
1 1/2" TYPE B METAL DECK, 20 GA., + 2 1/2" NWC
1 1/2" TYPE B METAL DECK, 20 GA., + 2 1/2" NWC
ROOF CONSTRUCTION LEGEND:
PROGRESS PRINT
3/14/2016
EXISTING STRUCTURAL ROOF CONSTRUCTION KEY PLAN
EXP. JOINT
SKYLIGHT/SCREEN
ROOF TOP UNIT
AREA WITH GRAVITY CAPACITY TO RECEIVE
WIDE SPREAD PV ARRAYS
LEGEND:
T.O.C. EL. 247'-8 3/8"
T.O.S. EL. 254'-0"
T.O.C. EL. 260'-0 3/8" (VARIES)
T.O.S. EL. 264'-0"
5,300 FT2
4,200 FT2
6,200 FT2
1,200 FT2
3,200 FT2
800 FT2
2,600 FT2
N
RESTRICTIVE STRIPS OF
AREA WITH CAPACITY TO
RECIEVE PV ARRAYS DUE
TO IRREGULAR SPACING
IN ROOF JOISTS-MAY NOT
BE PRACTICAL TO INSTALL
PV ARRAYS HERE.
PROGRESS PRINT
3/14/2016
PV ARRAY LAYOUT PLAN