SDN1501E ES1 BOD Plumb 0-3.pdf

PDF 15 MB Posted

Attached to
SDN1501E ES1 Norfolk Sheriff Office Energy Project Dedham
Solicitation number
BD-16-1019-DCP08-ENR01-00000008759
Issued by
Norfolk County, Massachusetts

About this file

This document is a Scope of Work (SOW) for an Energy Design Build Request for Proposals (RFP) issued by the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) on behalf of the Norfolk Sheriff's Office for an energy improvement project at their facility in Dedham, MA. The RFP seeks proposals to finalize the design, install, and commission various energy conservation measures (ECMs) including LED lighting upgrades, water controls, HVAC control upgrades, VFD upgrades, ozone laundry system, kitchen hood controls, and the potential for solar photovoltaics and combined heat and power (CHP) systems. The RFP was posted on COMMBUYS, the Massachusetts procurement portal, on June 8, 2016.

The RFP indicates that the project is being procured pursuant to Chapter 25A 11c of Massachusetts law. No pricing details, set-asides, or incumbent information is provided. The document states that funding sources and amounts will be determined, but does not specify those details.

View the file

Other files

File Type Posted
SDN1501E ES1 Forms BCD.xlsx XLSX spreadsheet
AEP Audit Template SDN1501E-ES1.xlsm XLSM spreadsheet
SDN1501E FormE.xlsx XLSX spreadsheet
N.C.S.O. CORI Security Clearance Request Form.pdf PDF
SDN1501E-ES1 RFP Final~1.pdf PDF
SDN1501E ES1 Main HOC Toilet Locations.pdf PDF
SDN1501E-ES1 3rd Site Visit Sign In 7-19-16.pdf PDF
SDN1501E ES1 Conditions Assessment.pdf PDF
SMRT Chiller EMS Study-Pg 57-61.pdf PDF
SMRT Chiller EMS Study-Pg 51-56.pdf PDF
SDN1501E ES1 Proposals Received.pdf PDF
SDN1501E-ES1 Pre-Proposal Sign-In.pdf PDF
SDN1501E ES1 BOD.pdf PDF
SDN1501E-ES1 Addnedum 1.pdf PDF
SDN1501 Preproposal AGENDA 6-22-16.pdf PDF
SDN1501E FormE - Rev 1.xlsx XLSX spreadsheet
SMRT Chiller EMS Study-Pg 48-50.pdf PDF
SDN1501E ES1_ListFinalQ-A.pdf PDF
SDN1501E ES1 ASHRAE Level I and II Report.pdf PDF
SDN1501E ES1 Forms BCD - Rev 1.xlsx XLSX spreadsheet
SDN1501E ES1 DCAMM File Release Form.pdf PDF
SDN1501E ES1 PV Addenda to BOD.pdf PDF
SDN1501E-ES1 Addendum 3.pdf PDF
SDN1501E ES1 BOD Plumb-4-7.pdf PDF
SDN1501E ES1 BOD body.pdf PDF
SDN1501 Pre-Proposal Presentation 6-22-16.ppt PPT presentation
SDN1501E-ES1 2nd Site Visit Sign in 7-13-16.pdf PDF
SMRT Chiller EMS Study-Pg 43-47.pdf PDF
SMRT Chiller EMS Study-Body.pdf PDF
SMRT Chiller Draft CDs.pdf PDF
SDN1501E-EC1 - ESA for RFP Final.pdf PDF
SDN1501E ES1 Accessible Toilet Room Report.pdf PDF
SDO Certified MWBE Subcontractors.xlsx XLSX spreadsheet
SDN1501E ES1 PV Array Layout Plan.pdf PDF
SDN1501E-ES1 Addendum 2.pdf PDF
SDN1501E ES1 Prevailing Wage Rates.pdf PDF
SDN1501Pre-proposal Minutes.pdf PDF
SDN1501E ES1 BOD Mech and Elec.pdf PDF
SDN1501E ES1 BOD Plumb-8-12.pdf PDF
SDN1501E ES1 Building Facility Description.pdf PDF
SMRT Chiller EMS Study.pdf PDF
SDN1501E-ES1 Form F.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VII. MEP DRAWINGS

a. Plumbing Drawings:

a. P-000: Plumbing Legend and Abbreviations

b. P-001: Plumbing Schedules and Details

c. P-002: Plumbing Jail First Floor Plan

d. P-003: Plumbing Jail Second Floor Plan

e. P-004: Plumbing Seg. Unit First Floor Plan

f. P-005: Plumbing Seg. Unit Second Floor Plan

g. P-006: Plumbing Central Unit South Floor Plan

h. P-007: Plumbing Central Unit North Floor Plan

i. P-008: Plumbing Central Mechanical Floor Plan

j. P-009: Plumbing HOC I First Floor Plan

k. P-010: Plumbing HOC I Second Floor Plan

l. P-011: Plumbing HOC II First Floor Plan

m. P-012: Plumbing HOC II Second Floor Plan

b. Mechanical Drawings:

a. M-001: Existing Hot Water Flow Diagram

b. M-002: Existing Mechanical Room Scope

c. M-003: Existing Boiler Room Scope

d. M-004: Mechanical Roof Plan

e. M-005: Mechanical First Floor Plan

f. M-006: Existing Central Kitchen

g. M-007: Cogeneration Flow Diagram

c. Electrical Drawings:

a. E-001 – Electrical Overall Plan

b. E-002 – Electrical Lighting Matrix

c. E-003 – Electrical Lighting Fixture Schedule

January 22, 2016 (30% SCHEMATIC DESIGN SET)

DCAMM Approvals

Project Engineer Date

Deputy Director Date

Director Date

This signature block is to be included for all preliminary submissions. It is not to be included on final submission sets for bid or construction.

Project Manager Date

PREPARED FOR

NORFOLK COUNTY CORRECTIONAL CENTER (NCCC)

THE COMMONWEALTH OF MASSACHUSETTS

EXECUTIVE OFFICE FOR ADMINISTRATION AND FINANCE

DIVISION OF CAPITAL ASSET MANAGEMENT AND MAINTENANCE

OFFICE OF PLANNING, DESIGN AND CONSTRUCTION

ACCELERATED ENERGY PROGRAM

ONE ASHBURTON PLACE, SUITE 1500

BOSTON, MA 02108

NCCC: 200 WEST ST., DEDHAM, MA 02027

ENERGY EFFICIENCY PROJECT

DCAMM PROJECT NUMBER: SDN1501E ES1

WSP | PARSONS BRINCKERHOFF

88 Black Falcon Ave

Suite #210

Boston, MA 02210

T: 617-210-1600 / F: 617-210-1800 www.wspgroup.com

DRAWING LIST

P-000 PLUMBING LEGEND AND ABBREVIATIONS

DRAWING NAME

P-001 PLUMBING SCHEDULES AND DETAILS

P-004

PLUMBING JAIL FIRST FLOOR PLAN

P-005

PLUMBING JAIL SECOND FLOOR PLAN

P-006

PLUMBING SEG. UNIT FIRST FLOOR PLAN

P-007

PLUMBING SEG. UNIT SECOND FLOOR PLAN

P-008

PLUMBING CENTRAL UNIT SOUTH FLOOR PLAN

P-009

PLUMBING CENTRAL UNIT NORTH FLOOR PLAN

P-011

PLUMBING HOC I FIRST FLOOR PLAN

P-010

PLUMBING CENTRAL MECHANICAL FLOOR PLAN

BUILDING NAMEDRAWING NUMBERDCAMM #

GENERAL COVER SHEETG-000 NCCC

NCCC

NCCC

MAIN BUILDING - JAIL

MAIN BUILDING

P-012

P-003

PLUMBING

PLUMBING

PLUMBING

PLUMBING

PLUMBING

PLUMBING

PLUMBING

PLUMBING

PLUMBING

PLUMBING

PLUMBING

PLUMBING

PLUMBING

ELECTRICAL

ELECTRICAL

ELECTRICAL

E-001

E-003

E-002

PLUMBING HOC I SECOND FLOOR PLAN

PLUMBING HOC II SECOND FLOOR PLAN

PLUMBING HOC II FIRST FLOOR PLAN

ELECTRICAL OVERALL PLAN

ELECTRICAL LIGHTING FIXTURE SCHEDULE

ELECTRICAL LIGHTING MATRIX

NCCC EXISTING HOT WATER FLOW DIAGRAMMECHANICAL M-001

NCCC EXISTING MECHANICAL ROOM SCOPEMECHANICAL M-002

NCCC EXISTING BOILER ROOM SCOPEMECHANICAL M-003

NCCC MECHANICAL ROOF PLANMECHANICAL M-004

MECHANICAL M-005

NCCC EXISTING CENTRAL KITCHENMECHANICAL M-006

P-002

NCCC COGENERATION FLOW DIAGRAMMECHANICAL M-007

NCCC MECHANICAL FIRST FLOOR PLAN

MAIN BUILDING - JAIL

MAIN BUILDING - SEG. UNIT

MAIN BUILDING - SEG. UNIT

MAIN BUILDING - CENTRAL UNIT

MAIN BUILDING - CENTRAL UNIT

MAIN BUILDING - CENTRAL MECH.

MAIN BUILDING - HOC I

MAIN BUILDING - HOC I

MAIN BUILDING - HOC II

MAIN BUILDING - HOC II

MAIN BUILDING

MAIN BUILDING

MAIN BUILDING

MAIN BUILDING

MAIN BUILDING

MAIN BUILDING

MAIN BUILDING

MAIN BUILDING

MAIN BUILDING

Y STRAINER WITH BLOW OFF VALVE

FLEXIBLE CONNECTION

EXPANSION LOOP SIZE

SEISMIC JOINT

SHOCK ABSORBER

VACUUM BREAKER

MANUAL AIR VENT

AUTOMATIC AIR VENT

PRESSURE GAUGE AND COCK

THERMOMETER

WATER FLOW SWITCH

RUNNING TRAP

BASKET STRAINER

VALVE (SPECIFICATION FOR TYPE)

CHECK VALVE

CHECK VALVE WITH ABD

SOLENOID VALVE

PRESSURE REDUCING VALVE

OS&Y (OUTSIDE SCREW & YOKE) VALVE

AUTOMATIC FLOW CONTROL VALVE

BUTTERFLY VALVE (MANUAL)

GLOBE VALVE

CALIBRATED BALANCING VALVE

BALANCING VALVE

VALVE WITH TAMPER SWITCH

GAS COCK VALVE

RELIEF VALVE

ANGLE RELIEF VALVE

TEMPERATURE MIXING VALVE

UNION

REDUCER

ECCENTRIC REDUCER (E.R.)

SLEEVE

PUMP

METER

HOSE BIBB

WATER HAMMER ARRESTER

FLOOR DRAIN, FLOOR SINK, AREA DRAIN

POINT OF CONNECTION (NEW TO EXISTING)

BOTTOM PIPE CONNECTION

TOP PIPE CONNECTION

VALVE IN VERTICAL

P-TRAP

FLOOR CLEANOUT/GRADE CLEANOUT

CLEANOUT/PLUG

PIPE DOWN

PIPE UP

CAP

CHANGE IN PIPE ELEVATION

ARROW INDICATES DIRECTION OF FLOW

PITCH PIPE DOWN IN DIRECTION OF ARROW

INSULATED AND HEAT TRACED PIPING

WALL HYDRANT

PLUMBING LEGEND AND ABBREVIATIONS

ABBREVIATIONS

AFF ABOVE FINISHED FLOOR

AP ACCESS PANEL

BLDG BUILDING

BOB BOTTOM OF BEAM

BOP BOTTOM OF PIPE

BV BALANCING VALVE

CD CONDENSATE DRAIN

CFH CUBIC FEET PER HOUR

CI CAST IRON

CLG CEILING

CO CLEANOUT

CONN CONNECTION

CONT CONTINUATION

CP CIRCULATING PUMP

CV CHECK VALVE

CW COLD WATER

DF DRINKING FOUNTAIN

DFU DRAINAGE FIXTURE UNIT

DIA DIAMETER

DN DOWN

DR DRAIN

DROP DROP (WITHIN FLOOR)

DWG DRAWING

(E) EXISTING

EL ELEVATION

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FL FLOOR

FT FEET

FU FIXTURE UNIT

G (LOW PRESSURE) NATURAL GAS

GAL GALLONS

GPM GALLONS PER MINUTE

HB HOSE BIBB

HT HEAT TRACING

HW HOT WATER

HWR HOT WATER RETURN

HX HEAT EXCHANGER

IE INVERT ELEVATION

IN INCH

IW INDIRECT WASTE

JS JANITOR SINK

L LAVATORY

MAX MAXIMUM

MIN MINIMUM

MS MOP SINK

(N) NEW

NC NORMALLY CLOSED

NIC NOT IN THIS CONTRACT

NO NORMALLY OPEN

NPW NON-POTABLE WATER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OST OVERFLOW STORM PIPING

OS&Y OUTSIDE SCREW & YOKE GATE VALVE

PD PUMP DISCHARGE

P/FT PITCH PER FOOT

PIV POST INDICATING VALVE

POC POINT OF CONNECTION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH (GAUGE)

RD ROOF DRAIN

RISE RISE (WITH IN FLOOR)

SA SHOCK ABSORBER

SAN SANITARY

SE SEWAGE EJECTOR

SED SEWAGE EJECTOR DISCHARGE

SF SQUARE FEET

SH SHOWER

SK SINK

SP SUMP PUMP

ST STORM PIPING

TDH TOTAL DISCHARGE HEAD

TMV TEMPERATURE MIXING VALVE

TOP TOP OF PIPE

TOS TOP OF SLAB

TP TRAP PRIMER

TPV TRAP PRIMER VALVE

TYP TYPICAL

UP UP (PENETRATES FLOOR SLAB)

UR URINAL

V VENT

VB VACUUM BREAKER

VR VENT RISE

VTR VENT THROUGH ROOF

WC WATER CLOSET

WCO WALL CLEANOUT

WH WALL HYDRANT

WFU WATER FIXTURE UNIT

MISCELLANEOUS

P = SAN, VENT STACK OR DOMESTIC WATER RISER

ST = STORM DRAIN LEADER RISER

F = FIRE STANDPIPE RISER

EQUIPMENT DESIGNATION

DETAIL DESIGNATION

SHEET NOTE NUMBER

REVISION NUMBER

RISER NO.

RISERP

DOMESTIC COLD WATER PIPING

DOMESTIC HOT WATER PIPING

DOMESTIC HOT WATER RETURN PIPING

PIPING / SYMBOL LEGEND

NATURAL GAS PIPING (LOW PRESSURE)

NATURAL GAS VENT PIPING (LOW PRESSURE)

NATURAL GAS PIPING (HIGH PRESSURE)

NATURAL GAS VENT PIPING (HIGH PRESSURE)

STEAM PIPING

SANITARY (ABOVE FLOOR)

SANITARY (BELOW FLOOR)

VENT PIPING

STORM DRAIN PIPING

INDIRECT WASTE PIPING

CONDENSATE DRAIN PIPING

SUMP PUMP DISCHARGE PIPING

SEWAGE EJECTOR DISCHARGE PIPING

SUMP PUMP VENT PIPING

SEWAGE EJECTOR VENT PIPING

PUMP DISCHARGE

CENTER LINE

EXISTING PIPING

EXISTING PIPING TO BE REMOVED

PIPING / SYMBOL LEGEND ABBREVIATIONS

P-000 PLUMBING LEGEND AND ABBREVIATIONS

DRAWING LIST

P-001 PLUMBING SCHEDULES AND DETAILS

P-002 PLUMBING JAIL FIRST FLOOR PLAN

P-003 PLUMBING JAIL SECOND FLOOR PLAN

P-004 PLUMBING SEG. UNIT FIRST FLOOR PLAN

P-005 PLUMBING SEG. UNIT SECOND FLOOR PLAN

P-006 PLUMBING CENTRAL UNIT SOUTH FLOOR PLAN

P-007 PLUMBING CENTRAL UNIT NORTH FLOOR PLAN

P-010 PLUMBING HOC I SECOND FLOOR PLAN

P-011

P-012

P-009 PLUMBING HOC I FIRST FLOOR PLAN

PLUMBING HOC II SECOND FLOOR PLAN

PLUMBING HOC II FIRST FLOOR PLAN

P-008 PLUMBING CENTRAL MECHANICAL FLOOR PLAN

ECM SCOPE

ECM-5.02a LOW FLOW / ULTRA LOW FLOW FIXTURES FOR GENERAL USE

ECM-5.02b WATER CONSERVATION CONTROL SYSTEM ON COMBI-UNITS AND

SHOWERS FOR INMATE USE

ECM-7.01 OZONE LAUNDRY SYSTEM

ECM-16.00 COGENERATION SYSTEM FOR DOMESTIC HOT WATER PRE-HEAT

Project Name:

DCAMM Project Number

NORFOLK COUNTY SHERIFF'S OFFICE

(NCSO): NORFOLK COUNTY

SDN1501E-ES1

Project Location

Project Architect

Site Number:

CAMIS Number:

Building Number:

Secretariat:

Original Issue Date

01 - 22 - 2016

Revisions

No. Description Date

Plan Name:

Drawing Number:

Project Consultant

Office of Planning

Design and Construction

McCormack Building

One Ashburton Place

Boston MA 02108

617 727 4050 www.mass.gov/cam

88 Black Falcon Ave., Suite 210

Boston, MA 02210

(617) 210-1600 www.wspgroup.com/usa

MA STATE PROJECT #: SDN1501E-ES1

Ja n 2

1, 3:4 5p m P

:\B

\B

0.0

_N

CC

C_

_M

EP

_B id_ Pa ck ag e\C

AD

\P

LB

G\

SH

EE

TS

\N

CC

C B1

_P

-0

.dw g

Us er

: u sb k0

WSP PROJECT NO. B1504600.000

N

CORRECTIONAL CENTER

DEDHAM, MA 02027

200 WEST STREET

P-000

PLUMBING FIXTURE SCHEDULE

DESCRIPTIONITEM

WC-1 WATER CLOSET

WC-1A

MODEL FITTINGS REMARKS

WATER CLOSETWC-3

WC-4 WATER CLOSET

WATER CLOSET - ADA

LAVATORYLV-1 -

NOTES:

UR-1 URINAL

WATER CLOSETWC-2

UR-2 URINAL -

SEAT, GASKET

AND BOLTS

LOW FLOW FLOOR MOUNTED FLUSH TANK-TYPE , 1.28GPF, VITREOUS CHINA

LOW FLOW WALL HUNG W/ FLUSH VALVE , 1.28GPF, VITREOUS CHINA

LOW FLOW FLOOR MOUNTED W/ FLUSH VALVE , 1.28GPF, STAINLESS STEAL

WALL HUNG, UNDERMOUNT LAVATORY WITH FAUCET & AERATOR

SEAT, GASKET

AND BOLTS ADA, LOW FLOW FLOOR MOUNTED FLUSH TANK-TYPE , 1.28GPF, VITREOUS CHINA

- LOW FLOW FLOOR MOUNTED W/ FLUSH VALVE , 1.28GPF, VITREOUS CHINA

REFER TO DRAWINGS FOR LOCATION OF UNITS

SEAT, GASKET, CARRIER

AND BOLTS

SEAT, GASKET

AND BOLTS

SEAT, GASKET

AND BOLTS

LOW FLOW WALL HUNG W/ FLUSH VALVE , 0.125 GPF, STAINLESS STEAL

LOW FLOW WALL HUNG W/ FLUSH VALVE , 0.125 GPF, VITREOUS CHINA

FT-1 FAUCET -

METERED FAUCET W/ AERATOR

GASKET, CARRIER

AND BOLTS

GASKET, CARRIER

AND BOLTS

LAVATORY-ADALV-1A - -

WALL HUNG, LAVATORY WITH FAUCET & AERATOR, ADA COMPLIANT

REMOVE AND REPLACE WALL TO ACCOMODATE NEW CHAIR CARRIER

REMOVE AND REPLACE WALL TO ACCOMODATE NEW CHAIR CARRIER

REMOVE AND REPLACE WALL TO ACCOMODATE NEW CHAIR CARRIER

REMOVE AND REPLACE WALL TO ACCOMODATE NEW CHAIR CARRIER

TS-1

C

TS-10

OUTSIDE AIR

TS-4

TS

TS

C

GLYCAMATIC

V-3

C

TS

T T

PLATE FRAME

H.X.-1HEAT EXCHANGER

T

V-1

AB B

A T

SEE DETAIL

HEAT-DISSIPATION UNIT

HX-3

DESIGN MANUFACTURER

COGENERATION SCHEDULE

MA GAS BOARD APPROVAL #

MODEL

FUEL

FUEL INPUT

G3-0110-276

BASIS OF DESIGN: AEGENCO

NATURAL GAS

TP-75LE

930 SCFH

P-1

MODULE

AEGENCO

COGENERATION

COGEN LOAD MODULE

PROVIDED & SET BY

AEGIS, MECHANICAL SUB

TO MAKE CONNECTIONS

UP TO MODULE, 1-1/2"

COPPER CONNECTIONS

COGEN PUMP MODULE

PROVIDED & SET BY

AEGIS, MECHANICAL SUB

TO MAKE CONNECTIONS

UP TO MODULE, 1-1/2"

COPPER CONNECTIONS

T

TS

TS-31

T T

B A

AB

DUMP VALVE MODULE

1 1/2" 3-WAY VALVE

PROVIDED BY AEGIS,

FIELD FABRICATED BY

PLUMBER

DUMP RADIATOR

PROVIDED & SET BY

AEGIS, CONTRACTOR TO

MAKE UP CONNECTIONS

TO UNIT.

P

C

LOCATE TAPS ON DOMESTIC

HOT WATER RETURN LINE

ACTUAL TIE IN DETAIL.

BY PLUMBING CONTRACTOR

TS-11

TS-12

TS

P-2

TS

1 12"

1 12"

1 1 2"

1 12"

1 12"

1 1 2"

1 12"

1 1 2"

1 12"

6"

COGENERATION MECHANICAL FLOW DIAGRAM1

GAS RISER DIAGRAM2

M

GG

GAS BOOSTER

(PROVIDED BY

COGEN SUPPLIER)

EXISTING

GAS METER

CO-GEN UNIT

(930 CFH)

TO WATER HEATER RETURN

P-001

G

NOTES:

1. INCOMING GAS PRESSURE REQUIREMENTS

TO BE CONFIRMED BY AWARDED CONTRACTOR.

REFER TO MECHANICAL DWG M-007

REFER TO MECHANICAL DWG M-007

Project Name:

DCAMM Project Number

NORFOLK COUNTY SHERIFF'S OFFICE

(NCSO): NORFOLK COUNTY

SDN1501E-ES1

Project Location

Project Architect

Site Number:

CAMIS Number:

Building Number:

Secretariat:

Original Issue Date

01 - 22 - 2016

Revisions

No. Description Date

Plan Name:

Drawing Number:

Project Consultant

Office of Planning

Design and Construction

McCormack Building

One Ashburton Place

Boston MA 02108

617 727 4050 www.mass.gov/cam

88 Black Falcon Ave., Suite 210

Boston, MA 02210

(617) 210-1600 www.wspgroup.com/usa

MA STATE PROJECT #: SDN1501E-ES1

Ja n 2

1, 3:4 5p m P

:\B

\B

0.0

_N

CC

C_

_M

EP

_B id_ Pa ck ag e\C

AD

\P

LB

G\

SH

EE

TS

\N

CC

C B1

_P

-0

.dw g

Us er

: u sb k0

WSP PROJECT NO. B1504600.000

N

CORRECTIONAL CENTER

DEDHAM, MA 02027

200 WEST STREET

P-001

PLUMBING KEY NOTES (ECM-5.02b):

REMOVE EXISTING PUSH BUTTON FLUSH FOR COMBI UNIT & REPLACE WITH NEW FLUSH VALVE (ECM-5.02b).

REMOVE EXISTING DUAL LAVATORY MANIFOLD AND REPLACE WITH NEW MANIFOLD

CONTROL MODULE FOR SHOWERS WIRED BACK TO

CONTROLLER MODULE WIRED BACK TO

WATER CONSERVATION CONTROL SYSTEM (TO BE INTEGRATED WITH EXISTING SECURITY SYSTEM).

REPLACE 5 SHOWER HEADS AND CONTROL WITH LOW FLOW SHOWER HEADS (ECM-5.02b).

PROVIDE SHOWER CONTROL MODULE WIRED BACK TO GUARD STATION ON THE FIRST FLOOR.

REPLACE 4 SHOWER HEADS AND CONTROL WITH LOW FLOW SHOWER HEADS (ECM-5.02b).

PROVIDE SHOWER CONTROL MODULE WIRED BACK TO GUARD STATION ON THE FIRST FLOOR.

REPLACE SHOWER HEAD AND CONTROL WITH LOW FLOW SHOWER HEAD (ECM-5.02b).

P-002

(TYPICAL)

P-002

(TYPICAL)

P-002

(TYPICAL)

P-002

(TYPICAL)

CEILING WORK NOTES:

1. CEILINGS: TYPICAL CEILINGS SHALL MATCH EXISTING.

AFFECTED AREAS WITH SUSPENDED CEILING SHALL BE

PATCHED,RECONSTRUCTED AND REFINISHED TO MATCH

EXISTING PAINTED DRYWALL OR ACOUSTICAL LAY-IN

CEILING SYSTEMS WHERE APPLICABLE. PLEASE REFER TO

SPECIFICATION SECTIONS:

- 092116 -- GYPSUM BOARD ASSEMBLIES

- 095113 -- ACOUSTICAL PANEL CEILINGS

- 099000 -- PAINTING AND COATING

2. WALLS: TYPICAL WALLS SHALL BE SIMILAR TO EXISTING

WITH PAINT TO MATCH EXISTING. NEW WALLS RUN FULL

HEIGHT FROM TOP OF SLAB TO UNDERSIDE OF DECK

ABOVE. AFFECTED AREAS WITH PAINTED DRYWALL

CONSTRUCTION SHALL BE PATCHED, RECONSTRUCTED AND

REFINISHED TO MATCH EXISTING. PLEASE REFER TO

SPECIFICATION SECTIONS:

- 092116 -- GYPSUM BOARD ASSEMBLIES

- 095113 -- ACOUSTICAL PANEL CEILINGS

- 099000 -- PAINTING AND COATING

P-002

(TYPICAL)

Project Name:

DCAMM Project Number

NORFOLK COUNTY SHERIFF'S OFFICE

(NCSO): NORFOLK COUNTY

SDN1501E-ES1

Project Location

Project Architect

Site Number:

CAMIS Number:

Building Number:

Secretariat:

Original Issue Date

01 - 22 - 2016

Revisions

No. Description Date

Plan Name:

Drawing Number:

Project Consultant

Office of Planning

Design and Construction

McCormack Building

One Ashburton Place

Boston MA 02108

617 727 4050 www.mass.gov/cam

88 Black Falcon Ave., Suite 210

Boston, MA 02210

(617) 210-1600 www.wspgroup.com/usa

MA STATE PROJECT #: SDN1501E-ES1

Ja n 2

1, 3:4 5p m P

:\B

\B

0.0

_N

CC

C_

_M

EP

_B id_ Pa ck ag e\C

AD

\P

LB

G\

SH

EE

TS

\N

CC

C B1

_P

-0

.dw g

Us er

: u sb k0

WSP PROJECT NO. B1504600.000

N

CORRECTIONAL CENTER

DEDHAM, MA 02027

200 WEST STREET

P-002

TYPICAL CELL RETRO FIT & CONTROL MODULE

NTS1

TYPICAL CELL RETRO FIT & CONTROL MODULE

NTS2 TYPICAL SHOWER RETRO FIT

NTS3

PLUMBING KEY NOTES (ECM-5.02b):

REMOVE EXISTING PUSH BUTTON FLUSH FOR COMBI UNIT & REPLACE WITH NEW FLUSH VALVE (ECM-5.02b).

REMOVE EXISTING DUAL LAVATORY MANIFOLD AND REPLACE WITH NEW MANIFOLD (ECM-5.02b).

CONTROL MODULE FOR SHOWERS WIRED BACK TO

CONTROLLER MODULE WIRED BACK TO

WATER CONSERVATION CONTROL SYSTEM ON THE FIRST FLOOR

(TO BE INTEGRATED WITH EXISTING SECURITY SYSTEM).

P-003

(TYPICAL)

P-003

(TYPICAL)

P-003

(TYPICAL)

P-003

(TYPICAL)

CEILING WORK NOTES:

1. CEILINGS: TYPICAL CEILINGS SHALL MATCH EXISTING.

AFFECTED AREAS WITH SUSPENDED CEILING SHALL BE

PATCHED,RECONSTRUCTED AND REFINISHED TO MATCH

EXISTING PAINTED DRYWALL OR ACOUSTICAL LAY-IN

CEILING SYSTEMS WHERE APPLICABLE. PLEASE REFER TO

SPECIFICATION SECTIONS:

- 092116 -- GYPSUM BOARD ASSEMBLIES

- 095113 -- ACOUSTICAL PANEL CEILINGS

- 099000 -- PAINTING AND COATING

2. WALLS: TYPICAL WALLS SHALL BE SIMILAR TO EXISTING

WITH PAINT TO MATCH EXISTING. NEW WALLS RUN FULL

HEIGHT FROM TOP OF SLAB TO UNDERSIDE OF DECK

ABOVE. AFFECTED AREAS WITH PAINTED DRYWALL

CONSTRUCTION SHALL BE PATCHED, RECONSTRUCTED AND

REFINISHED TO MATCH EXISTING. PLEASE REFER TO

SPECIFICATION SECTIONS:

- 092116 -- GYPSUM BOARD ASSEMBLIES

- 095113 -- ACOUSTICAL PANEL CEILINGS

- 099000 -- PAINTING AND COATING

Project Name:

DCAMM Project Number

NORFOLK COUNTY SHERIFF'S OFFICE

(NCSO): NORFOLK COUNTY

SDN1501E-ES1

Project Location

Project Architect

Site Number:

CAMIS Number:

Building Number:

Secretariat:

Original Issue Date

01 - 22 - 2016

Revisions

No. Description Date

Plan Name:

Drawing Number:

Project Consultant

Office of Planning

Design and Construction

McCormack Building

One Ashburton Place

Boston MA 02108

617 727 4050 www.mass.gov/cam

88 Black Falcon Ave., Suite 210

Boston, MA 02210

(617) 210-1600 www.wspgroup.com/usa

MA STATE PROJECT #: SDN1501E-ES1

Ja n 2

1, 3:4 6p m P

:\B

\B

0.0

_N

CC

C_

_M

EP

_B id_ Pa ck ag e\C

AD

\P

LB

G\

SH

EE

TS

\N

CC

C B1

_P

-0

.dw g

Us er

: u sb k0

WSP PROJECT NO. B1504600.000

N

CORRECTIONAL CENTER

DEDHAM, MA 02027

200 WEST STREET

P-003

TYPICAL CELL RETRO FIT & CONTROL MODULE

NTS1

TYPICAL CELL RETRO FIT & CONTROL MODULE

NTS2

File details come from the government source that posted it. Updated .