Pricing Tables

View the file

Other files

File Type Posted
SAQMMA12R0012A004.pdf PDF
DFAC EQUIPMENT LIST 14 May 2012 .pdf PDF
SAQMMA12R0012A003.pdf PDF
SF30_A002 Cont_Page May1.pdf PDF
D- SecJ ExhB SOW-A002 4_30a —
B- SAQMMA12R0012 A002 Sections B-M May1.pdf PDF
L- Sec J Exh L RCM Manual -A002.pdf PDF
K- Sec J Exh K Bahgdad equipments list by locations.pdf PDF
SF30_SAQMMA12R0012A002docx.pdf PDF
H-_Sec_J_Exh_F_Pricing_Tables_--A002 May1.xlsx XLSX spreadsheet
M- Sec J Exh M Baghdad OMSS Questions 4_30 —
C-SecJ Exh A and A 1-A002 May1.pdf PDF
Baghdad OMSS Questions 4_30 —
B- SAQMMA12R0012A001Sections B-M.pdf PDF
H- Sec J Exh F Pricing Tables --A001.xlsx XLSX spreadsheet
L- Sec J Exh J OMSS Veh.pdf PDF
SF30_A001 Cont_Page.pdf PDF
SF30_SAQMMA12R0012A001docx.pdf PDF
D- SecJ ExhB SOW-A001.pdf PDF
C-SecJ Exh A and A 1-A001.pdf PDF
J- Sec J Exh H--A001.pdf PDF
G- Sec J Exh E MRPT-A001.pdf PDF
E- SecJ ExhC Past_Performance_Questionnaire.pdf PDF
F- SecJ Exh D - DD254.pdf PDF
K- Sec J Exh I - VettingIraqiNationalReqs.pdf PDF
C- SecJ Exh A and A 1.pdf PDF
J- Sec J Exh H.pdf PDF
D- SecJ ExhB SOW —
A- SF-33_SAQMMA12R0012 Cover Sheet —
I- SecJ Exh G -Bahg Equip LIst.pdf PDF
G- Sec J Exh E MRPT.pdf PDF
B- SAQMMA12R0012 Section B-M —
OMSS Notification Site Survey.pdf PDF
Industry day Presentation Overview of Facility Management revised —
Section B-K Draft 03022012 —
SECTION C PWS Draft.pdf PDF
Site Survey attendance Rev 1 —
Site Survey attendance —
Industry Days Attendees List.pdf PDF
Attachment A Labor Format RFI.docx DOCX document
SECTIONC SOW RFI 1102012 —
SECTION B RFI 162012.docx DOCX document
BEC OM Industry Day Announcement.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Compliance Checklist

Table 1Price Volume Compliance Checklist
RFP
ReferenceRequirementComply
(Yes/No)Proposal Reference
L.16.2.2 (1)The electronic price proposal shall consist of the following, which are described further in this subsection:

a. Narrative (in Word or PDF)

b. Pricing Tables 1-5 (in one folder containing one Excel workbook)

c. Detail Pricing Tables (in a second folder containing one or more Excel workbooks)

d. Supporting Information (in Word or PDF)

Offerors shall prepare on a CD-ROM one electronic file for each of the above sections. Therefore, Offerors shall prepare four files on each CD-ROM.

L.16.2.2 (2) The hard-copy price proposal shall consist of the following, which are described further in this subsection:

a. Narrative

b. Pricing Tables 1-5

c. Detail Pricing Tables

d. Supporting Information

Offerors shall separate each of the above sections by a distinct tab and divider page.

L.16.2.2 (3)The content of the electronic price proposal and hard-copy price proposal shall match. If differences exist between the two proposals and there is insufficient time for reconciliation, the hard-copy proposal shall take precedence.
L.16.2.2 (4)Pricing Tables 1-5 are provided by the Government and shall be completed by the Offerors. Detail Pricing Tables shall be provided and completed by the Offerors.
L.16.2.2 (5)Offerors shall not add, delete, or otherwise alter the existing format or content in Pricing Tables 1-5. Offerors shall complete the required areas only.
L.16.2.2 (6)Offerors shall use for pricing purposes the following period of performance:

Transition: August 1, 2012 through October 31, 2012 Base Year: November 1, 2012 through October 31, 2013 Option Year 1: November 1, 2013 through October 31, 2014 Option Year 2: November 1, 2014 through October 31, 2015 Option Year 3: November 1, 2015 through October 31, 2016 Option Year 4: November 1, 2016 through October 31, 2017

L.16.2.2 (7)In Pricing Table 1, Offerors shall complete the “Comply (Yes/No)” and “Proposal Reference” columns.
L.16.2.2 (8)In Pricing Table 2, Offerors shall identify their most current indirect cost rates that would be used as the proposed provisional billing rates. If applicable, these indirect cost rates should be reflected in the most current indirect cost rate agreement that has been negotiated between the Offeror and its cognizant Federal agency official.
L.16.2.2 (9)In Pricing Table 2, the proposed provisional billing indirect cost rates shall not exceed the ceiling indirect cost rates proposed in Pricing Table 3.
L.16.2.2 (10)In Pricing Tables 2 and 3, Offerors shall propose only their own indirect cost rates. Indirect cost rates for subcontractors and/or other entities not proposed as the Offeror shall not be included in part or in whole.
L.16.2.2 (11)In Pricing Tables 2 and 3, Offerors shall add or delete rows as necessary. The number (e.g., “1)”) in the “Indirect Cost Rate Description” column signifies a specific indirect cost rate description. For example, an Offeror may elect to propose “Fringe Benefits” next to “1)”, “Overhead” next to “2)”, and “G&A” next to “3).”
L.16.2.2 (12)In Pricing Tables 2 and 3, each row will apply to a different Contractor Fiscal Year Period, which Offerors shall identify with month, day, and year in the right-most column
L.16.2.2 (13)In Pricing Tables 2 and 3, Offerors shall propose a Contractor Fiscal Year Period for each of its fiscal years through the life of the contract. Offerors shall assume that the life of the contract is August 1, 2012 through October 31, 2017.
L.16.2.2 (14)In Pricing Tables 2 and 3, Facilities Capital Cost of Money (FCCOM) factors shall be separately identified if the Offeror allocates FCCOM costs as part of its disclosed cost accounting practices.
L.16.2.2 (15)In Pricing Table 4, Offerors shall propose one price per square meter (M2) per description/sub-CLIN per month, regardless of which entity (Offeror, subcontractor Offeror, or other) is anticipated to perform the price per m2 category.
L.16.2.2 (16)In Pricing Table 4, each proposed unit price per square meter (M2) description type shall be based on the facility descriptions and performance requirements described in PWS Section C• (Except optional services specified in C.14 and C.19); and should be based on similar industry standards/sources.
L.16.2.2 (17)In Pricing Table 4, the proposed unit price per m2 shall be in whole numbers (i.e., no decimals).
L.16.2.2 (18)In Pricing Table 5, the Offeror's OMSS EC Baghdad task order proposed firm fixed prices for the base year and four 1-yr options will be inserted into the appropriate cells. Offerors shall verify the transfer amounts are correct.
L.16.2.2 (19)In Pricing Table 5 the Government provided formulas to transfer automatically the proposed fully-loaded price per m2 rates from Pricing Table 4 to the respective cells in the “Fixed Unit Price” column. However, Offerors shall verify the transfer and make any necessary corrections.
L.16.2.2 (20)In Pricing Table 5, the Government provided formulas to calculate automatically each proposed Subtotal sections. Each formula is “Descriptions Per Month” multiplied by “Fixed Unit Price Rate” multiplied by “m2 units.” However, Offerors shall verify the arithmetic accuracy and make any necessary corrections
L.16.2.2 (21)In Pricing Table 5 the estimated indirect costs in the “Ind $” column shall reflect the product of the applicable proposed ceiling indirect cost rate(s) and the RFP-specified estimated direct ODC/material cost.
L.16.2.2 (22)In Pricing Table 5, the Government provided formulas to calculate automatically each proposed Subtotal under the “Other Direct Costs/Materials” section. Each formula is “Dir $” plus “Ind $.” However, Offerors shall verify the arithmetic accuracy and make any necessary corrections.
L.16.2.2 (23)In Pricing Table 5, the Government provided formulas to calculate automatically the proposed Subtotal, Total, and Overall Proposed Price. However, Offerors shall verify the arithmetic accuracy and make any necessary corrections.
L.16.2.2 (24)In Pricing Table 5, the proposed Subtotal, Total, and Overall Proposed Price shall be in whole numbers; they shall not contain decimals.
L.16.2.2 (25)In Pricing Table 5, in order that the Government fosters a fair competition, Offerors shall not add any price per m2 categories or associated rates identified under “Proposed” in Pricing Table 4.
L.16.2.2 (26)In the Detail Pricing Tables, Offerors shall show for each performance year the build-up of each fully-loaded price per m2 rate proposed in Pricing Table 4 (see exception under item 46 below). Offerors shall identify on the build-up schedule:

a. Each RFP-specified price per m2 description.

b. Identification of whether the proposed fully-loaded price per m2 applies to performance by: 1) the offeror; 2) subcontractor offeror(s); and/or 3) divisions, subsidiaries, or affiliates of the offeror under a common control

c. Proposed unloaded price per m2 rate.

d. Each proposed fringe benefits description (if not included in an indirect cost pool)

e. Each proposed fringe benefits cost (if not included in an indirect cost pool)

f. Proposed bonus cost (if not included in an indirect cost pool) g Each proposed indirect cost rate description (e.g., Overhead, G&A)

h. Each proposed indirect cost rate

i. Each proposed indirect cost

j. Proposed profit percentage

k. Proposed profit dollar amount

l. Proposed fully-loaded price per m2 rate

L.16.2.2 (27)In the Detail Pricing Tables (in electronic submission only), Offerors shall show with formulas the arithmetic process by which they calculated their proposed fully-loaded price per m2 rates in Pricing Table 4
L.16.2.2 (28)In the Detail Pricing Tables, the proposed fully-loaded price per m2 rates shall match the respective proposed fully-loaded price per m2 in Pricing Table 4.
L.16.2.2 (29)In the Detail Pricing Tables, Offerors shall show for each contract year the breakdown of the estimated travel costs. The breakdown shall consist of at least the following:

a. RFP-specified estimated travel cost

b. Each applicable indirect cost rate description (e.g., G&A)

c. Each applicable ceiling indirect cost rate

d. Each ceiling indirect cost

e. Subtotal

L.16.2.2 (30)In the Detail Pricing Tables, Offerors shall ensure that the proposed applicable ceiling indirect cost rate(s) are for the contractor fiscal year(s) that coincides with the contract performance year.
L.16.2.2 (31)In the Detail Pricing Tables, the proposed applicable ceiling indirect cost rates shall match the respective proposed ceiling indirect cost rates in Pricing Table 3
L.16.2.2 (32)In the Detail Pricing Tables, the proposed ceiling indirect cost subtotals shall match the respective proposed “Ind $” costs in Pricing Table 5.
L.16.2.2 (33)In the Detail Pricing Tables (in electronic submission only), Offerors shall show with formulas the arithmetic process by which they calculated their estimated indirect costs and subtotal for travel.
L.16.2.2 (34)In Pricing Tables 1-5 and the Detail Pricing Tables, Offerors shall complete all applicable data cells.
L.16.2.2 (35)In Pricing Tables 1-5 and the Detail Pricing Tables (in electronic submission only), Offerors shall not hide or lock any rows, columns, or cells that contain proposed data.
L.16.2.2 (36)In Pricing Tables 1-5 and the Detail Pricing Tables, Offerors shall propose all rates, costs, and prices in United States currency.
L.16.2.2 (37)In the Narrative, Offerors shall identify, for each price per m2 category, the basis of estimate of the proposed unloaded price per m2 rates. Examples are actual company price per m2 data, industry standard or benchmark, or labor build up
L.16.2.2 (38)In the Narrative, Offerors shall identify, based on Pricing Table 5, their:

a. proposed subcontractors;

b. total dollars estimated to be subcontracted to each proposed subcontractor;

c. total dollars estimated to be performed by the Offeror; and

d. percentage of work (based on estimated total dollars) to be performed by the Offeror and each proposed subcontractor.

L.16.2.2 (39)In the Narrative, Offerors shall identify the name and full contact information of their cognizant Federal auditor (e.g., local Defense Contract Audit Agency branch).
L.16.2.2 (40)In the Narrative, Offerors shall identify the name and full contact information of their cognizant Federal agency official (CFAO). The CFAO works in the Offeror’s cognizant Federal agency, which is normally the agency with which the Offeror has the largest dollars in negotiated contracts, including option periods.
L.16.2.2 (41)In the Supporting Information, Offerors shall submit evidence to support the proposed provisional billing indirect cost rates in Pricing Table 2. Offerors shall submit such at least one of the following pieces of evidence pursuant to the following order of preference:

a. Current negotiated indirect cost rate agreement with the Offeror’s cognizant Federal agency official

b. Current forward pricing rate recommendation issued by the Offeror’s cognizant Federal agency official

c. Most recent (within the last two years) audit report from the Defense Contract Audit Agency (DCAA) or other qualified external auditor

d. Most recent (within the last two years) audit report from a qualified internal auditor

e. Current indirect cost rate proposal submitted to the Offeror’s cognizant Federal agency official and cognizant auditor

f. Copy of the Offeror’s most recent general ledger showing the indirect cost pools and respective allocation bases. The Government prefers that the Offeror submit such evidence in a format similar to the applicable schedules in Chapter 6 (Incurred Cost Proposals) of DCAA’s Information for Contractors, which may be found on DCAA’s Web site (www.dcaa.mil) under the “Publications” link under the Index on the left sidebar.

L.16.2.2 (42)In the Supporting Information, in accordance with FAR 52.237-10(f) (Identification of Uncompensated Overtime), Offerors shall include a copy of their policy addressing uncompensated overtime.
L.16.2.2 (43)In the Supporting Information, Offerors, in accordance with FAR 15.404-3(b) (Subcontract Pricing Considerations), shall conduct appropriate cost or price analyses to establish the reasonableness of proposed subcontract prices, and shall include the results of these analyses.

a. Results shall be in the form of the cost/price analysis report(s), which shall include:

1. cost/price analysis technique(s) used (e.g., comparison of proposed prices received in response to the solicitation);

2. summary findings;

3. detailed findings;

4. basis for the determination of fair and reasonable proposed subcontract prices.

b. For sub-CLINs X00XH through X00XAV, “proposed subcontract prices” shall mean “subcontractor Offeror’s proposed or negotiated fully-loaded price per m2 rates.”

L.16.2.2 (44) At this time, the Government does not require submission of subcontractor Offerors’ build-up of their proposed or negotiated fully-loaded rates, or breakdown of subcontractor Offerors’ proposed or negotiated unit prices, but the (prime) Offeror shall show on its build-up schedule in the Detail Pricing Tables any applicable indirect costs and profit it applied to the subcontractor Offerors’ proposed or negotiated fully-loaded rates and unit prices.

&"Times New Roman,Regular"&12

&"Times New Roman,Regular"&12

2. Provisional Billing Rates

Pricing Table 2Proposed Provisional Billing Indirect Cost Rates
Indirect Cost Rate Description (e.g., Fringe Benefits, Overhead, G&A)Proposed Provisional Billing RateBasis of Estimate of Proposed Provisional Billing Rate
(e.g., Negotiated Indirect Cost Rate Agreement with Cognizant FAO)Allocation Base
(e.g., Direct Labor Dollars, Total Cost Input)Contractor Fiscal Year Period

(e.g., January 1, 2012 - December 31, 2012) 1)

2)

THE FOLLOWING IS FOR ILLUSTRATION PURPOSES ONLY:

Indirect Cost Rate DescriptionProposed Provisional Billing RateBasis of Estimate of Proposed Provisional Billing RateAllocation Base
Contractor Fiscal Year Period

1) G&A 6.29% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2012 - December 31, 2012 G&A 6.27% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2013 - December 31, 2013 G&A 6.25% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2014 - December 31, 2014 G&A 6.00% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2015 - December 31, 2015 G&A 5.95% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2016 - December 31, 2016 G&A 5.80% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2017 - December 31, 2017

3. Ceiling Indirect Cost Rates Pricing Table 3 Proposed Ceiling Indirect Cost Rates

Indirect Cost Rate Description (e.g., Fringe Benefits, Overhead, G&A)Proposed Ceiling Indirect Cost RateBasis of Estimate of Proposed Ceiling Indirect Cost Rate
(e.g., Negotiated Indirect Cost Rate Agreement with Cognizant FAO)Allocation Base
(e.g., Direct Labor Dollars, Total Cost Input)Contractor Fiscal Year Period

(e.g., January 1, 2012 - December 31, 2012) 1)

2)

THE FOLLOWING IS FOR ILLUSTRATION PURPOSES ONLY:

Indirect Cost Rate Description Proposed Ceiling Indirect Cost Rate Basis of Estimate of Proposed Ceiling Indirect Cost Rate Allocation Base Contractor Fiscal Year Period

1) G&A 6.29% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2012 - December 31, 2012 G&A 6.27% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2013 - December 31, 2013 G&A 6.25% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2014 - December 31, 2014 G&A 6.00% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2015 - December 31, 2015 G&A 5.95% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2016 - December 31, 2016 G&A 5.80% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2017 - December 31, 2017

4. Firm-Fixed-Unit-Prices Pricing Table 4 Proposed Firm-Fixed-Unit-Prices per Square Meter (m2) per Month

Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4

Sub-CLIN Description

X00XHSingle Story Apartment Building
X00XI2 Story Apartment Building
X00XJ3 Story Apartment Building
X00XK4 Story Apartment Building
X00XL5 Story Apartment Building
X00XMSingle Family Detached Building
X00XNSingle Story Office Building
X00XO2 Story Office Building
X00XP2 Story Office Building (Classified)
X00XQ3 Story Office Building
X00XR3 Story Office Building (Classified)
X00XS4 Story Office Building
X00XT4 Story Office Building (Classified)
X00XUCompound Access Control Building
X00XV30 foot Guard Tower
X00XXDog Kennel
X00XYReverse Osmosis Water Treatment Plant
X00XZWaste Water Treatment Building
X00XAAPower Plant
X00XABWarehouse
X00XACDining Facility
X00XADSingle Story Medical Urgent Care Center
X00XAEFire Station
X00XAFVehicle Garage Maintenance Shops
X00XAGTelephone Exchange Building
X00XAHParking Lot
X00XAIRoads
X00XAJHelipad
X00XAKLandscaped Ground
X00XALRecreation Center
X00XAMOutdoor Pool Facility
X00XANSports fields
X00XAOTennis Court
X00XAPBasketball Court
X00XAQGymnasium
X00XARFuel Farm and delivery
X00XASAirfield repairs
X00XATLaundry
X00XAUCHUs dry
X00XAVCHUs wet

5. IDIQ Prices Pricing Table 5 IDIQ Proposed Prices

Proposed Prices for Facilities

Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4

Sub-CLIN Description Months Per Year Fixed Unit Price Units Subtotal Fixed Unit Price Units Subtotal Fixed Unit Price Units Subtotal Fixed Unit Price Units Subtotal Fixed Unit Price Units Subtotal TOTAL

X00XHSingle Story Apartment Building120100100100100100
X00XI2 Story Apartment Building12023,9250023,9250023,9250023,9250023,92500
X00XJ3 Story Apartment Building120100100100100100
X00XK4 Story Apartment Building12047,9900047,9900047,9900047,9900047,99000
X00XL5 Story Apartment Building12012,4140012,4140012,4140012,4140012,41400
X00XMSingle Family Detached Building1202,554002,554002,554002,554002,55400
X00XNSingle Story Office Building1203,926003,926003,926003,926003,92600
X00XO2 Story Office Building120100100100100100
X00XP2 Story Office Building (Classified)120100100100100100
X00XQ3 Story Office Building1207,855007,855007,855007,855007,85500
X00XR3 Story Office Building (Classified)1203,124003,124003,124003,124003,12400
X00XS4 Story Office Building120100100100100100
X00XT4 Story Office Building (Classified)12016,0360016,0360016,0360016,0360016,03600
X00XUCompound Access Control Building1201,752001,752001,752001,752001,75200
X00XV30 foot Guard Tower12080008000800080008000
X00XXDog Kennel1208030080300803008030080300
X00XYReverse Osmosis Water Treat Plant1201,708001,708001,708001,708001,70800
X00XZWaste Water Treatment Building12078007800780078007800
X00XAAPower Plant1201,838001,838001,838001,838001,83800
X00XABWarehouse1206,974006,974006,974006,974006,97400
X00XACDining Facility1203,192003,192003,192003,192003,19200
X00XADSingle Story Medical Urgent Care Center1202480024800248002480024800
X00XAEFire Station1202250022500225002250022500
X00XAFVehicle Garage Maintenance Shops1201,519001,519001,519001,519001,51900
X00XAGTelephone Exchange Building1201970019700197001970019700
X00XAHParking Lot12037,1920037,1920037,1920037,1920037,19200
X00XAIRoads12050,8200050,8200050,8200050,8200050,82000
X00XAJHelipad1201,703001,703001,703001,703001,70300
X00XAKLandscaped Ground12089,4480089,4480089,4480089,4480089,44800
X00XALRecreation Center1201,865001,865001,865001,865001,86500
X00XAMOutdoor Pool Facility1202,750002,750002,750002,750002,75000
X00XANSports fields1203,620003,620003,620003,620003,62000
X00XAOTennis Court1201,422001,422001,422001,422001,42200
X00XAPBasketball Court1209600096000960009600096000
X00XAQGymnasium1203,361003,361003,361003,361003,36100
X00XARFuel Farm and delivery1206790067900679006790067900
X00XASAirfield repairs120100100100100100
X00XATLaundry1201340013400134001340013400
X00XAUCHUs dry12041,0680041,0680041,0680041,0680041,06800
X00XAVCHUs wet1208520085200852008520085200

Estimated Costs for Non-Facilities

Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4

Sub-CLINDescriptionDir $Ind $SubtotalDir $Ind $SubtotalDir $Ind $SubtotalDir $Ind $SubtotalDir $Ind $Subtotal
Travel10,000,00010,000,00010,000,00010,000,00010,000,00010,000,00010,000,00010,000,00010,000,00010,000,00050,000,000

IDIQ OVERALL PROPOSED PRICE: 50,000,000

Notes
Fixed Unit Price = Proposed firm-fixed-unit-price per square meter (m2) per month
Units = RFP-specified estimated number of m2 per month
Subtotal (Facilities) = Months Per Year x Fixed Unit Price x Units
Dir $ = RFP-specified estimated direct costs
Ind $ = Estimated indirect costs
Subtotal (Travel) = Direct $ + Ind $
Total = Sum of Subtotals
IDIQ Overall Proposed Price = Sum of Totals

6. Task Order 1 Prices Pricing Table 6 Proposed Prices in Response to Task Order Request Number 2012-000X (PMO and Baghdad)

Proposed Prices for Facilities

Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4

Sub-CLIN Description Months Per Year Fixed Unit Price Units Subtotal Fixed Unit Price Units Subtotal Fixed Unit Price Units Subtotal Fixed Unit Price Units Subtotal Fixed Unit Price Units Subtotal TOTAL

X00XI2 Story Apartment Building12023,9250023,9250023,9250023,9250023,92500
X00XK4 Story Apartment Building12047,9900047,9900047,9900047,9900047,99000
X00XL5 Story Apartment Building12012,4140012,4140012,4140012,4140012,41400
X00XMSingle Family Detached Building1202,554002,554002,554002,554002,55400
X00XNSingle Story Office Building1203,926003,926003,926003,926003,92600
X00XQ3 Story Office Building1207,855007,855007,855007,855007,85500
X00XR3 Story Office Building (Classified)1203,124003,124003,124003,124003,12400
X00XT4 Story Office Building (Classified)12016,0360016,0360016,0360016,0360016,03600
X00XUCompound Access Control Building1201,752001,752001,752001,752001,75200
X00XV30 foot Guard Tower12080008000800080008000
X00XXDog Kennel1208030080300803008030080300
X00XYReverse Osmosis Water Treat Plant1201,708001,708001,708001,708001,70800
X00XZWaste Water Treatment Building12078007800780078007800
X00XAAPower Plant1201,838001,838001,838001,838001,83800
X00XABWarehouse1206,974006,974006,974006,974006,97400
X00XACDining Facility1203,192003,192003,192003,192003,19200
X00XADSingle Story Medical Urgent Care Center1202480024800248002480024800
X00XAEFire Station1202250022500225002250022500
X00XAFVehicle Garage Maintenance Shops1201,519001,519001,519001,519001,51900
X00XAGTelephone Exchange Building1201970019700197001970019700
X00XAHParking Lot12037,1920037,1920037,1920037,1920037,19200
X00XAIRoads12050,8200050,8200050,8200050,8200050,82000
X00XAJHelipad1201,703001,703001,703001,703001,70300
X00XAKLandscaped Ground12089,4480089,4480089,4480089,4480089,44800
X00XALRecreation Center1201,865001,865001,865001,865001,86500
X00XAMOutdoor Pool Facility1202,750002,750002,750002,750002,75000
X00XANSports fields1203,620003,620003,620003,620003,62000
X00XAOTennis Court1201,422001,422001,422001,422001,42200
X00XAPBasketball Court1209600096000960009600096000
X00XAQGymnasium1203,361003,361003,361003,361003,36100
X00XARFuel Farm and delivery1206790067900679006790067900
X00XATLaundry1201340013400134001340013400
X00XAUCHUs dry12041,0680041,0680041,0680041,0680041,06800
X00XAVCHUs wet1208520085200852008520085200

Proposed Firm-Fixed-Price for Facilities: 0 0 0 0 0 0

Proposed Firm-Fixed-Price for PMO:12012001200120012001200
Estimated Costs for Non-Facilities

Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4

Sub-CLINDescriptionDir $Ind $SubtotalDir $Ind $SubtotalDir $Ind $SubtotalDir $Ind $SubtotalDir $Ind $Subtotal
Transition (phase-in and phase-out)000
Non-Transition (ODCs/Materials)10,000,00010,000,00010,000,00010,000,00010,000,00010,000,00010,000,00010,000,00010,000,00010,000,00050,000,000
Fee %SubtotalFee %SubtotalFee %SubtotalFee %SubtotalFee %Subtotal
Fixed Fee000000

TASK ORDER FOR EXHIBIT A (BAGHDAD) AND A1 (PMO) OVERALL PROPOSED PRICE: 50,000,000

Notes
Fixed Unit Price = Proposed firm-fixed-unit-price per square meter (m2) per month
Units = RFP-specified estimated number of m2 per month
Subtotal (Facilities) = Months Per Year x Fixed Unit Price x Units
Dir $ (Transition) = Estimated direct costs
Dir $ (Non-Transition) = RFP-specified estimated direct costs
Ind $ = Estimated indirect costs
Subtotal (Transition and Non-Transition) = Direct $ + Ind $
Fee % = Proposed fee percentage
Subtotal (Fixed Fee) = (Transition Subtotal + Non-Transition Subtotal) x Fee %
Total = Sum of Subtotals
Task Order 1 Overall Proposed Price = Sum of Totals