E- SecJ ExhC Past_Performance_Questionnaire.pdf

PDF 156 KB Posted

Attached to
OMSS for US Mission Iraq Facilities
Solicitation number
SAQMMA-12-R-0012
Issued by

About this file

Section J Past Performance Questionaire

View the file

Other files

File Type Posted
SAQMMA12R0012A004.pdf PDF
DFAC EQUIPMENT LIST 14 May 2012 .pdf PDF
SAQMMA12R0012A003.pdf PDF
SF30_A002 Cont_Page May1.pdf PDF
D- SecJ ExhB SOW-A002 4_30a —
B- SAQMMA12R0012 A002 Sections B-M May1.pdf PDF
L- Sec J Exh L RCM Manual -A002.pdf PDF
K- Sec J Exh K Bahgdad equipments list by locations.pdf PDF
SF30_SAQMMA12R0012A002docx.pdf PDF
H-_Sec_J_Exh_F_Pricing_Tables_--A002 May1.xlsx XLSX spreadsheet
M- Sec J Exh M Baghdad OMSS Questions 4_30 —
C-SecJ Exh A and A 1-A002 May1.pdf PDF
Baghdad OMSS Questions 4_30 —
B- SAQMMA12R0012A001Sections B-M.pdf PDF
H- Sec J Exh F Pricing Tables --A001.xlsx XLSX spreadsheet
L- Sec J Exh J OMSS Veh.pdf PDF
SF30_A001 Cont_Page.pdf PDF
SF30_SAQMMA12R0012A001docx.pdf PDF
D- SecJ ExhB SOW-A001.pdf PDF
C-SecJ Exh A and A 1-A001.pdf PDF
J- Sec J Exh H--A001.pdf PDF
G- Sec J Exh E MRPT-A001.pdf PDF
F- SecJ Exh D - DD254.pdf PDF
K- Sec J Exh I - VettingIraqiNationalReqs.pdf PDF
H- Sec J Exh F Pricing Tables.xlsx XLSX spreadsheet
C- SecJ Exh A and A 1.pdf PDF
J- Sec J Exh H.pdf PDF
D- SecJ ExhB SOW —
A- SF-33_SAQMMA12R0012 Cover Sheet —
I- SecJ Exh G -Bahg Equip LIst.pdf PDF
G- Sec J Exh E MRPT.pdf PDF
B- SAQMMA12R0012 Section B-M —
OMSS Notification Site Survey.pdf PDF
Industry day Presentation Overview of Facility Management revised —
Section B-K Draft 03022012 —
SECTION C PWS Draft.pdf PDF
Site Survey attendance Rev 1 —
Site Survey attendance —
Industry Days Attendees List.pdf PDF
Attachment A Labor Format RFI.docx DOCX document
SECTIONC SOW RFI 1102012 —
SECTION B RFI 162012.docx DOCX document
BEC OM Industry Day Announcement.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J

EXHIBIT C – PAST PERFORMANCE QUESTIONNAIRE

Your immediate attention is requested no later than , please email the completed survey form directly to Laws2@state.gov or mail to:

U.S. Department of State

Office of Acquisition Management (A/LM/AQM)

Attn: Stephen Law

P.O. Box 9115 Rosslyn Station

Arlington VA 22219

You have been identified as a contact for___________ (insert name of Offeror). Using the rating table, please provide concise comments and ratings regarding your overall assessment of the Offeror’s performance on the contract identified below.

Please complete this questionnaire based on the following guidance. Handwritten responses are sufficient.

Indicate, based on the codes below, the contractor’s performance on the identified program. Assessments should reflect only contractor liable performance. The following is a definition of the scoring levels:

PERFORMANCE LEVEL CODE

EXCELLENT (E) Indicates that the contractor’s performance within the area of evaluation clearly exceeds contractual requirements.

GOOD (G) Indicates no problems exist in the area of evaluation or has only minor problems for which solutions are in hand.

MARGINAL (M) Indicates the area of evaluation contains an existing problem for which there is doubt whether the identified solution is adequate but the problem appears to be within the contractor’s ability to solve.

UNACCEPTABLE (U) Indicates a serious problem exists in the evaluation area which may be outside the contractor’s ability to solve. The contractor is in danger of not being able to satisfy contractual requirements and timely recovery in not likely.

NEUTRAL (N) Performance did not include such efforts or performance was not observed.

Please circle a letter corresponding to your rating or ‘N’ if you are unable to provide a rating for an area.

FOR ANY RATING BELOW SATISFACTORY, A CLARIFICATION AND EXPLANATION IS

REQUESTED. IF MORE SPACE IS NEEDED, USE THE BACK OF THIS QUESTIONNAIRE.

You are urged to add to your knowledge of the contractor’s performance with the judgment of others in your organization. In addition to completing the attached questionnaire for the identified program, we solicit your comments on other similar programs for which your activity has contracts with this offeror.

Return the completed questionnaire to the requestor in a sealed envelope with the responder’s signature over the seal or direct to email address listed below.

If you have any questions, please contact Stephen Law: Laws2@state.gov mailto:Laws2@state.gov

PROGRAM IDENTIFICATION

A. Contractor Name/Division:

B. Contract Number:

C. Contract Effort or Program Title:

D. Contract Type:

E. Estimated Amount/Annual Volume of Service:

F. Period of Performance:

G. Brief Description of contract effort or task:

MANAGEMENT ABILITY AND EFFECTIVENESS

1. The contractor provided experienced executives, including project manager and supervisors and replacements with the technical and administrative qualifications required to meet the contract requirements.

E G M U N

2. The contractor’s delegation of authority to project manager and supervisors met contract requirements.

3. The contractor provided adequate resources (personnel/equipment) in each specialty necessary to fulfill contractual requirements.

4. The contractor provided effective emergency response actions and corrective actions to cover incidents such as: disruption of utilities, accidents, material shortages, safety, security, and hazardous materials handling incidents.

QUALITY

1. Contractor provided effective Quality/ Inspection procedures and personnel to meet contract requirements.

2. When deficiencies were reported, the contractor took effective corrective actions pursuant to their Quality Control procedures.

3. Contractor completed projects and subsequent corrective actions, including punch-list items, in a timely manner.

4. Overall quality of the services provided under the contract E G M U N

COST/PRICE

1. The contractor provided accurate and timely proposals for changes.

2. The contractor implemented cost control measures and tracking that resulted in transparent, accurate, and timely cost reporting, if applicable.

GENERAL

1. Compliance with contract terms and conditions. E G M U N

2. Willingness to cooperate with and assist the customer in routine matters and when confronted by unexpected difficulties.

3. Business integrity and business conduct. E G M U N

4. Given the opportunity, would your organization enter into another contractual relationship with this contractor in the future?

Yes No

COMMENTS

NOTE: Additional comments are appreciated:

RESPONSE INFORMATION

The following information will assist in the analysis of the data. This information will be kept confidential.

Name of Evaluator

Phone Number

Email Address

Date Questionnaire Completed:

Source of Information/Documentation utilized to rate Performance Level

May we contact you to discuss/validate ? Yes or No (circle one)

File details come from the government source that posted it. Updated .