H- Sec J Exh F Pricing Tables --A001.xlsx

XLSX spreadsheet 74 KB Posted

Attached to
OMSS for US Mission Iraq Facilities
Solicitation number
SAQMMA-12-R-0012
Issued by

About this file

Amendment A001 to Sec J Exh F Pricing Tables

View the file

Other files

File Type Posted
SAQMMA12R0012A004.pdf PDF
DFAC EQUIPMENT LIST 14 May 2012 .pdf PDF
SAQMMA12R0012A003.pdf PDF
SF30_A002 Cont_Page May1.pdf PDF
D- SecJ ExhB SOW-A002 4_30a —
B- SAQMMA12R0012 A002 Sections B-M May1.pdf PDF
L- Sec J Exh L RCM Manual -A002.pdf PDF
K- Sec J Exh K Bahgdad equipments list by locations.pdf PDF
SF30_SAQMMA12R0012A002docx.pdf PDF
H-_Sec_J_Exh_F_Pricing_Tables_--A002 May1.xlsx XLSX spreadsheet
M- Sec J Exh M Baghdad OMSS Questions 4_30 —
C-SecJ Exh A and A 1-A002 May1.pdf PDF
Baghdad OMSS Questions 4_30 —
B- SAQMMA12R0012A001Sections B-M.pdf PDF
L- Sec J Exh J OMSS Veh.pdf PDF
SF30_A001 Cont_Page.pdf PDF
SF30_SAQMMA12R0012A001docx.pdf PDF
D- SecJ ExhB SOW-A001.pdf PDF
C-SecJ Exh A and A 1-A001.pdf PDF
J- Sec J Exh H--A001.pdf PDF
G- Sec J Exh E MRPT-A001.pdf PDF
E- SecJ ExhC Past_Performance_Questionnaire.pdf PDF
F- SecJ Exh D - DD254.pdf PDF
K- Sec J Exh I - VettingIraqiNationalReqs.pdf PDF
H- Sec J Exh F Pricing Tables.xlsx XLSX spreadsheet
C- SecJ Exh A and A 1.pdf PDF
J- Sec J Exh H.pdf PDF
D- SecJ ExhB SOW —
A- SF-33_SAQMMA12R0012 Cover Sheet —
I- SecJ Exh G -Bahg Equip LIst.pdf PDF
G- Sec J Exh E MRPT.pdf PDF
B- SAQMMA12R0012 Section B-M —
OMSS Notification Site Survey.pdf PDF
Industry day Presentation Overview of Facility Management revised —
Section B-K Draft 03022012 —
SECTION C PWS Draft.pdf PDF
Site Survey attendance Rev 1 —
Site Survey attendance —
Industry Days Attendees List.pdf PDF
Attachment A Labor Format RFI.docx DOCX document
SECTIONC SOW RFI 1102012 —
SECTION B RFI 162012.docx DOCX document
BEC OM Industry Day Announcement.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Compliance Checklist

Pricing Table 1Price Volume Compliance Checklist
RFP
ReferenceRequirementComply
(Yes/No)Proposal Reference
L.16.2.2 (1)The electronic price proposal shall consist of the following, which are described further in this subsection:

a. Narrative (in Word or PDF)

b. Pricing Tables 1-7 (in one folder containing one Excel workbook)

c. Detail Pricing Tables (in a second folder containing one or more Excel workbooks)

d. Supporting Information (in Word or PDF)

Offerors shall prepare on a CD-ROM one electronic file for each of the above sections. Therefore, offerors shall prepare four files on each CD-ROM.

L.16.2.2 (2) The hard-copy price proposal shall consist of the following, which are described further in this subsection:

a. Narrative

b. Pricing Tables 1-7

c. Detail Pricing Tables

d. Supporting Information

Offerors shall separate each of the above sections by a distinct tab and divider page.

L.16.2.2 (3)The content of the electronic price proposal and hard-copy price proposal shall match. If differences exist between the two proposals and there is insufficient time for reconciliation, the hard-copy proposal shall take precedence.
L.16.2.2 (4)Pricing Tables 1-7 are provided by the Government and shall be completed by the offerors. Detail Pricing Tables shall be provided and completed by the offerors.
L.16.2.2 (5)Offerors shall not add, delete, or otherwise alter the existing format or content in Pricing Tables 1-7. Offerors shall complete the required areas only.
L.16.2.2 (6)Offerors shall use for pricing purposes the following period of performance:

Transition: August 1, 2012 through October 31, 2012 Base Year: November 1, 2012 through October 31, 2013 Option Year 1: November 1, 2013 through October 31, 2014 Option Year 2: November 1, 2014 through October 31, 2015 Option Year 3: November 1, 2015 through October 31, 2016 Option Year 4: November 1, 2016 through October 31, 2017

L.16.2.2 (7)In Pricing Table 1, offerors shall complete the “Comply (Yes/No)” and “Proposal Reference” columns.
L.16.2.2 (8)In Pricing Table 2, offerors shall identify their most current indirect cost rates that would be used as the proposed provisional billing rates. If applicable, these indirect cost rates should be reflected in the most current indirect cost rate agreement that has been negotiated between the offeror and its cognizant Federal agency official.
L.16.2.2 (9)In Pricing Table 2, the proposed provisional billing indirect cost rates shall not exceed the ceiling indirect cost rates proposed in Pricing Table 3.
L.16.2.2 (10)In Pricing Tables 2 and 3, offerors shall propose only their own indirect cost rates. Indirect cost rates for subcontractors and/or other entities not proposed as the offeror shall not be included in part or in whole.
L.16.2.2 (11)In Pricing Tables 2 and 3, offerors shall add or delete rows as necessary. The number (e.g., “1)”) in the “Indirect Cost Rate Description” column signifies a specific indirect cost rate description. For example, an offeror may elect to propose “Fringe Benefits” next to “1)”, “Overhead” next to “2)”, and “G&A” next to “3).”
L.16.2.2 (12)In Pricing Tables 2 and 3, each row will apply to a different Contractor Fiscal Year Period, which offerors shall identify with month, day, and year in the right-most column.
L.16.2.2 (13)In Pricing Tables 2 and 3, offerors shall propose a Contractor Fiscal Year Period for each of its fiscal years through the life of the contract. Offerors shall assume that the life of the contract, including Transition, is August 1, 2012 through October 31, 2017.
L.16.2.2 (14)In Pricing Tables 2 and 3, Facilities Capital Cost of Money (FCCOM) factors shall be separately identified if the offeror allocates FCCOM costs as part of its disclosed cost accounting practices.
L.16.2.2 (15)In Pricing Table 4, offerors shall propose one firm-fixed-unit-price per sub-CLIN per contract year.
L.16.2.2 (16)In Pricing Table 4, each proposed firm-fixed-unit-price shall be based on all direct labor requirements described in Section C, excluding Transition, as described in Section C.2.G.1, and items marked “optional.”
L.16.2.2 (17)In Pricing Table 4, each proposed firm-fixed-unit-price shall consist of all applicable personnel’s (excluding program management personnel) taxable direct compensation costs (e.g., unloaded labor, bonus, Post Hardship Differential Pay, and Danger Pay costs), fringe benefits costs (if not included in applicable indirect costs), DBA Insurance costs, applicable indirect costs, and profit. No other costs shall be included.
L.16.2.2 (18)In Pricing Table 4, each proposed firm-fixed-unit-price shall be based on whichever entity(ies) is(are) proposed to perform the work (e.g., offeror, subcontractor offeror(s), and/or divisions, subsidiaries, or affiliates of the offeror under a common control).
L.16.2.2 (19)In Pricing Table 4, each proposed firm-fixed-unit-price shall be based on whichever nationality(ies) is(are) proposed to perform the work (e.g., U.S. citizen, host country/local national, and/or third-country national).
L.16.2.2 (20)In Pricing Table 4, the unit of measure of each proposed firm-fixed-unit-price shall be “square meter (m2) per month.”
L.16.2.2 (21)In Pricing Table 4, the proposed firm-fixed-unit-prices shall be based on a normal workweek of 40 hours (8 hours per day x 5 days per week) for performance inside the United States, 40 hours (8 hours per day x 5 days per week) for performance by Iraqi national within Iraq, and 60 hours (10 hours per day x 6 days per week) for performance outside the United States. “United States” is defined as “the 50 States plus the District of Columbia.”
L.16.2.2 (22)In Pricing Tables 4-5, the proposed costs and prices shall be in whole numbers (i.e., no decimals).
L.16.2.2 (23)In Pricing Table 5, the Government provided formulas to transfer automatically the proposed firm-fixed-unit-prices from Pricing Table 4 to the respective cells in the “Fixed Unit Price” column. However, offerors shall verify the transfer and make any necessary corrections.
L.16.2.2 (24)In Pricing Table 5, the Government provided formulas to calculate automatically each proposed Subtotal under the Operations and Maintenance Services section. Each formula is “Months Per Year” multiplied by “Fixed Unit Price” multiplied by “Units.” However, offerors shall verify the arithmetic accuracy and make any necessary corrections.
L.16.2.2 (25)In Pricing Table 5, under Operations and Maintenance Supplies, offerors shall enter the estimated indirect cost in the “Ind $” column.
L.16.2.2 (26)In Pricing Table 5, under Operations and Maintenance Supplies, the estimated indirect cost in the “Ind $” column shall reflect the applicable proposed ceiling indirect cost rate(s) multiplied by the RFP-specified estimated direct cost.
L.16.2.2 (27)In Pricing Table 5, under Operations and Maintenance Supplies, the Government provided formulas to calculate automatically each proposed Subtotal. Each formula is “Dir $” plus “Ind $.” However, offerors shall verify the arithmetic accuracy and make any necessary corrections.
L.16.2.2 (28)In Pricing Table 5, the Government provided formulas to calculate automatically each proposed Total. Each formula is "Sum of the Subtotals." However, offerors shall verify the arithmetic accuracy and make any necessary corrections.
L.16.2.2 (29)In Pricing Table 5, the Government provided formulas to calculate automatically the IDIQ Grand Total Proposed Price. The formula is "Sum of the Totals." However, offerors shall verify the arithmetic accuracy and make any necessary corrections.
L.16.2.2 (30)In the Detail Pricing Tables (for Pricing Table 4), offerors shall show for each contract year the breakdown of each firm-fixed-unit-price proposed in Pricing Table 4. The breakdown shall consist of at least the following:

a. Each RFP-specified labor category (see Section C.6)

b. Each internal labor category corresponding to RFP-specified category or otherwise

c. Proposed number of positions for each labor category

d. Proposed number of hours per position

e. Proposed fully-loaded hourly labor rate per position

f. Proposed DBA Insurance costs

g. Subtotal for each labor category

h. Proposed firm-fixed-unit-price

L.16.2.2 (31)In the Detail Pricing Tables (for Pricing Table 4), each fully-loaded hourly labor rate proposed via the previous instruction shall consist only of all applicable personnel’s (excluding program management personnel) taxable direct compensation costs (e.g., unloaded hourly labor rate, bonus, Post Hardship Differential Pay, and Danger Pay), fringe benefits (if not included in applicable indirect costs), applicable indirect costs, and profit. However, at this time, offerors are not required to show such build-up.
L.16.2.2 (32)In the Detail Pricing Tables (for Pricing Table 4), offerors shall show a breakdown of their proposed DBA Insurance costs included in the proposed firm-fixed-unit-prices. The breakdown shall consist of at least the following:

a. Each applicable RFP-specified labor category

b. Each covered employee name

c. Each covered employee title/internal labor category

d. Each covered employee designation (i.e., U.S. citizen, U.S. resident, hired in U.S. or its possessions, local national, or third-country national)

e. Number of proposed hours per covered employee

f. Proposed unloaded hourly labor rate per covered employee

g. Each “other taxable compensation” description(s) per covered employee

h. Each proposed “other taxable compensation” cost per covered employee

i. DBA Insurance rate

j. Subtotal

“Other taxable compensation” is compensation considered by the Internal Revenue Service as gross income for income tax purposes (e.g., Bonus, Post Hardship Differential Pay, and Danger Pay).

L.16.2.2 (33)In the Detail Pricing Tables (for Pricing Table 4), offerors shall base their proposed firm-fixed-unit-prices on a DBA Insurance rate of $4.00 per $100.00 of employee compensation for services and $5.50 per $100.00 of employee compensation for construction.
L.16.2.2 (34)In the Detail Pricing Tables (for Pricing Table 4), offerors shall assume that, for at least DBA Insurance purposes, overseas performance will be conducted in an area(s) where there are no local worker’s compensation laws.
L.16.2.2 (35)In the Detail Pricing Tables (for Pricing Table 4) (in electronic submission only), offerors shall show with formulas the arithmetic process by which they calculated their proposed firm-fixed-unit-prices in Pricing Table 4.
L.16.2.2 (36)In the Detail Pricing Tables (for Pricing Table 4), the proposed firm-fixed-unit-prices shall match the respective proposed firm-fixed-unit-prices in Pricing Table 4.
L.16.2.2 (37)In the Detail Pricing Tables (for Pricing Table 5), offerors shall show for each contract year the breakdown of the Operations and Maintenance Supplies estimated costs. The breakdown shall consist of at least the following:

a. RFP-specified estimated direct cost

b. Each applicable indirect cost rate description (e.g., G&A)

c. Each applicable ceiling indirect cost rate

d. Each ceiling indirect cost

e. Subtotal

L.16.2.2 (38)In the Detail Pricing Tables (for Pricing Table 5), offerors shall ensure that the proposed applicable ceiling indirect cost rate(s) are for the contractor fiscal year(s) that coincides with the contract performance year.
L.16.2.2 (39)In the Detail Pricing Tables (for Pricing Table 5), the proposed applicable ceiling indirect cost rates shall match the respective proposed ceiling indirect cost rates in Pricing Table 3.
L.16.2.2 (40)In the Detail Pricing Tables (for Pricing Table 5), the estimated ceiling indirect costs shall match the respective estimated “Ind $” costs in Pricing Table 5.
L.16.2.2 (41)In the Detail Pricing Tables (for Pricing Table 5) (in electronic submission only), offerors shall show with formulas the arithmetic process by which they calculated their estimated ceiling indirect costs.
L.16.2.2 (42)In Pricing Tables 1-5 and the Detail Pricing Tables, offerors shall complete all applicable data cells.
L.16.2.2 (43)In Pricing Tables 1-5 and the Detail Pricing Tables (in electronic submission only), offerors shall not hide or lock any rows, columns, or cells that contain proposed data.
L.16.2.2 (44)In Pricing Tables 2-5 and the Detail Pricing Tables, offerors shall propose all rates, costs, and prices in United States currency.
L.16.2.2 (45)In the Narrative, offerors shall identify, for each facility, the basis of estimate of the firm-fixed-unit-prices proposed in Pricing Table 4. Examples are the Whitestone Research Facility Operations Cost Reference and internal database.
L.16.2.2 (46)In the Narrative, offerors shall explain the methodology for constructing the firm-fixed-unit prices proposed in Pricing Table 4.
L.16.2.2 (47)In the Narrative, offerors shall identify the number of hours in their normal workweek.
L.16.2.2 (48)In the Narrative, offerors shall identify, based on Pricing Table 5, their:

a. proposed subcontractors;

b. total dollars estimated to be subcontracted to each proposed subcontractor;

c. total dollars estimated to be performed by the offeror; and

d. percentage of work (based on estimated total dollars) to be performed by the offeror and each proposed subcontractor.

L.16.2.2 (49)In the Narrative, offerors shall identify the name and full contact information of their cognizant Federal auditor (e.g., local Defense Contract Audit Agency branch).
L.16.2.2 (50)In the Narrative, offerors shall identify the name and full contact information of their cognizant Federal agency official (CFAO). The CFAO works in the offeror’s cognizant Federal agency, which is normally the agency with which the offeror has the largest dollars in negotiated contracts, including option periods.
L.16.2.2 (51)In the Supporting Information, offerors shall submit evidence to support the provisional billing indirect cost rates proposed in Pricing Table 2. Offerors shall submit such at least one of the following pieces of evidence pursuant to the following order of preference:

a. Current negotiated indirect cost rate agreement with the offeror’s cognizant Federal agency official

b. Current forward pricing rate recommendation issued by the offeror’s cognizant Federal agency official

c. Most recent (within the last two years) audit report from the Defense Contract Audit Agency (DCAA) or other qualified external auditor

d. Most recent (within the last two years) audit report from a qualified internal auditor

e. Current indirect cost rate proposal submitted to the offeror’s cognizant Federal agency official and cognizant auditor

f. Identification of the indirect cost pools and respective allocation bases, and breakdown of the cost elements/costs comprising such pools and bases. The Government prefers that the offeror submit such evidence in a format similar to the applicable schedules in Chapter 6 (Incurred Cost Proposals) of DCAA’s Information for Contractors, which may be found on DCAA’s Web site (www.dcaa.mil) under the “Publications” link under the Index on the left sidebar.

L.16.2.2 (52)In the Supporting Information, in accordance with FAR 52.237-10(f) (Identification of Uncompensated Overtime), offerors shall include a copy of their policy addressing uncompensated overtime.
L.16.2.2 (53)In the Supporting Information, offerors, in accordance with FAR 15.404-3(b) (Subcontract Pricing Considerations), shall conduct, based on Pricing Table 5, appropriate cost or price analyses to establish the reasonableness of proposed subcontract prices, and shall include the results of these analyses.

a. Results shall be in the form of the cost/price analysis report(s), which shall include:

a. cost/price analysis technique(s) used (e.g., comparison of proposed prices received in response to the solicitation);

b. summary findings;

c. detailed findings; and

d. basis for the determination of fair and reasonable proposed subcontract prices.

b. For sub-CLINs X00XB1 through X00XB40, “proposed subcontract prices” shall mean “subcontractor offeror’s proposed or negotiated firm-fixed-unit-prices.”

c. Results are not required for sub-CLINs X00XC1 through X00XC3.

L.16.2.2 (54)At this time, the Government does not require submission of subcontractor offerors’ build-up of their proposed or negotiated fully-loaded hourly labor rates, or breakdown of subcontractor offerors’ proposed or negotiated firm-fixed-unit-prices, but the (prime) offeror shall show on its build-up schedule in the Detail Pricing Tables any applicable indirect costs and profit it applied to the subcontractor offerors’ proposed or negotiated fully-loaded hourly labor rates and firm-fixed-unit-prices.
Baghdad Task Order Instructions
1Pricing Table 6 in Exhibit F of Section J is the spreadsheet where offerors shall propose their summary costs and prices for this contemplated task order.
2In Pricing Table 6, because all Operations and Maintenance supplies are not currently known, the Government provided for each task order year, as representatives of the “Operations and Maintenance Supplies” section, an estimated direct cost of $5,000,000 for Power Plant Overhaul Parts, $4,000,000 for HVAC Filters, and $1,000,000 for Travel. The contractor will be eligible to recover these and other descriptions' actual incurred costs during this task order’s performance. Offerors shall not add other descriptions and associated costs in Pricing Table 6.
3In Pricing Table 6, the proposed costs and prices shall be in whole numbers (i.e., no decimals).
4In Pricing Table 6, under Transition, offerors shall enter the estimated direct cost in the “Dir $” column.
5In Pricing Table 6, under Transition and Operations and Maintenance Supplies, offerors shall enter the estimated indirect cost in the “Ind $” column.
6In Pricing Table 6, under Transition, the estimated indirect cost in the “Ind $” column shall reflect the applicable proposed ceiling indirect cost rate(s) multiplied by the estimated direct cost.
7In Pricing Table 6, under Transition, the Government provided formulas to calculate automatically each proposed Subtotal for "Services" and "Supplies." Each formula is “Dir $” plus “Ind $.” However, offerors shall verify the arithmetic accuracy and make any necessary corrections.
8In Pricing Table 6, under Transition and Operations and Maintenance Supplies, offerors shall enter the proposed fee percentage in the “Fee %” column.
9In Pricing Table 6, under Transition, the Government provided formulas to calculate automatically the proposed fixed fee. Each formula is “Sum of the Services and Supplies Subtotals" multiplied by “Fee %.” However, offerors shall verify the arithmetic accuracy and make any necessary corrections.
10In Pricing Table 6, under Transition, the Government provided formulas to calculate automatically each proposed Total. Each formula is "the Subtotal." However, offerors shall verify the accuracy and make any necessary corrections.
11In Pricing Table 6, the Government provided formulas to transfer automatically the proposed firm-fixed-unit-prices from Pricing Table 4 to the respective cells in the “Fixed Unit Price” column. However, offerors shall verify the transfer and make any necessary corrections.
12In Pricing Table 6, under Operations and Maintenance Services, the Government provided formulas to calculate automatically each proposed Subtotal. Each formula is “Months Per Year” multiplied by “Fixed Unit Price” multiplied by “Units.” However, offerors shall verify the arithmetic accuracy and make any necessary corrections.
13In Pricing Table 6, under Operations and Maintenance Supplies, the estimated indirect cost in the “Ind $” column shall reflect the applicable proposed ceiling indirect cost rate(s) multiplied by the RFP-specified estimated direct cost.
14In Pricing Table 6, under Operations and Maintenance Supplies, the Government provided formulas to calculate automatically each proposed Subtotal for Power Plant Overhaul Parts, HVAC Filters, and Travel. Each formula is “Dir $” plus “Ind $.” However, offerors shall verify the arithmetic accuracy and make any necessary corrections.
15In Pricing Table 6, under Operations and Maintenance Supplies, the Government provided formulas to calculate automatically the proposed fixed fee. Each formula is “Sum of the Power Plant Overhaul Parts, HVAC Filters, and Travel Subtotals" multiplied by “Fee %.” However, offerors shall verify the arithmetic accuracy and make any necessary corrections.
16In Pricing Table 6, under Operations and Maintenance Services and Operations and Maintenance Supplies, the Government provided formulas to calculate automatically each proposed Total. Each formula is "Sum of the Subtotals." However, offerors shall verify the arithmetic accuracy and make any necessary corrections.
17In Pricing Table 6, the Government provided formulas to calculate automatically the Baghdad Task Order Grand Total Proposed Price. The formula is "Sum of the Totals." However, offerors shall verify the arithmetic accuracy and make any necessary corrections.
18In the Detail Pricing Tables (for Transition section of Pricing Table 6), offerors shall base their estimated costs on a DBA Insurance rate of $4.00 per $100.00 of employee compensation for services and $5.50 per $100.00 of employee compensation for construction.
19In the Detail Pricing Tables (for Transition section of Pricing Table 6), offerors shall assume that, for at least DBA Insurance purposes, overseas performance will be conducted in an area(s) where there are no local worker’s compensation laws.
20In the Detail Pricing Tables (for Pricing Table 6), offerors shall show for each contract year the breakdown of the estimated Services costs under Transition. The breakdown shall consist of at least the following:

a. Each RFP-specified labor category (see Section C.6)

b. Each internal labor category corresponding to RFP-specified category or otherwise

c. Estimated number of positions for each labor category

d. Estimated number of hours per position

e. Estimated unloaded hourly labor rate per position

f. Each other compensation description (e.g., Bonus, Post Hardship Differential Pay, Danger Pay) (if applicable)

g. Each other compensation percentage (if applicable)

h. Each other compensation cost (if applicable)

i. Each DBA Insurance cost

j. Each applicable indirect cost rate description (e.g., Overhead, G&A)

k. Each applicable provisional billing indirect cost rate

l. Each provisional billing indirect cost

m. Subtotal

21 In the Detail Pricing Tables (for Pricing Table 6), offerors shall show a breakdown of their estimated DBA Insurance costs under Services under Transition. The breakdown shall consist of at least the following:

a. Each applicable RFP-specified labor category

b. Each covered employee name

c. Each covered employee title/internal labor category

d. Each covered employee designation (i.e., U.S. citizen, U.S. resident, hired in U.S. or its possessions, local national, or third-country national)

e. Number of estimated hours per covered employee

f. Estimated unloaded hourly labor rate per covered employee

g. Each “other taxable compensation” description(s) per covered employee

h. Each estimated “other taxable compensation” cost per covered employee

i. DBA Insurance rate

j. Subtotal

“Other taxable compensation” is compensation considered by the Internal Revenue Service as gross income for income tax purposes (e.g., Bonus, Post Hardship Differential Pay, and Danger Pay).

22 In the Detail Pricing Tables (for Pricing Table 6), offerors shall show for each contract year the breakdown of the estimated Supplies costs under Transition. The breakdown shall consist of at least the following:

a. Each description

b. Estimated unit cost per description

c. Estimated unit of measurement per description

d. Estimated quantity per description

e. Each applicable indirect cost rate description (e.g., Overhead, G&A)

f. Each applicable provisional billing indirect cost rate

g. Each provisional billing indirect cost

h. Subtotal

23 In the Detail Pricing Tables (for Pricing Table 6), offerors shall show for each contract year the breakdown of the estimated Travel costs under Supplies under Transition. The breakdown shall consist of at least the following:

a. Contract-specified labor category (if applicable)

b. Internal labor category

c. Traveler name (if known)

d. Title of traveler or relationship of traveler to Contractor (if traveler is known)

e. Purpose of trip

f. Estimated dates of travel (if known)

g. Estimated number of days of travel

h. Origin

i. Destination

j. Estimated airfare or train fare

k. Estimated lodging cost per night

l. Lodging per diem, as indicated in FTR, JTR, or DSSR

m. Estimated meals and incidental expenses (M&IE) cost per day

n. Meals and incidental expenses (M&IE) per diem, as indicated in FTR, JTR, or DSSR

o. Estimated ground transportation cost per day

p. Estimated parking cost per day

q. Estimated tolls cost per day

r. Subtotal

The Contractor shall note that, pursuant to FAR 31.205-46(a)(1), the contractor’s costs for lodging, and meals and incidental expenses may be based on actual costs incurred, per diem, or a combination thereof, as long as the method used results in a reasonable charge. Similarly, the contractor’s costs for transportation may be based on actual costs incurred, mileage rates, or a combination thereof, as long as the method used results in a reasonable charge. The Contractor shall note in its proposal the respective methods used and/or intended to be used.

24 In the Detail Pricing Tables (for Pricing Table 6), offerors shall show for each contract year the breakdown of the estimated Operations and Maintenance Supplies costs. The breakdown shall consist of at least the following:

a. RFP-specified estimated direct cost

b. Each applicable indirect cost rate description (e.g., G&A)

c. Each applicable provisional billing indirect cost rate

d. Each provisional billing indirect cost

e. Subtotal

25In the Detail Pricing Tables (for Pricing Table 6), offerors shall ensure that the proposed applicable provisional billing indirect cost rate(s) are for the contractor fiscal year(s) that coincides with the contract performance year.
26In the Detail Pricing Tables (for Pricing Table 6), the proposed applicable provisional billing indirect cost rates shall match the respective proposed provisional billing indirect cost rates in Pricing Table 2.
27In the Detail Pricing Tables (for Pricing Table 6), the estimated provisional billing indirect costs shall match the respective estimated “Ind $” costs in Pricing Table 6.
28In the Detail Pricing Tables (for Pricing Table 6) (in electronic submission only), offerors shall show with formulas the arithmetic process by which they calculated their estimated provisional billing indirect costs.
29In the Detail Pricing Tables (for Pricing Table 6), for estimated hourly labor rates based on a 40-hour normal workweek under Transition, offerors shall identify the hours in excess of an average of 40 hours per week, by labor category at the same level of detail as compensated hours, and the uncompensated overtime rate per hour, whether at the prime or subcontract level, for any proposed hours against which an uncompensated overtime rate is applied [see FAR 52.237-10 (Identification of Uncompensated Overtime)]. This includes uncompensated overtime hours that are in indirect cost pools for personnel whose regular hours are normally charged direct.
30In Pricing Table 6 and the Detail Pricing Tables (for Pricing Table 6), offerors shall complete all applicable data cells.
31In Pricing Table 6 and the Detail Pricing Tables (for Pricing Table 6) (in electronic submission only), offerors shall not hide or lock any rows, columns, or cells that contain proposed data.
32In Pricing Table 6 and the Detail Pricing Tables (for Pricing Table 6), offerors shall propose all rates, costs, and prices in United States currency.
33In the Narrative, offerors shall address, based on Pricing Table 6, the items in FAR 52.215-22 (Limitations on Pass-Through Charges – Identification of Subcontract Effort).
34In the Supporting Information, offerors, in accordance with FAR 15.404-3(b) (Subcontract Pricing Considerations), shall conduct, based on Pricing Table 6, appropriate cost or price analyses to establish the reasonableness of proposed subcontract prices, and shall include the results of these analyses.

a. Results shall be in the form of the cost/price analysis report(s), which shall include:

i. cost/price analysis technique(s) used (e.g., comparison of proposed prices received in response to the solicitation);

ii. summary findings;

iii. detailed findings; and

iv. basis for the determination of fair and reasonable proposed subcontract prices.

b. For sub-CLINs 0004A1 and 0004A2, “proposed subcontract prices” shall mean “subcontractor offeror’s proposed or negotiated prices.”

c. Results are not required for sub-CLINs 0005A, X004C1 through X004C3, and X005C.

35Offerors shall comply with any other Pricing Table 6-related instructions stipulated in Section L.16.2.2 (Price Proposal Instructions) of the IDIQ RFP.
36The subtotals in Pricing Table 6 shall match the subtotals in the Detail Pricing Tables (for Pricing Table 6).
PMO Task Order Instructions
1Pricing Table 7 in Exhibit F of Section J is the spreadsheet where offerors shall propose their summary costs and prices for this contemplated task order.
2In Pricing Table 7, the proposed costs and prices shall be in whole numbers (i.e., no decimals).
3In Pricing Table 7, offerors shall enter the proposed direct cost in the “Dir $” column.
4In Pricing Table 7, offerors shall enter the proposed indirect cost in the “Ind $” column.
5In Pricing Table 7, offerors shall enter the proposed profit dollar amount in the “Profit $” column.
6In Pricing Table 7, the proposed indirect cost in the “Ind $” column shall reflect the applicable proposed indirect cost rate(s) multiplied by the estimated direct cost.
7In Pricing Table 7, the Government provided formulas to calculate automatically each proposed Subtotal. Each formula is “Dir $” plus “Ind $” plus “Profit $.” However, offerors shall verify the arithmetic accuracy and make any necessary corrections.
8In Pricing Table 7, the Government provided formulas to calculate automatically each proposed Total. Each formula is the “Sum of the Subtotals." However, offerors shall verify the arithmetic accuracy and make any necessary corrections.
9In Pricing Table 7, the Government provided formulas to calculate automatically the PMO Task Order Grand Total Proposed Price. The formula is "Sum of the Totals." However, offerors shall verify the arithmetic accuracy and make any necessary corrections.
10In the Detail Pricing Tables (for Pricing Table 7), offerors shall base their proposed costs on a DBA Insurance rate of $4.00 per $100.00 of employee compensation for services.
11In the Detail Pricing Tables (for Pricing Table 7), offerors shall assume that, for at least DBA Insurance purposes, overseas performance will be conducted in an area(s) where there are no local worker’s compensation laws.
12In the Detail Pricing Tables (for Pricing Table 7), offerors shall show for each contract year the breakdown of the proposed Domestic Services and Iraq Services prices. The breakdown shall consist of at least the following:

a. Each RFP-specified labor category (see Section C.6)

b. Each internal labor category corresponding to RFP-specified category or otherwise

c. Proposed number of positions for each labor category

d. Proposed number of hours per position

e. Proposed unloaded hourly labor rate per position

f. Each other compensation description (e.g., Bonus, Post Hardship Differential Pay, Danger Pay) (if applicable)

g. Each other compensation percentage (if applicable)

h. Each other compensation cost (if applicable)

i. Each DBA Insurance cost

j. Each applicable indirect cost rate description (e.g., Overhead, G&A)

k. Each proposed applicable indirect cost rate

l. Each proposed indirect cost

m. Proposed profit percentage

n. Proposed profit dollar amount

o. Subtotal

13 In the Detail Pricing Tables (for Pricing Table 7), offerors shall show a breakdown of their proposed DBA Insurance costs under Domestic Services and Iraq Services. The breakdown shall consist of at least the following:

a. Each applicable RFP-specified labor category

b. Each covered employee name

c. Each covered employee title/internal labor category

d. Each covered employee designation (i.e., U.S. citizen, U.S. resident, hired in U.S. or its possessions, local national, or third-country national)

e. Number of proposed hours per covered employee

f. Proposed unloaded hourly labor rate per covered employee

g. Each “other taxable compensation” description(s) per covered employee

h. Each proposed “other taxable compensation” cost per covered employee

i. DBA Insurance rate

j. Subtotal

“Other taxable compensation” is compensation considered by the Internal Revenue Service as gross income for income tax purposes (e.g., Bonus, Post Hardship Differential Pay, and Danger Pay).

14 In the Detail Pricing Tables (for Pricing Table 7), offerors shall show for each contract year the breakdown of the proposed Domestic Supplies and Iraq Supplies costs. The breakdown shall consist of at least the following:

a. Each description

b. Proposed unit cost per description

c. Proposed unit of measurement per description

d. Proposed quantity per description

e. Each applicable indirect cost rate description (e.g., Overhead, G&A)

f. Each proposed applicable indirect cost rate

g. Each proposed indirect cost

h. Proposed profit percentage

i. Proposed profit dollar amount

j. Subtotal

15 In the Detail Pricing Tables (for Pricing Table 7), offerors shall show for each contract year the breakdown of the proposed Travel costs under Domestic Supplies and Iraq Supplies costs. The breakdown shall consist of at least the following:

a. Contract-specified labor category (if applicable)

b. Internal labor category

c. Traveler name (if known)

d. Title of traveler or relationship of traveler to Contractor (if traveler is known)

e. Purpose of trip

f. Proposed dates of travel (if known)

g. Proposed number of days of travel

h. Origin

i. Destination

j. Proposed airfare or train fare

k. Proposed lodging cost per night

l. Lodging per diem, as indicated in FTR, JTR, or DSSR

m. Proposed meals and incidental expenses (M&IE) cost per day

n. Meals and incidental expenses (M&IE) per diem, as indicated in FTR, JTR, or DSSR

o. Proposed ground transportation cost per day

p. Proposed parking cost per day

q. Proposed tolls cost per day

r. Subtotal

The Contractor shall note that, pursuant to FAR 31.205-46(a)(1), the contractor’s costs for lodging, and meals and incidental expenses may be based on actual costs incurred, per diem, or a combination thereof, as long as the method used results in a reasonable charge. Similarly, the contractor’s costs for transportation may be based on actual costs incurred, mileage rates, or a combination thereof, as long as the method used results in a reasonable charge. The Contractor shall note in its proposal the respective methods used and/or intended to be used.

Pursuant to FAR 47.402, 47.403, and the Fly America Act, the Contractor shall use a U.S.-flag air carrier service unless specific conditions exist. If such conditions exist, the Contractor shall submit with its task order proposal a memorandum explaining why it does not intend to use a U.S.-flag air carrier service. Inclusion of such costs in the awarded fixed-price is contingent upon Government acceptance of such explanation.

16In the Detail Pricing Tables (for Pricing Table 7) (in electronic submission only), offerors shall show with formulas the arithmetic process by which they calculated their proposed costs and prices.
17In Pricing Table 7 and the Detail Pricing Tables (for Pricing Table 7), offerors shall complete all applicable data cells.
18In Pricing Table 7 and the Detail Pricing Tables (for Pricing Table 7) (in electronic submission only), offerors shall not hide or lock any rows, columns, or cells that contain proposed data.
19In Pricing Table 7 and the Detail Pricing Tables (for Pricing Table 7), offerors shall propose all rates, costs, and prices in United States currency.
20In the Supporting Information, offerors, in accordance with FAR 15.404-3(b) (Subcontract Pricing Considerations), shall conduct, based on Pricing Table 6, appropriate cost or price analyses to establish the reasonableness of proposed subcontract prices, and shall include the results of these analyses.

a. Results shall be in the form of the cost/price analysis report(s), which shall include:

i. cost/price analysis technique(s) used (e.g., comparison of proposed prices received in response to the solicitation);

ii. summary findings;

iii. detailed findings; and

iv. basis for the determination of fair and reasonable proposed subcontract prices.

b. For all sub-CLINs, “proposed subcontract prices” shall mean “subcontractor offeror’s proposed or negotiated prices.”

21Offerors shall comply with any other Pricing Table 7-related instructions stipulated in Section L.16.2.2 (Price Proposal Instructions) of the IDIQ RFP.
22Program management costs shall be defined as “all direct and indirect costs associated with the contract-specified program manager labor category, and all direct and indirect costs required to manage overall contract performance both in a domestic location and in Iraq.” See Section B.9 for further description.
23The subtotals in Pricing Table 7 shall match the subtotals in the Detail Pricing Tables (for Pricing Table 7).

&"Times New Roman,Regular"&12

&"Times New Roman,Regular"&12

2. Provisional Billing Rates

Pricing Table 2Proposed Provisional Billing Indirect Cost Rates
Indirect Cost Rate Description (e.g., Fringe Benefits, Overhead, G&A)Proposed Provisional Billing RateBasis of Estimate of Proposed Provisional Billing Rate
(e.g., Negotiated Indirect Cost Rate Agreement with Cognizant FAO)Allocation Base
(e.g., Direct Labor Dollars, Total Cost Input)Contractor Fiscal Year Period

(e.g., January 1, 2012 - December 31, 2012) 1)

2)

THE FOLLOWING IS FOR ILLUSTRATION PURPOSES ONLY:

Indirect Cost Rate DescriptionProposed Provisional Billing RateBasis of Estimate of Proposed Provisional Billing RateAllocation Base
Contractor Fiscal Year Period

1) G&A 6.29% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2012 - December 31, 2012 G&A 6.27% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2013 - December 31, 2013 G&A 6.25% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2014 - December 31, 2014 G&A 6.00% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2015 - December 31, 2015 G&A 5.95% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2016 - December 31, 2016 G&A 5.80% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2017 - December 31, 2017

3. Ceiling Indirect Cost Rates Pricing Table 3 Proposed Ceiling Indirect Cost Rates

Indirect Cost Rate Description (e.g., Fringe Benefits, Overhead, G&A)Proposed Ceiling Indirect Cost RateBasis of Estimate of Proposed Ceiling Indirect Cost Rate
(e.g., Negotiated Indirect Cost Rate Agreement with Cognizant FAO)Allocation Base
(e.g., Direct Labor Dollars, Total Cost Input)Contractor Fiscal Year Period

(e.g., January 1, 2012 - December 31, 2012) 1)

2)

THE FOLLOWING IS FOR ILLUSTRATION PURPOSES ONLY:

Indirect Cost Rate Description Proposed Ceiling Indirect Cost Rate Basis of Estimate of Proposed Ceiling Indirect Cost Rate Allocation Base Contractor Fiscal Year Period

1) G&A 6.29% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2012 - December 31, 2012 G&A 6.27% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2013 - December 31, 2013 G&A 6.25% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2014 - December 31, 2014 G&A 6.00% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2015 - December 31, 2015 G&A 5.95% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2016 - December 31, 2016 G&A 5.80% March 1, 2012 Forward Pricing Rate Agreement with Cognizant Federal Agency Official Total Cost Input January 1, 2017 - December 31, 2017

4. Firm-Fixed-Unit-Prices Pricing Table 4 Proposed Firm-Fixed-Unit-Prices per Square Meter (m2) per Month

Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4

Sub-CLIN Description

X00XB1Single Story Apartment Building
X00XB22 Story Apartment Building
X00XB33 Story Apartment Building
X00XB44 Story Apartment Building
X00XB55 Story Apartment Building
X00XB6Single Family Detached Building
X00XB7Single Story Office Building
X00XB82 Story Office Building
X00XB92 Story Office Building (Classified)
X00XB103 Story Office Building
X00XB113 Story Office Building (Classified)
X00XB124 Story Office Building
X00XB134 Story Office Building (Classified)
X00XB14Compound Access Control Building
X00XB1530 foot Guard Tower
X00XB16Dog Kennel
X00XB17Reverse Osmosis Water Treatment Plant
X00XB18Waste Water Treatment Building
X00XB19Power Plant
X00XB20Warehouse
X00XB21Dining Facility
X00XB22Single Story Medical Urgent Care Center
X00XB23Fire Station
X00XB24Vehicle Garage Maintenance Shops
X00XB25Telephone Exchange Building
X00XB26Parking Lot
X00XB27Roads
X00XB28Helipad
X00XB29Landscaped Ground
X00XB30Recreation Center
X00XB31Outdoor Pool Facility
X00XB32Sports fields
X00XB33Tennis Court
X00XB34Basketball Court
X00XB35Gymnasium
X00XB36Fuel Farm and delivery
X00XB37Airfield repairs
X00XB38Laundry
X00XB39CHUs dry
X00XB40CHUs wet

5. IDIQ Prices Pricing Table 5 IDIQ Proposed Prices

Operations and Maintenance Services

Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4

Sub-CLIN Description Months Per Year Fixed Unit Price Units Subtotal Fixed Unit Price Units Subtotal Fixed Unit Price Units Subtotal Fixed Unit Price Units Subtotal Fixed Unit Price Units Subtotal TOTAL

X00XB1Single Story Apartment Building120400400400400400
X00XB22 Story Apartment Building12095,7000095,7000095,7000095,7000095,70000
X00XB33 Story Apartment Building120400400400400400
X00XB44 Story Apartment Building120191,96000191,96000191,96000191,96000191,96000
X00XB55 Story Apartment Building12049,6560049,6560049,6560049,6560049,65600
X00XB6Single Family Detached Building12010,2160010,2160010,2160010,2160010,21600
X00XB7Single Story Office Building12015,7040015,7040015,7040015,7040015,70400
X00XB82 Story Office Building120400400400400400
X00XB92 Story Office Building (Classified)120400400400400400
X00XB103 Story Office Building12031,4200031,4200031,4200031,4200031,42000
X00XB113 Story Office Building (Classified)12012,4960012,4960012,4960012,4960012,49600
X00XB124 Story Office Building120400400400400400
X00XB134 Story Office Building (Classified)12064,1440064,1440064,1440064,1440064,14400
X00XB14Compound Access Control Building1207,008007,008007,008007,008007,00800
X00XB1530 foot Guard Tower1203200032000320003200032000
X00XB16Dog Kennel1203,212003,212003,212003,212003,21200
X00XB17Reverse Osmosis Water Treat Plant1206,832006,832006,832006,832006,83200
X00XB18Waste Water Treatment Building1203120031200312003120031200
X00XB19Power Plant1207,352007,352007,352007,352007,35200
X00XB20Warehouse12027,8960027,8960027,8960027,8960027,89600
X00XB21Dining Facility12012,7680012,7680012,7680012,7680012,76800
X00XB22Single Story Medical Urgent Care Ctr.1209920099200992009920099200
X00XB23Fire Station1209000090000900009000090000
X00XB24Vehicle Garage Maintenance Shops1206,076006,076006,076006,076006,07600
X00XB25Telephone Exchange Building1207880078800788007880078800
X00XB26Parking Lot120148,76800148,76800148,76800148,76800148,76800
X00XB27Roads120203,28000203,28000203,28000203,28000203,28000
X00XB28Helipad1206,812006,812006,812006,812006,81200
X00XB29Landscaped Ground120357,79200357,79200357,79200357,79200357,79200
X00XB30Recreation Center1207,460007,460007,460007,460007,46000
X00XB31Outdoor Pool Facility12011,0000011,0000011,0000011,0000011,00000
X00XB32Sports fields12014,4800014,4800014,4800014,4800014,48000
X00XB33Tennis Court1205,688005,688005,688005,688005,68800
X00XB34Basketball Court1203,840003,840003,840003,840003,84000
X00XB35Gymnasium12013,4440013,4440013,4440013,4440013,44400
X00XB36Fuel Farm and delivery1202,716002,716002,716002,716002,71600
X00XB37Airfield repairs120400400400400400
X00XB38Laundry1205360053600536005360053600
X00XB39CHUs dry120164,27200164,27200164,27200164,27200164,27200
X00XB40CHUs wet1203,408003,408003,408003,408003,40800

Operations and Maintenance Supplies

Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4

Sub-CLINDescriptionDir $Ind $SubtotalDir $Ind $SubtotalDir $Ind $SubtotalDir $Ind $SubtotalDir $Ind $Subtotal
X00XC1Power Plant Overhaul Parts20,000,00020,000,00020,000,00020,000,00020,000,00020,000,00020,000,00020,000,00020,000,00020,000,000100,000,000
X00XC2HVAC Filters16,000,00016,000,00016,000,00016,000,00016,000,00016,000,00016,000,00016,000,00016,000,00016,000,00080,000,000
X00XC3Travel4,000,0004,000,0004,000,0004,000,0004,000,0004,000,0004,000,0004,000,0004,000,0004,000,00020,000,000

IDIQ GRAND TOTAL PROPOSED PRICE: 200,000,000

Notes
Fixed Unit Price = Proposed firm-fixed-unit-price per square meter (m2) per month
Units = RFP-specified estimated number of m2 per month
Subtotal (Operations and Maintenance Services) = Months Per Year x Fixed Unit Price x Units
Dir $ = RFP-specified estimated direct cost
Ind $ = Estimated ceiling indirect cost
Subtotal (Operations and Maintenance Supplies) = Direct $ + Ind $
Total = Sum of Subtotals
IDIQ Grand Total Proposed Price = Sum of Totals

6. Baghdad Task Order Prices Pricing Table 6 Proposed Prices in Response to Task Order Request Number 2012-0001 (Baghdad)

Transition
Pre-Base Year
Sub-CLINDescriptionDir $Ind $SubtotalTOTAL
0004A1Services00
0004A2Supplies00
Fee %Subtotal
0005AFixed Fee00
Operations and Maintenance Services

Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4

Sub-CLIN Description Months Per Year Fixed Unit Price Units Subtotal Fixed Unit Price Units Subtotal Fixed Unit Price Units Subtotal Fixed Unit Price Units Subtotal Fixed Unit Price Units Subtotal TOTAL

X002B
X002B22 Story Apartment Building12023,9250023,9250023,9250023,9250023,92500
X002B44 Story Apartment Building12047,9900047,9900047,9900047,9900047,99000
X002B55 Story Apartment Building12012,4140012,4140012,4140012,4140012,41400
X002B6Single Family Detached Building1202,554002,554002,554002,554002,55400
X002B7Single Story Office Building1203,926003,926003,926003,926003,92600
X002B103 Story Office Building1207,855007,855007,855007,855007,85500
X002B113 Story Office Building (Classified)1203,124003,124003,124003,124003,12400
X002B134 Story Office Building (Classified)12016,0360016,0360016,0360016,0360016,03600
X002B14Compound Access Control Building1201,752001,752001,752001,752001,75200
X002B1530 foot Guard Tower12080008000800080008000
X002B16Dog Kennel1208030080300803008030080300
X002B17Reverse Osmosis Water Treat Plant1201,708001,708001,708001,708001,70800
X002B18Waste Water Treatment Building12078007800780078007800
X002B19Power Plant1201,838001,838001,838001,838001,83800
X002B20Warehouse1206,974006,974006,974006,974006,97400
X002B21Dining Facility1203,192003,192003,192003,192003,19200
X002B22Single Story Medical Urgent Care Ctr.1202480024800248002480024800
X002B23Fire Station1202250022500225002250022500
X002B24Vehicle Garage Maintenance Shops1201,519001,519001,519001,519001,51900
X002B25Telephone Exchange Building1201970019700197001970019700
X002B26Parking Lot12037,1920037,1920037,1920037,1920037,19200
X002B27Roads12050,8200050,8200050,8200050,8200050,82000
X002B28Helipad1201,703001,703001,703001,703001,70300
X002B29Landscaped Ground12089,4480089,4480089,4480089,4480089,44800
X002B30Recreation Center1201,865001,865001,865001,865001,86500
X002B31Outdoor Pool Facility1202,750002,750002,750002,750002,75000
X002B32Sports fields1203,620003,620003,620003,620003,62000
X002B33Tennis Court1201,422001,422001,422001,422001,42200
X002B34Basketball Court1209600096000960009600096000
X002B35Gymnasium1203,361003,361003,361003,361003,36100
X002B36Fuel Farm and delivery1206790067900679006790067900
X002B38Laundry1201340013400134001340013400