S02 - Past Performance Questionnaire.docx

DOCX document 24 KB Posted

Attached to
Z1DA--528A5-20-502 BOILER REPLACEMENT PROJECT Federal contract opportunity
Solicitation number
36C24224R0032
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document is a Past Performance Questionnaire related to a federal contract opportunity. It requests information about the contractor's past performance, including quality, schedule, customer satisfaction, management, cost/financial management, safety/security, and other general factors. The client is asked to provide ratings and comments on the contractor's performance across these areas.

The related federal contract opportunity is for a Department of Veterans Affairs boiler replacement project, Solicitation Number 36C24224R0032. The opportunity has been revised to be a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside, with a proposal due date of June 28, 2024 and a revised site visit date of June 6, 2024. The evaluation criteria have also been updated to consider similar past contracts within the last 10 years instead of 3 years.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--528A5-20-502 BOILER REPLACEMENT PROJECT, newest first.
File Type Posted
Canandaigua VAMC Boiler Plant - Final RBM Survey.pdf PDF
36C24224R0032 0009.docx DOCX document
852.219-75 VA Notice of Limitations on Subcontracting.docx DOCX document
36C24224R0032 0008.docx DOCX document
36C24224R0032 0007.docx DOCX document
Attachment B.pdf PDF
Attachment A_VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition.pdf PDF
36C24224R0032 0006.docx DOCX document
36C24224R0032 0005.docx DOCX document
Touchpoint Plus_Quick Start guide.pdf PDF
2024-06-13 Question 1 Attachments.pdf PDF
36C24224R0032 0004.docx DOCX document
Sensepoint XCD_IOM.pdf PDF
Copy of Pre-Bid RFI Questions_Encorus Response 2024-06-13.pdf PDF
touchpoint-plus-user-guide-man0996_v1_0216.pdf PDF
36C24224R0032 0003.docx DOCX document
Site Visit Sign In Sheet.pdf PDF
528A5-20-502 Boiler Replacement_Plans_Part 2.pdf PDF
36C24224R0032 0002.docx DOCX document
528A5-20-502_SOW R1_Boiler Plant Replacement.pdf PDF
528A5-20-502 Boiler Replacement_Plans_Part 3.pdf PDF
528A5-20-502 Boiler Replacement_Plans_Part 1.pdf PDF
528A5-20-502 Boiler Replacement_Specifications REV1.pdf PDF
S02 - Past Performance Questionnaire - Exhibit B.docx DOCX document
36C24224R0032 0001.docx DOCX document
528A5-20-502 DESIGN BOLIER REPLACEMENT SET.pdf PDF
S02 - Contractor Projects Form.docx DOCX document
36C24224R0032.docx DOCX document
20-502 Bid Specifications.pdf PDF
852.219-78 VA Notice of Limitations on Subcontracting.docx DOCX document
013200 Construction Documentation.pdf PDF
P07 Wage Determination.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE

Solicitation Number:
Project Title:

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information
Firm Name:CAGE Code:
Address:DUNs Number:

Phone Number: Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number: Delivery/Task Order Number (if applicable):

Contract Type: |_| Firm Fixed Price |_| Cost Reimbursement |_| Other (Please specify):

Contract Title: Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work |_| High |_| Med |_| Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name: Title:

Phone Number: Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

E
VG
S
M
U
N

Exceptional (Outstanding) Very Good (Above Average)

Satisfactory
Marginal
Unsatisfactory
Not Available

Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective

Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effectiveSection D: Performance Information: Choose the letter on the scale that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY UNSATISFACTORY OR MARGINAL RATINGS.

Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear, or were, satisfactory.
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor’s proposed actions appear only marginally effective, or were not fully implemented

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective

No record of past performance or the record is inconclusive.

1. QUALITY:

a) Quality of technical data/report preparation efforts
E VG S M U N

a.1. Comments:

b) Ability to meet quality standards specified for technical performance
E VG S M U N

b.1. Comments:

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N

c.1. Comments:

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N

d.1. Comments:

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N

2.a.1 Comments:

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N

2.b.1. Comments:

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project?
E VG S M U N

3. a.1. Comments:

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
E VG S M U N

3.b.1. Comments:

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N

3.c.1. Comments:

d) Overall customer satisfaction
E VG S M U N

3.d.1 Comments:

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG S M U N

4.a.1. Comments:

b) Ability to hire, apply, and retain a qualified workforce to this effort
E VG S M U N

4.b.1 Comments:

c) Government Property Control
E VG S M U N

4.c.1. Comments:

d) Knowledge/expertise demonstrated by contractor personnel
E VG S M U N

4.d.1. Comments:

e) Utilization of Small Business concerns
E VG S M U N

4.e.1. Comments:

f) Ability to simultaneously manage multiple projects with multiple disciplines
E VG S M U N

4.f.1. Comments:

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N

4.g.1. Comments:

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N

4.h.1. Comments:

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?
E VG S M U N

5.a.1. Comments:

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N

5.b.1. Comments:

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N

5.c.1. Comments:

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No

5.d.1. Comments:

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No

5.e.1. Comments:

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
Yes No

5.f.1 Comments:

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N

6.a.1 Comments:

b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N

6.b.1. Comments:

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N

7.a.1. Comments:

b) Compliance with contractual terms/provisions (explain if specific issues)
E VG S M U N

7.b.1. Comments:

c) Would you hire or work with this firm again? (If no, please explain below)
Yes No

7.c.1. Comments:

d) In summary, provide an overall rating for the work performed by this contractor.
E VG S M U N

7.d.1. Comments:

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________STRENGTHS:_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________WEAKNESSES:________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ DEFICIENCIES:_____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ COMMENTS:________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Past Performance Information provided by: __________________________________________________ (Printed Name)

Signature: ________________________________________ Date: ____________________________ Organization: _____________________________________ Phone: ____________________________