528A5-20-502 Boiler Replacement_Plans_Part 1.pdf

PDF 15 MB Posted

Attached to
Z1DA--528A5-20-502 BOILER REPLACEMENT PROJECT Federal contract opportunity
Solicitation number
36C24224R0032
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document is a solicitation (Solicitation # 36C24224R0032) for a boiler replacement project. The key details are:

The procurement is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside with a business size standard of $19M. The solicitation is issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 2. The project involves the replacement of boilers. The proposal due date is Friday, June 28, 2024. A site visit is scheduled for Thursday, June 6, 2024 at 11:00 AM Eastern. Offerors are required to provide details of three previous similar contracts within the past ten years. A copy of the amendment must be included with the proposal.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--528A5-20-502 BOILER REPLACEMENT PROJECT, newest first.
File Type Posted
36C24224R0032 0009.docx DOCX document
Canandaigua VAMC Boiler Plant - Final RBM Survey.pdf PDF
852.219-75 VA Notice of Limitations on Subcontracting.docx DOCX document
36C24224R0032 0008.docx DOCX document
36C24224R0032 0007.docx DOCX document
Attachment B.pdf PDF
Attachment A_VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition.pdf PDF
36C24224R0032 0006.docx DOCX document
36C24224R0032 0005.docx DOCX document
Touchpoint Plus_Quick Start guide.pdf PDF
2024-06-13 Question 1 Attachments.pdf PDF
36C24224R0032 0004.docx DOCX document
touchpoint-plus-user-guide-man0996_v1_0216.pdf PDF
Sensepoint XCD_IOM.pdf PDF
Copy of Pre-Bid RFI Questions_Encorus Response 2024-06-13.pdf PDF
Site Visit Sign In Sheet.pdf PDF
36C24224R0032 0003.docx DOCX document
528A5-20-502 Boiler Replacement_Plans_Part 2.pdf PDF
36C24224R0032 0002.docx DOCX document
528A5-20-502_SOW R1_Boiler Plant Replacement.pdf PDF
528A5-20-502 Boiler Replacement_Plans_Part 3.pdf PDF
528A5-20-502 Boiler Replacement_Specifications REV1.pdf PDF
S02 - Past Performance Questionnaire - Exhibit B.docx DOCX document
36C24224R0032 0001.docx DOCX document
528A5-20-502 DESIGN BOLIER REPLACEMENT SET.pdf PDF
S02 - Contractor Projects Form.docx DOCX document
36C24224R0032.docx DOCX document
20-502 Bid Specifications.pdf PDF
013200 Construction Documentation.pdf PDF
P07 Wage Determination.pdf PDF
S02 - Past Performance Questionnaire.docx DOCX document
852.219-78 VA Notice of Limitations on Subcontracting.docx DOCX document
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

TITLE SHEET 100% STAMPED FINAL

DESIGN

FULLY SPRINKLERED

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

2023-06-23

GI001

BLDG 12

528A5-20-502

DGA CJR

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

NORTH ARROW

DETAIL NUMBER

DETAIL IDENTIFIER

DETAIL TITLE NUMBER /

SHEET REF NUMBER

SECTION IDENTIFIER

SHEET REF NUMBER

DETAIL

IDENTIFIER

SHEET REF

NUMBER

DETAIL SECTION IDENTIFIER

VIEWING

DIRECTION

VIEW TITLE

BUILDING/WALL SECTION CUT

EXTERIOR ELEVATION

DETAIL SECTION CUT

DETAIL CALLOUT

DRAWING SYMBOLS

N

INTERIOR ELEVATION

DD###

DD###

X

DD###

X

SCALE: 1'-0" = 1'-0"

DETAIL TITLEX

1 / DD###

DD###

X

DD###

X

TRUE NORTH

PLAN NORTH

VIEWING

DIRECTION

SHEET REF NUMBER

SHEET REF NUMBER

DRAWING INDEX

DRAWING

NUMBER DRAWING TITLE

GENERAL

GI001 TITLE SHEET

GC101 GENERAL PHASING PLAN

GC102 GENERAL PHASING PLAN

GC103 GENERAL PHASING PLAN

GC601 CONDENSATE PHASING DIAGRAM

HAZARDOUS MATERIALS

H-101 HAZARDOUS ABATEMENT PLAN

CIVIL

C-001 CIVIL NOTES AND LEGENDS

CS101 CIVIL SITE PLAN

CU101 CIVIL UTILITY PLAN

CU501 CIVIL UTILITY DETAILS

STRUCTURAL

S-001 STRUCTURAL NOTES AND LEGENDS

SD101 STRUCTURAL FOUNDATION DEMOLITION PLAN

SD102 STRUCTURAL DEMOLITION PLAN

SD103 STRUCTURAL DEMOLITION PLAN - PLATFORM VARIES LEVELS

SB101 STRUCTURAL FOUNDATION PLAN

SF101 STRUCTURAL FRAMING PLAN - LOWER LEVEL

SF102 STRUCTURAL FRAMING PLAN - PLATFORM VARIOUS LEVELS

SF201 STRUCTURAL FRAMING INTERIOR ELEVATIONS

SF202 STRUCTURAL FRAMING INTERIOR ELEVATIONS

SF203 STRUCTURAL FRAMING INTERIOR ELEVATIONS

SF204 STRUCTURAL FRAMING INTERIOR ELEVATIONS

SF205 STRUCTURAL FRAMING INTERIOR ELEVATIONS

SF206 STRUCTURAL FRAMING EXTERIOR ELEVATIONS

SF301 STRUCTURAL FRAMING SECTIONS

SF302 STRUCTURAL FRAMING SECTIONS

SF303 STRUCTURAL FRAMING SECTIONS

SF304 STRUCTURAL FRAMING SECTIONS

SF305 STRUCTURAL FRAMING SECTIONS

SF306 STRUCTURAL FRAMING SECTIONS

SF401 STRUCTURAL FRAMING ENLARGED PLANS

SF402 STRUCTURAL FRAMING ENLARGED PLANS

SF403 STRUCTURAL FRAMING ENLARGED PLANS

SF404 STRUCTURAL FRAMING ENLARGED PLANS

SF405 STRUCTURAL FRAMING ENLARGED PLANS

SF406 STRUCTURAL FRAMING ENLARGED PLANS

S-501 STRUCTURAL TYPICAL CONCRETE DETAILS

S-502 STRUCTURAL TYPICAL STEEL DETAILS

S-503 STRUCTURAL TYPICAL STEEL DETAILS

S-504 STRUCTURAL TYPICAL STEEL DETAILS

S-505 STRUCTURAL TYPICAL STEEL DETAILS

S-506 STRUCTURAL TYPICAL DETAILS

S-507 STRUCTURAL TYPICAL DETAILS

S-601 STRUCTURAL SCHEDULES

ARCHITECTURAL

A-001 ARCHITECTURAL NOTES AND LEGENDS

A-002 ARCHITECTURAL LIFE SAFETY PLAN - INDUSTRIAL AREA

A-003 ARCHITECTURAL LIFE SAFETY PLAN - STORAGE AREA

AD101 ARCHITECTURAL DEMOLITION FLOOR PLAN - LOWER LEVEL

AD102 ARCHITECTURAL DEMOLITION ROOF PLAN

AD201 ARCHITECTURAL DEMOLITION EXTERIOR ELEVATIONS

AD202 ARCHITECTURAL DEMOLITION EXTERIOR ELEVATIONS

AD203 ARCHITECTURAL DEMOLITION INTERIOR DETAILS

AD401 ARCHITECTURAL ENLARGED DEMOLITION FLOOR PLAN

A-101 ARCHITECTURAL ROOF PLAN

A-102 ARCHITECTURAL FLOOR PLAN - LOWER LEVEL

A-103 ARCHITECTURAL FLOOR PLAN - STORAGE AREA

A-104 ARCHITECTURAL REFLECTED CEILING PLANS

A-201 ARCHITECTURAL EXTERIOR ELEVATIONS

A-202 ARCHITECTURAL EXTERIOR ELEVATIONS

A-203 ARCHITECTURAL INTERIOR ELEVATIONS

A-204 ARCHITECTURAL INTERIOR ELEVATIONS

A-401 ARCHITECTURAL ENLARGED FLOOR PLAN AND DETAILS

A-402 ARCHITECTURAL ENLARGED FLOOR PLANS

A-501 ARCHITECTURAL WALL DETAILS

A-502 ARCHITECTURAL BUILDING DETAILS

A-503 ARCHITECTURAL ROOF DETAILS

A-504 ARCHITECTURAL MASONRY RESTORATION DETAILS

A-601 ARCHTECTURAL DOOR SCHEDULE AND DETAILS

A-602 ARCHTECTURAL WINDOW SCHEDULE AND DETAILS

A-603 ARCHTECTURAL SCHEDULES

A-801 ARCHITECTURAL BOILER PLANT SIGNAGE

FIRE PROTECTION

F-001 FIRE PROTECTION NOTES AND LEGENDS

FD101 FIRE PROTECTION DEMOLITION PLAN

FD601 FIRE ALARM DEMOLITION RISER DIAGRAM

FA101 FIRE ALARM PLAN - LOWER LEVEL

FA102 FIRE ALARM PLAN - PIT LEVEL

FA601 FIRE ALARM RISER DIAGRAM

FX101 FIRE SPRINKLER PLAN - LOWER LEVEL

FX102 FIRE SPRINKLER PLAN - UPPER LEVEL

FX103 FIRE SPRINKLER PLAN - PIT LEVEL

FX501 FIRE SPRINKLER DETAILS

PLUMBING

P-001 PLUMBING NOTES AND LEGENDS

PD101 PLUMBING DEMOLITION PLAN

PP101 PLUMBING PLAN - SANITARY

PP102 PLUMBING PLAN - DOMESTIC

PP401 PLUMBING ENLARGED PLANS

PP601 PLUMBING DOMESTIC WATER RISER DIAGRAM

PP602 PLUMBING SANITARY RISER DIAGRAM

PROCESS

D-001 PROCESS NOTES AND LEGENDS

D-601 PROCESS FLOW DIAGRAM

D-611 PROCESS AND INSTRUMENTATION (P&ID) DIAGRAM- FUEL OIL

D-621 PROCESS AND INSTRUMENTATION (P&ID) DIAGRAM - NATURAL GAS

D-631 PROCESS AND INSTRUMENTATION (P&ID) DIAGRAM - FEEDWATER

D-632 PROCESS AND INSTRUMENTATION (P&ID) DIAGRAM - FEEDWATER

D-633 PROCESS AND INSTRUMENTATION (P&ID) DIAGRAM - FEEDWATER

D-641 PROCESS AND INSTRUMENTATION (P&ID) DIAGRAM - STEAM

D-642 PROCESS AND INSTRUMENTATION (P&ID) DIAGRAM - STEAM

D-651 PROCESS AND INSTRUMENTATION (P&ID) DIAGRAM - COMBUSTION AIR

DD601 PROCESS STEAM SYSTEM DEMOLITION - PHASE 2

DD602 PROCESS STEAM SYSTEM DEMOLITION - PHASE 4

MECHANICAL

M-001 MECHANICAL NOTES AND LEGENDS

MD101 MECHANICAL EQUIPMENT DEMOLITION PLAN - LOWER LEVEL

MD102 MECHANICAL EQUIPMENT DEMO PLAN - UPPER LEVEL & PIT

MD103 MECHANICAL EQUIPMENT DEMOLITION PLAN - ROOF

MD901 MECHANICAL DEMOLITION - REFERENCE PHOTOS

MD902 MECHANICAL DEMOLITION - REFERENCE PHOTOS

MH101 MECHANICAL HVAC PLAN - LOWER LEVEL

MH102 MECHANICAL ROOF PLAN

MH103 MECHANICAL HVAC PLAN - STORAGE A001

MH401 MECHANICAL HVAC ENLARGED PLAN

MH501 MECHANICAL HVAC DETAILS

MH601 MECHANICAL HVAC SCHEDULES

MI601 MECHANICAL CONTROLS DIAGRAMS

MI602 MECHANICAL CONTROLS DIAGRAMS CONT.

MP101 MECHANICAL PIPING - STEAM

MP102 MECHANICAL PIPING - FEEDWATER

MP103 MECHANICAL PIPING - FUEL

MP501 MECHANICAL PIPING DETAILS

MP502 MECHANICAL PIPING DETAILS

MP503 MECHANICAL TYPICAL PIPING DETAILS

MK101 MECHANICAL EQUIPMENT PLAN - LOWER LEVEL

MK201 MECHANICAL ELEVATIONS

MK202 MECHANICAL ELEVATIONS

MK203 MECHANICAL ELEVATIONS

MK204 MECHANICAL ELEVATIONS

MK601 MECHANICAL EQUIPMENT SCHEDULES

MJ101 MECHANICAL MACHINERY PLAN - STORAGE A101

RM101 MECHANICAL EQUIPMENT PLAN - EXIST BOILER PLANT LOWER LEVEL

RM102 MECHANICAL EQUIPMENT PLAN - EXIST BOILER PLANT UPPER LEVEL

ELECTRICAL

E-001 ELECTRICAL NOTES AND LEGENDS

E-201 ELECTRICAL ELEVATIONS

E-401 ELECTRICAL ENLARGED PLAN

ED101 ELECTRICAL DEMOLITION POWER PLAN - LOWER LEVEL

ED102 ELECTRICAL DEMOLITION POWER PLAN - UPPER LEVEL

ED103 ELECTRICAL DEMOLITION LIGHTING PLAN - LOWER LEVEL

ED104 ELECTRICAL DEMOLITION LIGHTING PLAN - UPPER LEVEL

ED112 ELECTRICAL DEMOLITION SECURITY PLAN - LOWER LEVEL

ED601 ELECTRICAL DEMOLITION ONE-LINE DIAGRAM

ED602 ELECTRICAL DEMOLITION ONE-LINE DIAGRAM

EL101 ELECTRICAL LIGHTING PLAN - LOWER LEVEL

EL102 ELECTRICAL LIGHTING PLAN - UPPER LEVEL

EL103 ELECTRICAL LIGHTING PLAN -STORAGE A001

EL501 ELECTRICAL LIGHTING DETAILS

EP101 ELECTRICAL POWER PLAN - LOWER LEVEL

EP102 ELECTRICAL POWER PLAN - UPPER LEVEL

EP103 ELECTRICAL POWER PLAN - ROOF

EP104 ELECTRICAL POWER PLAN - STORAGE A001

EP401 ELECTRICAL POWER ENLARGED PLAN - LOWER LEVEL

EP402 ELECTRICAL POWER ENLARGED PLAN - LOWER LEVEL

EP501 ELECTRICAL POWER DETAILS

EP601 ELECTRICAL POWER ONE-LINE DIAGRAM

EP602 ELECTRICAL POWER ONE-LINE DIAGRAM

EP603 ELECTRICAL POWER ONE-LINE DIAGRAM

EP611 ELECTRICAL POWER SCHEDULES

EP612 ELECTRICAL POWER SCHEDULES

EP613 ELECTRICAL POWER SCHEDULES

EP614 ELECTRICAL POWER SCHEDULES

EP615 ELECTRICAL CABLE AND CONDUIT SCHEDULES

EI101 ELECTRICAL INSTRUMENTATION PLAN - LOWER LEVEL

EI102 ELECTRICAL INSRUMENTATION PARTIAL PLAN - UPPER LEVEL

EI103 ELECTRICAL INSRUMENTATION PLAN - ROOF

EI111 ELECTRICAL INSTRUMENTATION - GAS DETECTION SYSTEM

EI501 ELECTRICAL INSTRUMENTATION DETAILS

EI701 BOILER PLANT SUPERVISORY NETWORK TOPOLOGY

EY101 ELECTRICAL SECURITY PLAN - PIT LEVEL

EY102 ELECTRICAL SECURITY PLAN - LOWER LEVEL

EY103 ELECTRICAL SECURITY PLAN - UPPER LEVEL

6/23/2023

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

CANANDAIGUA VAMC

AutoCAD SHX Text

BOILER REPLACEMENT 400 FORT HILL AVE CANANDAIGUA, NY 14424

AutoCAD SHX Text N

CO

NC

W

AL

K S

W

XX

X

X X

X X

CONC WALK

CO

CO

BUSHWOOD LANE

TANK

50000 GALLON FUEL OIL

ABOVE GROUND

BUILDING 16

BUILDING 10

BUILDING 11

WAREHOUSE

BUILDING 12

BOILER PLANT

METAL STORAGE

BUILDING

METAL

BUILDING

N62°58'15"E 714.94'

N27°38'33"W 241.21'

S74°17'31"W473.01'

GRAVEL AREATRUCK PARKING

PAVED PARKING LOT

TANK#020

1000 GALLON DIESEL

ABOVE GROUND WITH PUMP ON

CONC PAD WITH WOODEN ROOF

G

AL

T

AN

K

BUILDING 13

X

X X

X X

X X

X X

X X

X X

X X

CONTRACTOR LAYDOWN

AREA. COORDINATED AREA

WITH COR/VA.

GATE 10' WIDE

CONSTRUCTION FENCE

CONSTRUCTION FENCE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL PHASING PLAN 100% STAMPED FINAL

DESIGN

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

2023-06-23

GC101

BLDG 12

528A5-20-502

DGA CJR

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

SCALE: 1" = 250'

PHASE 1 - MOBILIZATION PLAN1

N

GENERAL NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING AREAS.

MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF PROJECT. COORDINATE

FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL APPROVAL.

2. PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES DO NOT

IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR CREATING

CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST TRADES.

3. ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY ANALYSIS.

CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE COMMENCING WORK.

4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

5. WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE PHASED

WORK. CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN ANY AND ALL

SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT SHOWN THROUGHOUT

THIS DRAWING SET.

6. REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

PHASE 1 NOTES - MOBILIZATION

1 ESTABLISH CONTRACTOR LAY DOWN AREA. COORDINATE AREA WITH COR/VA.

2 INSTALL 6' HIGH CHAIN LINK FENCING AROUND WORK AREAS. SECURE FENCE TO RESIST A 50 LB

HORIZONTAL FORCE ALONG TOP OR BOTTOM.

3 MAINTAIN OPERATION OF THE TWO PUMP STATIONS LOCATED TO THE NORTH AND SOUTH OF

THE FUEL BUNKER FOR THE DURATION OF THE PROJECT. THESE PUMPS ARE ESSENTIAL FOR

FOUNDATION DRAINAGE AROUND THE FUEL BUNKER.

6/23/2023

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

GV

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

DN

DN

UP

UP

MLKJHGFEDCBA

7.1

8 8

4.4

1 2

MLKJHGFEDCBA

7.1

8 8

4.4

CONTROL ROOM

A105

JANITOR

A109

WOMEN

A108

MEN

A107

ELECTRICAL ROOM

A103

3 5

73 5

PHASE 2 NOTES - DEMOLITION OF EXISTING

BOILERS 4 & 5

REMOVE BOILER PLANT EQUIPMENT IN AREA SHOWN ON DRAWING. REFER TO MD101 AND MD102

FOR MECHANICAL EQUIPMENT DEMOLITION PLAN. REFER TO SD101 FOR STRUCTURAL

DEMOLITION PLAN.

HAZARDOUS MATERIALS ARE NOT EXPECTED TO BE ENCOUNTERED DURING THIS PHASE.

PHASE 3 NOTES - INSTALL AND COMMISSION

NEW BOILER PLANT EQUIPMENT

1 RELOCATE GENERATOR INSIDE BUILDING 12.

2 INSTALL UNDERGROUND NATURAL GAS LINE.

3 INSTALL BOILER EQUIPMENT, HVAC EQUIPMENT, LOCKER ROOMS, AND BATHROOMS.

3 CONTRACTOR TO COORDINATE LOCKOUT/TAGOUT OF THE STEAM SYSTEM WITH THE VA BOILER

PLANT SUPERVISOR BEFORE STARTING DEMOLITION. REFER TO DD601 FOR DETAILS.

COMMISSION NEW BOILER PLANT EQUIPMENT. THE NEW BOILER PLANT SYSTEM MUST OPERATE

CONTINUOUSLY FOR 30 DAYS BEFORE MOVING TO PHASE 4. THE EXISTING BOILER PLANT SHALL

REMAIN FULLY OPERATIONAL DURING THIS PERIOD.

6 INFILL THE OPENING IN THE 2 HOUR FIREWALL BETWEEN THE NEW BOILER PLANT AND THE

FUEL BUNKER BEFORE OPERATING NEW BOILER PLANT EQUIPMENT.

7 REMOVE FIREPUMP AND COMPLETE THE INSTALLATION OF THE SPRINKLER SYSTEM BEFORE

OPERATING NEW BOILER PLANT EQUIPMENT.

4 INSTALL CONDENSATE RECIEVER PER CG601.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CONSULTANT

321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot

6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

100% STAMPED FINAL

DESIGN

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

528A5-20-502

2023-06-23

GC102

GENERAL PHASING PLAN

BLDG 12

BEH CJR

FULLY SPRINKLERED

SCALE: 1/16" = 1'-0"1

PHASE 2 - DEMOLITION OF EXISTING BOILERS 4 & 5

SCALE: 1/16" = 1'-0"2

PHASE 3 - INSTALL & COMMISSION NEW BOILER PLANT

N N

6.

REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

5.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE PHASED WORK.

CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN ANY AND ALL

SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT SHOWN THROUGHOUT

THIS DRAWING SET.

4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA

3.

ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY ANALYSIS.

CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE COMMENCING WORK.

2.

PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES DO NOT

IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR CREATING

CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST TRADES.

1.

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING AREAS.

MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF PROJECT. COORDINATE

FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL APPROVAL.

GENERAL NOTES

Revisions: Date: 6/23/2023

DN

UP

UP

T

T

MLKJHGFEDCBA

7.1

8 8

4.4

2 3

MLKJHGFEDCBA

7.1

8 8

4.4

CONTROL ROOM

A105

JANITOR

A109

WOMEN

A108

MEN

A107

ELECTRICAL ROOM

A103

1 INSTALL NEW DECK AS SHOWN ON A-402 AND SF404.

PHASE 4 NOTES - DEMOLITION OF EXISTING

BOILERS 1,2, & 3

REMOVE EXISTING BOILERS 1, 2, & 3 EQUIPMENT AS SHOWN ON MD101 AND MD102.

HAZARDOUS MATERIALS ARE PRESENT IN THIS AREA. REFER TO HAZARDOUS MATERIALS PLAN

H-101.

PHASE 5 NOTES - RENOVATE ORIGINAL BOILER

PLANT AND FUEL BUNKER

VERIFY THE DE-ENERGIZATION OF THE STEAM SYSTEM FOR EXISTING BOILERS 1, 2, & 3 BEFORE STARTING DEMOLITION. CONTRACTOR TO COORDINATE WITH THE VA BOILER PLANT SUPERVISOR

TO LOCKOUT/TAGOUT THE SYSTEM. REFER TO DD602 FOR DETAILS AND ISOLATION POINTS.

2 RENOVATE OFFICE ON MEZZANINE LEVEL AS SHOWN ON A-403 .

3 PAINT AND WINDOW REPLACEMENT IN ORIGINAL BOILER PLANT. REFER TO ARCHITECTURAL

DRAWINGS.

4 HAZARDOUS MATERIALS ARE PRESENT IN THIS AREA. REFER TO HAZARDOUS MATERIALS PLAN H-101.

INSTALL NEW PLATFORM, STAIRS, AND HYDRAULIC LIFT IN THE FUEL BUNKER AREA. WORK IN THIS AREA WILL NOT AFFECT THE BOILER PLANT INSTALLATION, SO IT CAN BE PERFORMED AT

ANYTIME AFTER PHASE 2. INFILL OF THE 2 HOUR FIRE WALL SHALL BE COMPLETED BEFORE

OPERATING THE NEW BOILER PLANT EQUPIMENT.

4 REMOVE THE EXISTING FUEL OIL BACKPRESSURE REGULATOR AS SHOWN ON DD603.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CONSULTANT

321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot

6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

100% STAMPED FINAL

DESIGN

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

528A5-20-502

2023-06-23

GC103

GENERAL PHASING PLAN

BLDG 12

BEH CJR

FULLY SPRINKLERED

SCALE: 1/16" = 1'-0"1

PHASE 4 - DEMOLITION OF EXISTING BOILERS 1,2, & 3

SCALE: 1/16" = 1'-0"2

PHASE 5 - RENOVATE ORIGINAL BOILER PLANT AND FUEL BUNKER

6.

REFER TO SPECIFICATION 010000 GENERAL REQUIREMENTS FOR ADDITIONAL PHASING

INFORMATION.

5.

WORK OUTSIDE THE DESIGNATED PHASE AREA MAY BE REQUIRED TO COMPLETE PHASED WORK.

CONTRACTOR IS TO COORDINATE ALL WORK WITH COR AND BETWEEN ANY AND ALL

SUBCONTRACTORS TO ENSURE CONTINUED OPERATIONS AND INTENT SHOWN THROUGHOUT...

4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #

3.

ANY SITE WORK BELOW SURFACE WILL REQUIRE THIRD PARTY UTILITY COMPANY ANALYSIS.

CONTRACTOR SHALL PROVIDE PROOF OF COMPLETION BEFORE COMMENCING WORK.

2.

PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES DO NOT

IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR CREATING

CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST TRADES.

1.

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AREA AND LAY DOWN FENCING AREAS.

MAINTAIN SAFE AND CLEAN CONDITIONS THROUGHOUT DURATION OF PROJECT. COORDINATE

FINAL LOCATION/LAYOUT/DIMENSIONS WITH VA FOR FINAL APPROVAL.

GENERAL NOTES

N N

TE

31816

PG

31810A

PG

31809B

M M

GRAVITY CONDENSATE

RECEIVER

VENT

YC

31809B

YC

31809A

12-B101-PMP-303

12-B101-PMP-304

CONDENSATE RECEIVER

FE

31813

FIT

31813

3" LPR

1 1/2" LPRM

TG

31804

V-31801

TE

31802

V-31810B

V-31811B V-31812B

V-31811A V-31812A

V-31810A

NC

NC

V-31808

V-31807

WATER LEVEL GAUGE

NC

FLUSHING

CONNECTION

V-31806 V-31813A V-31813B

V-31814

V-31815

3/4 " D

R

TIT

31816

TI

31816

FI

31813

FQI

31813

TIT

31802

TI

31802

LS

31809

LSH

31809

LAH

31809

LG

31805

CP-9

CP-9

CP-9

LC

31809

CP-9

CP-9 CP-9

F-31803

YIR

31809A

YA

31809A

YI

31809AA

YI

31809AB

YI

31809AC

YIR

31809B

YA

31809B

YI

31809BA

YI

31809BB

YI

31809BC

12-B101-TK-107

TO SURGE TANK 12-A102-TK-102

AS SHOWN ON DWG D-631

EXISTING DEAERATOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

CONDENSATE PHASING DIAGRAM 100% STAMPED FINAL

DESIGN

FULLY SPRINKLERED

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

2023-06-23

GC601

BLDG12

528A5-20-502

EAG CJR

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

GENERAL NOTES

1. THIS DRAWING IS INTENDED TO INDICATE PIPING/PUMP CONFIGURATION TO ALLOW FOR SIMULTANEOUS

CONDENSATE RETURN TO BOTH EXISTING AND NEW BOILERS DURING BOILER COMMISSIONING PERIOD.

2. ALL VALVE BODIES AND FITTINGS IN THE BOILER PLANT SHALL BE CAST OR FORGED STEEL. CAST IRON, DUCTILE IRON, AND BRONZE ARE PROHIBITED, WITH THE EXCEPTION OF DOMESTIC WATER SERVICES.

3. ON COMPLETION OF BOILER COMMISSIONING, DISCONNECT 3" LINE FROM DEAERATOR, CONNECT

CONDENSATE RECEIVER TO SOUTH CONDENSATE LOOP RETURN PER D-631.

KEYED NOTES

1 INSTALL CONDENSATE RECEIVER FOR SOUTH CONDENSATE LOOP.

2 PIPE PUMP DISCHARGE TO NEW SURGE TANK AS SHOWN ON DWG D-631.

PIPE FROM EXISTING DEAERATOR 3" OUTLET TO INLET OF CONDENSATE RECEIVER. PROVIDE 3" DIA MOTORIZED VALVE. WIRE TO SURGE TANK CONTROLLER. VALVE TO OPEN ON SURGE TANK CALL FOR

WATER ADDITION.

6/23/2023 one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DN

UP

NO ASBESTOS DETECTED

IN THIS AREA

NO ASBESTOS DETECTED

IN THIS AREA

AA-1 AA-1

AA-1

AA-1

AA-1

AA-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

HAZARDOUS ABATEMENT PLAN 100% STAMPED FINAL

DESIGN

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

2023-06-23 H-101

BLDG 12

528A5-20-502

BEH CJR

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

GENERAL NOTES

1. CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND

FEDERAL RULES, REGULATIONS, GUIDELINES, VARIANCES AND THE CONTRACT DOCUMENTS.

2. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE. CONTRACTOR IS

RESPONSIBLE FOR FIELD VERIFICATION.

3. IF UNANTICIPATED SUSPECT ASBESTOS-CONTAINING MATERIALS ARE IDENTIFIED DURING CONSTRUCTION, CEASE OPERATIONS AND NOTIFY COR FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT AND/OR ANALYZE BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF COR.

4. THE LOCATION OF SITE STORAGE OF ALL MATERIAL, EQUIPMENT, DECONTAMINATION UNITS, AND THE WASTE

TRAILER/DUMPSTER SHALL BE COORDINATED WITH AND APPROVED BY COR.

5. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, AND SUPPLIES. COR WILL NOT BE LIABLE FOR THEFT OR

DAMAGE.

6. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION. CONTRACTOR SHALL ENSURE THAT UNCERTIFIED PERSONNEL AND/OR UNAUTHORIZED VISITORS DO NOT ENTER THE REGULATED ABATEMENT WORK AREA OR THE ADJACENT RESTRICTED CONSTRUCTION AREA. CAREFULLY PERFORM WORK TO PREVENT DAMAGE TO FINISHES/MATERIALS SCHEDULED TO REMAIN. REPAIR OF DAMAGE CAUSED AS A RESULT OF IMPROPER TEMPORARY PROTECTION OR CONTRACTOR ACTIVITIES WILL BE THE RESPONSIBILITY OF THE

CONTRACTOR.

7. ALL PROJECT-RELATED REMOVAL/DEMOLITION ACTIVITIES SHALL BE PERFORMED BY THE ABATEMENT CONTRACTOR INSIDE THE REGULATED ABATEMENT WORK AREA AS PART OF THE ASBESTOS ABATEMENT PROJECT, FOLLOWED BY A THOROUGH CLEANING OF ALL ACCESSIBLE SURFACES/CAVITIES. COORDINATE ALL WORK ACTIVITIES WITH THE CONTRACT DOCUMENTS AND COR TO ENSURE REMOVAL ACTIVITIES ARE SUFFICIENT TO ACCOMMODATE THE

PROJECT OBJECTIVES.

8. ALL ASBESTOS-CONTAINING MATERIAL SHALL BE PROPERLY PACKAGED PRIOR TO BEING REMOVED FROM THE REGULATED WORK AREA(S). ASBESTOS WARNING LABELS SHALL BE APPLIED TO THE ASBESTOS WASTE BAGS. ALL ASBESTOS MATERIALS THAT ARE REMOVED FROM THE SITE SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD AND SIGNED ASBESTOS WASTE MANIFEST. COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO COR AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE SHIPMENT RECORDS MUST BE PROVIDED WITHIN 30

DAYS OF THE WASTE LEAVING THE SITE.

9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING TEMPORARY PROTECTION TO KEEP THE BUILDING IN A WATERTIGHT CONDITION AND TO PREVENT UNAUTHORIZED ACCESS AT ALL TIMES FOR THE DURATION OF THE PROJECT. REPAIRING DAMAGE CAUSED AS A RESULT OF IMPROPER TEMPORARY PROTECTION SHALL BE THE

RESPONSIBLE OF THE CONTRACTOR.

10. CONTRACTOR SHALL PROVIDE ALL SCAFFOLDING, LIFTS, ETC. REQUIRED TO REMOVE ALL MATERIALS.

11. WHERE FEASIBLE, NON-POROUS CLEANABLE MATERIALS REMOVED DURING ASBESTOS ABATEMENT ACTIVITIES (SUCH AS CABINETS, CEILING TILE GRID WORK, METAL STUDS, CONDUITS, WINDOWS, ETC.) SHALL BE PROPERLY CLEANED AND RECYCLED OR DISPOSED OF AS C&D DEBRIS, AS APPROPRIATE. THE PROJECT MONITOR SHALL VISUALLY INSPECT ALL SUCH MATERIALS TO ENSURE PROPER CLEANING/DECONTAMINATION HAS OCCURRED PRIOR TO BEING

REMOVED FROM THE REGULATED ABATEMENT WORK AREA.

12. REFER TO SPECIFICATION 024100 FOR A SURVEY REPORT OF REGULATED BUILDING MATERIALS IN BUILDING 12.

LEAD AWARENESS NOTES

1. CONTRACTORS ARE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION;

INTERIM FINAL RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEE MAY BE OCCUPATIONALLY EXPOSED TO LEAD.

2. PRIOR TO THE PREPARATION OF THE CONTRACT DOCUMENTS, TESTING HAS BEEN PERFORMED ON REPRESENTATIVE BUILDING COMPONENTS THAT MAY BE DISTURBED BY THIS PROJECT. THE FOLLOWING MATERIALS ARE EXPECTED TO BE

COVERED WITH LEAD-BASED PAINT:

· STRUCTURAL STEEL THROUGHOUT THE BUILDING (INCLUDING ROOF DECK)

· MASONRY WALLS THROUGHOUT

3. REFER TO DRAWINGS OF THE SPECIFIC TRADES FOR LOCATIONS WHERE WORK OF THE CONTRACT WILL NECESSITATE

DISTURBANCE OF LEAD.

4. FURNISHING OF THIS INFORMATION IS NOT INTENDED TO RELIEVE CONTRACTORS OF THEIR RESPONSIBILITIES UNDER OSHA TO DETERMINE THE LEAD-CONTAINING MATERIALS THAT THEIR EMPLOYEES AND SUBCONTRACTORS MAY BE EXPOSED TO, AND TO WARN THEIR EMPLOYEES OF THE POTENTIAL DANGERS OF THE DISTURBANCE OF LEAD-CONTAINING MATERIALS. CONTRACTOR IS RESPONSIBLE FOR CHARACTERIZING ALL WASTE USING EPA METHOD 1311, TOXIC CHARACTERISTIC LEACHING PROCEDURE (TCLP). SUBMIT COPIES OF ALL LABORATORY RESULTS, WASTE

TRANSPORTER, AND LANDFILL PERMITS, PRIOR TO REMOVING WASTE FROM THE SITE.

ASBESTOS ABATEMENT NOTES

AA-1 CONTRACTOR SHALL PROPERLY REMOVE AND DISPOSE OF WINDOW SASH WITH ASBESTOS-CONTAINING GLAZING

COMPOUND, AS INDICATED. REMOVE ENTIRE WINDOW SASH INCLUDING GLASS. AFTER WINDOW SASH AND ASBESTOS-CONTAINING GLAZING COMPOUND HAS BEEN REMOVED, THE CONTRACTOR SHALL PROVIDE TEMPORARY

PROTECTION IN ACCORDANCE WITH GENERAL NOTE I.

AA-2 CONTRACTOR SHALL PROPERLY REMOVE AND DISPOSE OF ALL ASBESTOS-CONTAINING THERMAL SYSTEM INSULATION (TSI) AND ASSOCIATED MUDDED FITTINGS, AS INDICATED. ASBESTOS-CONTAINING TSI IS ATTACHED TO EQUIPMENT THROUGHOUT THE BUILDING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF UNITS AND ALL ASSOCIATED PIPE INSULATION. CONTRACTOR SHALL PROPERLY DISPOSE OF ALL INSULATION, PIPING AND ASSOCIATED DEBRIS AS ACM WASTE. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO

ACCESS TSI INCLUDING CEILING SYSTEMS, HVAC AND MECHANICAL EQUIPMENT.

ANTICIPATED QUANTITIES OF PIPING INSULATION:

2"-3 1/2" DIA - 1200LF

4"-6" DIA - 400LF

8"-14" DIA - 200LF

ENVIRONMENTAL AWARENESS NOTES

1. CONTRACTOR SHALL REMOVE AND PROPERLY PACKAGE ALL FLUORESCENT BULBS AND BALLASTS SCHEDULED FOR

REMOVAL THROUGHOUT THE PROJECT LIMITS AND TURN THE PACKAGES OVER TO COR FOR DISPOSAL. THE BULBS MAY CONTAIN MERCURY AND THE BALLASTS MAY CONTAIN DEHP. NOTE: FLUORESCENT BULBS BROKEN DURING CONSTRUCTION SHALL BE DISPOSED OF AS HAZARDOUS WASTE. CONTRACTOR SHALL NOT REMOVE BULBS AND/OR

BALLASTS FROM THE SITE.

KEYPLAN

B12

B11

PARKING

N

KEYPLAN

B12

B11

PARKING

N

SCALE: 1/8" = 1'-0"

LOWER LEVEL PLAN1 SCALE: 1/8" = 1'-0"

UPPER LEVEL PLAN2

6/23/2023

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

CIVIL NOTES AND LEGENDS 100% STAMPED FINAL

DESIGN

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

2023-06-23 C-001

528A5-20-502 "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

GENERAL NOTES:

1. CONTRACTOR SHALL MAINTAIN THE WORK SITE IN AN ORDERLY CONDITION AND PROVIDE FOR REGULAR CLEAN UP OF THE

CONSTRUCTION AREA ON A DAILY BASIS. UPON COMPLETION OF ALL WORK, CONTRACTOR SHALL REMOVE ANY TEMPORARY FACILITIES, EQUIPMENT, SURPLUS MATERIAL AND SUPPLIES. FINAL CLEANUP SHALL LEAVE THE SITE IN AN ORDERLY CONDITION.

2. PERFORM ALL EXCAVATION IN ACCORDANCE WITH OSHA "CONSTRUCTION STANDARDS FOR TRENCHING AND EXCAVATION, 29 CFR, PART 1926, SUBPART P" GUIDELINES AND SITE PROCEDURES.

3. CONTRACTOR IS RESPONSIBLE TO VERIFY ALL SITE, FIELD AND BUILDING CONDITIONS PRIOR TO SUBMITTING BIDS AND COMMENCING WORK. IF THERE ARE ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS, NOTIFY THE COR AND REQUEST

CLARIFICATION.

4. THE LOCATIONS AND DEPTHS OF EXISTING UNDERGROUND UTILITIES AS SHOWN ON PLANS ARE APPROXIMATE. OTHER UNDERGROUND UTILITIES NOT SHOWN MAY BE ENCOUNTERED. THE CONTRACTOR SHALL PERFORM TEST PITS TO VERIFY THE LOCATION AND ELEVATION OF UTILITIES AT INTERCONNECTIONS AND CROSSINGS AS SHOWN, DIRECTED OR REQUIRED. THE CONTRACTOR SHALL EXCAVATE IN ADVANCE OF THE UTILITY WORK AND EXPOSE ALL EXISTING UNDERGROUND UTILITIES TO PREVENT DAMAGE DURING CONSTRUCTION AND TO DETERMINE REQUIRED CHANGES IN GRADE NECESSARY TO INSTALL THE

UTILITIES TO AVOID CONFLICTS.

5. ALL SAW CUTS ARE TO BE FULL DEPTH. CONTRACTOR TO MATCH PAVEMENT WITH EXISTING OR AS NOTED.

6. THE CONTRACTOR SHALL BE PRESENT AND ASSIST IN THE FINAL WALK INSPECTION. THE CONTRACTOR SHALL PROVIDE SUFFICIENT

PERSONNEL AND EQUIPMENT TO DEMONSTRATE TO THE COR THAT ALL UTILITIES OPERATE AS REQUIRED.

7. NO HOLES, TRENCHES OR STRUCTURES SHALL BE LEFT OPEN OVERNIGHT IN ANY EXCAVATION.

8. ALL EXCAVATIONS, INCLUDING JACK AND BORE PITS SHALL BE SURROUNDED BY 8' HIGH CHAIN LINK FENCE.

9. THE CONTRACTOR SHALL LOCATE, MARK, SAFEGUARD, AND PRESERVE ALL SURVEY CONTROL MONUMENTS IN THE AREAS OF

CONSTRUCTION.

10. THE CONTRACTOR SHALL MAINTAIN IN SERVICE ALL EXISTING SEWERS, CULVERTS, DITCHES, MANHOLES, AND CATCH BASINS DURING

CONSTRUCTION.

11. CONSTRUCTION STAKEOUT: THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION STAKEOUT.

12. TRAFFIC SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. INGRESS AND EGRESS TO DRIVEWAYS, PARKING LOTS, AND SERVICE

ROADS SHALL BE CONTINUOUSLY MAINTAINED THROUGHOUT THE PERIOD OF CONSTRUCTION, TO THE EXTENT DELINEATED ON THE

PHASING DRAWINGS.

13. THE CONTRACTOR SHALL TAKE CARE TO PREVENT DAMAGE TO EXISTING UTILITIES. DAMAGED UTILITIES SHALL BE IMMEDIATELY

REPAIRED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.

14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND INCURRING THE COST OF ALL REQUIRED PERMITS, INSPECTIONS, CERTIFICATES, ETC. AND SHALL COMPLY WITH ALL REQUIRED PERMITS.

15. ALL WORK SHALL BE DONE IN STRICT COMPLIANCE WITH ALL APPLICABLE NATIONAL AND STATE CODES, STANDARDS, ORDINANCES, RULES, AND REGULATIONS.

16. MISCELLANEOUS WORK NOT SPECIFICALLY SHOWN ON THE CONTRACT DRAWINGS SUCH AS PATCHING, BLOCKING, TRIMMING, ETC.

SHALL BE PERFORMED AS REQUIRED TO MAKE THE WORK COMPLETE.

17. IT IS THE CONTRACTOR'S RESPONSIBILITY TO EXAMINE ALL PLAN SHEETS AND COORDINATE WORK WITH ALL OTHER CONTRACTS FOR

THE SITE.

18. THE CONTRACTING OFFICER AND CONTRACTING OFFICER'S REPRESENTATIVE SHALL BE NOTIFIED, IN WRITING, OF ANY CONDITIONS THAT VARY FROM THOSE SHOWN ON THE PLANS. THE CONTRACTOR'S WORK SHALL NOT VARY FROM THE PLANS WITHOUT PRIOR

WRITTEN APPROVAL OF THE CONTRACTING 0FFICER.

19. THE CONTRACTOR SHALL RESTORE LAWNS, DRIVEWAYS, CULVERTS, SIGNS, AND OTHER PUBLIC OR PRIVATE PROPERTY DAMAGED OR REMOVED TO AT LEAST AS GOOD A CONDITION AS BEFORE BEING DISTURBED AS DETERMINED BY COR. ANY DAMAGED TREES, SHRUBS, AND/OR HEDGES SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE.

20. UNSUITABLE MATERIALS SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED OF OFF-SITE.

21. TWO WEEKS NOTICE IS REQUIRED IN ADVANCE OF ALL WATER OUTAGES.

22. ASSUME TYPICAL WORK HOURS FROM 8:00 AM TO 4:30 PM WITH 10% OFF-SHIFT WORK.

23. SAFETY DATA SHEET TO BE SUBMITTED FOR ALL CHEMICALS BROUGHT TO SITE.

24. ALL MATERIALS TO BE PURCHASED IN ACCORDANCE WITH THE BUY AMERICAN ACT.

25. ALL TONNAGES OF RECYCLED MATERIALS AND TRIP TICKETS TO BE TURNED INTO THE ENVIRONMENTAL MANAGER.

ABBREVIATIONS

ABAND ABANDONED

BLDG BUILDING

CB CATCH BASIN

CONC CONCRETE

DI DUCTILE IRON

ELEC ELECTRICAL

ELEV ELEVATION

EX EXISTING

FF FINISHED FLOOR

FH FIRE HYDRANT

GV GATE VALVE

HDPE HIGH DENSITY POLYETHYLENE PIPE

HPS HIGH PRESSURE STEAM

HYD HYDRANT

INV INVERT

LF LINEAR FEET

LPR LOW PRESSURE RETURN

MAX MAXIMUM

MH MANHOLE

MIN MINIMUM

MJ MECHANICAL JOINT

MPS MEDIUM PRESSURE STEAM

RET RETAINING

SAN SANITARY

SMH SEWER MANHOLE

ST STORM

SW SIDEWALK

SWR SEWER

TYP TYPICAL

VVB VALVE IN VALVE BOX

WTR WATER

CIVIL SYMBOL LEGEND

STEAM MANHOLE

STORM MANHOLE

CONDENSER

GATE VALVE

SANITARY SEWER MANHOLE

TELEPHONE MH

POWER MH

PULL BOX

MOTOR

HANDHOLE

ABANDONED ELECT MH

XFMR

XFMR ROOM

HYDRANT

HANDHOLE

ELECTRIC MANHOLE

MANHOLE

TREE

FLAG POLE

LIGHT POST

POST

UTILITY POLE

CATCH BASIN

W

T

SS

AG

UE

RETURN AIR FLOW DIRECTION

CLEANOUT IN FLOOR

GREASE TRAP

MANHOLE BEND

SCREWED GATE VALVE

VALVE BOX

CAP

UNDERGROUND ELECTRIC

ABANDONED GAS

SANITARY SEWER

COMMUNICATIONS

SITE WATER

CIVIL LINETYPE LEGEND

CIVIL HATCH LEGEND

WATER MANHOLE

CWR

CWS CHILLED WATER

CHILLED WATER RETURN

MPS MEDIUM PRESSURE STEAM

CONCRETE

PAVEMENT

X X X DEMOLITION

■ ■ COMPOST FILTER SOCK

DEMOLITIONX

BUILDING

WATER VALVE

VALVE IN VALVE BOX

POST INDICATOR VALVE

EXISTING HYDRANT

DWS DOMESTIC WATER SUPPLY

FW FIRE WATER

AW ABANDONED WATER

OS&Y VALVE

ELK HMS

E OVERHEAD ELECTRIC

G GAS

SD STORM SEWER

HPS HIGH PRESSURE STEAM

FENCE

STONE

EXISTING DUCT BANK

POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK

LIMIT OF DEMOLITION

6/23/2023

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

ST

AutoCAD SHX Text D

AutoCAD SHX Text w

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text E

VB

AREA OF PAVEMENT

RESTORATION ±990 SQFT

X

X X

BUILDING 12

BOILER PLANT

CONCRETERAMP

CONC

METAL

BUILDING

FF EL=781.15

FF EL=

779.66FF EL=774.87

FF EL=786.67

FF EL=789.40

FF EL=789.63

CO

NC

CO

NC

W

AL

K

CONC

RAMP

CB-1597

CB-1546

SMH-1443

DMH-1526

CB-1100

CB-1109

CB-1656

CB-1447

S74°17'31"W 473.01'

PAVED YARD

LOADING BAY

LOADING BAY

CB-1595

S

CO

NC

RE

TE

LO

AD

IN

G

DO

CK

W

IT

H

OV

ER

H

AN

G

BUILDING 11 WAREHOUSE

BUILDING 12

BOILER PLANT

SIGN

LOADING DOCK ROOF

6" STEEL VERTICAL VENT PIPES

G

AL

T

AN

K

VENT

CO

CO

NEW MANHOLE

CU501

CU501

CU501

CU501

AREA OF NEW CONCRETE

RESTORATION ±160 SQFT

CU501

CU501

CU501

RELOCATED

CATCH BASIN CU501

CU501

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

CIVIL SITE PLAN 100% STAMPED FINAL

DESIGN

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

2023-06-23

CS101

528A5-20-502 "Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

SCALE: 1" = 10'-0"

CIVIL SITE PLAN1

N

GENERAL NOTES

1. SEE SHEET C-001 FOR CIVIL NOTES AND LEGENDS.

2.

PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES

DO NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR

CREATING CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST

TRADES.

KEYPLAN

B12

B11

PARKING

N

ELK CJR

KEYED NOTES

1 CONTRACTOR TO CUT/ GRIND ALL EQUIPMENT TO FLUSH WITH TOP OF SLAB.

2 DEMOLISH AND REMOVE CONCRETE SIDEWALK AND STEP. REGRADE AS REQUIRED.

3 ADD NEW CONCRETE SIDEWALK TO EXISTING ASPHALT ROAD. MATCH EXISTING.

4 NEW 5'x5' CONCRETE PAD AT NEW EXIT DISCHARGE.

5 DEMOLISH AND REMOVE CLEANOUTS.

6 REMOVE BOLLARD

7 SAWCUT PAVEMENT FULL DEPTH. MATCH EXISTING.

8 RESTORE CONCRETE

9 NEW 6'x5' CONCRETE PAD

10 SEE DWG A-201FOR LOCATION OF DOWNSPOUTS

11 DEMOLISH AND REMOVE EXISTING CATCH BASIN.

CU501

6/23/2023

AutoCAD SHX Text

GV

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text D

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text D

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UE

UE

UE

UE

UE

UE

UE

UE

AST

AST

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

AW

AW

AW

AW

HPS

HPS

HPS

HPS

HPS

HPS

HPS

W W

W W

W W

W W

W

W

W

W

W

W

W

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

AG

AG

AG

AG

AST

AST

AST

BUILDING 12

BOILER PLANT

CONCRETERAMP

CONC

METAL

BUILDING

FF EL=781.15

FF EL=

779.66FF EL=774.87

FF EL=786.67

FF EL=789.40

FF EL=789.63

CO

NC

CO

NC

W

AL

K

CONC

RAMP

CB-1597

CB-1546

SMH-1443

DMH-1526

CB-1100

CB-1109

CB-1656

CB-1447

S74°17'31"W 473.01'

PAVED YARD

LOADING BAY

LOADING BAY

STEAM

CB-1595

S

ABANDONED STEAM

STEAM

CO

NC

RE

TE

LO

AD

IN

G

DO

CK

W

IT

H

OV

ER

H

AN

G

BUILDING 11 WAREHOUSE

BUILDING 12

BOILER PLANT

SIGN

LOADING DOCK ROOF

6" STEEL VERTICAL VENT PIPES

G

AL

T

AN

K

VENT

NEW SAN MANHOLE

RIM: 779.4

INV N: 773.22

INV W: 773.22

INV NW: 773.42

CU501

CU501

1,2

CU501

NEW OIL WATER SEPARATOR

INV IN: 773.61

INV OUT: 773.64

EX SAN MANHOLE

RIM: 779.0

INV N: 772.65

INV E: 772.65

INV S: 771.68 CU501

15 LF 4" SDR35 SEWER @ 2% MIN

11 LF SDR35 SEWER @ 2%

BLDG CONNECTION : 774.11

5 CU501

EXISTING 12"

STORM DRAIN LINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

CIVIL UTILITY PLAN 100% STAMPED FINAL

DESIGN

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

2023-06-23

CU101

528A5-20-502

ELK HMS

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

SCALE: 1" = 10'-0"

CIVIL UTILITY PLAN1

N

GENERAL NOTES

1. SEE SHEET C-001 FOR CIVIL NOTES AND LEGENDS.

2.

PHASING NOTES INDICATE GENERAL WORK ITEMS TO BE PERFORMED. PHASE NOTES

DO NOT IMPLY SEQUENCE OF OPERATION. CONTRACTOR IS RESPONSIBLE FOR

CREATING CONSTRUCTION SCHEDULE AND COORDINATION OF SCHEDULE AMONGST

TRADES.

KEYED NOTES

1 NEW GAS SERVICE TO BE TIED IN UPSTREAM OF SHUTOFF VALVE FOR EXISTING

BOILERS.

2 NEW 6" A53 STEEL NATURAL GAS SUPPLY.

3 ABANDON EXISTING GAS LINE IN PLACE.

4 SEE EP101 FOR MODIFICATIONS TO GENERATOR DUCT BANK.

5 PLACE NEW CATCH BASIN OVER EXISTING PIPE. MATCH INVERTS.

6 RELOCATE EXISTING DOWNSPOUT AND TIE TO EXISTING 12" STORM DRAIN. SEE A-201

FOR COORDINATION.

KEYPLAN

B12

B11

PARKING

N

6/23/2023

AutoCAD SHX Text

GV

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text D

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text D

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

2 3

INSTALL NEW SPOOL WITH

NEW ISOLATION VALVE

TO A102 EQUIPMENT

REMOVE VALVE AND CAP PIPE

ENDS AFTER DECOMMISSIONING

OF EQUIPMENT IN B101

ISOLATE GAS SERVICE

AND REMOVE SPOOL

2 1 /2"

5 1 /2"

2" 1"

TOP COURSE

NYSDOT TYPE 7

BINDER COURSE

NYSDOT TYPE 3

BASE COURSE

NYSDOT TYPE 7

REGRADE AND

PROOF ROLL

SUB-GRADE

NOTE:

1. SUBGRADE TO BE PROOF-ROLLED AND SLOPED

TO DRAIN PER GRADING PLAN.

PIPE OD + 2"

GAS LINE

SUITABLE

EXCAVATED

MATERIAL

TOPSOIL & SEED 4" FINISHED GRADE

6" MIN #1 STONE ABOVE

AND BELOW PIPE

LAWN/ FIELD PAVEMENT/ DRIVEWAY

MATCH EXISTING

PAVEMENT SECTION.

SAWCUT ALL JOINTS IN

EXISTING PAVEMENTS.

6-WAY (3X2)

4" DUCTBANK

EX GROUND

BOILER PLANT

BLDG

UTILITY SHED

NEW 6" GASLINE 24

MI

N

ABANDONED GAS

12" STORM DRAIN

0+00 0+04 0+06

24" CAST IRON COVER

RIM AT TOP OF PAVEMENT

CAST IRON FRAME

(BOLTED AND GASKETED)

RISER RINGS

TYP

5 3/4" DIA

PLUG COVER

24" CLEAR OPENING

8" KNOCKOUT

5'-0" 6"

5'- 1"

4'-

" 5'- 0"

6" 6"

6'- 0"

8" KNOCKOUT

4'-0" 6"

FLOW LINE

1'- 6"

4'- 3"

6"

SECTION A-A

STRUCTURAL FILL

NATIVE SOIL

EXISTING GROUND

773.81 IN 773.64 OUT

NOTES:

1. EXPANSION JOINTS SHALL BE LOCATED WHERE SIDEWALK ABUTS CONCRETE DRIVEWAYS, CURB

OR OTHER ADJACENT STRUCTURES.

2. ONE-HALF INCH BITUMINOUS JOINT FILLER SHALL BE INSTALLED AT EXPANSION JOINT

LOCATIONS AND SHALL EXTEND THE FULL DEPTH OF THE CONCRETE.

3. 1" DEEP CONTRACTION JOINTS SHALL BE PLACED AT INTERVALS OF APPROXIMATELY 15' OR AT

A SPACING THAT MATCHES THE ADJACENT CURB.

4. FORMED CONTRACTION JOINTS SHALL BE FINISHED WITH A TOOL HAVING A 1/4" RADIUS.

5. SCORED JOINTS SHALL BE 1/4" DEEP AND PLACED AT THE SPACING INDICATED FOR THE WIDTH

OF SIDEWALK OR MATCH SCORED JOINTS OF ADJACENT CURB.

6. CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELLED AND BROOMED WITH

A FINE BRUSH IN A TRANSVERSE DIRECTION.

7. 1/4" DEEP SCORED JOINTS (TYP) SPACED AT 6' OR EQUAL TO SIDEWALK WIDTH.

1% MIN,

2% MAX

1% MIN,

2% MAX

6" M

IN

VARIES PER PLANS 0' MIN

10.5' MAX

TYPICAL SECTION

EXPANSION AND SCORED JOINT DETAIL

60' MAX

EXPANSION JOINT TO EXPANSION JOINT

60' MAX

EXPANSION JOINT TO EXPANSION JOINT

SEE NOTE 7

(TYP) PL

AN

S

P

ER

P

ER

PL

AN

S

PLAN

CLASS "B" CONCRETE

1" SCORED OR SAWCUT

CONTRACTION JOINT

1/4" R (TYP) FORMED

JOINTS ONLY

1/4" DEEP

SCORED

JOINTS3/1

6"

4" (T

YP

EXPANSION JOINT WITH 1/4"

BITUMINOUS JOINT FILLER

TOP OF CURB

SECTION B-B

ECCENTRIC CONE

GRADE 1

"O" RING JOINT, TYLOX SUPERSEAL, OR EQUAL

ASTM C478 (LATEST DATE)

REINFORCED CONCRETE (4000 PSI)

TONGUE AND GROOVE SECTIONS

WITH ROUND NEOPRENE GASKETS

OR TYLOX SUPERSEAL.

ADJUST TO GRADE WITH APPROVED PRE-CAST EXTENSION RINGS.

(A) THE JOINTS BETWEEN THE CONE SECTION AND THE

EXTENSION RINGS SHALL BE MORTARED IN PLACE.

(B) THE INDIVIDUAL RINGS SHALL NOT EXCEED 6" IN THICKNESS.

THE TOTAL NUMBER PLACED SHALL BE LIMITED TO 2 OR A

MAXIMUM OF 12" IN HEIGHT.

(C) THE ENTIRE OUTSIDE SURFACE FROM THE FRAME CASTING

TO THE CONE SECTION SHALL BE COATED WITH AN

APPROVED COATING MATERIAL SUCH AS PRECO-PATCH",

ROCK MOUNT", WATER PLUG", OR APPROVED EQUAL.

FIRST MANHOLE STEP SHALL BE

6" FROM THE TOP OF THE CONE.

AFTER THE BARREL SECTIONS ARE ASSEMBLED, THE EXCESS JOINT

COMPOUND SHALL BE TROWELED OFF THE INSIDE AND OUTSIDE FACES.

THE INSIDE FACE OF THE JOINT SHALL THEN BE TROWELED WITH

PRECO-PATCH" OR APPROVED EQUAL, THE OUTSIDE WITH DEWITT NO. 10,

DURASEAL 3101, PIONEER 301 OR APPROVED EQUAL.

SEWER PIPE SHALL NOT BE CLOSER THAN

6" TO MANHOLE JOINT SURFACES FOR

BASE AND BARREL SECTIONS.

THE JOINT BETWEEN THE MANHOLE FRAME AND THE EXTENSION

RING TO BE MADE WITH AN APPROVED COMPOUND SUCH AS

DEWITT NO.10, DURASEAL 3101, PIONEER 301 OR EQUAL.

EARTHFILL RIM ELEVATION OF THE COVER TO BE FLUSH

WITH EXISTING PAVEMENT OR LAWN AREAS. IN

UNDEVELOPED AREAS THE RIM ELEVATION

SHALL BE SET ACCORDING TO THE PROFILES.

WATERTIGHT MANHOLE BOOT SEAL (PSX:DIRECT DRIVE OR

APPROVED EQUAL) OR LINK-SEAL CONSISTING OF SOLID

SYNTHETIC RUBBER LINKS CONNECTED WITH HEAVY

ELONGATED WASHERS, BOLTS AND NUTS, AS MANUFACTURED

BY THE THUNDERLINE CORP. OF WAYNE, MICHIGAN OR

APPROVED EQUAL. AFTER INSTALLATION, THE LINK SEAL

ASSEMBLIES AT THE WALL PENETRATIONS OF THE MANHOLE

SHALL BE COATED WITH "PRECO-PATCH" OR APPROVED EQUAL.

4000 PSI CONCRETE FILL

#4 6" EW (12' DEPTH OR LESS)

#5 5" EW (12' DEPTH OR MORE)

THE CHANNEL WIDTHS OF ALL BENCH

TROUGHS SHALL BE EQUAL TO THE

DIAMETER OF THE PIPE.

FOR "O" RING JOINTS, ASPHALTIC JOINT

COMPOUND (60-100MIL) SHALL BE BUTTERED

ON SPIGOTS AND BELLS PRIOR TO

ASSEMBLING THE MANHOLE SECTIONS.

2° TAPER

70"

6" MI

N6" 6"

4'-0" 5"

8" 2'-0" 8"

6"

2'- 6"

(M

IN

4'

-0

MA

X)

2 1 /2"

3'- 0"

(M

IN

6'

-0

MA

X)

1"

8"

12"

6" CLASS 1, NO 1 STONE COMPACTED

TO THE PROPER ELEVATION , REQUIRED

UNDER ALL MANHOLE BASES

1'- 0"

6" 6"

CONCRETE

PAVEMENT

SUB-BASE COURSE

FILL VOIDS AND LEVEL WITH

CRUSHED NO 1 STONE

1/4" SAW CUT

CONTRACTION JOINT

X X X

3"

#16 HOT DIP GALVANIZED

MASONRY HORIZONTAL

TRUSS REINFORCEMENT

SAWCUT & PATCH

EXISTING SLAB

6" MIN EMBEDMENT

ALL SIDES (TYP)

EXISTING SLAB

WELDED WIRE FABRIC

DRILL AND GROUT #4

@ 12" OC 1'-6" LONG

X

SECTION "A"-"A"

"A"

30" SQ.

5'- 0"

M

IN

TOP VIEW

"A"

NOTES:

CONCRETE: 4000 PSI @ 28 DAYS

STEEL: ASTM A496-A615 GRADE

60-60 KSI

USE KISTNER PRECAST OR

APPROVED EQUAL

6"

5" DIA

DRAIN HOLE

FRAME W/ NEENAH

R-3561 GRATE, OR

APPROVED EQUAL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

CIVIL UTILITY DETAILS 100% STAMPED FINAL

DESIGN

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

2023-06-23

CU501

528A5-20-502

ELK HMS

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

SCALE: NTS

NATURAL GAS MANIFOLD DEMOLITION1

CU101

SCALE: NTS

NATURAL GAS MANIFOLD MODIFICATION2

CU101

KEYED NOTES

1 DISCONNECT AT FACE OF METER BUILDING

2 NEW BOILER FUEL FEED ISOLATION VALVE

3 ROUTE ALONG SOUTH FACE OF METER BUILDING AND DROP TO GRADE

SCALE: NO SCALE

NEW PAVEMENT SECTION7

CS101

SCALE: NTS

GAS LINE TRENCH CROSS-SECTION4

CS101

SCALE: NTS

GAS LINE PROFILE3

CU101

SCALE: NTS

OIL WATER SEPARATOR6

CU101

SCALE: NTS

TYPICAL CONCRETE SIDEWALK DETAIL9

CS101

SCALE: NTS

PRECAST 4' MANHOLE11

CS101

CU101

SCALE: NO SCALE

NEW CONCRETE SLAB SECTION8

CS101

SCALE: NO SCALE

TYP UTILITY TRENCH IN EXISTING SLAB ON GRADE DETAIL5

CS101

SCALE: NTS

TYPICAL CATCH BASIN DETAIL10

CS101

CU101

6/23/2023

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MPS CJR

GENERAL SYMBOLS

X ROOF LEGEND KEY

X KEYED NOTE

ELE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .