528A5-20-502 Boiler Replacement_Plans_Part 2.pdf

PDF 20 MB Posted

Attached to
Z1DA--528A5-20-502 BOILER REPLACEMENT PROJECT Federal contract opportunity
Solicitation number
36C24224R0032
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document is an amendment to Solicitation #36C24224R0032 for the Z1DA--528A5-20-502 Boiler Replacement Project. The procurement has been changed from a 100% Veteran Owned Small Business (VOSB) set-aside to a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside, with the business size standard changing from $19.5M to $19M. The proposal due date has been extended from June 21, 2024, to June 28, 2024, and the site visit date has been changed from May 30, 2024, to June 6, 2024. The evaluation factor for previous similar contracts has been updated to require details of three contracts within the past 10 years, instead of 3 years. Offerors must include a copy of this amendment with their proposal.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--528A5-20-502 BOILER REPLACEMENT PROJECT, newest first.
File Type Posted
Canandaigua VAMC Boiler Plant - Final RBM Survey.pdf PDF
36C24224R0032 0009.docx DOCX document
852.219-75 VA Notice of Limitations on Subcontracting.docx DOCX document
36C24224R0032 0008.docx DOCX document
36C24224R0032 0007.docx DOCX document
36C24224R0032 0006.docx DOCX document
Attachment B.pdf PDF
Attachment A_VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition.pdf PDF
36C24224R0032 0005.docx DOCX document
Touchpoint Plus_Quick Start guide.pdf PDF
2024-06-13 Question 1 Attachments.pdf PDF
36C24224R0032 0004.docx DOCX document
Sensepoint XCD_IOM.pdf PDF
Copy of Pre-Bid RFI Questions_Encorus Response 2024-06-13.pdf PDF
touchpoint-plus-user-guide-man0996_v1_0216.pdf PDF
36C24224R0032 0003.docx DOCX document
Site Visit Sign In Sheet.pdf PDF
36C24224R0032 0002.docx DOCX document
528A5-20-502 Boiler Replacement_Plans_Part 3.pdf PDF
528A5-20-502 Boiler Replacement_Plans_Part 1.pdf PDF
528A5-20-502 Boiler Replacement_Specifications REV1.pdf PDF
S02 - Past Performance Questionnaire - Exhibit B.docx DOCX document
528A5-20-502_SOW R1_Boiler Plant Replacement.pdf PDF
36C24224R0032 0001.docx DOCX document
528A5-20-502 DESIGN BOLIER REPLACEMENT SET.pdf PDF
S02 - Contractor Projects Form.docx DOCX document
36C24224R0032.docx DOCX document
S02 - Past Performance Questionnaire.docx DOCX document
852.219-78 VA Notice of Limitations on Subcontracting.docx DOCX document
20-502 Bid Specifications.pdf PDF
013200 Construction Documentation.pdf PDF
P07 Wage Determination.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

FIRE PROTECTION NOTES AND

LEGENDS

100% STAMPED FINAL

DESIGN

FULLY SPRINKLERED

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

2023-06-23 F-001

BLDG 12

528A5-20-502

AJW CJR

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

SPRINKLER SYMBOLS

PENDANT SPRINKLER, ON DROP NIPPLE

ENDCAP

UPRIGHT SPRINKLER

SPRINKLER RISER

TOP CONNECTION, 45° OR 90°

BOTTOM CONNECTION, 45° OR 90°

CAPPED OUTLET

PENDANT SPRINKLER

UPRIGHT SPRINKLER, ELEVATION

PLUG WITH BLEEDER

GENERIC VALVE SYMBOL

UPRIGHT SPRINKLER WITH GUARD, ELEVATION

PIPE SECTION

■ ■ ■ NEW FIRE BARRIER, 1 HOUR

NEW FIRE BARRIER, 2 HOUR

3/4-HOUR FIRE-RATED DOOR

1 1/2-HOUR FIRE-RATED DOOR

S 3/4-HOUR FIRE-RATED, SMOKE-RESISTANT DOOR

■ ■ ■ EXISTING FIRE BARRIER, 1 HOUR

EXISTING FIRE BARRIER, 2 HOUR■ ■ ■ ■ ■ ■

NEW SMOKE BARRIERS

EXISTING FIRE-BARRIER, SMOKE BARRIER,1 HOUR■S ■S

EXISTING FIRE-BARRIER, SMOKE BARRIER, 2 HOUR■ ■S ■ ■S

S EXISTING SMOKE BARRIER LINE

NEW FIRE-BARRIER, SMOKE BARRIER,1 HOUR■S ■S

NEW FIRE-BARRIER, SMOKE BARRIER, 2 HOUR■ ■S ■ ■S

SMOKE AND FIRE BARRIER SYMBOLS

GENERAL PLUMBING SYMBOLS

GENERAL NOTES

1. NOTIFY CONTRACTING OFFICE REPRESENTATIVE (COR) 2 DAYS PRIOR TO PERFORMING WORK ON FIRE DETECTION OR FIRE

SUPPRESSION SYSTEMS.

2. COMMISSIONING SHALL BE COMPLETED PER SPECIFICATION 019100, 210800, AND 280800.

3. PERFORM WORK IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. INSTALL ALL EQUIPMENT PER MANUFACTURERS

INSTALLATION INSTRUCTIONS.

4. SEE THE MOST RECENT EDITION OF THE VA FIRE PROTECTION DESIGN MANUAL FOR SPECIFIC VA REQUIREMENTS.

5. ALL EQUIPMENT AND MATERIALS PROCURED FOR THIS PROJECT SHALL BE NEW. EQUIPMENT AND MATERIALS DIRECTLY RELATED TO

THE FIRE DETECTION OR SUPPRESSION SYSTEM SHALL BE UNDERWRITERS LABORATORY (UL) LISTED OR FACTORY MUTUAL (FM)

APPROVED.

6. ALL MATERIALS TO BE PURCHASED IN ACCORDANCE WITH THE BUY AMERICAN ACT.

FIRE ALARM AND DETECTION SYSTEM

1. INSTALLATION OF THE FIRE ALARM SYSTEM COMPONENTS SHALL BE IN ACCORDANCE WITH NFPA 72, NATIONAL FIRE ALARM CODE.

2. INSTALLATION OF CONDUIT AND WIRING SHALL BE IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE (NEC).

3. WIRING INSTALLED IN METAL RACEWAYS WITH THE BUILDING THAT IS PROTECTED BY AUTOMATIC SPRINKLER SYSTEM SHALL BE

CONSIDERED TO MEET THE REQUIREMENTS FOR PATHWAY SURVIVABILITY LEVEL 2 IN ACCORDANCE WITH NFPA 72.

4. IDENTIFICATION OF CONDUIT, JUNCTION BOXES AND TERMINAL CABINETS SHALL BE IN ACCORDANCE WITH THE CONTRACT

SPECIFICATIONS AND THE VA DESIGN MANUALS. ENSURE ALL COMPONENTS ARE COLORED RED PER SPECIFICATION 283100.

5. THE EXISTING SITE SYSTEM IS MANUFACTURED BY SIMPLEX. ALL NEW DEVICES SHALL BE COMPATIBLE WITH THE EXISTING SYSTEM.

6. FIRE ALARM SUBCONTRACTOR SHALL MARKUP (REDLINE) EXISTING FIRE ALARM DRAWINGS TO SHOW CHANGES AND SUBMIT

CHANGES TO THE COR.

7. SMOKE DETECTORS SHALL NOT BE INSTALLED WITHIN 3'-0" OF AN AIR SUPPLY OR RETURN VENT.

8. TESTING, ACCEPTANCE, AND COMMISSIONING: (SEE SPECIFICATIONS FOR CRITERIA)

a. TESTING OF THE FIRE ALARM DEVICES SHALL BE IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS AND NFPA 72.

b. TESTING WILL ALSO INCLUDE FUNCTION TEST OF THE SPRINKLER FLOW AND TAMPER SWITCH.

c. PROVIDE TESTING REPORTS PER NFPA 72.

d. NOTIFY COR 2 DAYS PRIOR TO PRELIMINARY TESTING.

e. NOTIFY COR 3 DAYS PRIOR TO FINAL COMMISSIONING.

SPRINKLER SYSTEM INSTALLATION

1. ALL WORK TO COMPLY WITH THE VA FIRE PROTECTION DESIGN MANUAL, NFPA 101 LIFE SAFETY CODE, AND ALL OTHER APPLICABLE

CODES ADOPTED BY THE VA. ALL EQUIPMENT AND FIXTURES SHALL BE INSTALLED PER THE MANUFACTURER'S RECOMMENDATIONS.

ALL SPRINKLER PIPING SHALL CONFORM TO NFPA 13 STANDARD FOR THE INSTALLATION OF AUTOMATIC SPRINKLER SYSTEMS.

2. THE CONTRACTOR SHALL COORDINATE PIPE ROUTINGS WITH STRUCTURE, DUCTWORK, PIPING, LIGHTS, ETC. PIPING SHALL NOT BE

INSTALLED ABOVE ELECTRICAL PANELS.

3. PROVIDE FACTORY MUTUAL (FM) APPROVED, QUICK RESPONSE SPRINKLERS IN ALL AREAS.

4. THE CONTRACTOR SHALL COORDINATE SPRINKLER HEAD LOCATIONS WITH STRUCTURE, DUCTWORK, DIFFUSERS, LIGHTS, REFLECTED CEILING PLANS, ETC.

5. WATER SUPPLY FOR ALL CONTROL VALVES SHALL BE ELECTRICALLY SUPERVISED AND MECHANICALLY LOCKED FOR PROPER

POSITION. WATER FLOW AND SUPERVISORY CIRCUITS SHALL BE IN ACCORDANCE WITH NFPA 13 STANDARD FOR THE INSTALLATION

OF AUTOMATIC SPRINKLER SYSTEMS AND NFPA 72 NATIONAL FIRE ALARM CODE.

6. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION SHALL BE FIRESTOPPED. REFER TO SPECIFICATIONS.

7. ALL PIPING TO BE PAINTED RED PER SPECIFICATION.

NAC NOTIFICATION APPLIANCE CIRCUIT

BATTERIESBATT

FSC FAN SHUTDOWN CONTROL

AHU AIR HANDLING UNIT

EOL

XX

END OF LINE DEVICE

XX=TYPE: R=RESISTOR

FIRE ALARM EQUIPMENT

PANELS/CABINETS/MISC DEVICES

FACP

FACC

FAA

OPA

FIRE ALARM CONTROL PANEL

FIRE ALARM CENTRAL CONSOLE

FIRE ALARM MASTER CONTROL UNIT

FIRE ALARM ANNUNCIATOR

OPERATOR STATION

UPS UNINTERRUPTIBLE POWER SUPPLY

MFACU

PRN PRINTER

MIC MICROPHONE

FACU FIRE ALARM CONTROL UNIT

FATC FIRE ALARM TERMINAL CABINET

CARBON MONOXIDE DETECTOR

E=EXISTING

FIRE PROTECTION MISC SYMBOLS

COMBINATION SPEAKER/VISIBLE

C=CEILING MOUNT

CD = CANDELA RATING

W = SPEAKER WATTAGE

CD

W

DUCT SMOKE DETECTOR

P = PHOTOELECTRIC

WP = WEATHERPROOF

S P/WP

ALARM, SPEAKER ONLY

X LETTER INDICATES AS FOLLOWS:

C=CEILING MOUNTED

W=WATTAGE

XX LETTER INDICATES AS FOLLOWS:

WP = WEATHERPROOF

X

XX

S

ADDRESSABLE INPUT MODULE

2 = DUAL INPUTAIM

WF FLOW DETECTOR SWITCH

AOM ADDRESSABLE ALARM OUTPUT MODULE

FIRE EXTINGUISHER - CLEAN AGENT

FIRE DAMPER

S

SMOKE DAMPER

SPD

TSS

LOW TEMPERATURE SWITCH

(AMBIENT AIR TEMPERATURE)

SURGE PROTECTION DEVICE

GENERAL SYMBOLS

DEMOLISH/REMOVE DEVICE

GENERAL LINETYPES

DEMOLITION LINE

ROOM NAME AND NUMBERC2

CORRIDOR

ELECTRICAL ABBREVIATIONS

VOICE EVACUATION CONTROL UNIT

LCD LCD ANNUNCIATOR/DISPLAY

EVAC

WCU WIRELESS CONTROL UNIT

FIBER OPTIC/RUI LINEFO

DATA/COMMUNICATION LINECOMM

ECCU EMERGENCY COMMUNICATION CONTROL UNIT

BLDG BUILDING

CORR CORRIDOR

DEMO DEMOLITION

DWG DRAWING

ELEC ELECTRIC

EMER EMERGENCY

ENCL ENCLOSURE

EQUIP EQUIPMENT

FO FIBER OPTIC

FP FIRE PROTECTION

J-BOX JUNCTION BOX

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

N NORTH

NA NOT APPLICABLE

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

OCC OCCUPY

OFF OFFICE

OPNG OPENING

OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

RM ROOM

TYP TYPICAL

TTB TELEPHONE TERMINAL BOARD

VALVE SUPERVISORY SWITCH

H

FIRE SERVICE OR EMERGENCY PHONE STATION

H=HANDSET

ALARM, FIRE, MANUAL PULL STATION

E=EXISTING

F

TRN FIRE ALARM TRANSPONDER

VS

DETECTOR, SMOKE;

X LETTER INDICATES AS FOLLOWS:

H=HEAT SMOKE

I=IONIZATION SMOKE

P=PHOTOELECTRIC SMOKE

IH=IONIZATION AND HEAT SMOKE

IP=IONIZATION AND PHOTOELECTRIC SMOKE

PH=PHOTOELECTRIC AND HEAT SMOKE

IPH=IONIZATION, PHOTOELECTRIC, AND HEAT

XX LETTER INDICATES AS FOLLOWS:

SB=SOUNDER BASE

SL=STROBE LIGHT

WET CHEMICAL SYSTEMWC

H

F

R/F

DETECTOR, HEAT

R/F=COMBINATION RATE OF RISE/FIXED TEMPERATURE

DETECTOR, HEAT

F=FIXED TEMPERATURE

SPD SURGE PROTECTION DEVICE

T

CU

TELEPHONE

ELECTRICAL COPPER

3-WAY VALVE

OS&Y VALVE

REDUCED PRESSURE ZONE RPZ

(INDICATE IF IT IS A DETECTOR TYPE)

ANGLE VALVE

ALARM CHECK VALVE

ALARM, WET CHEMICAL MANUAL PULL STATION

E=EXISTING

WC

POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

LIMIT OF DEMOLITION

SMOKE DETECTOR/ HEAT DETECTOR COMBINATIONH

X

S

S

XX

SINGLE FIRE DEPARTMENT CONNECTION

DH DOOR HOLDER

CD

CD

VISIBILITY ONLY (STROBE) - CEILING MOUNT

CD = CANDELA RATING

VISIBILITY ONLY (STROBE) - WALL MOUNT

CD = CANDELA RATING

PHASE CALLOUT# SYSTEM DESIGNATIONS & HAZARD CLASSIFICATIONS

ROOMS/ AREAS SYSTEM TYPE CODE HAZARD

CATEGORY

DESIGN AREA COVERAGE/

SPRINKLER

DESIGN

DENSITY

HOSE

STREAM

ALL AREAS WET-PIPE NFPA 13 ORDINARY HAZARD

GROUP 2

1500 SQFT 130 SQFT 0.20 GPM/SQFT 250 GPM

6/23/2023

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

CO

AutoCAD SHX Text X

FF

HS

R

F

F

F

F

VS

VS

VS

VS

VS

VSVS

F

F

VS

F

VS VS VS VS VS VS VS VS VS

VS VS VS VS VS VS VS

F A

TC

.1

4009.2

AIM

H

H

H H

AIM

AIM

AIM

AIM

AIMAIM

AIM

AIM

AIM

AIM AIM AIM AIM AIM AIM AIM AIM AIM

AIM AIM AIM AIM AIM AIM AIM AIM AIM

WF LA

AIM

FIRE PUMP

RUNNING

AIM

LOSS OF

PHASE

AIM

PHASE

REVERSAL

AIM

CONTROLLER

CONNECTED TO

ALTERNATE SOURCEFIRE PUMP

A

LT

R

AIM

MLKJHGFEDCBA

7.1

THREE VALVE SUPERVISORY

SWITCHES REMAIN TO INDICATE

THE FIRE HOSE SUPPLY SHUFOFF,

WET-PIPE SHUTOFF, AND THE DRY-

PIPE TO BE CONVERTED TO WET-

PIPE SHUTOFF VALVES

4.4

XX

X

X

X

X

X

JOCKEY PUMP CONTROLLER

FIRE PUMP CONTROLLER

X

X X

ELECTRICAL

ROOM

CONTROL

ROOM

TOILET

CHEMICAL

STORAGE

FIRE PUMP

ROOM

FUEL

BUNKER

EXISTING

BUILDING 12

BOILER PLANT

TWO VALVE SUPERVISORY

SWITCHES REMAIN WITH

BACKFLOW PREVENTER

ISOLATION VALVES

X X

X

X

X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CONSULTANT

321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot

6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

100% STAMPED FINAL

DESIGN

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

528A5-20-502

2023-06-23

FD101

FIRE PROTECTION DEMOLITION PLAN

BLDG 12

AJW DGA

FULLY SPRINKLERED

KEYPLAN

B12

B11

PARKING

N

SCALE: 1/8" = 1'-0"1

FIRE PROTECTION DEMOLITION PLAN - UPPER LEVEL

GENERAL NOTES

1. SEE F-001 FOE F-SERIES NOTES AND LEGENDS.

2. ALL FIRE PROTECTION DEMOLITION SHALL BE DONE IN COORDINATION WITH

PHASING DRAWINGS.

3. PRIOR TO REMOVAL OF THE FIRE PUMP, THE CONTRACTOR SHALL OBTAIN

UPDATED HYDRANT FLOW TEST DATA AND PROVIDE THE REQUIRED SHOP

DRAWING AND HYDRAULIC CALCULATION SUBMITTALS, PROVING THE WATER

SUPPLY IS ADEQUATE WITHOUT THE FIRE PUMP.

4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #

N

KEYED NOTES

1 REMOVE DELUGE SYSTEM. THIS INCLUDES ALL PIPES (250-350 FEET), NOZZLES,

AND DELUGE VALVE BACK TO FIRE PROTECTION RISER HEADER IN FIRE PUMP

ROOM. THIS ALSO INCLUDES HEAT DETECTION WIRE AND ASSOCIATED DEVICES.

CAP PIPE ABOVE SHUTOFF VALVE.

2 REMOVE ASH CONVEYOR SPRINKLERS AND PIPE BACK TO MAIN PIPE IN PUMP

ROOM AND CAP.

3 FIRE PUMP, JOCKEY PUMP, AND ALL ASSOCIATED CONTROLLERS, DEVICES, AND

PIPING TO BE REMOVED.

4 ALL FIRE ALARM DEVICES, CONDUIT, AND ASSOCIATED WIRING IN EXISTING

BOILER PLANT BETWEEN COLUMN LINES A AND D TO BE REMOVED BACK TO FATC

IN HALLWAY TO NORTH OF ROOM.

5 DRY-PIPE SYSTEM BRANCH PIPE PROTECTING AUGER BIN AREA TO BE REMOVED

BACK TO MAIN PIPE.

6 REMOVE INSPECTOR TEST PORT AND PATCH PENETRATION THROUGH EXTERIOR

WALL.

7 RELOCATE FIRE HOSE CABINET, VALVE, AND TAMPER SWITCH PER FX101.

8 REMOVE FIRE PUMP TEST HEADER AND NOZZLES. PATCH WALL TO MATCH

EXISTING.

9 VERIFY EXTENTS OF PREVIOUS DEMO, AND REMOVE PIPING AS NEEDED TO VIABLE

CONNECTION POINT FOR NEW PIPING AS SHOWN ON FX DRAWINGS.

Revisions: Date: 6/23/2023

NACALTR:V4

ALTR:V4-1

BLD

G 12

FUEL B

UNKER

NACALTR:V4

V

NAC ALTR:V3

ALTR:V3-1

BLD

G 12

FUEL B

UNKER

NAC ALTR:V3

V

H

ALTR:V3-2

BLD

G 12

FUEL B

UNKER

EP

NAC ALTR:V2

ALTR:V2-1

BLD

G 12

FUEL B

UNKER

NAC ALTR:V2

V

H

ALTR:V2-2

BLD

G 12

FUEL B

UNKER

EP

NAC ALTR:V1

ALTR:V1-1

BLD

G 12

FUEL B

UNKER

NAC ALTR:V1

V

H

ALTR:V1-2

BLD

G 12

FUEL B

UNKER

EP

ALTR

HALLWAY Z

NAC NAC2:V3

NAC2:V

3-1

BLD

G 12

FUEL B

UNKER

NAC NAC2:V3

V

V

M

4009:2

ELECTRICAL RM

NAC1:V4

NAC1:V

3-8

BLD

G 12

COGEN AREA

NAC1:V3

V

NAC1:V

3-9

BLD

G 12

COGEN AREA

NAC1:V

4-9

BLD

G 12

COGEN AREA

NAC1:V

4-8

BLD

G 12

COGEN AREA

NAC1:V

4-1

BLD

G 12

COGEN AREA

COGEN AREA

M

V

NAC1:V

4-7

BLD

G 12

W

ORK AREA

NAC1:V

4-6

BLD

G 12

W

ORK AREA

15 1W 30 1W 75 1W 75 15

NAC1:V

4-2

BLD

G 12

ELE

CTRICAL R

OOM

NAC1:V

4-5

BLD

G 12

W

ORK AREA

NAC1:V

4-4

BLD

G 12

W

ORK AREA

NAC1:V

4-3

BLD

G 12

W

ORK AREA

0.5W

NAC1:V

4-1

BLD

G 12

ELE

CTRICAL R

OOM

NAC NAC1:V4

V

S

EXISTING

4009:1

HALLWAY

0.5W

0.5W 30 1W 75

NAC1:V

3-7

BLD

G 12

BY STAIRS

NAC1:V

3-6

BLD

G 12

FIRE PUMP ROOM

NAC1:V

3-5

BLD

G 12

W

ORK AREA

0.5W

NAC1:V

3-4

BLD

G 12

CONTROL R

OOM

NAC1:V

3-3

BLD

G 12

CONTROL R

OOM

NAC1:V

3-2

BLD

G 12

TOILE

T

1W 75

NAC1:V

3-1

BLD

G 12

W

ORK AREA

S

M

2M

NAC NAC1:V3

V

EXISTING

FACP

BLDG 16

AIM F AIM F F F F AIM AIM SRP

VS VS VS MS

VZZZZM

IDNET - M1

V

V

CS

V

M1-1

BLD

G 12

HALLW

AY

BY NAC PANELS M1-2

BLD

G 12

HALLW

AY

BY NAC PANELS M1-1

BLD

G 12

ELE

CTRICAL R

OOM M1-1

BLD

G 12

ELE

CTRICAL R

OOM M1-1

BLD

G 12

ELE

CTRICAL R

OOM M1-1

BLD

G 12

ELE

CTRICAL R

OOM M1-1

BLD

G 12

W

ORK FLO

OR M1-1

BLD

G 12

W

ORK FLO

OR M1-1

BLD

G 12

W

ORK FLO

OR M1-1

BLD

G 12

CONTROL R

OOM M1-1

BLD

G 12

CONTROL R

OOM M1-1

BLD

G 12

CONTROL R

OOM M1-1

BLD

G 12

W

ORK ROOM

HOSE CABINET M1-1

BLD

G 12

W

ORK ROOM

HOSE CABINET

NAC2: V

1-1 M

1-1

BLD

G 12

FIRE PUMP ROOM

SUPPRESSON RELE

ASE PANEL

AIM

VS

Z

M1-1

BLD

G 12

DELU

GE

TAMPER SWITCH

AIM

PS

Z

M1-1

BLD

G 12

DELU

GE

PRESSURE SWITCH

AIM

WF

Z

M1-1

BLD

G 12

FIRE PUMP ROOM

AIM

LA

Z

M1-1

BLD

G 12

FIRE PUMP ROOM

AIM

PS

Z

M1-1

BLD

G 12

FIRE PUMP ROOM

AIM

VS

Z

M1-1

BLD

G 12

FIRE PUMP ROOM

AIM

VS

Z

M1-1

BLD

G 12

FIRE PUMP ROOM

AIM

VS

Z

M1-1

BLD

G 12

FIRE PUMP ROOM

AIM

VS

Z

M1-1

BLD

G 12

FIRE PUMP ROOM

AIM

VS

Z

M1-1

BLD

G 12

FIRE PUMP ROOM

AIM

VS

Z

M1-1

BLD

G 12

FIRE PUMP ROOM

AIM

VS

Z

M1-1

BLD

G 12

FIRE PUMP ROOM

AIM

VS

Z

M1-1

BLD

G 12

FIRE PUMP ROOM

AIM

VS

Z

M1-1

BLD

G 12

FIRE PUMP ROOM

AIM

VS

Z

M1-1

BLD

G 12

FIRE PUMP ROOM

F

M1-2

BLD

G 12

STAIR

AREA

AIM

VS

Z

M1-2

BLD

G 12

FUEL B

UNKER HOSE

CABINET

F

M1-2

BLD

G 12

F FUEL B

UNKER

AIM

M1-2

BLD

G 12

FUEL B

UNKER EP

PULL

AIM

M1:2

BLD

G 12

FUEL B

UNKER EP

PULL

ISB

FEP FEP

ZZ

AIM

VS

Z

M1-1

BLD

G 12

FIRE

PUMP ROOM

AIM

VS

Z

M1-1

BLD

G 12

FIRE PUMP ROOM

AIM

VS

Z

M1-1

BLD

G 12

FIRE PUMP ROOM

AIM

VS

Z

M1-1

BLD

G 12

FIRE PUMP ROOM

AIM

VS

Z

M1-1

BLD

G 12

FIRE PUMP ROOM

AIM

Z

M1-1

BLD

G 12

FIRE PUMP RUNNING

FIRE PUMP

RUNNING

AIM

Z

M1-2

BLD

G 12

LO

SS OF PHASE

LOSS OF

PHASE

AIM

Z

M1-2

BLD

G 12

CONTROLLE

R

CONNECTED TO

ALTERNATE SOURCE

AIM

Z

M1-2

BLD

G 12

PHASE REVERSAL

CONTROLLER

CONNECTED TO

ALTERNATE SOURCE

AIM

VS

Z

M1-2

BLD

G 12

STAIR AREA HOSE

CABINET

AIM

VS

Z

M1-2

BLD

G 12

STAIR AREA TAMPER

SWITCH

AIM

WF

Z

M1-2

BLD

G 12

STAIR AREA W

ATER

FLO

W

BUILDING 12

BUILDING 16

BUILDING 12

BUILDING 16

2M

120 VOLT AC

PHASE

REVERSAL

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K EOL

R6.8K EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R10K

EOL

R10K

EOL

R10K

EOL

R10K

EOL

R10K

EOL

R10K

EOL

R10K

EOL

R10K

EOL

R10K

EOL

R10K

HS H

AJW RJB

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

GENERAL NOTES

1. SEE F-001 FOR F- SERIES NOTES AND LEGENDS.

2. DEVICES ARE TYPICAL SEE FLOOR PLAN FOR QUANTITY AND LOCATIONS.

3. EXPLOSION PROOF DEVICES ARE TO BE REMOVED AND REPLACED WITH STANDARD DEVICES.

SEE FA601 FOR PROPOSED NEW RISER.

4.

THIS DRAWING, ALONG WITH DEVICE NUMBERING HAS BEEN CREATED THROUGH THE USE OF

SUBMITTED AS-BUILTS FROM A PREVIOUS PROJECT COMBINED WITH ENGINEERING SITE VISITS.

FIRE ALARM CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO WORK ON THE

SYSTEM.

KEYED NOTES

1 DEVICES WERE NOT IDENTIFIED IN ENGINEERING INVESTIGATIONS. CONTRACTOR SHALL

IDENTIFY LOCATION AND PURPOSE OF THESE ITEMS, AND IF NECESSARY PROVIDE A REQUEST

FOR INFORMATION ON WHAT IS TO BE DONE WITH THE DEVICE.

2 DEVICE REMOVED DURING BOILER REMOVAL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

FIRE ALARM DEMOLITION RISER

DIAGRAM

100% STAMPED FINAL

DESIGN

FULLY SPRINKLERED

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

2023-06-23

FD601

BLDG 12

528A5-20-502

6/23/2023

AutoCAD SHX Text

EP

AutoCAD SHX Text

EP

AutoCAD SHX Text

EP

AutoCAD SHX Text

EP

AutoCAD SHX Text

EP

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

T

MLKJHGF

EDCBA

7.1

1"ø

1"ø

1"ø

1"ø 1"ø

2" DOWN FROM

CEILING LEVEL

EXISTING 2" DOWN FROM

CEILING WITH 1"

AUXILARY DRAIN

2" ø

1/

2" ø

1/

2" ø

1" ø

ELECTRICAL ROOM

A103

BOILER ROOM

A102

GENERATOR

A112

MEN

A107

WOMEN

A108

JANITOR

A109

STAIRS

A111

UTILITY ROOM

A106

CONTROL ROOM

A105

4.4

12-A102-BLR-001

FIRETUBE

BOILER

12-A102-BLR-002

FIRETUBE

BOILER

12-A102-BLR-003

FIRETUBE

BOILER

STORAGE

A101

2"ø

1"ø

FROM UPPER

LEVEL WITH

AUXILIARY DRAIN

FROM

UPPER LEVEL

WITH AUXILIARY

DRAIN

FROM UPPER

LEVEL WITH

AUXILIARY DRAIN

1 1/4"ø

1" ø

1"ø 1"ø

1" ø

1" ø

1"ø 2"ø1" ø 1" ø

1" ø

1" ø

1" ø

1" ø

1 1/2"ø1"ø

2"ø

1"ø1"ø

1 1/2"ø

1"ø1"ø

2" ø

2" ø

2" ø

EXISTING 4" UP TO

BOILER PLANT AND

SHOP SPRINKLERS

4" UP TO STORAGE

AREA SPRINKLERS

1 1/2" DROP

FROM ABOVE

EXISTING FIRE

HOSE CABINET

EXISTING FIRE

HOSE CABINET

2" TEE DOWN

RELOCATE FIRE HOSE

CABINET, ASSOCIATED

PIPING AND SHUFF OFF

VALVE TO THIS LOCATION

EXISTING FIRE

HOSE CABINET

FX501

1"ø 1"ø

1"ø 1"ø

1"ø FROM

UPPER LEVEL

1"ø

1"ø

1 1/4"ø FROM

UPPER LEVEL

3" PASSING THROUGH

TO STORAGE A001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CONSULTANT

321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot

6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

100% STAMPED FINAL

DESIGN

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

528A5-20-502

2023-06-23

FX101

FIRE SPRINKLER PLAN - LOWER

LEVEL BLDG 12

AJW DGA

FULLY SPRINKLERED

KEYPLAN

B12

B11

PARKING

N

SCALE: 1/8" = 1'-0"1

FIRE PROTECTION SPRINKLER PLAN - LOWER LEVEL

N

GENERAL NOTES

1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #

6" PIPE ROUTED OVER HEAD

TO RISER HEADER INLET

KEYED NOTES

1 PROVIDE SPRINKLERS UNDERNEATH CATWALKS. SPRINKLER TO HAVE WATER

SHIELD, AND GUARD IF HEAD IS LOCATED AT AN ELEVATION OF 7'-6" OR LESS.

2 PROVIDE SPRINKLERS UNDERNEATH VESSELS. SPRINKLERS TO HAVE WATER

SHIELD, AND GUARD IF HEAD IS LOCATED AT AN ELEVATION OF 7'-6" OR LESS.

3 INSTALL INSPECTORS TEST CONNECTION IN OPENING TO BE PATCHED BETWEEN

COLUMN LINES G AND H.

VS

VS

VS

VS

VS

VS VS VS VS

VS

AIM

WF

F A

TC

.1

4009.2

AIM

AIM

AIM

AIM

AIM

AIM AIM AIM AIM

AIM AIM

WF

DH

F A T C

FF

F

F

F

F

F

DH

S

P/WP

MLKJHGFEDCBA

7.1

8 8

FLASH TANK

ECONOMIZER

BLOWDOWN

SEPERATOR

UTILITY ROOM

A106

CONTROL ROOM

A105

STAIRS

A111

BOILER ROOM

A102

STORAGE

A101

JANITOR

A109

MEN

A107

WOMEN

A108

ELECTRICAL ROOM

A103

4.4

GENERATOR

SURGE TANK

DEAERATOR

WATER

SOFTNER

CHEMICAL

FEED SYSTEM

WORKSHOP

B101

EXISTING PULL BOX

FROM BUILDING 16 FACP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CONSULTANT

321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot

6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

100% STAMPED FINAL

DESIGN

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

528A5-20-502

2023-06-23

FA101

FIRE ALARM PLAN - LOWER LEVEL

BLDG 12

AJW DGA

FULLY SPRINKLERED

KEYPLAN

B12

B11

PARKING

N

SCALE: 1/8" = 1'-0"1

FIRE ALARM PLAN - LOWER LEVEL

N

GENERAL NOTES

1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #

KEYED NOTES

1 RELOCATE PULL STATION AND CONDUIT TO FACE OF COLUMN TO MAKE ROOM

FOR DOUBLE DOOR.

2 RELOCATE TAMPER SWITCH TO SUPPORT RELOCATION OF FIRE HOSE CABINET.

3 DUCT SMOKE DETECTOR INSTALLED FOR RTU LOCATED ON ROOF.

MLKJ

7.1

4.4

STORAGE

A001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CONSULTANT

321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot

6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

100% STAMPED FINAL

DESIGN

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

528A5-20-502

2023-06-23

FA102

FIRE ALARM PLAN - PIT LEVEL

BLDG 12

AJW DGA

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"1

FIRE PROTECTION ALARM PLAN - PIT LEVEL

KEYPLAN

B12

B11

PARKING

N

N

1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.

GENERAL NOTES

EXISTING

4009:2

ELECTRICAL RM

NAC1:V4

10K

NAC1:V

3-8

BLD

G 12

BOILE

R ROOM

NAC1:V3

NAC1:V

3-9

BLD

G 12

BOILE

R ROOM

NAC1:V

4-9

BLD

G 12

BOILE

R ROOM

NAC1:V

4-8

BLD

G 12

BOILE

R ROOM

NAC1:V

4-7

BLD

G 12

BOILE

R ROOM

NAC1:V

4-6

BLD

G 12

BOILE

R ROOM

15 1W 30 1W 75 1W 75 15

NAC1:V

4-2

BLD

G 12

ELE

CTRICAL R

OOM

NAC1:V

4-5

BLD

G 12

BOILE

R ROOM

NAC1:V

4-4

BLD

G 12

BOILE

R ROOM

NAC1:V

4-3

BLD

G 12

BOILE

R ROOM

0.5W

NAC1:V

4-1

BLD

G 12

ELE

CTRICAL R

OOM

NAC NAC1:V4

EXISTING

4009:1

HALLWAY

0.5W

0.5W 30 1W 75

NAC1:V

3-7

BLD

G 12

BY STAIRS

NAC1:V

3-6

BLD

G 12

UTILIT

Y ROOM

NAC1:V

3-5

BLD

G 12

BOILE

R ROOM

0.5W

NAC1:V

3-4

BLD

G 12

CONTROL R

OOM

NAC1:V

3-3

BLD

G 12

CONTROL R

OOM

NAC1:V

3-2

BLD

G 12

TOILE

T

1W 75

NAC1:V

3-1

BLD

G 12

BOILE

R ROOM

NAC NAC1:V3

EXISTING

FACP

BLDG 16

F AIM F F F F AIM AIM

VS VS VS

M1-1

BLD

G 12

ELE

CTRICAL R

OOM M1-1

BLD

G 12

ELE

CTRICAL R

OOM M1-1

BLD

G 12

W

ORK FLO

OR M1-1

BLD

G 12

W

ORK FLO

OR M1-1

BLD

G 12

W

ORK FLO

OR M1-1

BLD

G 12

CONTROL R

OOM M1-1

BLD

G 12

W

ORK ROOM

HOSE CABINET M1-1

BLD

G 12

W

ORK ROOM

HOSE CABINET

AIM

WF

M1-1

BLD

G 12

UTILIT

Y ROOM

AIM

VS

M1-1

BLD

G 12

UTILIT

Y ROOM

AIM

VS

M1-1

BLD

G 12

UTILIT

Y ROOM

AIM

VS

M1-1

BLD

G 12

UTILIT

Y ROOM

F

M1-2

BLD

G 12

STAIR

AREA

AIM

VS

M1-2

BLD

G 12

STORAGE HOSE

CABINET

F

M1-2

BLD

G 12

PIT AREA

AIM

VS

M1-1

BLD

G 12

UTILIT

Y ROOM

AIM

VS

M1-1

BLD

G 12

UTILIT

Y ROOM

AIM

VS

M1-1

BLD

G 12

UTILIT

Y ROOM

AIM

VS

M1-2

BLD

G 12

STAIR AREA HOSE

CABINET

AIM

WF

M1-2

BLD

G 12

STAIR AREA W

ATER

FLO

W

BUILDING 12

BUILDING 16

BUILDING 12

BUILDING 16

120 VOLT AC

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R6.8K

EOL

R10K

EOL

R10K

EOL

EOL

R10K

EOL

EOL

F F

AOM

DH

DH

AIM

WF

BLD

G 12

UTILIT

Y ROOM

EOL

R6.8K

ROOM A101

ROOMS A107

AND A108 ROOMS A001 AND A101

ROOMS B101

F

S P

M1-1

BLD

G 12

TOILE

T

ROOM A001

2 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

FIRE ALARM RISER DIAGRAM 100% STAMPED FINAL

DESIGN

FULLY SPRINKLERED

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

2023-06-23

FA601

BLDG 12

528A5-20-502

BEH CJR

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

GENERAL NOTES

1. SEE F-001 FOR F- SERIES NOTES AND LEGENDS.

2.

RISER IS A DIAGRAMMATICAL REPRESENTATION OF THE SYSTEM ARCHITECTURE. IT IS NOT

INTENDED TO ROPRESENT ACTUAL WIRE RUNS OR PANEL PENETRATIONS. REFER TO FLOOR

PLANS AND PANEL DETAILS FOR CIRCUIT ROUTING INFORMATION.

3. ALL WIRING SHALL COMPLY WITH NFPA 70 ARTICLE 760 POWE LIMITED SYSTEMS. SEE FA-002

FOR WIRE SCHEDULE.

4.

THIS DRAWING, ALONG WITH DEVICE NUMBERING HAS BEEN CREATED THROUGH THE USE OF

SUBMITTED AS-BUILTS FROM A PREVIOUS PROJECT COMBINED WITH ENGINEERING SITE VISITS.

IT INCLUDES BASIC DESIGN AND DEVICE LAYOUT. FIRE ALARM CONTRACTOR SHALL VERIFY

EXISTING CONDITIONS PRIOR TO WORK ON THE SYSTEM AND PROVIDE AS-BUILTS AT THE END

OF THE PROJECT.

KEYED NOTES

1 M1-205 WATER FLOW SWITCH AND M1-198 VALVE SUPERVISORY SWITCH WERE NOT IDENTIFIED

IN ENGINEERING INVESTIGATIONS. CONTRACTOR SHALL IDENTIFY AND PROVIDE AN RFI ON

WHAT IS TO BE DONE WITH THESE DEVICES. CONTRACTOR TO PROVIDE AS-BUILTS FOR ANY

CHANGES MADE.

2 CONTRACTOR TO REWORK CONDUIT AND WIRING AS NEEDED TO ACCOUNT FOR REMOVED

DEVICES.

3 CONTRACTOR TO EVALUATE NAC EXTENDER CAPACITIES AND CONFIGURATIONS AND

DETERMINE THE BEST CONFIGURATIONS TO SUPPORT SYSTEM MODIFICATIONS.

FIRE ALARM SYSTEM

INPUT OUTPUT MATRIX

INPUT OU

TP

UT

AC

TU

AT

E

CO

MM

ON

AL

AR

M

SI

GN

AL

IN

DI

CA

TO

R

AC

TU

AT

E

AU

DI

BL

E

AL

AR

M

SI

GN

AL

AC

TU

AT

E

CO

MM

ON

SU

PE

RV

IS

OR

Y

SI

GN

AL

IN

DI

CA

TO

R

AC

TU

AT

E

AU

DI

BL

E

SU

PE

RV

IS

OR

Y

SI

GN

AL

AC

TU

AT

E

CO

MM

ON

TR

OU

BL

E

SI

GN

AL

IN

DI

CA

TO

R

AC

TU

AT

E

AU

DI

BL

E

TR

OU

BL

E

SI

GN

AL

AC

TU

AT

E

AP

PR

OP

RI

AT

E

LO

CA

TI

ON

IN

DI

CA

TO

R

AC

TU

AT

E

AL

L

AU

DI

BL

E

EV

AC

UA

TI

ON

SI

GN

AL

S

AC

TU

AT

E

AL

L

VI

SI

BL

E

EV

AC

UA

TI

ON

SI

GN

AL

S

DI

SP

LA

Y

CH

AN

GE

OF

S

TA

TU

S

TR

AN

SM

IT

A

LA

RM

SI

GN

AL

T O

SU

PE

RV

IS

IN

G

ST

AT

IO

N

TR

AN

SM

IT

S

UP

V.

SI

GN

AL

T O

SU

PE

RV

IS

IN

G

ST

AT

IO

N

TR

AN

SM

IT

TR

OU

BL

E

SI

GN

AL

TO

S

UP

ER

VI

SI

NG

ST

AT

IO

N

DE

VI

CE

A

CT

IV

AT

IO

N

MANUAL PULL STATION X X X X X X X

HEAT SENSOR/DETECTOR X X X X X X X

WATERFLOW SWITCH X X X X X X X

TAMPER SWITCH

X X X X X

FIRE ALARM AC POWER FAILURE

X X X X

FIRE ALARM SYSTEM LOW BETTERY

X X X X

OPEN CIRCUIT OR GROUND FAULT X X X X

CLASS B NOTIFICATION CIRCUIT (NAC) - SHORT X X X X

1. SEE SPECIFICATION 28 31 00 "FIRE DETECTION AND ALARM" FOR ADDITIONAL INFORMATION.

2. CAMPUS CENTRAL MONITORING IN BUILDING 37 AUTOMATICALLY NOTIFED UPON ANY ALARM CONDITION

6/23/2023

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MLKJHGF

EDCBA

7.1

4" UP FROM RISER IN FIRE

PUMP ROOM

4" UP FROM RISER IN FIRE

PUMP ROOM (EXISTING)

1 1/2" DOWN TO

HOSE CABINET

(EXISTING)

2" DROP TO

ELECTRICAL

ROOM WITH 1"

AUXILARY DRAIN

(EXISTING)

1 1/2" DOWN TO

HOSE CABINET

(EXISTING)

2 1/2" FROM HOSE

SUPPLY RISER IN FIRE

PUMP ROOM (EXISTING)

1 1/2" DOWN TO

HOSE CABINET

4.4

4"ø

1/

2" ø

3" ø

1"ø

3" ø

DOWN TO

LOWER LEVEL

1"ø

2"ø

DOWN TO

LOWER LEVEL

DOWN TO

LOWER LEVEL

2"ø

1"ø1"ø1"ø

1"ø

1"ø

1"ø

1"ø 1"ø

1"ø 1"ø

1"ø1"ø

1"ø 1"ø 1"ø

1"ø 1"ø 1"ø

1"ø1"ø 1"ø

1"ø1"ø1"ø

1"ø 1"ø

1"ø 1 1/4"ø

1" ø

1" ø

2" ø

1/

2" ø

3" ø

1/

2" ø

1/

2" ø

1/

2" ø

1/

2" ø

2" ø

2 1/2"ø

1"ø

2" DOWN TO

CONTROL ROOM

(EXISTING)

1" DOWN TO

INSPECTION TEST

CONNECTION

1 1/4"øDOWN TO

LOWER LEVEL

1"ø DOWN TO

LOWER PLATFORM

DOWN TO

LOWER

PLATFORM

1"ø

1" DOWN TO

LOWER LEVEL

3" DOWN TO

STORAGE A001

4"ø 4"ø 4"ø

2" ø

2" ø

2" ø

2" ø 2" ø

1"ø

1" ø

2" ø

2" ø

2" ø

2" ø

2" ø

2" ø

2" ø

2" ø

2" ø

1/

2" ø

2" ø

2" ø

1/

2" ø

1/

2" ø

1"ø

3"ø

2 1/2"ø 2 1/2"ø 2 1/2"ø 2"ø 1 1/2"ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

4"ø

1" ø

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CONSULTANT

321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot

6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

100% STAMPED FINAL

DESIGN

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

528A5-20-502

2023-06-23

FX102

FIRE SPRINKLER PLAN - UPPER

LEVEL BLDG 12

AJW DGA

FULLY SPRINKLERED

KEYPLAN

B12

B11

PARKING

N

SCALE: 1/8" = 1'-0"1

FIRE PROTECTION SPRINKLER PLAN - UPPER LEVEL

N

GENERAL NOTES

1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #

KEYED NOTES

1 RECONNECT 1-1/2" PIPE FOR HOSE CABINET SUPPLY.

MLKJ

7.1

1"ø

1"ø

1"ø

1"ø

1"ø 1"ø

1"ø

1"ø

1"ø

1" ø

1/

2" ø

2" ø

2" ø

2" FROM ABOVE WITH

1" AUXILARY DRAIN

2" ø

4.4

3" FROM UPPER

LEVEL WITH

AUXILIARY DRAIN

2 1/2"ø1" ø

1" ø 1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

2 1/2"ø 2"ø 1 1/2"ø

1"ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

1" ø

STORAGE

A001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CONSULTANT

321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot

6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

100% STAMPED FINAL

DESIGN

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

528A5-20-502

2023-06-23

FX103

FIRE SPRINKLER PLAN - PIT LEVEL

BLDG 12

AJW CCW

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"1

FIRE PROTECTION SPRINKLER PLAN - PIT LEVEL

GENERAL NOTES

1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #

KEYPLAN

B12

B11

PARKING

N

N

1" PIPE

SPLIT PIPE CLAMP WITH

STANDOFF

SMOOTH BORE

CORROSION-RESISTANT OUTLET

GIVING FLOW EQUIVALENT TO

ONE SPRINKLER

SPLASH BLOCK

FINISHED FLOOR

PIPE

HANGER

TEST VALVE IN

READILY ACCESSIBLE

LOCATION

(NORMALLY CLOSED)

A S

R E

Q U

IR

E

D 2"

-1 2"

CEILING

1" SCHEDULE 40 PIPE

REDUCING BUSHING

AS REQUIRED

REDUCING FITTING

UPRIGHT

SPRINKLER HEAD

S E

E N

O

TE

NOTES:

1 - ANY SPRIGS EXCEEDING 4 FT SHALL BE RESTRAINED AGAINST LATERAL MOVEMENT,

NFPA 13.

NOTE:

APPLICABLE TO PENETRATIONS OF ALL FIRE

RATED MEMBRANES, IN ACCORDANCE WITH NFPA

101. REFER TO SPECIFICATIONS SECTION 07 84 00,

FIRE STOPPING SYSTEMS.FLOOR OR DECK PENETRATION

PARTITION OR CHASE PENETRATION

DRYWALL

PARTITION

PARTITION SUPPORT

FIRESTOP MATERIAL

MASONRY PARTITION

FLOOR

FIRESTOP MATERIAL

3/8" FLUSH ANCHOR

3/8" DIA HANGER ROD

ADJUSTABLE CLEVIS HANGER

PER NFPA 13, CHAPTER 9

NOTES:

SEE SPECIFICATION AND

NFPA 13, CHAPTER 9

FOR HANGER REQUIREMENTS

3/8" NUT AND WASHER

BEAM CLAMP HANGER

NOTE: APPROVED FLEXIBLE SPRINKLER CONNECTIONS CAN BE USED IN PLACE OF RETURN

BENDS, INSTALL PER MANUFACTURERS INSTRUCTIONS

IF OFFSET LENGTH

EXCEEDS 2'-0" PROVIDE

PIPE HANGER

TWO PIECE ESCUTCHEON WITH

3/4" VERTICAL ADJUSTMENT

PENDANT STYLE SPRINKLER HEAD

SPRINKLER

BRANCH

LINE

CLOSE

NIPPLE

THREADED 90

DEG ELBOW (TYP)

DROP NIPPLE

REDUCER

SUSPENDED

CEILING

WHITE FINISH UNLESS OTHERWISE

CALLED OUT BY ARCHITECTURAL

DRAWINGS OR REQUESTED BY

OWNER

LOWER LEVEL

781' - 0"

LOWER LEVEL

781' - 0"

UPPER LEVEL

792' - 0"

/1 FX101

NEW 6" SUPPLY PIPE FROM

DOUBLE CHECK IN SOUTHEAST

CORNER OF ROOM

EXISTING 6" TO MAIN BOILER AREA

EXISTING FDC

EXISTING DRAIN

CAPPED DRAIN LINE FROM

PREVIOUS DELUGE SYSTEM

CAPPED PIPE TEE TO

PREVIOUS DELUGE SYSTEM

EXISTING 2 1/2" TO HOSE CABINETS

EXISTING 4" SUPPLY

TO STORAGE AREAS

INSTALL FLOW SWITCH

UPDATE HYDRAULIC DATA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CONSULTANT

321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot

6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

100% STAMPED FINAL

DESIGN

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

528A5-20-502

2023-06-23

FX501

FIRE SPRINKLER DETAILS

BLDG 12

AJW DGA

FULLY SPRINKLERED

SCALE: 1" = 1'-0"1

FIRE PROTECTION HEADER

1. SEE F-001 FOR F-SERIES NOTES AND LEGENDS.

GENERAL NOTES

SCALE: 1 1/2" = 1'-0"2

INSPECTORS TEST CONNECTION DETAIL

SCALE: 12" = 1'-0"3

TYPICAL UPRIGHT SPRINKLER

SCALE: 12" = 1'-0"4

TYPICAL PENETRATION OF SMOKE/FIRE BARRIERS

SCALE: 12" = 1'-0"5

STANDARD PIPE HANGARS

SCALE: 1 1/2" = 1'-0"6

TYPICAL RETURN BEND

KEYED NOTES

1 REPLACE EXISTING DRY PIPE VALVE WITH A WET-PIPE RISER AND TIE INTO

EXISTING DRAIN. REUSE EXISTING BUTTERFLY VALVE AND SUPERVISORY SWITCH.

REDUCE FROM 6" TO 4" ABOVE HEADER.

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

PLUMBING NOTES AND LEGENDS 100% STAMPED FINAL

DESIGN

FULLY SPRINKLERED

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

2023-06-23 P-001

BLDG 12

528A5-20-502

AJW CJR

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

GENERAL NOTES:

1. DESIGN CONSTRUCTION AND SAFETY SHALL CONFORM TO ALL LOCAL, STATE AND OWNER SPECIFIC CODES, INCLUDING (BUT NOT LIMITED TO) THE INTERNATIONAL BUILDING CODE, THE NFPA 101 LIFE SAFETY CODE, ANSI A117.1, OSHA, AND ANY OTHER CODES GOVERNED BY THE JURISDICTION IN WHICH

THIS PROJECT IS BEING CONSTRUCTED.

2. PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR REQUIRED TO COMPLETE DEMOLITION OF THE CURRENT PIPING, AS WELL AS AN OPERABLE FINAL CONFIGURATION PLUMBING SYSTEM AS INDICATED ON THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY APPLICABLE LOCAL CODES AND REGULATIONS.

3. CONTRACT DOCUMENT DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.

4. INSTALL ALL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND ALL

APPLICABLE CODES AND REGULATIONS.

5. COORDINATE CONSTRUCTION OF ALL PLUMBING WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL, ELECTRICAL, AND HVAC WORK SHOWN ON OTHER

CONTRACT DRAWINGS.

6. LABEL ALL PIPING IN ACCORDANCE WITH ASME A13.1.

7. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS, OR CALLED OUT IN THE SPECIFICATIONS, ARE APPROXIMATE ONLY. DO NOT SCALE DRAWINGS.

8. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSET IN PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO

ADDITIONAL COST TO THE OWNER. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE COORDINATED WITH ALL OTHER TRADES.

9. ALL PENETRATIONS THROUGH FLOORS AND FULL HEIGHT WALLS TO BE FIRE STOPPED. ALL GAPS AND JOINTS AT FIRE RESISTIVE FLOORS, ROOFS AND

WALL TO BE FIRE AND SMOKE STOPPED. GAPS AND JOINTS INCLUDE (BUT ARE NOT LIMITED TO) TOP OF WALL TO FLOOR OR ROOF DECK WALL TO BEAMS, AND CONTROL OR EXPANSION FIRE STOPPING INCLUDES BOTH FORM OR PACKING MATERIAL AND THE FILL, VOID OR CAVITY MATERIAL.

10. ALL PIPING SHALL CLEAR DOORS.

11. INCLUDE FLOW-DIRECTION ARROWS INTEGRAL WITH PIPING SYSTEM SERVICE LETTERING TO ACCOMMODATE BOTH DIRECTIONS OR AS SEPARATE UNIT ON

EACH PIPE LABEL TO INDICATE FLOW DIRECTION.

12. PIPE LABEL LOCATIONS: LOCATE PIPE LABELS, WHERE PIPING IS EXPOSED OR ABOVE ACCESSIBLE CEILINGS IN FINISHED SPACES; MACHINE ROOMS;

ACCESSIBLE MAINTENANCE SPACES SUCH AS SHAFTS, TUNNELS, AND PLENUMS; AND EXTERIOR EXPOSED LOCATIONS AS FOLLOWS:

A. NEAR EACH VALVE AND CONTROL DEVICE.

B. NEAR EACH BRANCH CONNECTION, EXCLUDING SHORT TAKEOFFS FOR FIXTURES AND TERMINAL UNITS. WHERE FLOW PATTERN IS NOT OBVIOUS, MARK EACH PIPE AT BRANCH.

C. NEAR PENETRATIONS AND ON BOTH SIDES OF THROUGH WALLS, FLOORS, CEILINGS, AND INACCESSIBLE ENCLOSURES.

D. AT ACCESS DOORS, MANHOLES, AND SIMILAR ACCESS POINTS THAT PERMIT VIEW OF CONCEALED PIPING.

E. NEAR MAJOR EQUIPMENT ITEMS AND OTHER POINTS OF ORIGINATION AND TERMINATION.

F. SPACED AT MAXIMUM INTERVALS OF 50 FEET ALONG EACH RUN. REDUCE INTERVALS TO 25 FEET IN AREAS OF CONGESTED PIPING AND EQUIPMENT.

13. REFER TO GC101 THROUGH GC103 AND GC601 FOR PHASING DETAILS.

14. ALL MATERIALS TO BE PURCHASED IN ACCORDANCE WITH THE BUY AMERICAN ACT.

GENERAL SYMBOLS

ROOM NAME AND NUMBER

DEMOLISH/REMOVE DEVICE

EXISTING CONDENSATE DRAIN LINE

GENERAL LINETYPES

GENERAL PLUMBING SYMBOLS

VALVE SYMBOLS

FD FLOOR DRAIN

DIRECTION OF PIPE PITCH (DOWN)

DIRECTION OF FLOW

ANCHOR

REDUCER OR INCREASER

ECCENTRIC REDUCER

TOP CONNECTION, 45° OR 90°

BOTTOM CONNECTION, 45° OR 90°

SIDE CONNECTION

CAPPED OUTLET

RISE OR DROP IN PIPE

UNION

PIPE UP

PIPE DOWN

POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK

LIMIT OF DEMOLITION

INVERTED BUCKET TRAP SET INCLUDING PIPING ACCESSORIES

FLOAT & THERMOSTATIC TRAP SET INCLUDING PIPING ACCESSORIES

STRAINER

THERMOMETER

PRESSURE GAGE

FLOW ELEMENT

CLEAN OUT

HOSE BIB

GATE VALVE - THREADED/FLANGED

GLOBE VALVE - THREADED/FLANGED

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE HOSE CONNECTOR

FLEXIBLE CONNECTION

ANGLE GLOBE VALVE

BUTTERFLY VALVE

BALL VALVE

MODULATING CONTROL VALVE

MODULATING CONTROL BUTTERFLY VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

THREE-WAY TWO POSITION CONTROL VALVE

PRESSURE REGULATING VALVE

PRESSURE SAFETY VALVE

AUTOMATIC BALANCING CONTROL VALVE

WATER BALANCE DEVICE

CIRCUIT SETTER VALVE

GATE VALVE WITH GLOBE-VALVED BYPASS

PLUG VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

PRESSURE REDUCING VALVE (PRV)

WATER LEVEL CONTROLLER

EXISTING SANITARY SEWERSS

NEW SANITARY SEWERSS

NEW CONDENSATE DRAIN LINE

PIPE MARKING COLOR SCHEDULE

FLUID SERVICE BACKGROUND COLOR LETTER COLOR

FIRE QUENCHING FLUIDS SAFETY RED WHITE

TOXIC AND CORROSVIE FLUIDS SAFETY ORANGE BLACK

FLAMMABLE FLUIDS SAFETY YELLOW BLACK

COMBUSTIBLE FLUIDS SAFETY BROWN WHITE

POTABLE, COOLING, BOILER FEED, AND OTHER WATER SAFETY GREEN WHITE

COMPRESSED AIR SAFETY BLUE WHITE

REFRIGERANT LIQUID SAFETY PURPLE WHITE

REFRIGERANT GAS SAFETY WHITE BLACK

DRAIN/SANITARY SAFETY GRAY WHITE

EXISTING DOMESTIC COLD WATERCW

NEW DOMESTIC COLD WATERCW

NEW VENT

VV VENT

DRIP FUNNELDF

EXISTING DOMESTIC HOT WATERHW

NEW DOMESTIC HOT WATERHW

CO

CO CLEAN OUT

CW COLD WATER

DN DOWN

FS FLOW SENSOR

FT FEET

GPM GALLONS PER MINUTE

HP HORSEPOWER

HW HOT WATER

MAX MAXIMUM

MBH THOUSAND BTU PER HOUR

MIN MINIMUM

NTS NOT TO SCALE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

SP STATIC PRESSURE

SS SANITARY SEWER

TEMP TEMPERATURE

TYP TYPICAL

V VENT

WCO WALL CLEAN OUT

GENERAL ABBREVIATIONS

FLOOR DRAIN WITH FUNNELFDF

DOMESTIC HOT WATER RETURNHWR

C2

CORRIDOR

WATER HEATER SCHEDULE

UNIT TYPE FLOW (GPM) TEMP RISE (F)

ELECTRICAL

BASIS OF DESIGN

V AMPS kW

HWH-1 INSTANTANEOUS ELECTRIC 2 82 480 87 24 EXISTING EEMAX ED024480T2T

HWH-2 INSTANTANEOUS ELECTRIC 2 82 240 100 24 RHEEM RTEX-24

HWH-3 & 4 INSTANTANEOUS ELECTRIC 1 37 220 25 6 RHEEM RTEX-06

DEMOLITION LINE

PLUMBING FIXTURE SCHEDULE

MARK DESCRIPTION

WASTE

PIPE VENT PIPE COLD

WATER HOT WATER WASTE

FIXTURE

UNITS

WATER

FIXTURE

UNITSIN IN IN IN

P-103 WATER CLOSET, WALL HUNG 3 2 1.25 6 10

P-201 URINAL WALL HUNG 2 1.5 .75 2 5

P-401 LAVATORY 2 1.5 .5 .5 2 2

P-501 SERVICE SINK 3 1.5 .5 .5 2 4

P-502 SERVICE SINK (CORNER,FLOOR MOUNTED) 3 1.5 .5 .5 2 4

P-528 SINK 1.5 1.5 .5 .5 3 2

P-606 DRINKING FOUNTAIN 2 1.5 .5 1 1

P-701 SHOWER 2 1.5 .5 .5 2 2

P-707 EMERGENCY SHOWER, EYE & FACE WASH .75 .75

WATER HAMMER ARRESTOR

ABANDONED SANITARY SEWERASA

PHASE CALLOUT#

6/23/2023

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

FE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LC

X

MLKJHGFEDCBA

7.1

8 8

C W

C W

CW

C W

C W

CW

C W

C W

CW CWCW

C W

CW

CW

C W

C W

CW

CWCW

CW

CW

C W

HWHW

CW

HW

CW

4.4

SS

S S

SS

SS

SS

SS

S S

SS

S S

SS

S S

S S

SSA

S S

SSA

S S

SSA

S S

SSA

S S

S S

S S

S S

SS

SS

S S

S S

S S

S S

SSA

S S

S S

S S

S S

S S

SSSSSS

SS

SS SS CW

CW

CW

EXISTING WATER

COOLER TO REMAIN

EXISTING LAVATORY

SINK TO REMAIN

EXISTING WATER HEATER

MOUNTED ON EXTERIOR

BATHROOM WALL TO REMAIN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CONSULTANT

321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot

6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

100% STAMPED FINAL

DESIGN

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

528A5-20-502

2023-06-23

PD101

PLUMBING DEMOLITION PLAN

BLDG 12

AJW DGA

FULLY SPRINKLERED

KEYPLAN

B12

B11

PARKING

N

SCALE: 1/8" = 1'-0"1

PLUMBING DEMOLITION PLAN

N

GENERAL NOTES

1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.

2. ALL PIPING ASSOCIATED WITH FIXTURE DEMO SHALL BE REMOVED BACK TO

NEAREST MAIN AND CAPPED. AUG MAIN PIPING NO LONGER SERVISING FIXTURES

SHALL BE REMOVED BACK TO SUPPLY AND CAPPED.

3. FOUNDATION SLAB DEMOLITION IS SHOWN ON STRUCTURAL DEMOLITION

DRAWINGS. NEARLY ALL FOUNDATION SLAB IN MAIN BOILER AREA IS BEING

REMOVED TO THE SUB-GRADE. PLUMBING CONTRACTOR TO COORDINATE

ACCORDINGLY.

4. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #

REMOVE LAVATORY,

LEAVE CW AND HW

CONNECTIONS FOR NEW

SHOWER/EYEWASH STATION

KEYED NOTES

1 BATHROOM IS TO BE RE-PURPOSED AS THE CHEMICAL FEED STORAGE ROOM. THE

MOP BASIN, WATER CLOSET, AND URINAL ARE TO BE REMOVED. CUT AND CAP

PIPE. PATCH WALLS AND FLOORS TO MATCH EXISTING. LAVATORY, WATER

HEATER, AND FLOOR DRAIN ARE TO REMAIN. COLD AND HOT WATER SUPPLIES TO

BE REMOVED ONLY TO DEMOLISHED FIXTURES.

2 REMOVE EYEWASH STATION IN PREPARATION FOR NEW SHOWER/EYEWASH

COMBINATION.

3 KITCHENETTE SINK TO BE REMOVED ALONG WITH ALL DOMESTIC WATER PIPING,

SANITARY, AND VENT PIPE.

4 REMOVE ALL BATHROOM FIXTURES AND PIPE INCLUDING DOMESTIC WATER,

SANITARY, AND VENT PIPE.

5 REMOVE WATER HEATER AND ALL ASSOCIATED PIPE. REMOVE COLD WATER PIPE

BACK TO MAIN AND CAP.

6 SANITARY PIPE ASSOCIATED WITH BATHROOM TO BE REMOVED SHALL BE CUT

AND CAPPED AND FLOOR OR WALL PENETRATIONS.

7 PLUMBING FLOOR PENETRATIONS AT THESE LOCATIONS ARE TO BE DEMOLISHED

AND CAPPED BELOW THE NEW SLAB ON GRADE INSTALLATION. SEE STRUCTURAL

DRAWINGS FOR INFORMATION. DRAIN LEADERS TO BE ABANDONED IN PLACE.

8 EXISTING TRENCH DRAINS TO BE REMOVED ALONG WITH FLOOR SLAB DEMO.

9 PLUMBING FOR HOSE BIBBS TO BE REROUTED TO THE EAST TO AVOID CONFLICT

WITH PROPANE TANK LOCATION. SEE PP102 FOR NEW LOCATION.

7.1

S S

S S

SS

S S

SS

S S

S S

SS

SSA

SS

SSA

S S

A

SS

S S

S S

S S

SS

SS

SS

SS

SS

CONTROL ROOM

A105

UTILITY ROOM

A106

BOILER ROOM

A102

WOMEN

A108

MEN

A107

GENERATOR

A112

ELECTRICAL ROOM

A103

JANITOR

A109

STAIRS

A111

S S

SS

S S

SS

4.4

SS

SS

SS

SS

SS

S S

SS

S S

S S

S S

SS

S S

SS

S S

S S

S S

S S

S S

S S

S S

SS

FD

FDF

FD

FD

FD

FDF

FDF

FDF

FDF

CO

CO

CO

CO

CO

CO

CO

FLOOR TRENCH

(TYP)

BOTTOM OF

SS= 772.40

PP401

EXISTING WATER COOLER

FOUNTAIN TO REMAIN

V

SS

V

SS

S S

S S

S S

S S

S S

S S

S S

S S

SS

S S

SS

S S

S S

SSSS

S S

A

SSA

S S

A

SS

EXISTING WATER

HEATER TO REMAIN

HWH-4 0.6

Gallon

WORKSHOP

B101

STORAGE

A101

TIE SERVICE SINK VENT INTO

EXISTING 3" VENT STACK

INV. 778.19' TO OIL WATER

SEPARATOR. SEE CIVIL UTILITES

DRAWING FOR CONTINUATION

STAIRS

A002

CO

CONNECT TO EXPOSED

SANITARY WITHIN OLD

CONVEYOR AREA

SS

SS

SS

SS

SS

S S

SS

SSA

1/

2" ø

4" ø

4"ø4"ø

4"ø

4" ø

4" ø

4"ø

2" ø

4"ø

4" ø

4" ø

4"ø 4"ø

4" ø

4"ø

4" ø

4"ø

4"ø 4"ø

4" ø

4"ø

4" ø

4"ø

4" ø

2"ø

1/

4" ø

3"ø

4"ø 4"ø4" ø

4" ø

4" ø

4" ø

4"ø4"ø 4"ø

4"ø

3" ø

2"ø

3" ø

4" ø

3" ø

4" ø

4"ø

4" ø

4"ø

4" ø

4" ø

4" ø

4"ø

4" ø

4"ø

2"ø

4" ø

4" ø

4" ø

4" ø

2"ø

CO

4"ø

SSAP-528

HWH-3 0.6

Gallon

P-528

SUMP IN LOWER

STORAGE A001

(EXISTING BELOW

STAIRS)

SUMP IN LOWER STORAGE

A001 (EXISTING BELOW

GENERATOR)

P-707

P-707

3"ø SS

MECH

A104

P-501

EXISTING

DISCHARGE TO

SITE SANITARY

EXISTING 3" VENT

STACK

INSTALL CATCH BASIN FOR

MECHANICAL EQUIPMENT

DRAINAGE

3" VENT (EXISTING)

1 1/4" V

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CONSULTANT

321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot

6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23

100% STAMPED FINAL

DESIGN

DESIGN BOILER REPLACEMENT -

CANANDAIGUA VAMC

400 FORT HILL AVENUE

CANANDAIGUA, NY 14424

528A5-20-502

2023-06-23

PP101

PLUMBING PLAN - SANITARY

BLDG 12

AJW DGA

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"1

PLUMBING PLAN - SANITARY

KEYPLAN

B12

B11

PARKING

N

N

GENERAL NOTES

1. SEE P-001 FOR P-SERIES NOTES AND LEGENDS.

2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #

KEYED NOTES

1 INSTALL FLOOR DRAIN AT PIT LEVEL STORAGE. ROUTE PIPE TO EXISTING SUMP PIT

AND TERMINATE DISCHARGE IN PIT.

2 SANITARY DRAIN PIPES TO BE INSTALLED BELOW MECHANICAL PIPE TRENCH.

3 CONNECT 1 1/4" VENT PIPE FROM SINK INTO EXISTING 4" VENT STACK.

4 INSTALL UNDER SINK AIR VENT.

7.1

CW

CW3/4"ø

C W

CONTROL ROOM

A105

UTILITY ROOM

A106

BOILER ROOM

A102

WOMEN

A108

MEN

A107

GENERATOR

A112

ELECTRICAL ROOM

A103

JANITOR

A109

STAIRS

A111

C W

EXISTING 3/4" DOWN TO

INTERIOR HOSE BIBB

EXISTING 3/4" DOWN TO

EXTERIOR HOSE BIBB

EXISTING 3/4" DOWN TO

INTERIOR HOSE BIBB

4.4

PP401

HW1/2"ø

WORKSHOP

B101

STORAGE

A101

STAIRS

A002

HWH-4 0.6

Gallon

CW DROP TO SINK

AND WATER HEATER

CW DROP TO SINK

AND WATER HEATER

HWH-3 0.6

Gallon

HW

CW

HW

CW CW

CW CW CW

C W

CW

C W

C W

H W

C W

CW

C W

CW

C W

C W

C W

CW

C W

CW

C W

CW CW

C W

CW

C W

C W

CW

C W

CW

1/2"ø

2"ø

2"ø

3/4"ø

3/ 4" ø

3/4"ø

2"ø

2" ø

3/ 4" ø

1"ø

3/ 4" ø

1"ø

1" ø

1" ø

1"ø

1" ø

2" ø

1/ 2" ø

1" ø

2"ø 2"ø

2"ø

2" ø

2" ø

EXISTING WATER COOLER

FOUNTAIN TO REMAIN

HWH-1 0.6

GallonCW1"ø

HW1/2"ø

1" ø

P-528

P-707

P-707

MECH

A104

P-501

P-528

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CONSULTANT

321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot

6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

R…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .