36C24224R0032 0004.docx
DOCX document 75 KB Posted
- Attached to
- Z1DA--528A5-20-502 BOILER REPLACEMENT PROJECT Federal contract opportunity
- Solicitation number
- 36C24224R0032
About this file
This document appears to be a contract amendment for Solicitation # 36C24224R0032, which is for a boiler replacement project at the Canandaigua VA Medical Center. The amendment corrects some errors and makes additional changes, including:
- Changing the set-aside from 100% Veteran Owned Small Business (VOSB) to 100% Service-Disabled Veteran Owned Small Business (SDVOSB), and changing the business size standard from $19.5M to $19M.
- Extending the proposal due date from June 21, 2024 to June 28, 2024.
- Changing the site visit date from May 30, 2024 to June 6, 2024.
- Revising the evaluation factor for previous similar contracts from 3 within the last 3 years to 3 within the last 10 years.
The document also includes a set of questions and answers related to the project's design, equipment, and control systems.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
TBD
528A5-20-502 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga
NY
14227 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga
NY
14227 To all Offerors/Bidders
36C24224R0032
X X X
TBD
See continuation page and attachments for Q&As.
Veronica Baldwin Contracting Specialist
| DOCUMENT TITLE: |
| Comment Response Matrix |
| ENCORUS PROJECT NO. |
| 21070 |
| CLIENT PROJECT NO. |
| 528A5-20-502 |
| PROJECT DESCRIPTION: |
| Design Boiler Replacement |
| SUBMISSION: |
| Pre-Bid RFI |
| DATE: |
| 6/13/2024 |
**Design Boiler Replacement - Canandaigua VAMC**
| # |
| DWG/SPEC # |
| Commenter |
| Customer Comment |
| Encorus Response |
| VA Response |
| Open/Closed |
| 1 |
| EI701 |
| Per 23 09 11, paragraph 2.5 (Pg 37/69) there is one desktop computer and one, 19” monitor for the SCADA computer. However… |
| See updated 230911 paragraph 2.5 attached. |
See attached for 4160V Generator and CP-5 points list. Note that the CP-5 points list that contrains equipment that has been previously removed and would no longer need to be monitored.
For the 480V switchgear, the SCADA system should monitor the status of each breaker within the switchgear and incoming and generator Voltage, Current, kW, kVA, PF, and kWH.
The security system is stand alone, however provisions should be added to the operator stations to monitor cameras throughout and surrounding the boiler plant.
The monitored points for the other equipment are shown on the PID Drawings
| 2 |
| MK601 |
| We do not see the receiver tank sizes in the mechanical schedule or specification. Could you please advise to the receiver tank size? We see the condensate receivers shown on drawing MK101 and see the pumps for this receiver on the MK601 schedule, but do not see any mention of tank size. |
| A new condensate receriver schedule was provided with the previous set of RFI responses on 6/4/2024. The tank size is 65 gallons. The schedule is shown below. |
| In the RFI responses the Government lists two revised contract durations – 730 and 750 calendar days. Can you please advise which number is correct? |
| 750 Calendar Days |
| 4 |
| D-641 |
The drawing D-641 shows the blowdown separator cooling through a solenoid valve, which is controlled from panel...The drawing D-641 shows the blowdown separator cooling through a solenoid valve, which is controlled from panel CP-6A. CP-6A is the Deaerator control panel. Also shown is a temperature transmitter.
99% of the VA drawings show the self-controlling temperature regulating valve with capillary tubing.
Please confirm the design intent is to have this process controlled via the PLC controlled solenoid valve for admitting cooling water to BDHR.
Local control with capillary tubing is acceptable.
In review of D-621, 641, 642 can you please confirm that all the manual valves and other associated components for the main and pilot gas trains below will require position feedback (4-20mA) signal? Or is this a typo?
The steam flow diagram D-642 has ZT position indication for all the manual valves (11 per my count) in the steam flow diagram. It’s labeled as position feedback (4-20mA) signal, and not a simple switch contact (such as position either open or close limit switch).
The steam silence vent valve(s) are manual. Typically, these are motorized electric modulating valves that can be controlled by master panel. This project does not appear to have this, but does have the position feedback of the manual vent valves as well.
The safety relief valves are also indicating the requirements for a ZSO. We don’t believe the illustrated valve exists. Please confirm if this is a typo and or specify manufacturer.
The safety valves AFGSOV and APFGSOV are required to have a prove open switch, prove close switch, and a control open function. The vent valves AFGSVV and APFGSVV are required to have a prove open switch, prove close switch, and a control close function. The symbols above the pressure transmitters and flow transmitters are for the pressure and flow information, but the valves are just manual valves without any position indication or control.
Manual valves on the steam header can have a close limit switch (ZIC).
Although the drawing shows manual valves, a change to a motorized valve would be acceptable if desired for testing and tuning.
The ZSO should not be on the safety relief valves. See specification 23 52 39 paragraph 2.2 B for requirements.
| Drawing EI 111 details the dangerous gas detection system. Is there any technical information available for the existing system, IOM, wiring diagram, etc..? |
| Yes, there are IOM manuals and reference drawings. One caveat is that the system was hacked up more than it was supposed to be by the company removing the biomass boilers. Reference documents are attached in case you want to post them. |
| Per the Specifications It is noted that only the Natural Gas piping system for the Mechanical and Plumbing scope is to be seismically rated. Can you confirm that this is the only required mechanical or plumbing system to require seismic bracing? |
| Yes, the natural gas piping is the only seismically rated system. |
This document is also provided as an attachment.
See attached document: Copy of Pre-Bid RFI Questions_Encorus Response 2024-06-13.
See attached document: 2024-06-13 Question 1 Attachments.
See attached document: Sensepoint XCD_IOM.
See attached document: touchpoint-plus-user-guide-man0996_v1_0216.
See attached document: Touchpoint Plus_Quick Start guide.
image1.png image2.png
File details come from the government source that posted it. Updated .