528A5-20-502 Boiler Replacement_Plans_Part 3.pdf
PDF 7 MB Posted
- Attached to
- Z1DA--528A5-20-502 BOILER REPLACEMENT PROJECT Federal contract opportunity
- Solicitation number
- 36C24224R0032
About this file
This document is a solicitation (Solicitation Number: 36C24224R0032) for the Boiler Replacement Project at the Canandaigua VA Medical Center. The Department of Veterans Affairs is seeking a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) firm to perform this work. The project involves replacing existing boilers and associated equipment at the facility. Proposals are due by Friday, June 28, 2024 at the previously stated time. The evaluation criteria include details of three previous similar contracts performed within the past ten years. A site visit is scheduled for Thursday, June 6, 2024. This is an amendment to the original solicitation to correct errors and make additional changes.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL NOTES AND LEGENDS 100% STAMPED FINAL
DESIGN
FULLY SPRINKLERED
DESIGN BOILER REPLACEMENT -
CANANDAIGUA VAMC
400 FORT HILL AVENUE
CANANDAIGUA, NY 14424
2023-06-23 E-001
BLDG 12
528A5-20-502
JFF CJR
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23
SWITCH, SINGLE BREAK
FUSE WITH RATING
NORMALLY CLOSED RELAY CONTACT
NORMALLY OPEN RELAY CONTACT
MOLDED CASE CIRCUIT BREAKER
LOW-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER
HIGH-VOLTAGE OIL CIRCUIT BREAKER
HIGH-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER
SWITCH AND FUSE UNIT
FUSED DRAWOUT POTENTIAL TRANSFORMER
FUSIBLE LINK
GENERATOR, POWERG
CAPACITOR
METER
AMMETER
VOLTMETER
WATTMETER
WATT-HOUR METER
PANELBOARD CABINET, FLUSH MOUNTED
PANELBOARD CABINET, SURFACE MOUNTED
RECEPTACLE, DUPLEX
RECEPTACLE, DUPLEX ON EMERGENCY POWER
RECEPTACLE, DUPLEX WITH GROUND FAULT
CIRCUIT INTERRUPTER
RECEPTACLE, QUADRAPLEX
RECEPTACLE, SINGLE
RECEPTACLE, SINGLE WITH SWITCHS
RECEPTACLE, SPECIAL PURPOSE
S RECEPTACLE, SWITCHED DUPLEX
ELECTRICAL SYMBOLS - POWER PLAN
MOTOR, SINGLE-PHASE
MOTOR, THREE-PHASE
DELTA CONNECTION
TRANSFORMER
WYE CONNECTION
EARTH GROUND
TRANSFORMER, PLANT
BRANCH CIRCUIT HOMERUN. LINES INDICATE
NUMBER OF CIRCUITS, NEUTRAL, AND SWITCH LEG
CONDUCTORS. ONE SEPARATE GREEN
GROUNDING CONDUCTOR SHALL BE PROVIDED
FOR EACH HOMERUN; NOT SHOWN
JB PULL BOX/JUNCTION BOX
WIREWAY
RIGID CONDUIT LINE = RC
DUCT BANK
POWER DUCT = P
BUSWAY
DISCONNECT SWITCH, FUSED
DISCONNECT SWITCH, UNFUSED
STARTER, COMBINATION WITH DISCONNECT SWITCH
STARTER OR MOTOR CONTROLLER
CONDUIT TERMINATED 6" [152mm] AFF
IN STANDARD BOX FOR EXTENSION TO
EQUIPMENT AS DIRECTED.
CONDUIT TERMINATED W/COUPLING
(FLUSH W/FINISHED FLOOR) FOR
EXTENSION TO EQUIPMENT AS DIRECTED.
VARIABLE FREQUENCY DRIVE
VFD
SWITCH (# SUBSCRIPT AS INDICATED BELOW):
BLANK = SINGLE POLE
3 = THREE-WAY
P = WITH PILOT LIGHT
WP= WEATHER PROOF
LOWER CASE = FIXTURE CONTROLLED
ELECTRICAL SYMBOLS - LIGHTING PLAN
LIGHT FIXTURE, CEILING MOUNTED, LETTER INDICATES TYPE.
LIGHTING, ONE HEAD EMERGENCY BATTERY POWER
LIGHTING, TWO HEAD EMERGENCY BATTERY POWER
LIGHTING, THREE HEAD EMERGENCY BATTERY POWER
EXIT SIGN, WALL MOUNTED WITH DIRECTIONAL ARROWS AND FACES AS SHOWN
EXIT SIGN, CEILING MOUNTED WITH DIRECTIONAL ARROWS AND FACES AS SHOWN
GENERAL ELECTRICAL NOTES
A. ALL FINAL LOCATIONS AND ARRANGEMENTS OF LIGHTING FIXTURES SHALL BE OBTAINED FROM THE
ARCHITECTURAL REFLECTED CEILING PLAN.
B. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS. EACH BRANCH
CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED EQUIPMENT GROUNDING CONDUCTOR.
C. MULTI-GANG BACKBOXES FOR DIFFERENT VOLTAGES AND TYPES OF EMERGENCY AND NORMAL BRANCH
WIRING DEVICES SHALL HAVE DIVIDERS BETWEEN DEVICES.
D. COORDINATE ALL SHUTDOWNS AND INTERRUPTIONS OF SERVICE WITH THE COR IN ACCORDANCE WITH
THE SPECIFICATION REQUIREMENTS.
E. ALL CONDUIT TO BE LABELED AT EACH END TO IDENTIFY TERMINATION LOCATIONS.
F. ALL SPARE CONDUIT SHALL CONTAIN A PULL STRING TO FACILITATE FUTURE USE.
G. THE CONTRACTOR IS TO PROVIDE EXCAVATION/TRENCHING PLANS TO THE VA COR FOR APPROVAL
PRIOR TO STARTING ANY EXCAVATION OR TRENCHING WORK.
H. CONTRACTOR TO LABEL ALL EQUIPMENT, CONDUIT, JUNCTION BOXES, PULL BOXES, ETC IN
ACCORDANCE WITH VA COR PROVIDED DIRECTION..
I. REFER TO GC101 THROUGH GC103, GC601 FOR PHASING DETAILS.
J. ALL MATERIALS TO BE PURCHASED IN ACCORDANCE WITH THE BUY AMERICAN ACT.
GENERAL ELECTRICAL NOTES - DEMOLITION
A. FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING DEVICES, CONDUITS, ETC, SHOWN ON
PLANS TO BE REMOVED, COMPLETELY REMOVE CONDUIT AND WIRING TO THE SOURCE (OVER CURRENT
PROTECTIVE DEVICE, DISCONNECT, ETC).
B. DISCONNECT ALL ABANDONED WIRING OF ALL TYPES AT THE OVERCURRENT PROTECTIVE DEVICE.
COMPLETELY REMOVE ALL ABANDONED WIRING.
C. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS PASSING THROUGH
RENOVATED AREAS AND SERVICING UNDISTURBED AREAS.
PHOTOCELLPC
ELECTRICAL DUCTBANK
X# FEEDER ID
X# = SEE FEEDER SCHEDULE E-601
LIGHT FIXTURE, WALL MOUNTED, LETTER INDICATES TYPE.
A
K KEY INTERLOCKED SWITCH
M MANHOLE
UNDERGROUND ELECTRICUE
GENERAL LINETYPES
EXISTING DUCT BANK
EXTENTS OF DETAIL
DEMOLITION
UNDERGROUND FUEL LINEFOS
ABANDON DUCT BANK
SAW CUT CONCRETE
WATER LINEW
STORM LINESD
FIREWATER LINEFW
SANITARY SEWER LINESS
GAS LINEG
FENCE LINE
ABANDON UNDERGROUND ELECTRICAUE
GROUND LINE
* PROTECTIVE RELAY (* INDICATES ANSI FUNCTION
NUMBER AND NUMBER INDICATES QUANTITY)
25 - SYNCHRONIZING OR SYNCHRONISM- CHECK
DEVICE
50 - INSTANTANEOUS OVERCURRENT
51 - AC INVERSE TIME OVERCURRENT RELAY
52 - AC CIRCUIT BREAKER
67 - AC DIRECTIONAL OVER CURRENT RELAY
87 - DIFFERENTIAL PROTECTIVE RELAY
SUFFIXES INDICATING ZONE OF PROTECTION
B - BUS G - GROUND L - LINE
N - NEUTRAL T - TRANSFORMER U - UNIT
SPARE CONDUIT
FILLED CONDUIT
CURRENT TRANSFORMER
FO FIBER OPTIC
A
GFCI
PORT, TELEPHONE; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK/TABLE F-FLUSH FL-FLUSH
G-GROUND H-HIDDEN M-MULLION O-OUTDOOR
P-PEDESTAL RK-RACK R-ROOF REC-RECESSED
S-SURFACE W-WALL
T=TECHNOLOGY
P-PHONE FX-FAX/FACSIMILE
T2-SECONDARY TECHNOLOGY
X-LEGEND REF
M T
T2 X
PORT, DATA; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING O-OUTDOOR
FL-FLOOR W-WALL D-DESK/TABLE
T=TECHNOLOGY/TYPE
IP-INTERNET PROTOCOL (RJ45)
T2-SECONDARY TECHNOLOGY
X-LEGEND REFERENCE
E-EXISTING
M T
T2 X
DEMOLITIONX X X X
GND
CONDUIT SYMBOLS
CONDUIT UP
CONDUIT DOWN
VERTICAL RISER
DEMOLITION/ / / / / / / / / / / /
M
A
V
W
WH
W W
RC
DB
P
B B
O.C.B.
CU ELECTRICAL COPPER
TELECOMMUNICATION SYMBOLS
AUDIO DEVICE; LETTER INDICATES AS FOLLOWS:
M=MOUNT
S-SURFACE C-CEILING W-WALL
T=TECHNOLOGY/TYPE
B-BELL C-CHIME H-HORN K-KLAXON
Z-BUZZER EP-EXPLOSION PROTECTED HORN LOUD SPEAKER
IP-NETWORK LOUD SPEAKER E-EXISTING
M T E
INTERCOM; LETTER INDICATES AS FOLLOWS:
M=MOUNT
S-SURFACE C-CEILING W-WALL D-DESK
T=TECHNOLOGY/TYPE
M-MASTER S-SLAVE E-EXISTING
VIDEO CAMERA; LETTER INDICATES AS FOLLOWS:
M=MOUNT
S-SURFACE C-CEILING W-WALL R-ROOF CM-CORNER
T/T2=TECHNOLOGY/TYPE
WP, WEATHER RESISTANT 720-HD 720P 1080-HD1080P
PTZ-PAN/TILT/ZOOM CLR-COLOR, E-EXISTING EX-EXPLOSION PROOF
ELECTRONIC LOCK; LETTER INDICATES AS FOLLOWS:
T=TECHNOLOGY/TYPE
S-STRIKE E-EXISTING
E T
T
M
E T M
T2 X T M
E
M
TE
CENTRAL PROCESSING UNIT; LETTER INDICATES AS FOLLOWS:
E-EXISTING
CARD READER; LETTER INDICATES AS FOLLOWS:
M=MOUNT
W-WALL
T/T2=TECHNOLOGY/TYPE
P-PROXIMITY E-EXISTING
PUSH BUTTON; LETTER INDICATES AS FOLLOWS:
M=MOUNT
W-WALL D-DESK
T/T2=TECHNOLOGY/TYPE
X-REQUEST TO EXIST ESB-BOILER PLANT EMERGENCY STOP
E-EXISTING
LIGHT FIXTURE, LETTER INDICATES TYPE
LIGHT FIXTURE, CEILING MOUNTED, LETTER INDICATES TYPE
LIGHT FIXTURE, CEILING MOUNTED EMERGENCY, LETTER INDICATES TYPE
A
A
A
LIGHT FIXTURE, CEILING MOUNTED, LETTER INDICATES TYPE
A
A
LIGHT FIXTURE, CEILING MOUNTED EMERGENCY, LETTER INDICATES TYPE
T
M RECORDER; LETTER INDICATES AS FOLLOWS:
M=MOUNT
R-RACK
T=TECHNOLOGY/TYPE
D-DIGITAL
INSTRUMENTATION SYMBOLS
W CARD READER WITH KEYPAD; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN
P-PEDESTAL R-RACK S-SURFACE W-WALL
M-MULLION
GAS
E
GAS DETECTION SYSTEM CONTROL PANEL
E = EXISTING
GAS DETECTOR; LETTER INDICATES AS FOLLOWS:
T = TYPE
CO = CARBON MONOXIDE
GAS = COMBUSTIBLE GAS
T
GENERAL SYMBOLS
DEMOLISH/REMOVE
ROOM NAME AND NUMBERC2
CORRIDOR
PHASE CALLOUT#
6/23/2023
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text X
LOWER LEVEL
781' - 0"
F
65"-70" SCADA BOARD
POWER AND DATA
OUTLET (BEHIND
VIDEO BOARD)
/1 EI101
UPPER LEVEL
792' - 0"
VA ROOM NAME PLATE
DUPLEX OUTLET
1'
6"
5'
0"
INTERCOM
4'
0"
LOWER LEVEL
781' - 0"
G F E
/1 E-401
REFRIGERATOR
DUPLEX GFCI
(BEHIND
REFRIGERATOR)
DUPLEX GFCI DUPLEX GFCI INTERCOM
PANEL
BOILER
EMERGENCY
STOP
PULL STATION
ELECTRONIC
SECURITY LOCK
4'
0"
1'
1/
4"
1'
1/
4"
1'
3/
4"
DUPLEX GFCI
LOWER LEVEL
781' - 0"
GFE
55"-60" OVERHEAD SCADA BOARDS.
PROVIDE WITH ARTICULATING TV
WALL MOUNT
SCADA SYSTEM
EQUIPMENT RACK AND
SECURITY RACK
POWER AND
DATA OUTLET
(BEHIND SCADA
BOARDS)
POWER AND
DATA OUTLET
(BEHIND SCADA
BOARDS)
EXISTING GENERATOR
ANNUNCIATOR PANEL
/1 E-401
QUADRUPLEX
OUTLET
2 POINT
DATA OUTLET
GAS DETECTOR
DUPLEX OUTLET DUPLEX OUTLET
QUADRUPLEX
OUTLET
QUADRUPLEX
OUTLET
INTERCOM
1'
6"
4'
0"
6'
0"
8 POINT
DATA OUTLET
QUADRUPLEX
OUTLET
QUADRUPLEX OUTLET
(IN WALL)
8 POINT DATA OUTLET
8 POINT DATA
OUTLET
QUADRUPLEX
OUTLET
8 POINT DATA
OUTLET
8 POINT DATA
OUTLET
PIT LEVEL
764' - 7"
4.4
HYDRAULIC
LIFT FUSED
DISCONNECT
/1 EP104
(LOCATE WITHIN
LINE OF SIGHT OF LIFT)
4'
1/
4"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23
100% STAMPED FINAL
DESIGN
DESIGN BOILER REPLACEMENT -
CANANDAIGUA VAMC
400 FORT HILL AVENUE
CANANDAIGUA, NY 14424
528A5-20-502
2023-06-23 E-201
ELECTRICAL ELEVATIONS
BLDG 12
JFF DGA
FULLY SPRINKLERED
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
SCALE: 1/2" = 1'-0"3
ELEVATION OUTSIDE CONTROL ROOM A105
SCALE: 1/2" = 1'-0"1
CONTROL ROOM SOUTH WALL ELEVATION
SCALE: 1/2" = 1'-0"2
CONTROL ROOM NORTH WALL ELEVATION
SCALE: 1/2" = 1'-0"4
ELECTRICAL ELEVATION STORAGE A001 - LOOKING WEST
EXISTING LIGHT SWITCH
TO REMAIN
Revisions: Date: 6/23/2023
GFCI GFCI GFCI COGFCI
H H
F
J
G F C I
GFCI
G F
C I
G F
C I
GFE
SCADA SYSTEM
EQUIPMENT RACK
CONDUIT STUB-UPS
VA WORKSTATION
VA WORKSTATION ENGINEERING WORKSTATION
SCADA PRINTEROPERATOR WORKSTATION ENGINEERING PRINTER
SECURITY EQUIPMENT RACK
OPERATORS WORKSTATION
CONTROL ROOM
A105
EXISTING NETWORK EQUIPMENT RACK
EXISTING GENERATOR
ANNUNCIATOR PANEL
W
IP
E
W
IP
W
IP
/1 EI101
E-201
SYSTEM OVERVIEW SCREENS
GAS DETECTOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23
100% STAMPED FINAL
DESIGN
DESIGN BOILER REPLACEMENT -
CANANDAIGUA VAMC
400 FORT HILL AVENUE
CANANDAIGUA, NY 14424
528A5-20-502
2023-06-23 E-401
ELECTRICAL ENLARGED PLAN
BLDG 12
JFF DGA
FULLY SPRINKLERED
SCALE: 1/2" = 1'-0"1
ELECTRICAL ENLARGED PLAN - CONTROL ROOM
N
KEYPLAN
B12
B11
PARKING
N
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. OPERATORS' WORKSTATIONS TO BE PROVIDED BY CONTRACTOR. OPERATORS'
WORKSTATIONS SHALL BE PROVIDED WITH SCADA CLIENT, DAILY AND MONTHLY
REPORTING CLIENT, MAINTENANCE TRACKING SOFTWARE PACKAGES, AND
ACCESS TO CAMERA FEEDS WITHIN THE BOILER PLANT.
3. SYSTEM OVERVIEW SCREENS WITHIN THE CONTROL ROOM SHELL BE
CONTROLLABLE BY THE OPERATORS' WORKSTATIONS TO DISPLAY ANY SCREEN
THAT IS A PART OF THE SCADA SYSTEM. SYSTEM OVERVIEW SCREENS TO BE
PROVIDED BY CONTRACTOR.
4. ENGINEERING WORK STATIONS TO BE PROVIDED BY CONTRACTOR. ENGINEERING
WORKSTATIONS SHELL BE PROVIDED WITH SOFTWARE NECESSARY TO MAKE
MODIFICATION TO ALL PLCS, SCADA SCREENS, SERVERS, ETC. THAT FORM A
PART OF THE BOILER MONITORING AND CONTROL SYSTEMS, AND HAVE SYSTEMS
LOCATED WITHIN THE BOILER PLANT.
5. VA WORKSTATIONS TO BE SUPPLIED BY THE VA. VA TO SUPPLY VA
WORKSTATIONS WITH REQUIRED SOFTWARE PACKAGES.
6. SEE SPECIFICATION 23 09 11 SECTION 2.5 FOR FOR SPECIFIC INFORMATION
REGARDING WORKSTATION REQUIREMENTS FOR THOSE SERVING THE BOILER
PLANT OPERATIONS.
UP
UP
UP
DN
DN
GFCI
G F
C I
G F
C I
GFCI
GFCIGFCI
G F
C I
GFCI
G F
C I
GFCI
G F
C I
T
GFCI GFCI
G F
C I
G F
C I
GFCI
GFCI
G F
C I
G F
C I
GFCI
C P
C P
M
M
C P
M
M
M
M
M
M M
M
M
M
M
C P
M
M
M
M
M M
M
M
M M
M
ATS
MM
M
M
M
M
J
J
J
J
J
MC
P
MM
MLKJHGFEDCBA
7.1
CONDUIT TO EXISTING METAL
STORAGE BUILDING AND DIESEL
TANK BUILDING TO BE REMOVED
EXISTING 208V GENERATOR
TO BE REMOVED
EXISTING ATS
TO BE REMOVED
UNDER MAIN CB
CHASE TO REMAIN
X
X
XXX
X X
X X
XX
X
XX
X
XX X
X
X
X
X X
X X
X
X
X
X
X
X
X
X
BLDG 13
PNLB
EXISTING DAY TANK/FUEL
PUMP TO BE REMOVED
480V
SWGR-ATS
MASTER BOILER
CTRL PNL
AIR COMPRESSOR AC-1
TO BE REMOVED AND
SAVED FOR REUSE
AC-2
AC-2 DISCONNECT
CHEMICAL PUMPS 1 & 2
CHEMICAL PUMP CONTROLLERS 1 & 2
FWP (FEED
WATER PUMP)
PANEL LP1
PANEL P
UNUSED DISC
PANEL M DISC
SUPPLY PUMP 1
SUPPLY PUMP 2
CONDENSATE TRANSFER
PUMP 1 DISC
CONDENSATE TRANSFER
PUMP 2 DISC
XX
CONDENSATE
TRANSFER PUMPS
XX XXX
FWP
CONTROLLER
X
PANEL M
X X X
TELEPHONE
PANEL LP-2
X X
PNL LP-2-1
X
X
X
X
XX
X
X
X
CFP-1
CFP-2
X X
DEDICATED
CIRCUIT FOR A/C
PANEL 1A
BUILDING 12
METER/CT CABINET
BLDG 12 PANEL
HWH-1
BOILER EMERGENCY STOPCCTV
MONITORS
GAS MONITORING
PANEL
PP3-5
PP3-2
GENERATOR
ANNUNCITOR PANEL
BOILER
EMERGENCY
STOP
NEW BOILER
EMERGENCY STOP
BOILER
EMERGENCY STOP
NEW BOILER STOP
PP-3
PULLBOX
4.4
X
REMOVE
TRANSFORMER T12.1
AND SAVE FOR
REINSTALLATION
X XXXX X
X X
EF-4 DISC
X
X
SUMP
PUMP-2 CP
SAH-1 DISC
EUH-1 DISC
SAF-1 DISC
SUMP
PUMP-1 CP
X X X
X
XXX
PP-5
BOILER 2 CTRL PNL
BOILER 1 CTRL PNL
BOILER 3 CTRL PNL
SEE DWG MD101
FOR ADDITIONAL INFORMATION
XMFR T12.2
XMFR T12.3
EF-6
PP-2
PP-1
DP-1
DP-2
DP-3
VFC'S
EF-4
STRT
SAF-2
DISC.
SAF-3
DISC.
EUH-3
DISC.
SAH-2
DISC.
HVAC CONDUIT
STUB-UP AREA
SUMP
PUMP-2
EUH-2
DISC.
GD-3
GD-3
DISC.
GD-3A
GD-3A
DISC.
EF-8
EF-8 DISC.
FIRE PUMP
COMPRESSOR
DISC
UNIT HEATER
UH-1
FXAC
M.O.D.
EF-8 DAMPER
JOCKEY PUMP
CONTROLLER
FIRE PUMP CONTROLLER/
POWER TRANSFER SWITCH
HVAC CONDUIT
STUB-UP AREA
FWP-5 FWP-4
SUPPLY PUMPS
DISC.
EF-7 DISC.
EF-7
DIESEL PUMP
DISC.
GENERATOR TO BE
RELOCATED.SEE EP101
FOR NEW LOCATION
GD-2, 2A
DISC.
GD-2, 2A
GD-1, 1A
DISC.
GD-1, 1A
VACUUM
CONDENSATE
PUMP
DIESEL TANK MONITOR
FUEL OIL PUMPS
FUEL OIL TANK MONITOR
XXX
FIRE AND
JOCKEY PUMPS
BOILER
EMERGENCY STOP
RELOCATE EXISTING
DISCONNECT SWITCH TO
ALLOW INSTALLATION OF
NEW DOORWAY
SUMP PUMPS. INTERRUPTION
OF SUMP PUMPS MUST BE
COORDINATED WITH VA COR.
IN NO CASE SHALL SUMP
PUMPS BE LEFT OFF AND
UNMONITORED.
SUMP PUMPS. INTERRUPTION
OF SUMP PUMPS MUST BE
COORDINATED WITH VA COR.
IN NO CASE SHALL SUMP
PUMPS BE LEFT OFF AND
UNMONITORED.
XX
12 6
4 8
1 412
X
XX
X
X
XX
X
MP1-4
PB7 PB6
LSB #4
LSB #5
SP2SP1
RR-1 DISC 2
RR-1
RR-1 DISC 1
CP-5
B12 DISC
X
EXISTING
CONCRETE PADCF-1
HWH-1 DISC
PP3-29
PDMP-4
X1X4X2X4X4X1
UH-1 DISC
REMOVE ALL
LIGHTING,
OUTLETS, ETC IN
THESE SPACES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23
100% STAMPED FINAL
DESIGN
DESIGN BOILER REPLACEMENT -
CANANDAIGUA VAMC
400 FORT HILL AVENUE
CANANDAIGUA, NY 14424
528A5-20-502
2023-06-23
ED101
ELECTRICAL DEMOLITION POWER
PLAN - LOWER LEVEL BLDG 12
JFF MAW
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"1
ELECTRICAL DEMOLITION POWER PLAN - LOWER LEVEL
N
KEYPLAN
B12
B11
PARKING
N
GENERAL NOTES
1. SEE E-001 FOE E-SERIES NOTES AND LEGENDS.
2. SEE ED601 FOR DEMO ONE-LINE DIAGRAM
3. SEE MECHANICAL DRAWING MD101 FOR ADDITIONAL INFORMATION
4. THIS IS A PHASED PROJECT. SEE PHASING PLAN FOR ADDITONAL INFORMATION.
5. PROTECT BUILDING GROUNDING CONDUCTOR(S) FROM DAMAGE DURING SLAB
DEMOLITION.
6. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #
1/2" 1/4"
KEYED NOTES
1 CUT CONDUIT STUB-UPS FLUSH WITH FLOOR SLAB, AND CAP.
2 CONDUIT TO BE PROTECTED DURING SLAB DEMOLITION.
3 CONDUIT FED FROM MP-2 CUT BACK TO EDGE OF SLAB DEMOLITION AND CAP.
REFER TO DRAWING SD101 FOR ADDITIONAL DETAILS.
4 CONDUIT FED FROM CP-1 CUT BACK TO EDGE OF SLAB DEMOLITION AND CAP.
REFER TO DRAWING SD101 FOR ADDITIONAL DETAILS.
5 CONDUIT FED FROM SWITCHGEAR CUT BACK TO EDGE OF SLAB DEMOLITION AND
CAP. REFER TO DRAWING SD101 FOR ADDITIONAL DETAILS.
6 CONDUITS FED FROM DP 3 PROTECT DURING SLAB DEMOLITION,CONDUITS FED
FROM MP-4, AND, MP-3 CUT BACK TO EDGE OF SLAB DEMOLITION AND CAP. REFER
TO DRAWING SD101 FOR ADDITIONAL DETAILS.
7 CONDUITS FED FROM MP-1, AND, MP-3 CUT BACK TO EDGE OF SLAB DEMOLITION
AND CAP. REFER TO DRAWING SD101 FOR ADDITIONAL DETAILS.
8 CONDUIT FED FROM FED FROM DP-1 PROTECT DURING SLAB DEMOLITION.
CONDUIT FED FROM MP-1 CUT BACK TO EDGE OF SLAB DEMOLITION AND CAP.
REFER TO DRAWING SD101 FOR ADDITIONAL DETAILS.
9 CONDUITS FED FROM MP-3, AND MP-5 CUT BACK TO EDGE OF SLAB DEMOLITION
AND CAP. REFER TO DRAWING SD101 FOR ADDITIONAL DETAILS.
10 CONDUIT FED FROM CP-2 CUT BACK TO EDGE OF SLAB DEMOLITION AND CAP.
REFER TO DRAWING SD101 FOR ADDITIONAL DETAILS.
11 CONDUIT FED FROM CP-3 CUT BACK TO EDGE OF SLAB DEMOLITION AND CAP.
REFER TO DRAWING SD101 FOR ADDITIONAL DETAILS.
12 CONDUIT FED FROM MP-4 CUT BACK TO EDGE OF SLAB DEMOLITION AND CAP.
REFER TO DRAWING SD101 FOR ADDITIONAL DETAILS.
13 ALL STUB ENDED CONDUIT AND WIRE TO BE REMOVED BACK TO SURFACE.
M
H
H
H
M
M
M
M M
F A T C
JHGFEDCBA
SAH-1
EUH-1
SAF-1
EF-4
CONDUIT EXTENDS
DOWN TO DISCONNECT
SWITCH BELOW, (TYP OF 2)
EUH-2
EUH-3
SAF-3SAF-2
CONDUIT EXTENDS
DOWN TO DISCONNECT
SWITCH BELOW,
(TYP OF 5)
X
X
SP1/SP2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23
100% STAMPED FINAL
DESIGN
DESIGN BOILER REPLACEMENT -
CANANDAIGUA VAMC
400 FORT HILL AVENUE
CANANDAIGUA, NY 14424
528A5-20-502
2023-06-23
ED102
ELECTRICAL DEMOLITION POWER
PLAN - UPPER LEVEL BLDG 12
JFF DGA
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"1
ELECTRICAL DEMOLITION POWER PLAN - UPPER LEVEL
KEYPLAN
B12
B11
PARKING
N
N
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. THIS IS A PHASED PROJECT. SEE PHASING PLAN FOR ADDITONAL INFORMATION.
3. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #
4. REMOVE ALL CABLE AND CONDUIT ASSOCIATED WITH ROOFTOP PACUS. SEE
MECHANICAL DEMOLITION DRAWINGS REMOVAL OF ROOFTOP UNITS.
PANEL EM-GEN
EXSITING 4160V
GENERATOR AND
CONTROLS TO REMAIN
DEAERATOR TANK TO BE REMOVED, SEE
MECHANICAL DRAWINGS FOR ADDITIONAL
INFORMATION. COORDINATE ELECTRICAL
DISCONNECTION WITH MECHANICAL
DEMOLITION
4 4
4 4
A3 B3
A
B
N/L
3 3 a b a b
B A
B A B A
B A B A
B A B A
B A
DP-1-4
DP-1-3
DP-1-3
DP-1-3
DP-1-3
DP-1-8
DP-1-4
DP-1-8
DP-1-8
DP-1-7DP-1-7
DP-1-7
DP-1-7
DP-1-7
DP-1-7
DP-1-7
DP-1-5,a
DP-1-3
DP-1-3 DP-1-3
DP-1-3
DP-1-4
DP-1-4
DP-1-4
DP-1-6
DP-1-1 DP-1-2
DP-1-4
DP-1-3
DP-1-2
DP-1-5,b
DP-1-10
DP-1-7
DP-1-7
DP-1-5
DP-1-7
DP-1-10
DP-1-10
DP-1-10
DP-1-10
DP-1-8
DP-1-8
DP-1-4 DP-1-4
DP-1-6
DP-1-5,b
DP-1-5,a
DP-1-5,b
DP-1-5,a
DP-1-5,a
DP-1-1
DP-1-2
DP-1-4
DP-1-4
DP-1-4 DP-1-4
DP-1-4
DP-1-5,a
DP-1-5,a
DP-1-4
DP-1-4
DP-1-6 DP-1-6
DP-1-6
DP-1-6
DP-1-7
DP-1-6
DP-1-6
DP-1-6
DP-1-6
DP-1-4141 41
41 41
DP-1-5,b
DP-1-7
DP-1-5,a
DP-1-5,b
DP-1-5,bDP-1-5,a DP-1-5,b
DP-1-5,aDP-1-5,aDP-1-5,b
DP-1-5,a
DP-1-5,a
DP-1-5,b
DP-1-6
DP-1-6
DP-1-10
DP-1-8
DP-1-6DP-1-6
DP-1-6
DP-1-6
DP-1-6
DN
UP
UP
DN
DN
MLKJHGFEDCBA
7.1
X X X
X
XXX
X
X X
X
XX
X X
XXXXXX X
X X X X X X X X X X X X X X X
XXXX
X
XXXX
XXXXXXX
X
X X
X
X X
X
X X
X
XX XX
X X
X X
X
X
X
X X
X X
X
X X
X
X X
X X
X
XX
XX
X X
X
X X
X X X X X XX
X
X
X
XXX XXXX
X
X
X
X
XXX
X X X
XXX
XX
X
X
X X
X X
X
X
X X
4.4
XX XX
XXX
X X
XX
X
X
XXXX
XXXX
X
XX
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23
100% STAMPED FINAL
DESIGN
DESIGN BOILER REPLACEMENT -
CANANDAIGUA VAMC
400 FORT HILL AVENUE
CANANDAIGUA, NY 14424
528A5-20-502
2023-06-23
ED103
ELECTRICAL DEMOLITION LIGHTING
PLAN - LOWER LEVEL BLDG 12
JFF DGA
FULLY SPRINKLERED
KEYPLAN
B12
B11
PARKING
N
N
SCALE: 1/8" = 1'-0"1
ELECTRICAL DEMOLITION LIGHTING PLAN - LOWER LEVEL
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. THIS IS A PHASED PROJECT. SEE PHASING PLAN FOR ADDITONAL INFORMATION.
3. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #
KEYED NOTES
1 REMOVE REMAINING JUCTION BOX AND FIXTURES. PULL WIRES BACK TO PANEL
AND REMOVE CONDUIT.
2 MAINTAIN EXISTING CONDUIT AND CABLE TO RECONNECT TO NEW LIGHTING
FIXTURES. SEE EL101.
H
M
M
M
M M
N/L
N/L
N/L
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
N/L
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
DP-1-2-a
DP-1-2-b
MLKJHGFEDCBA
7.1
X
X
X
X
X
X
X
X
X X X
X
X
X
X
X
X
X
X
X
X
XX
XXX
X
XX
X
4.4
X X
X X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23
100% STAMPED FINAL
DESIGN
DESIGN BOILER REPLACEMENT -
CANANDAIGUA VAMC
400 FORT HILL AVENUE
CANANDAIGUA, NY 14424
528A5-20-502
2023-06-23
ED104
ELECTRICAL DEMOLITION LIGHTING
PLAN - UPPER LEVEL BLDG 12
JFF DGA
FULLY SPRINKLERED
KEYPLAN
B12
B11
PARKING
N
N
SCALE: 1/8" = 1'-0"1
ELECTRICAL DEMOLITION LIGHTING PLAN - UPPER LEVEL
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. THIS IS A PHASED PROJECT. SEE PHASING PLAN FOR ADDITONAL INFORMATION.
3. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #
X X
X
G F
C I
GFCI
T XX
X
X
X
X
X X
X
X
X
X
X
X
X
GFCI GFCI
G F
C I
G F
C I
GFCI
G F
C I
G F
C I
GFCI
MLKJHGFEDCBA
7.1
8 8
4.4
W 72
E
W 72
E
W 72
E
W I P E
X
X
X
X
W
W
W
TYP
W
HS
HS
HS
HS
HS
HS
HS
HS
HS
HS
HS
HS
X
X
X
X
HS
HS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23
100% STAMPED FINAL
DESIGN
DESIGN BOILER REPLACEMENT -
CANANDAIGUA VAMC
400 FORT HILL AVENUE
CANANDAIGUA, NY 14424
528A5-20-502
2023-06-23
ED112
ELECTRICAL DEMOLITION SECURITY
PLAN - LOWER LEVEL BLDG 12
KRK CJR
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"1
ELECTRICAL SECURITY DEMOLITION PLAN - LOWER LEVEL
KEYPLAN
B12
B11
PARKING
N
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYED NOTES
1 REMOVE EXISTING CAMERAS. UPDATE EXISTING SYSTEM TO ACCOMMODATE
REMOVAL. TURN CAMERAS OVER TO VA FOLLOWING REMOVAL
2 REMOVE EXISTING LOUDSPEAKER. TURN OVER TO VA FOLLOWING REMOVAL.
3 EXISTING CARD READERS TO BE REMOVED AND REPLACED WITH NEW DEVICES
COMPLIANT WITH VA REQUIREMENTS AND PROJECT SPECIFICATIONS.
4 REMOTE ALARM SPEAKER AND LIGHT. REMOVE ALONG WITH ALL CONDUIT AND
WIRE BACK TO SOURCE PANEL. RETURN SPEAKER AND LIGHTS TO VA FOLLOWING
REMOVAL.
RG&E CKT 251
4160V, 3Ø
EX 3#250 kcmil &
1#4/0 AWG
RG&E STATION 755
S&C, 15kV, 40kA
RG&E CKT 2901
4160V, 3Ø
MH-E-3
EX 3#250 kcmil & 1#4/0 AWG
EX 3#2/0 AWG & 1#4/0 AWGEX 3#2/0 AWG & 1#4/0 AWG
TO BLDG #10
MH-E-6
MV SWITCH SS-7
15kV, S&C, PMH-6, 600A
MV SWITCH SS-1A
15kV, S&C, PMH-10, 600A
MV SWITCH SS-1B
15kV, S&C, PMH-10, 600A
TO MH-E-7
MH-E-5 MH-E-4
TO BLDG
#11 & #16
TO BLDG #10
TO MH-E-2
TO MH-E-2
CO-GEN PLANT GENERATOR SWITCHGEAR
480V, 1600A, 3Ø, 4W, 60HZ BUSBARS
FULLY RATED FOR 65kA RMS SYM FAULT CURRENT
/800A
GENERATOR
DISCONNECT
25104
GENERATOR
DISCONNECT
290105
N.C.
PREPARED
SPACE
PREPARED
SPACE
TO PANEL DP-1
(ED602)
TO PANEL DP-2
(ED602)
600A 800A F101
LSIG
1200A 1600A F102
LSIG
1600A 1600A F103
800A 800A F104
1200A 1600A M101 N.C.
LSI
BECKWITH
M3410A
PROTECTION:
27/59 81 O/U
ALARM:
60V 51N
52a-G101 52b-G101
TRIP-G101 -86G
TRIP-G101
TRIP-M101 -50BF
CT CT
GEN PT'S (3)
120V/69V480V
BUS PT'S (3)
120V/69V480V
800:5
800A 800A G101 N.0.
LINE PT'S (3)
120V/69V480V
1200:5
600A 800A G102B N.C.
DG-1
550.4KW,
480V, 3Ø, 60Hz
DIESEL GENERATOR
TVSS
ALLEN-BRADLEY PLC CONTROL
SYSTEM
24 VDC
BATTERY AND
CHARGER
120V 480V
CPT
TO SWITCHGEAR
LOADS/TRIP & CLOSE CKTS
P026 P027
SQUARE D
ION MTR
60A
XFMR T-12
4160V PRI
1000kVA OA
480/277V SEC
RECONNECT EXISTING PRIMARY
CABLES TO NEW SERVICE
TRANSFORMER.
UNDER OIL
LOAD LINE
SELECTOR SWITCH
#4/0 AWG
L.A. L.A.
BECKWITH
M3410A
PROTECTION:
27/59
ALARM:
60V
CT CT
TRIP M101
52a-M101 52b-M101
50N 51N /
1200:5
BASLER BE1
TRIP M101
TRIP G102B
TRIP G101
24V TO DG-1
3/0
SEL
REMOTE
I/O
MODULE
TX
RX
SEL
REMOTE
I/O
MODULE
TX
RX
CT CT
VAMC MAIN SWGR
1200A, 4160V, 3Ø, 4W, 58kA RMS MOMENTARY, 60HZ BUSBARS SQUARE D, METAL-CLAD, OUTDOOR SHELTERED ISLE SWGR
5252 52-A
NORMAL
52-B
EMERGENCY
300:5 300:5
52 52-1
200:5
52 52-2
240/120V-4160V
15kVA, CPT
STATION
POWER PANEL
240/120V-4160V
SEL 751
TRIP
50N 51N
ALARM
CT CT 200:5
SEL 751
ALARM
CT CT
SEL 751
TRIP
51N
CT CT
TRIP 52-A NORMAL
(51/51N)
SEL 751
TRIP
51N
CT CT
ALARM ALARM
TRIP 52-1 TRIP 52-2
TRIP
50N 51N
TRIP 52-B EMERGENCY
(51/51N)
BUS PT
EXISTING FIBER OPTIC CABLE
TRIP AB PLC (32) TRIP AB PLC (32)
N E
L
350A 400A
FIRE
PUMP
JOCKEY
PUMP
FIRE PUMP
CONTROLLER/POWER
TRANSFER SWITCH
JOCKEY PUMP
CONTROLLER
/350A
3#-1/0 AWG & 1-#2 GRD IN 4"
CND
3#-4/0 AWG & 1-#2
GRD IN 2" CND
EXISTING GENERATOR TO BE
RELOCATED. DISCONNECT WIRING
AT GENERATOR AND PREPARE TO
BE EXTENDED TO NEW GENERATOR
LOCATION.
EXISTING FIRE PUMP, FIRE PUMP
CONTROLLER, JOCKEY PUMP, AND
JOCKEY PUMP CONTROLLER TO BE
DISCONNECTED AND REMOVED.
TURN OVER TO VA FOLLOWING
REMOVAL. EXISTING WIRING FROM
FIRE PUMP CONTROLLER TO
TRANSFORMER T-12 AND
GENERATOR DG-1 TO BE
COMPLETELY REMOVED. CAP AND
SEAL CONDUIT AT BUILDING
ENTRANCE AND AT GENERATOR
PAD.
MODIFY EXISTING TRIP CIRCUITRY
TO REMOVE TRIP SIGNAL TO
BREAKER G102B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL DEMOLITION ONE-LINE
DIAGRAM
100% STAMPED FINAL
DESIGN
FULLY SPRINKLERED
DESIGN BOILER REPLACEMENT -
CANANDAIGUA VAMC
400 FORT HILL AVENUE
CANANDAIGUA, NY 14424
2023-06-23
ED601
BLDG 12
528A5-20-502
JFF CJR
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
6/23/2023
AutoCAD SHX Text
EXCITER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DM
AutoCAD SHX Text
TTB
AutoCAD SHX Text
TTB
AutoCAD SHX Text
TTB
AutoCAD SHX Text 86G
AutoCAD SHX Text
TTB
AutoCAD SHX Text
TTB
AutoCAD SHX Text
TTB
AutoCAD SHX Text
DM
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text
ABC
AutoCAD SHX Text
AutoCAD SHX Text V
AutoCAD SHX Text
TTB
AutoCAD SHX Text
AS
AutoCAD SHX Text A
AutoCAD SHX Text
TTB
AutoCAD SHX Text
AS
AutoCAD SHX Text A
AutoCAD SHX Text
TTB
AutoCAD SHX Text
AS
AutoCAD SHX Text A
AutoCAD SHX Text
TTB
AutoCAD SHX Text
TTB
AutoCAD SHX Text
AS
AutoCAD SHX Text A
AutoCAD SHX Text
TTB
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
DISTRIBUTION DP-2
1200A, 480V, 3Ø, 4W, 60HZ BUSBARS
FULLY RATED FOR 65kA RMS SYM FAULT CURRENT
MLO
150A175A175A 125A125A125A
SAF-1
DISTRIBUTION DP-3
20A
SAF-2 SAF-3 EF-1 EF-2 EF-3 PACKAGED AC UNIT
PACU-1
4 TON
30A
225A
PACKAGED AC UNIT
PACU-2
3 TON
30A
AC-1
20kVA
35A15A
EF-4
225A, 480V, 3Ø, 3-W, 60Hz BUSBARS FULLY RATED FOR 65kA RMS SYM FAULT CURRENT
FROM CO-GEN PLANT
PARALLELING SWGR,
BREAKER F102
(ED601)
MLO
80A 80A 25A 225A
SAH-1
15A15A
SAH-2
20A 20A 20A 20A 20A 20A 20A
DUPLEX
SUMP PUMP
40A
HOT WATER
HEATER
20A
GD-1
20A
GD-2
20A
GD-3
DP-1
XFMR T12.1
480V PRI
112.5kVA
208/120V SEC
PANEL
PP-1
FROM CO-GEN PLANT
PARALLELING SWGR,
BREAKER F101
(ED601)
/400A
PANEL
PP-2
FEED-THROUGH
LUGS
CONNECTION
/// DM
200A
175A 150A100A
80A
80A
20A 20A
SPARE SPAREDUPLEX
SUMP PUMP
25A 70A
XFMR T12.2
480V PRI
112.5kVA
208/120V SEC
PANEL
PP-4
EXHAUST
FAN
EF-8
FIRE PUMP
ROOM
RECEPT.
20A 20A
20A
FIRE PUMP
ROOM
LIGHTING
UNIT
HEATER
UH-2
20A
UNIT
HEATER
UH-1
20A
EX ATS
ASCO 7000
W/ BYPASS
TO BLDG 16
EMERGENCY POWER
200kW/250kVA 208/120V
DETROIT DIESEL
694A, SKID MOUNTED
250A
N E
L / / / / /
/JUNCTION
BOX IN
EX BLDG
EX J-BOX
BLDG 12
EX CT CABINET
UTILIZED AS TAP BOX,
TO BE REMOVED
EX BUILDING 12 PANELBOARD
208/120V, 3Ø, 4W, 60HZ BUSBARS
400A 70A 100A
PANEL 1A PANEL P PANEL LT-1 EMERGENCY
GEN PANEL
(4160V GEN)
PANEL
LT-2
FUEL
PUMP
STATION
S. METAL
STORAGE
BUILDING
400A
PANEL M
20A
GD-3A
20A
GD-2A
20A
GD-1A
EXISTING ATS IN
BUILDING 13 TO
BE REMOVED.
TURN OVER TO
VA FOLLOWING
REMOVAL.
EXISTING
PANELBOARDS
TO BE REMOVED
EXISTING
METERING
EQUIPMENT TO
BE REMOVED
EXISTING
PANELBOARDS
TO BE REMOVED
EXISTING
ENCLOSED
CIRCUIT
BREAKER TO BE
REMOVED
EXISTING
TRANSFORMER
TO BE
RELOCATED.
EXISTING
GENERATOR AND
ASSOCIATED
EQUIPMENT TO
BE REMOVED
PANEL
INCINERATOR
(BUILDING 13)
225A
SEE MECHANICAL DRAWINGS
FOR EQUIPMENT REMOVAL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL DEMOLITION ONE-LINE
DIAGRAM
100% STAMPED FINAL
DESIGN
FULLY SPRINKLERED
DESIGN BOILER REPLACEMENT -
CANANDAIGUA VAMC
400 FORT HILL AVENUE
CANANDAIGUA, NY 14424
2023-06-23
ED602
BLDG 12
528A5-20-502
JFF CJR
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
6/23/2023
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SIZE 1
AutoCAD SHX Text
FVNR
AutoCAD SHX Text 3/4
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
CP
AutoCAD SHX Text
CP
AutoCAD SHX Text
CP
AutoCAD SHX Text 30A
AutoCAD SHX Text 30A
AutoCAD SHX Text 30A
AutoCAD SHX Text 60A
AutoCAD SHX Text 3/4
AutoCAD SHX Text 3/4
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
VFC
AutoCAD SHX Text
VFC
AutoCAD SHX Text
VFC
AutoCAD SHX Text
VFC
AutoCAD SHX Text
VFC
AutoCAD SHX Text
VFC
AutoCAD SHX Text 30A
AutoCAD SHX Text 30A
AutoCAD SHX Text
SIZE 1
AutoCAD SHX Text
FVNR
AutoCAD SHX Text
SIZE 1
AutoCAD SHX Text
FVNR
AutoCAD SHX Text 24kW
AutoCAD SHX Text 60A
AutoCAD SHX Text H
AutoCAD SHX Text 1.5
AutoCAD SHX Text M
AutoCAD SHX Text 30A
AutoCAD SHX Text 3/4
AutoCAD SHX Text M
AutoCAD SHX Text 30A
AutoCAD SHX Text 1.5
AutoCAD SHX Text M
AutoCAD SHX Text 30A
AutoCAD SHX Text
SIZE 1
AutoCAD SHX Text
FVNR
AutoCAD SHX Text
SIZE 1
AutoCAD SHX Text
FVNR
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text
CP
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text
CP
AutoCAD SHX Text M
AutoCAD SHX Text .25
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text G
AutoCAD SHX Text 1.5
AutoCAD SHX Text M
AutoCAD SHX Text 30A
AutoCAD SHX Text 3/4
AutoCAD SHX Text M
AutoCAD SHX Text 30A
AutoCAD SHX Text 1.5
AutoCAD SHX Text M
AutoCAD SHX Text 30A
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
P
MLKJHGFEDCBA
7.1
4.4
H01
H01
H01
H01H01
H01 H01
H01 H01
H01H01
C01
C01 C01
C01 C01
C01 C01
UTILITY ROOM
A106
STAIRS
A111
CONTROL ROOM
A105
ELECTRICAL ROOM
A103
WORKSHOP
B101
BOILER ROOM
A102
MEN
A107
JANITOR
A109
WOMEN
A108
B02B02B02
C01
C01
E01
E01
E01
E01
A01
A01
G01 G01
G01 G01 G01
G01 G01
G01
C01
C01 C01 C01
C01C01
C01 C01
C01 C01
C01 C01
A01
B02 B02
E01
I01
9 TYP
I01
I01 a b a b
I01
I01 I01
I01
I01 I01
I01
I01
DP-4
DP-1
A01
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-5
DP-5
1 DP-5
DP-1
3 DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
9 DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-5
DP-5
DP-5
DP-1
DP-1
DP-1
STORAGE
A101
STAIRS
A002 c c c d d d d g g g e e e ee e e h
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23
100% STAMPED FINAL
DESIGN
DESIGN BOILER REPLACEMENT -
CANANDAIGUA VAMC
400 FORT HILL AVENUE
CANANDAIGUA, NY 14424
528A5-20-502
2023-06-23
EL101
ELECTRICAL LIGHTING PLAN -
LOWER LEVEL BLDG 12
JFF DGA
FULLY SPRINKLERED
KEYPLAN
B12
B11
PARKING
N
N
SCALE: 1/8" = 1'-0"1
ELECTRICAL LIGHTING PLAN - LOWER LEVEL
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #.
3. SEE EP600 SERIES FOR DETAILED CIRCUITING INFORMATION.
KEYED NOTES
1 RECONNECT LIGHTS TO EXISTING CIRCUITS.
2 INSTALL NEW LIGHTS UNDER THE WORKSHOP PLATFORM ALONG CENTRAL BEAM
NEAREST GRID LINE C.
3 LOCATE LIGHT SWTICH NEXT TO WORKSHOP PLATFORM ACCESS DOOR.
4 INSTALL NEW LIGHTS UNDER THE BOILER PLATFORM ALONG CENTERLINE.
5 MOUNT LIGHTS TO CEILING.
6 RECESS LIGHT FIXTURES IN CEILING IN BATHROOMS AND JANITOR'S CLOSET.
7 MOUNT LIGHT TO CEILING IN STAIR A002.
8 SUSPEND LIGHTS 3 FEET FROM CEILING IN STAIR A002.
9 ALL EXIT SIGNS TO BE EXIT AND EMERGENCY LIGHT COMBINATION.
Revisions: Date:
i i i i j jj
6/23/2023
MLKJHGFEDCBA
7.1
4.4
C01
D01 D01 D01
C01 C01
C01
D01 D02
D02D01
D01 D02
D02D01
D02 D01 D02 D01
D02
D01
D02
D02 D01 D02
D02 D01 D02
D02
D02 D01 D02
D02
D02 D02 D01
C01
C01
C01
C01C01
C01 C01
C01 C01
D01 D01
D01
D01
D01
FED FROM
EMERGENCY GEN PANEL
D02
D01
D01
F01
F01 F01
F01
F01
F01
G01
G01H01 H01
B01 B01 B01
B02B02B02
B01 B01
B01
5 6 a a a a a a a a a a a a aa a a a a a a a a a b b b b b b b b b b b b b b b
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
1 DP-1
DP-1
DP-5
DP-5
DP-5
DP-5
DP-5
DP-5
DP-5
DP-5
DP-5
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
DP-4
I01
I01
STORAGE
A101
BOILER ROOM
A102
WORKSHOP
B101
OFFICE
B102 f f fff h h h h h h hh h h h i i i i i i i ii
I01
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23
100% STAMPED FINAL
DESIGN
DESIGN BOILER REPLACEMENT -
CANANDAIGUA VAMC
400 FORT HILL AVENUE
CANANDAIGUA, NY 14424
528A5-20-502
2023-06-23
EL102
ELECTRICAL LIGHTING PLAN - UPPER
LEVEL BLDG 12
JFF DGA
FULLY SPRINKLERED
KEYPLAN
B12
B11
PARKING
N
SCALE: 1/8" = 1'-0"1
ELECTRICAL LIGHTING PLAN - UPPER LEVELN
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. SEE EL601 FOR LIGHTING FIXTURE SCHEDULE.
3. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #
4. SEE EP600 SERIES FOR DETAILED CIRCUITING INFORMATION.
KEYED NOTES
1 SUSPEND LIGHT FIXTURES 19 FEET ABOVE FINISHED FLOOR.
2 SUSPEND LIGHT FIXTURES 15 FEET AND 3 INCHES ABOVE MEZZANINE DECK.
3 LIGHT FIXTURES RECESSED IN CEILING OF SUPERVISOR'S OFFICE.
4 SUSPEND LIGHT FIXTURES 7 FEET AND 5 INCHES ABOVE FINISHED FLOOR.
5 SUSPEND LIGHT FIXTURES 14 FEET ABOVE FINISHED FLOOR.
6 SUSPEND LIGHT FIXTURES 18 FEET ABOVE FINISHED FLOOR.
7 SUSPEND LIGHT FIXTURES 32 FEET AND 5 INCHES ABOVE FINISHED FLOOR.
8 SUSPEND LIGHT FIXTURES 14 FEET AND 6 INCHES ABOVE FINISHED FLOOR.
9 SUSPEND LIGHT FIXTURES 15 FEET ABOVE FINISHED FLOOR.
10 RECONNECT LIGHTS TO EXISTING CIRCUIT.
Revisions: Date:
e e e e e e
MLKJ
7.1
4.4
E01
E01
E01
E01
E01
B01B01B02
B01 B02 B01
B01B01
D01
D01
D01
D01
STORAGE
A001
E01 1
I01
I01
I01
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-1
DP-5
DP-5
DP-5
DP-5
DP-5
DP-5
DP-5
DP-5
DP-5
DP-5
3DP-1
DP-1
j
STAIRS
A002 j k k k k k k k k k
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23
100% STAMPED FINAL
DESIGN
DESIGN BOILER REPLACEMENT -
CANANDAIGUA VAMC
400 FORT HILL AVENUE
CANANDAIGUA, NY 14424
528A5-20-502
2023-06-23
EL103
ELECTRICAL LIGHTING PLAN
-STORAGE A001 BLDG 12
JFF DGA
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"1
ELECTRICAL LIGHTING PLAN -STORAGE A001
KEYPLAN
B12
B11
PARKING
N
N
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. SEE EL601 FOR LIGHTING FIXTURE SCHEDULE.
3. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #
4. SEE EP600 SERIES FOR DETAILED CIRCUITING INFORMATION.
KEYED NOTES
1 WALL MOUNT FIXTURE 8 FEET ABOVE FLOOR.
2 WALL MOUNT FIXTURES 19 FEET ABOVE FLOOR.
3 SUSPEND LIGHT FIXTURES 11 FEET AND 5 INCHES ABOVE GRATED FLOOR.
4 SUSPEND LIGHT FIXTURE 17 FEET ABOVE FINISHED FLOOR.
5 SUSPEND LIGHT FIXTURE 14 FEET AND 7 INCHES ABOVE FINISHED FLOOR.
Revisions: Date:
RE-CONNECT LIGHTS ON
DP-1 6 TO EXISTING
SWITCHING CIRCUIT
NOTE:
1. ALL SUPPORTS SHALL BE ASTM A36 PLAIN CARBON STEEL, HOT DIP
GALVANIZED AFTER FABRICATION.
BLOCK WALL
RIGID CONDUIT
1/4" PLATE
WELDED TO DOOR
FRAME
DOOR FRAME
EXIST SIGN FASTENED TO
PLATE WITH NUT, BOLT &
WASHER
LUMINAIRE MANUFACTURER'S
MOUNTING HARDWARE
REFER TO SPECIFICATION
SECTION 26 51 00
LUMINAIRE
(REFER TO
SCHEDULE)
LUMINAIRE (REFER
TO SCHEDULE)
FIXTURE WHIP FROM
JUNCTION BOX (6'-0"
LONG MAX)
LUMINAIRE SUSPENSION WIRES
REFER TO SPECIFICATION
SECTION 26 51 00
3 TWIST
MINIMUM, TYP
ARCHITECTURAL CEILING GRID
ACOUSTICAL
CEILING TILE, TYP
NOTE:
1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING INSTRUCTIONS
AND USING THE RECOMMENDED MOUNTING HARDWARE
LIGHTING FIXTURE SCHEDULE
MARK DESCRIPTION
LAMPS
LENS FINISH MOUNTING BASIS OF DESIGN NOTES
TYPE VOLTS WATTS
A01 4FT WATERPROOF LED FIXTURE, 4000LM, MIN 80 CRI LED
UNIVERSAL
(120-277V)
29.4W FROSTED ACRYLIC FIBERGLASS REINFORCED POLYESTER SURFACE MOUNTED
DAY-BRITE / CFI VAPORLUME LED SEALED INDUSTRIAL DW BY
SIGNIFY PART# DWAE35L840-4-UNV-EMLED
WET LOCATION: 1P65
EMERGENCY BATTERY
B01 / B02
4FT GENERAL LED FIXTURE, 4000LM, MIN 80 CRI LED
UNIVERSAL
(120-277V)
31W FROSTED ACRYLIC POLYESTER POWDER FINISH SUSPENDED
DAY-BRITE / CFI LED LINEAR SUSPENDED LBX LUMINAIRES BY
SIGNIFY PART# LBX40L840-UNV
B02 ADD EMERGENCY BATTERY OPTION
C01 4FT GENERAL LED FIXTURE, 5500LM, MIN 80 CRI LED
UNIVERSAL
(120-277V)
41W FROSTED ACRYLIC POLYESTER POWDER FINISH SUSPENDED
DAY-BRITE / CFI LED LINEAR SUSPENDED LBX LUMINAIRES BY
SIGNIFY PART# LBX55L840-UNV
D01 / D02
4FT GENERAL LED FIXTURE, 9000LM, MIN 80 CRI LED
UNIVERSAL
(120-277V)
66W FROSTED ACRYLIC POLYESTER POWDER FINISH SUSPENDED
DAY-BRITE / CFI LED LINEAR SUSPENDED LBX LUMINAIRES BY
SIGNIFY PART# LBX90L840-UNV
D02 ADD EMERGENCY BATTERY OPTION
E01 4FT SEALED LED FIXTURE, 4000LM, MIN 80 CRI LED
UNIVERSAL
(120-277V)
32W
FROSTED
POLYCARBONATE
WHITE POLYCARBONATE SURFACE MOUNTED DAY-BRITE / CFI FLUXSTREAM LED SEALED STRIP BY SIGNIFY
PART# FSX440L840-UNV
IMPACT RESISTANT: IK08
F01 4FT SLATTED LED FIXTURE, 4000LM, MIN 80 CRI LED
UNIVERSAL
(120-277V)
27W FROSTED ACRYLIC POLYESTER POWDER FINISH SUSPENDED
DAY-BRITE / CFI 5FL LED SPECIFICATION INDUSTRIAL BY
SIGNIFY PART# 5FL440L840-PP2-UNV
G01 2FT x 4FT RECESSED LED FIXTURE, 3200LM, MIN 80 CRI LED
UNIVERSAL
(120-277V)
27.4W FROSTED ACRYLIC HIGH REFLECTANCE BAKED WHITE ENAMEL RECESSED
DAY-BRITE / CFI T-GRID LED TROFFER BY SIGNIFY PART#
TG32L840-4-FS-02F-UNV
H01 2FT x 2FT RECESSED LED FIXTURE, 3800LM, MIN 80 CRI LED
UNIVERSAL
(120-277V)
34W FROSTED ACRYLIC HIGH REFLECTANCE BAKED WHITE ENAMEL RECESSED
DAY-BRITE / CFI T-GRID LED TROFFER BY SIGNIFY
PART# 2STXG38B8400-2-DS-UNV-S-WL
WET LOCATION
I01 RED LED EXIT/UNIT COMBO, ROUNDLAMP HEADS LED
UNIVERSAL
(120-277V)
2W
ALL-INCLUSIVE LAMP,
REFLECTOR, AND LENS
ASSEMBLY
WHITE THERMOPLASTIC
TOP, END, OR BACK
MOUNT
LITHONIA LIGHTING CONTRACTOR SELECT
PART# ECRG RD M6
CRI: RD 80CRI
CCT: RD 6200K
RD 85 LUMENS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23
100% STAMPED FINAL
DESIGN
DESIGN BOILER REPLACEMENT -
CANANDAIGUA VAMC
400 FORT HILL AVENUE
CANANDAIGUA, NY 14424
528A5-20-502
2023-06-23
EL501
ELECTRICAL LIGHTING DETAILS
BLDG 12
KRK RJB
FULLY SPRINKLERED
SCALE: NTS1
LIFE SAFETY - EXIT SIGN
SCALE: NTS2
LUMINAIRE MOUNTING - LAY-IN CEILING
Revisions: Date:
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
GENERAL NOTES
S B
GFCI
G F
C I
G F
C I
GFCI
GFCI
GFCI
J
GFCI
G F
C I
GFCI
G F
C I
GFCI
G F
C I
J
GFCI GFCI
G F
C I
G F
C I
GFCI
GFCI
G F
C I
G F
C I
G F C I
GFCI
G F
C I
G F
C I
MLKJHGFEDCBA
7.1
8 8
FLASH TANK
ECONOMIZER
BLOWDOWN
SEPERATOR
GENERATOR
GD-1 DISC
GD-2 DISC
480V
SWGR-ATS
VFD'S
(EXISTING)
EF-6 DISC
PP-5
EF-7 DISC
AIR COMPRESSOR
AC-1
FUEL 1 DISC
FUEL 2 DISC
EXISTING
FUEL OIL
PUMP
EXISTING
CONDENSATE
VACUUM PUMP
EUH-2 DISC
(4) 2 AWG
(1) 8 AWG GND
IN 1 1/2" RMC
(4) 2 AWG
(1) 8 AWG GND
IN 1 1/2" RMC
(4) 2 AWG
(1) 8 AWG GND
IN 1 1/2" RMC
(2) 10 AWG
(1) 12 AWG GND
IN 3/4" RMC
PP-3
DUPLEX STEAM
CONDENSATE
PUMP
DUPLEX STEAM
CONDENSATE PUMP
4.44.4
(4) 6 AWG
(1) 10 AWG GND
IN 1-1/4" RMC
PP-6
DP-4
CONDENSATE TRANSFER
PUMPS 1 & 2 (BELOW
CONDENSATE TANK)
(4) #12 AWG
(1) #12 AWG GND
IN 1" CONDUIT
TO GENERATOR
ANNUNCIATOR PANEL
TO BLDG 16
EXISTING GENERATOR STUB-UPS.
INTERCEPT AND EXTEND TO
LOCATION OF NEW GENERATOR
UTILITY ROOM
A106
CONTROL ROOM
A105
BOILER ROOM
A102
STORAGE
A101
ELECTRICAL ROOM
A103
WORKSHOP
B101
T12.1
PP-1
PP-2
PP-4
PP-4
DP-3
DP-2
DP-1
DP-4
19,21,23
DP-4
14,16,18
T12.3
EF-4
STARTER
(EXISTING)
SAF-2 DISC
12-A102-BLR-002
FIRETUBE
BOILER
12-A102-BLR-003
FIRETUBE
BOILER
12-A102-BLR-001
FIRETUBE
BOILER
12-A101-UH-006
12-A101-UH-007
DP-5
T12.4
PP-7
T12.4
HWH-3 0.6
Gallon
HWH-2
PP-3
PP-5
PP-4
DP-2
2,4,6
T12.2
HWH-4 0.6
Gallon
DP-2
1,3,5
GD-3 DISC
DP-1
17,19,21
DP-2
13,15,17
DP-2
26,28,30
DP-2
20,22,24
PP-4
PP-1
EP401
EP402
PP-3
DISC N.
DUPLEX
SUMP
PUMPS
DISC S.
DUPLEX
SUMP
PUMPS
SAH-1 DISC
EUH-1 DISC
SAF-1 DISC
SAH-2 DISCEUH-3 DISCSAF-3 DISC
STAIRS
A002
PP-5
2,4,6
CP-10
CP-11
T
PP-7
T
T
SUMP PUMPS. INTERRUPTION
OF SUMP PUMPS MUST BE
COORDINATED WITH VA COR.
IN NO CASE SHALL SUMP
PUMPS BE LEFT OFF AND
UNMONITORED.
SUMP PUMPS. INTERRUPTION
OF SUMP PUMPS MUST BE
COORDINATED WITH VA COR.
IN NO CASE SHALL SUMP
PUMPS BE LEFT OFF AND
UNMONITORED.
PP-7
PP-7
PP-7
EXISTING CONDUITS TO FORMER
FIRE PUMP CONTROLLER TO BE
ABANDONED
(EXISTING)
(EXISTING)
(EXISTING)
(EXISTING)
(EXISTING) (EXISTING)
WOMEN
A108
MEN
A107
STAIRS
A111
MECH
A104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot t h re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" t h re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot t h re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - 100% STAMPED FINAL DESIGN 2023-06-23
100% STAMPED FINAL
DESIGN
DESIGN BOILER REPLACEMENT -
CANANDAIGUA VAMC
400 FORT HILL AVENUE
CANANDAIGUA, NY 14424
528A5-20-502
2023-06-23
EP101
ELECTRICAL POWER PLAN - LOWER
LEVEL BLDG 12
JFF DGA
FULLY SPRINKLERED
N
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. PHASING IS DESIGNATED THROUGHOUT THE DRAWING SET VIA #
3. SEE EP600 SERIES FOR DETAILED CIRCUITING INFORMATION.
KEYPLAN
B12
B11
PARKING
N
SCALE: 1/8" = 1'-0"1
ELEC…