36C24224R0032 0002.docx

DOCX document 584 KB Posted

Attached to
Z1DA--528A5-20-502 BOILER REPLACEMENT PROJECT Federal contract opportunity
Solicitation number
36C24224R0032
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document is a solicitation amendment for Solicitation # 36C24224R0032, titled "Z1DA--528A5-20-502 BOILER REPLACEMENT PROJECT". The amendment is issued to address several RFI questions and make changes to the solicitation, including:

  • Revising the set-aside from 100% Veteran Owned Small Business (VOSB) to 100% Service-Disabled Veteran Owned Small Business (SDVOSB)
  • Extending the proposal due date from June 21, 2024 to June 28, 2024
  • Changing the site visit date from May 30, 2024 to June 6, 2024
  • Revising the past performance requirement from 3 projects in the past 3 years to 3 projects in the past 10 years
  • Allowing contractors to submit CPARS evaluations in lieu of Past Performance Questionnaires
  • Clarifying that a divisional price breakdown template will not be provided and that contractors should format their own
  • Replacing the Buy American clause with 52.225-10
  • Confirming the bid guarantee amount is 20% of the bid price or $3 million, whichever is less.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--528A5-20-502 BOILER REPLACEMENT PROJECT, newest first.
File Type Posted
Canandaigua VAMC Boiler Plant - Final RBM Survey.pdf PDF
36C24224R0032 0009.docx DOCX document
852.219-75 VA Notice of Limitations on Subcontracting.docx DOCX document
36C24224R0032 0008.docx DOCX document
36C24224R0032 0007.docx DOCX document
36C24224R0032 0006.docx DOCX document
Attachment B.pdf PDF
Attachment A_VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition.pdf PDF
36C24224R0032 0005.docx DOCX document
Touchpoint Plus_Quick Start guide.pdf PDF
2024-06-13 Question 1 Attachments.pdf PDF
36C24224R0032 0004.docx DOCX document
Sensepoint XCD_IOM.pdf PDF
Copy of Pre-Bid RFI Questions_Encorus Response 2024-06-13.pdf PDF
touchpoint-plus-user-guide-man0996_v1_0216.pdf PDF
36C24224R0032 0003.docx DOCX document
Site Visit Sign In Sheet.pdf PDF
528A5-20-502 Boiler Replacement_Plans_Part 2.pdf PDF
528A5-20-502 Boiler Replacement_Plans_Part 3.pdf PDF
528A5-20-502 Boiler Replacement_Plans_Part 1.pdf PDF
528A5-20-502 Boiler Replacement_Specifications REV1.pdf PDF
S02 - Past Performance Questionnaire - Exhibit B.docx DOCX document
528A5-20-502_SOW R1_Boiler Plant Replacement.pdf PDF
36C24224R0032 0001.docx DOCX document
528A5-20-502 DESIGN BOLIER REPLACEMENT SET.pdf PDF
S02 - Contractor Projects Form.docx DOCX document
36C24224R0032.docx DOCX document
S02 - Past Performance Questionnaire.docx DOCX document
852.219-78 VA Notice of Limitations on Subcontracting.docx DOCX document
20-502 Bid Specifications.pdf PDF
013200 Construction Documentation.pdf PDF
P07 Wage Determination.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Continuation Page Solicitation # 36C24224R0032

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

TBD

528A5-20-502 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga

NY

14227 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga

NY

14227 To all Offerors/Bidders

36C24224R0032

X X X

TBD

See Continuation Page for Instructions/Changes

Veronica Baldwin Contracting Officer This amendment is issued to address RFIs.

1. Looking thru the spec sections on the VAMC Canandaigua project and we do not see the below highlighted sections. Could you please advise?

A. VAMC Response: Refer to amended specifications attached.

2. The drawings regarding Project #528A-20-502 are 8.5 x 11. Will full size drawings be available?

A. VAMC Response: Refer to amended plans attached.

3. Could you please clarify whether this amendment needs to be signed and submitted with the bid, or if simply acknowledging receipt on the SF1442 is sufficient?

A. Simply acknowledging receipt on the SF1442 is sufficient.

4. Page 15 of the solicitation under Factor 2 says:

“The past performance section shall not exceed four (4) pages and shall be rated based on recent and relevant project submittals. To be evaluated favorably the offeror must provide details of three (3) previous similar contracts within the past three (3) years including: …”

a. Does this mean (4) total pages or (4) pages per project times (3) projects equivalent to (12) pages?

A. 4 pages per project for a total of 12 pages

1. Is the expectation that contractors use the file named “S02 – Contractor Projects Form.docx” to complete this task, or can the task be completed as long as all items on the Contractor Projects Form have been accounted for within the contractor’s response?

A. Yes, the task can be completed as long as all items on the Contractor’s project form have been accounted for.

5. Is there a mechanical schedule that lists the boiler flue gas economizer? It’s called out for in the spec but it is not listed in any schedule.

A. VAMC Response: See schedule below.

6. What are the materials of construction for the water softener? We do not see the water softener listed in the spec – I believe this should be in the missing spec section 23 50 11 boiler plant mechanical equipment.

A. VAMC Response: This information is in specification 223111 Water Softeners.

7. 01 00 00 1.26 Submittal Hosting. Can the Contractor utilize Procore for the submittal exchange on-line interface or is the Contractor to pay for Submittal Exchange for this Contract?

A. VAMC Response: Autodesk Construction Cloud will be used for this project and administered by the VA. Refer to spec section 01 32 00 of the amended specifications attached. Also refer to amended scope of work.

8. Please confirm the fabricator and erector must be an AISC Fabricator and Erector per 05 12 00 1.5.

A. VAMC Response: Confirmed.

9. Specification 01 91 00 is not included. Please include. Is the CxA by the Government or the Contractor?

A. VAMC Response: Refer to the amended specifications attached. Commissioning agent shall be a third party not part of this contract.

10. Please provide equipment schedule and basis of design for the condensate receivers and pumps. CRUs are detailed and outlined in Specification 23 22 23, but no sizing is provided on schedule.

A. VAMC Response: See schedule below.

11. There is no Specification for 25 10 10. In general, a lot of specification sections are missing. We respectfully request that the VA go through and confirm that each specification in the TOC is included.

A. VAMC Response: Refer to amended specifications attached.

12. Drawing A-101 on page 53 of 166 General Notes and Keyed Notes are scrambled.

A. VAMC Response: Refer to amended plans attached.

13. Drawing A-203 on page 59 of 166 General Notes and Keyed Notes are scrambled.

A. VAMC Response: Refer to amended plans attached.

14. Drawing MH-102 on page 107 of 166 General Notes and Keyed Notes are scrambled.

A. VAMC Response: Refer to amended plans attached.

15. Drawing MH-103 on page 108 of 166 General Notes and Keyed Notes are scrambled.

A. VAMC Response: Refer to amended plans attached.

16. Drawing EP-104 on page 146 of 166 General Notes and Keyed Notes are scrambled.

A. VAMC Response: Refer to amended plans attached.

17. Is the VA responsible for providing a temporary control room/bathroom for the operators during construction?

A. VAMC Response: A temporary control room and bathroom are not needed because the new control room and bathroom are in an area that is not currently being used.

18. Please provide a full-size PDF file for the drawings. The PDF is currently in 11 x 17.

A. VAMC Response: Refer to amended plans attached.

19. Does the Prime Contractor need to have a full-time on-site SSHO and a full-time on-site QC Manager (in addition to the Super)? Does the Project require three on-site full-time hats, or can one individual fulfill multiple roles?

A. VAMC Response: The SSHO can be the superintendent OR QC manager. The QC manager cannot be the superintendent.

20. SF 1442 indicates the project shall be complete within 589 calendar days after issuance of NTP, which equates to ~19.5 months. The boiler submittals will likely take 12-weeks after NTP to generate plus VA/A&E submittal review (likely another 30 days). Once approved, manufacturing lead time is likely at 26 weeks, or half a year. By the time the boilers and balance of plant equipment arrive to site, ~300 calendar days have expired. Once the system is fully installed after the equipment is set, and fully started/commissioned, the boilers must go through a 30-day runtime before entering Phase IV. 589 calendar days is not enough time to complete this Contract. We respectfully request that the Government reevaluate.

A. VAMC Response: Revised period of performance is 730 days. Refer to the amended SOW.

21. Evaluation Factor 2 - Contractor's Past Performance states that the section shall not exceed four pages. It further states: "This information shall be submitted for this procurement using Exhibit C, Past Performance Questionnaire, transmitted via Exhibit B, Sample Transmittal Letter and past Performance Evaluation Questionnaire." "S02 - Contractor Projects Form" and "S02 - Past Performance Questionnaire" were included with the solicitation package documents. Please advise on the following:

0. Is this Factor to include both completed Project Forms and PPQs for each of the three projects submitted?

A. See #4 above.

0. If PPQs are required, are they to be submitted in the Factor or directly back to the Contracting Office?

A. Include as part of the proposal.

0. If PPQs are required and a CPARS evaluation also exists for a particular project, we respectfully request that we be allowed to submit the CPARS in lieu of the PPQ. Several of our client's main POCs have either moved to other agencies or have retired. Additionally, several of our client's main POCs have also stated that they will not complete a PPQ if a CPARS evaluation exists.

A. Considering some contractors may experience problems receiving this information, we will allow you to submit the CPARs in lieu of the PPQ. Therefore, you may submit one or the other and we will accept either.

0. If PPQs must be submitted, and we are unable to obtain one, please advise on next steps. As mentioned in question 3, it has been quite difficult obtaining completed PPQs.

A. See 21c above.

0. If Project Forms and PPQs and/or CPARS are to be submitted in this Factor, we respectfully request that the Government increase the page limits as four pages will not be sufficient.

A. See #4 above.

22. Please advise if there are page limits for Evaluation Factor 3 - Contractor's Schedule. None were listed.

A. No, please follow the instructions given for the contractor’s schedule. I can’t imagine this would be an extremely long document.

23. Evaluation Factor 4 - Volume II - Price Information asks for a "division cost breakdown template" on Solicitation Page 17 of 64. No such template was provided. Please provide or advise as to how the Offeror should satisfy the requirement for divisional price breakdown.

A. The Divisional breakdown is something like the example below:

· Division 01 - General Requirements

· Division 02 - Site Construction

· Division 03 - Concrete

· Division 04 - Masonry

· Division 05 - Metals

· Division 06 - Wood and Plastics

· Division 07 - Thermal and Moisture Protection

· Division 08 - Door and Windows

· Division 09 - Finishes

· Division 10 - Specialties

· Division 11 - Equipment

· Division 12 - Furnishings

· Division 13 - Special Construction

· Division 14 - Conveying Systems

· Division 15 - Mechanical

· Division 16 - Electrical

24. The Bid Guarantee clause on Solicitation Page 19 of 64 states "(c) The amount of the bid guarantee shall be 100 percent of the bid price or , whichever is less." Please confirm this should read "20 percent, or 3 million, whichever is less."

A. Yes, the amount of the bid guarantee shall be 20 percent of the bid price or $3 million, whichever is less.

25. Solicitation Page 7 of 64 states "(e) One (1) signed Buy American Certificate". In looking at the Buy American Certificate clause on Solicitation Pages 62 and 63 of 64, we have never had to complete this and submit it with a proposal before. Furthermore, we will not definitively know the nature of the end products used until the submittal and buy-out phase of the project, if awarded, so we do not have the information available during the bidding phase to complete items (b) and (c). Lastly, there is no signature line featured with this clause; there is nowhere to officially sign. We respectfully request that the requirement to submit this clause (completed and signed) be removed from the Solicitation. This should be a post-award item.

A. The clause 52.225-2 is replaced with 52.225-10. You are not required to sign and return the anything for this clause. You are required to Buy American.

26. Page 16 of the solicitation says:

“This information shall be submitted for this procurement using Exhibit C, Past Performance Questionnaire, transmitted via Exhibit B, Sample Transmittal Letter and past Performance Evaluation Questionnaire.”

1. There is no Exhibit B with the bid documents that we could find. Typically, this exhibit provides directions to the entity completing the PPQ and explains how and when the government expects to receive returned PPQ’s.

0. Should the PPQ’s be returned directly to the contracting officer? Should the PPQ’s be returned to the contractor and submitted as part of Section 2, Past Performance? We have seen it done both ways.

A. It should be submitted with your proposal. The form was provided but wasn’t labeled Exhibit B. I have attached with that label.

0. If the PPQ should be returned directly to the contracting officer, when is it due?

A. It should be a part of your proposal.

See attached document: S02 - Past Performance Questionnaire - Exhibit B.

See attached document: 528A5-20-502_SOW R1_Boiler Plant Replacement.

See attached document: 528A5-20-502 Boiler Replacement_Specifications REV1.

See attached document: 528A5-20-502 Boiler Replacement_Plans_Part 1.

See attached document: 528A5-20-502 Boiler Replacement_Plans_Part 2.

See attached document: 528A5-20-502 Boiler Replacement_Plans_Part 3.

FAR Number
Title
Date
52.225-10
NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS ALTERNATE I (MAY 2014)
MAY 2014

image1.png image2.png image3.png