S02 DWG FINAL SUBMITTAL-VOL2 Part B 22 Dec 20.pdf

PDF 14 MB Posted

Attached to
Z1DA--Service-Renovate Domestic Water Piping Projects FMS (VA-21-00001742)605-21-1-6043-0001-
Solicitation number
36C25821R0015
Issued by

About this file

This federal contract opportunity notice is for renovations to domestic water piping projects at a Department of Veterans Affairs medical center. The solicitation number is 36C25821R0015 and proposals are due no later than August 28, 2021 at 2:00 PM Pacific Standard Time. Any requests for information must be submitted in writing to the listed points of contact no later than August 16. The opportunity is for project number 605-20-201 to renovate domestic water piping at the location. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 is the contracting agency.

View the file

Other files

File Type Posted
36C25821R0015 0006.docx DOCX document
Questions - RFI last Questions.pdf PDF
36C25821R0015 0005.docx DOCX document
CLC_RCP-A-131-2019-11-18.pdf PDF
CLC2_RCP-AE1-16-2019-11-18.pdf PDF
Second Set of Questions.pdf PDF
36C25821R0015 0004.docx DOCX document
Site Walk Sign In Sheet.pdf PDF
36C25821R0015 0003.docx DOCX document
Questions.pdf PDF
Volume II Building 1 Loma Linda Final.pdf PDF
36C25821R0015 0002.docx DOCX document
36C25821R0015 0001.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL2 Part C 22 Dec 20.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL1 PART A 22 Dec 20.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL1 PART B 22 Dec 20.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL2 Part A 22 Dec 20.pdf PDF
Attachment J Legionella 1061 Directive.pdf PDF
Attachment F AWWA C651-14 Disinfecting Water Mains.pdf PDF
Attachment H Loma Linda HCS Infection Prevention Guide.pdf PDF
Attachment C Self Performance Calculations.docx DOCX document
Attachment B Bid Breakout Form.docx DOCX document
S20 SPEC FINAL SUBMITTAL 22 Dec 20.pdf PDF
Attachment I 1061 D 2021-02-16.pdf PDF
Attachment E Davis Bacon Wage 06.25.21.docx DOCX document
Attachment A Instructions for Contractors 07.27.docx DOCX document
Attachment G Part 8 ICRA for Loma Linda Renovate Domestic Piping.doc DOC document
Attachment D Past Performance Survey 07.27.docx DOCX document
36C25821R0015_1.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

K

J

H

G

F

17 16 15 14 13 12 11 10 9 8.6 8.5 8.3 8 7.9

(E) 2 1/2" CW

(E) 1" CW

CW

HW

(E) 2" HW

(E) 3/4" CW

H W

(E) 3/4" HWR

(E) 3" CW

(E) 2 1/2" HW(E) 2 1/2" CW

(E) 2" HW

(E) 2 1/2" CW

(E) 2" HW

(E) 2" HW

(E) 1 1/4" HW

(E) 3/4" HWR

(E) 3" CW

(E) 3/4" CW

(E) 2" HW (E) 1 1/4" HW

(N) 2" CW

(E) 2" CW

HW

H W

(E) 3/4" CW

(E) 3/4" HW

(E) 2" HW

(E) 2" HW

(E) 2 1/2" CW

(E) 2" CW

(E) 2" HW

(E) 2" HW

(E) 2" CW

(E) 3/4" HW

(E) 3/4" HW

(E) 3/4" CW

(N) 1" CW

(E) 3" CW

(N) 3/4" HWS

C W

R C

W H

W S

HWS

CW

HWS

CW

HWS

CW

HWS

CW

CW

(N) 1 1/2" HWS

(N) 1 1/4" HWS

(N) 1 1/4" HWS

(N) 1" HWS

(N) 1" HWS

(N) 1" HWS

(N) 2" HWS(N) 2" HWS

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" HWS

(N) 1 1/2" CW (N) 1 1/2" CW

(N) 1 1/2" HWS

(N) 1" CW

(N) 1" HWS

SOV

SOV

SOV

SOV

SOV

SOV

SOV

SOV

SOV

SOV SOV

SOV

SOV

SOV SOV

SOV

SOV

SOV

(N) 2 1/2" CW

(N) 2" HWS

(N) 3/4" CW

(N) 2 1/2" CW

(N) 3/4" HWS

(N) 2 1/2" HWS

(E) 2 1/2" HW

(N) 2" HWS

(N) 2 1/2" CW

CW

HWS

CW

HWS

CW

HW

C W

2 2

(E) 2 1/2" CW

(E) 2" HW

SOV

(N) 2" CW

(N) 3/4" HWS

(N) 3/4" CW

SOV

(N) 3/4" CW(N) 3/4" HWS

SOV

H W

2 1

(N) 3/4" CW

(N) 2" CW

(N) 2" HWS

(N) 2" CW

(N) 1 1/2" HWS

(N) 2" CW

(N) 3/4" HWS

(N) 3/4" CW

SOV

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" HWR

(N) 1 1/2" HWS

(N) 1 1/2" HWS

(N) 1" HWS

2 2 1

(E) 3/4" HW

(E) 3" CW

(N) 3/4" CW

(N) 1" HWS

(N) 3/4" HWS

(N) 3/4" CW (N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" CW

(N) 3/4" CW

(N) 3/4" CWR

(N) 1" CW

(N) 1 1/2" CW

(E) 2 1/2" CW

(E) 2 1/2" CW

(N) 3/4" HWS

(N) 1" HWS

(N) 1 1/2" HWS

(N) 2" HWS

(N) 2" HWS

(N) 2 1/2" HWS

(N) 2" HWS

(N) 1 1/2" CW

SERVICE BAY

SB02-4

SERVICE BAY

SB02-6

PW-502

PW-502

(N) 1" CW

(N) 1" HWS

(E) 2" HW

(E) 2" HW

(N) 2 1/2" CW(N) 2" HWS

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" HWS(N) 2 1/2" CW

(N) 2" CW

(N) 2" CW

(N) 1 1/2" CW (N) 1 1/2" CW

(N) 3/4" CW

(N) 1 1/4" HWS

(N) 1 1/2" CW

(N) 1 1/4" HWS

(N) 1 1/2" CW

(N) 1 1/2" CW

(N) 1" CW

(N) 1 1/2" CW

(N) 2" HWS

(N) 1 1/2" CW

(E) 2" HW

(N) 1 1/2" CW

(N) 2" HWS

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" HWS

(N) 2 1/2" CW

(N) 2 1/2" HWS

(N) 2 1/2" CW

WFM

WFM

CP

(E)

WFM

CP

WFM

(E)

1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF

EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD

LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD

ENDS SHALL BE ALLOWED PER VA DIRECTIVE.

2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION

CHART ON SHEET P001.

3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE

TO PROVIDE A CONTINUOS FLOW.

4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL

EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.

POC - CONNECT NEW COLD WATER TO EXISTING COLD

WATER IN INTERSTITIAL SPACE.

POC - CONNECT NEW HOT AND COLD WATER TO EXISTING

HOT /COLD WATER IN INTERSTITIAL SPACE.

3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)

4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC

COLD WATER LOOPING SYSTEM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

FI

N

AL

C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00

C :\U se rs

\rm ar tin ez

\D oc um en ts \V

AL

L

- L eg io ne lla S tu dy

Pl um bi ng _P bs en gi ne er s.

rv t

/1

7/

:4 4:

A

M

PW-204

NEW PARTIAL SECOND FLOOR PLAN #4 RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

C.N. G.H.

KEY NOTES

SERVICE BAY 1

SERVICE BAY 3

SERVICE BAY 5

SERVICE BAY 7

SERVICE BAY 2

SERVICE BAY 4

SERVICE BAY 6

SERVICE BAY 8

DD

CC

W

O

K G

S

C

V

N

J

F

R

B

X

T

D

H

L

P

U

A

E

I

M

Q

TRUE

NORTH

N

GENERAL NOTES

1/8" = 1'-0"1 02 Water - Segment D New

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

100% CONSTRUCTION DOCUMENTS 08/05/2020

FINAL CONSTRUCTION DOCUMENTS 12/10/2020

26 71

STAFF TEAMING RM

2D-84

STAFF RESPITE AREA

2D-86

ON-CALL RM

2D-85

TOILET

2D-68A

TOILET

2D-66A

TOILET

2D-64A

TOILET

2D-62A

TOILET

2D-60A

TOILET

2D-58A

TOILET

2D-56A

TOILET

2D-54A

TOILET

2D-52A

TOILET

2D-50A

TOILET

2D-67A

TOILET

2D-65A

TOILET

2D-63A

TOILET

2D-61A

TOILET

2D-59A

TOILET BARIATRIC

2D-57A

SOILED UTILITY

2D-72

CLEAN UTILITY

2D-73

MEDICATION

2D-74

NOURISH

2D-80

STAFF TOILET

2D-82

STAFF TOILET

2D-81

EQUIPMENT STORAGE

2D-83

STAFF TL/SH

2D-85A

ICU 7

2D-68

ICU 8

2D-66

ICU 9

2D-64

ICU 10

2D-62

ICU 11

2D-60

ICU 12

2D-58

ICU 13

2D-56

ICU 14

2D-54

ICU 15

2D-52

ICU 16

2D-50

ICU 1 ISOLATION/ BARIATRIC

2D-57

ICU 2

2D-59

ICU 3

2D-61

ICU 4

2D-63

ICU 5

2D-65

ICU 6

2D-67

EQ ALC

C2-78A

EQ ALC

C2-79F

EQ ALC

C2-76D

CORR

C2-77

CORR

C2-78

CORR

C2-76

CORR

C2-79

CORR

C2-74

NURSE STATION

2D-78

PHYSICIAN

WORKROOM

2D-96

STRTCH/

EQUIP ALC

C2-78B C2-78C

PTS

2D-57E

26 25.5 25.4 25

F

E.5

E

D

C

E.9

24.9 24 23 22 21 20.5 20 19 18 17

(E) 1 1/2" HW

(E) 2 1/2" CW

HW

CW

(E) 3" CW

CW CW

HW

CW

(E) 2 1/2" CW

(E) 2" CW

(E) 2" HW

(E) 3" CW

CW

SERVICE BAY

SB02-7

PW-502

(N) 1 1/2" CW

SOV

(N) 3" CW

(N) 3" CW

(N) 3/4" CW

(N) 1 1/2" CW

(N) 3/4" CW

(N) 3/4" CW

(N) 3" CW

(N) 3/4" CW

(N) 3" CW

(N) 3/4" CW

(N) 3/4" CW (N) 3/4" CW

(N) 3/4" CW

(N) 1 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 3/4" CW

(N) 3/4" CW

(N) 3/4" CW

(N) 3/4" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 3/4" CW

(N) 3/4" CW

(N) 3/4" CW

(N) 3/4" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 1 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 3/4" CW

(N) 2 1/2" CW

(N) 3/4" CW

(N) 2 1/2" CW

(N) 1" CW

(N) 3/4" CW

(N) 1 1/2" CW

(N) 3/4" CW

(N) 2 1/2" CW

(N) 3/4" CW

(N) 1" CW

(N) 3/4" CW

(N) 2 1/2" CW

(N) 3/4" CW

(N) 2 1/2" CW

(N) 3/4" CW

(E) 2 1/2" CW

(N) 2" CW(N) 2" CW

(N) 3/4" CW

(N) 1" CW

(N) 2" CW

(N) 2 1/2" CW

(N) 1 1/2" CW(N) 3/4" CW

(N) 2" CW

(N) 2 1/2" CW

(N) 2" CW

(E) 3/4" CW

(E) 3/4" CW

(N) 1 1/2" CW

(N) 2" CW

(N) 3/4" CWR

(N) 3/4" CW

(N) 1 1/2" CW

(N) 1" CW

(N) 2" HWS

(N) 1 1/2" HWS

(N) 2 1/2" CW

(N) 1 1/2" HWS

(N) 2 1/2" CW

(N) 1 1/4" HWS

(N) 1 1/4" HWS

HWS

HW

WFM

WFM

CP

(E)

1 2

2 2

(N) 2" HWS

(N) 2" HWS

1 1

(E) 3/4" HW

(E) 3/4" HW

21 2 21 2 21 2 21 2 21

2 1

1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF

EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD

LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD

ENDS SHALL BE ALLOWED PER VA DIRECTIVE.

2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION

CHART ON SHEET P001.

3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE

TO PROVIDE A CONTINUOS FLOW.

4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL

EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.

POC - CONNECT NEW COLD WATER TO EXISTING COLD

WATER IN INTERSTITIAL SPACE.

POC - CONNECT NEW HOT AND COLD WATER TO EXISTING

HOT /COLD WATER IN INTERSTITIAL SPACE.

3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)

4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC

COLD WATER LOOPING SYSTEM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

FI

N

AL

C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00

C :\U se rs

\rm ar tin ez

\D oc um en ts \V

AL

L

- L eg io ne lla S tu dy

Pl um bi ng _P bs en gi ne er s.

rv t

/1

7/

:4 4:

A

M

PW-205

NEW PARTIAL SECOND FLOOR PLAN #5 RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

C.N. G.H.

KEY NOTES

SERVICE BAY 1

SERVICE BAY 3

SERVICE BAY 5

SERVICE BAY 7

SERVICE BAY 2

SERVICE BAY 4

SERVICE BAY 6

SERVICE BAY 8

DD

CC

W

O

K G

S

C

V

N

J

F

R

B

X

T

D

H

L

P

U

A

E

I

M

Q

TRUE

NORTH

N

GENERAL NOTES

1/8" = 1'-0"1 02 Water - Segment E New

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

100% CONSTRUCTION DOCUMENTS 08/05/2020

27 71

E

D

C

16 15 14 13 12 11 10 9 8 7

(E) 3/4" HWR

(E) 2 1/2" HW

(N) 1 1/4" HWS

HW

(E) 3/4" CW

(E) 3/4" HW

(E) 1 1/2" CW2

(N) 2" CW

(N) 2" HWS

SOV

SOV

(N) 3/4" CW

(N) 3/4" CW

(N) 2 1/2" CW

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" HWS

SOVSOV

(N) 3/4" HWS

SOV

SOV

(N) 3/4" CW

(N) 3/4" CW

(N) 2 1/2" CW

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" HWS

SOV

(N) 3/4" HWS

(N) 3/4" HWS(N) 1" HWS

(N) 2 1/2" CW

(N) 2" CW

(N) 2 1/2" CW

1 1

2 2

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW

(N) 1 1/2" CW

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW (N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW

1 1

2 2

2 2

(N) 1 1/2" CW

(N) 1 1/2" CW

1 1

(N) 1 1/2" CW

(N) 1 1/2" CW

(N) 1 1/4" HWS

(N) 2" CW

(N) 3" CW

SERVICE BAY

SB02-8

PW-502

(E) 2" HW

HWS

CW CW

HWS

CW

HWS

CW

H W

S C

W

C W

H W

S

HWS

CW

HWS

CW

CW

HWS

H W

R C

W

(N) 1 1/2" CW

SOV

SOV

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" CW

(N) 3/4" HWS

SOV

SOV

SOV

(N) 2" HWS

(N) 1 1/2" HWS

(N) 3/4" HWS

(N) 3/4" CW

(N) 1 1/4" HWS

(N) 1 1/2" HWS

HWS

CW

CW

HWS

C W

H W

S

H W

S C

W

H W

S C

W

H W

S C

W

H W

S C

W

(N) 3/4" CW

(N) 3/4" HWS

(N) 2 1/2" CW

(N) 3" CW

SOV

(N) 3/4" CW

(N) 3/4" HWS

(N) 1 1/2" HWS

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW

(N) 2 1/2" CW

(N) 1 1/2" HWS

(N) 3/4" CW

(N) 3/4" HWS

(N) 2 1/2" CW

(N) 2" HWS

HWS

CWCW

HWS

HWS

CW

(N) 2 1/2" CW(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" CW

(N) 3/4" HWS

(N) 1 1/2" CW

(N) 1 1/2" HWS

(N) 2 1/2" CW

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" CW

(N) 3/4" HWS

(N) 1 1/4" HWS

(N) 1" HWS

(N) 3/4" HWS

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW

(N) 1 1/2" CW

(N) 1 1/2" CW

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" CW

(N) 3/4" HWS

WFM

WFM

CP

(E)

(N) 2 1/2" CW

CW

HWS

1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF

EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD

LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD

ENDS SHALL BE ALLOWED PER VA DIRECTIVE.

2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION

CHART ON SHEET P001.

3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE

TO PROVIDE A CONTINUOS FLOW.

4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL

EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.

POC - CONNECT NEW COLD WATER TO EXISTING COLD

WATER IN INTERSTITIAL SPACE.

POC - CONNECT NEW HOT AND COLD WATER TO EXISTING

HOT /COLD WATER IN INTERSTITIAL SPACE.

3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)

4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC

COLD WATER LOOPING SYSTEM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

FI

N

AL

C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00

C :\U se rs

\rm ar tin ez

\D oc um en ts \V

AL

L

- L eg io ne lla S tu dy

Pl um bi ng _P bs en gi ne er s.

rv t

/1

7/

:4 5:

A

M

PW-206

NEW PARTIAL SECOND FLOOR PLAN #6 RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

C.N. G.H.

KEY NOTES

SERVICE BAY 1

SERVICE BAY 3

SERVICE BAY 5

SERVICE BAY 7

SERVICE BAY 2

SERVICE BAY 4

SERVICE BAY 6

SERVICE BAY 8

DD

CC

W

O

K G

S

C

V

N

J

F

R

B

X

T

D

H

L

P

U

A

E

I

M

Q

TRUE

NORTH

N

GENERAL NOTES

1/8" = 1'-0"1 02 Water - Segment F New

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

100% CONSTRUCTION DOCUMENTS 08/05/2020

28 71

25.5

25.5

N N

M M

C C

D D

E E

F F

G G

H H

J J

K K

K.1 K.1

L L

PW-503

PW-503

PW-503

PW-503

PW-503

PW-503

PW-503

PW-503

PW-301

1 PW-302

PW-303

PW-304

PW-305

PW-306

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

FI

N

AL

C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00

C :\U se rs

\rm ar tin ez

\D oc um en ts \V

AL

L

- L eg io ne lla S tu dy

Pl um bi ng _P bs en gi ne er s.

rv t

/1

7/

:4 5:

A

M

PW-300

OVERALL THIRD FLOOR PLAN RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

C.N. G.H.

3/64" = 1'-0"1 OVERALL 03 - 3RD FLOOR PLAN - Waste & Vent - New

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

100% CONSTRUCTION DOCUMENTS 08/05/2020

29 71

26 25.5 25.4 25

N

M.5

M

L

K.1

24.9 24 23 22 21 20.5 20 19 18 17

(E) 3" CW

CW

HW

(E) 1/2" CW (E) 1 1/2" CW

(E) 3" CW

CW

(E) 3" CW

CW

(E) 2" HW

H W

(E) 2 1/2" HW

(E) 3/4" HWR

(E) 2 1/2" HW

(E) 2" HW

HW

(E) 1/2" HW

HW

(E) 2" HW

(E) 3" CW

(E) 2" HW

(E) 3/4" CW

H W

H W

(E) 2 1/2" HW

(E) 2 1/2" HW

(E) 3/4" HW

WHA

(E) 1 1/2" CW

(E) 1 1/2" CW (E) 3/4" HW

222222

CP

WFM

WFM

(N) 2 1/2" CW

(N) 2" CW

(N) 1" HWS

(N) 1" HWS (N) 1 1/2" HWS

(N) 1" CW (N) 2" CW

(N) 2" CW

(N) 2 1/2" CW

(N) 3" CW(N) 3/4" HWS

(N) 3" CW

PW-501

(E)

(N) 2" CW

(N) 1 1/2" HWS

(N) 1" HWS

(N) 1" CW

(N) 2 1/2" CW

(N) 1" HWS

(N) 1 1/2" HWS

(N) 2" CW (N) 2 1/2" CW

(N) 1 1/2" HWS

(N) 2 1/2" CW

(N) 2" HWS

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" HWS

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2" HWS

(E) 3/4" HW

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" CW

(N) 1 1/2" HWS

(N) 2" CW

(N) 1 1/2" HWS

(N) 2" HWS

(N) 3" CW

(N) 2" HWS

(N) 2" HWS

(N) 3" CW

(N) 3" CW

(N) 2" HWS

(N) 3/4" CW

(N) 1/2" CW

SOV

1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF

EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD

LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD

ENDS SHALL BE ALLOWED PER VA DIRECTIVE.

2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION

CHART ON SHEET P001.

3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE

TO PROVIDE A CONTINUOS FLOW.

4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL

EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.

POC - CONNECT NEW COLD WATER TO EXISTING COLD

WATER IN INTERSTITIAL SPACE.

POC - CONNECT NEW HOT AND COLD WATER TO EXISTING

HOT /COLD WATER IN INTERSTITIAL SPACE.

3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)

4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC

COLD WATER LOOPING SYSTEM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

FI

N

AL

C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00

C :\U se rs

\rm ar tin ez

\D oc um en ts \V

AL

L

- L eg io ne lla S tu dy

Pl um bi ng _P bs en gi ne er s.

rv t

/1

7/

:4 6:

A

M

PW-301

NEW PARTIAL THIRD FLOOR PLAN #1 RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

C.N. G.H.

KEY NOTES

TRUE

NORTH

N

SERVICE BAY 1

SERVICE BAY 3

SERVICE BAY 5

SERVICE BAY 7

SERVICE BAY 2

SERVICE BAY 4

SERVICE BAY 6

SERVICE BAY 8

W

O

K G

S

C

V

N

J

F

R

B

X

T

D

H

L

P

U

A

E

I

M

Q

GENERAL NOTES

1/8" = 1'-0"1 03 Water - Segment A New

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

100% CONSTRUCTION DOCUMENTS 08/05/2020

30 71

N

M.5

M

L

K.1

17 16 15 14 13 12 11 10 9 8.6 8.5 8.3 8 7.9

(E) 2 1/2" HW

(E) 3/4" HW

HW

CW

SO

V

H W

S C

W

HWS

CW

CW

HWS

(N) 1 1/2" CW

(N) 1" CW

(N) 1" HWS

H W

R C

W

(N) 3/4" HWR

(E) 3/4" HWR

(N) 2 1/2" CW (E) 2 1/2" CW

(N) 2" HWS

(E) 2" HW

(N) 2" HWS

(N) 2 1/2" CW

2 2

(N) 3/4" CW

(N) 3/4" HWS

11 2

22 2

2 2

2 1

SO

V

(E) 2" HW

(E) 3" CW

(N) 3/4" CW

(N) 1" HWS

(N) 1 1/2" HWS

(N) 2" HWS

(N) 1 1/2" HWS

(N) 2" CW

(N) 2 1/2" CW

(N) 2" CW

(N) 1 1/2" CW

(N) 2 1/2" CW

PW-502

WFM

WFM

CP

(E)

(N) 2 1/2" CW

(N) 2" HWS

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" CW

(N) 2" HWS

(N) 2" CW

(N) 1 1/2" HWS

(N) 2" HWS

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2" HWS

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" CW

(N) 1 1/2" HWS

1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF

EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD

LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD

ENDS SHALL BE ALLOWED PER VA DIRECTIVE.

2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION

CHART ON SHEET P001.

3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE

TO PROVIDE A CONTINUOS FLOW.

4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL

EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.

POC - CONNECT NEW COLD WATER TO EXISTING COLD

WATER IN INTERSTITIAL SPACE.

POC - CONNECT NEW HOT AND COLD WATER TO EXISTING

HOT /COLD WATER IN INTERSTITIAL SPACE.

3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)

4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC

COLD WATER LOOPING SYSTEM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

FI

N

AL

C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00

C :\U se rs

\rm ar tin ez

\D oc um en ts \V

AL

L

- L eg io ne lla S tu dy

Pl um bi ng _P bs en gi ne er s.

rv t

/1

7/

:4 6:

A

M

PW-302

NEW PARTIAL THIRD FLOOR PLAN #2 RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

C.N. G.H.

KEY NOTES

SERVICE BAY 1

SERVICE BAY 3

SERVICE BAY 5

SERVICE BAY 7

SERVICE BAY 2

SERVICE BAY 4

SERVICE BAY 6

SERVICE BAY 8

DD

CC

W

O

K G

S

C

V

N

J

F

R

B

X

T

D

H

L

P

U

A

E

I

M

Q

TRUE

NORTH

N

GENERAL NOTES

1/8" = 1'-0"1 03 Water - Segment B New

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

100% CONSTRUCTION DOCUMENTS 08/05/2020

31 71

J

H

G

F

24.9 24 23 22 21 20.5 20 19 18 17

(E) 3/4" HW

(E) 3/4" HW

(E) 3/4" HW

(E) 3/4" HW

HW

(E) 2" HW(E) 2" HW

HW

(E) 2" HW

HW HW

(E) 1" CW

CW

(E) 2 1/2" CW

CW

(E) 2 1/2" CW

CW

(E) 2 1/2" CW

(E) 3/4" CW

(E) 3/4" HW

(E) 3/4" HW

(E) 3/4" CW

(E) 3/4" HW

(E) 2" HW

(E) 2 1/2" CW

(E) 3/4" CW

(E) 3/4" HW

(E) 3/4" HW

(E) 3/4" HW

C W

H W

(E) 2 1/2" CW

CW

HW

HWR

HW

(E) 2 1/2" CW

(E) 2" HW

(E) 3/4" HWR

(E) 3/4" CW

CW

HW

(E) 3/4" CW

(E) 3/4" CW

(E) 3/4" HW

(E) 2 1/2" CW

(E) 3/4" HWR

(N) 2 1/2" CW

(N) 2" CW

HWR

CWR

H W

S C

W

HWS

CW

HWS

CW

CW

HWS

CW

(N) 1 1/2" HWS

(N) 1" HWS

(N) 2" HWS

(N) 3/4" CWR

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 3/4" HWS

(N) 1" HWS

(N) 1" HWS

(N) 1 1/2" HWS

(N) 1 1/2" HWS

(N) 2" HWS

(N) 1 1/2" CW

(N) 2" CW

(E) 3" CW

(N) 3" CW

(N) 2 1/2" CW(N) 3/4" CW

PW-501

PW-501

WFM

CP

WFM

(E)

CW

CP

WFM

WFM

(E)

(N) 2 1/2" CW

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" HWS

(N) 2" HWS

(N) 2" HWS

(N) 1 1/2" HWS

(N) 2" CW

(N) 2" CW

(N) 1 1/2" HWS

(N) 2 1/2" CW

(N) 1 1/2" HWS

(N) 1 1/2" HWS

(N) 2 1/2" CW

(N) 1" HWS

(N) 1 1/2" HWS

(N) 1 1/2" CW

(N) 3/4" CW

2 2

2 2

1 2

1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF

EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD

LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD

ENDS SHALL BE ALLOWED PER VA DIRECTIVE.

2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION

CHART ON SHEET P001.

3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE

TO PROVIDE A CONTINUOS FLOW.

4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL

EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.

POC - CONNECT NEW COLD WATER TO EXISTING COLD

WATER IN INTERSTITIAL SPACE.

POC - CONNECT NEW HOT AND COLD WATER TO EXISTING

HOT /COLD WATER IN INTERSTITIAL SPACE.

3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)

4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC

COLD WATER LOOPING SYSTEM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

FI

N

AL

C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00

C :\U se rs

\rm ar tin ez

\D oc um en ts \V

AL

L

- L eg io ne lla S tu dy

Pl um bi ng _P bs en gi ne er s.

rv t

/1

7/

:4 6:

A

M

PW-303

NEW PARTIAL THIRD FLOOR PLAN #3 RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

C.N. G.H.

KEY NOTES

TRUE

NORTH

N

SERVICE BAY 1

SERVICE BAY 3

SERVICE BAY 5

SERVICE BAY 7

SERVICE BAY 2

SERVICE BAY 4

SERVICE BAY 6

SERVICE BAY 8

W

O

K G

S

C

V

N

J

F

R

B

X

T

D

H

L

P

U

A

E

I

M

Q

GENERAL NOTES

1/8" = 1'-0"1 03 Water - Segment C New

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

100% CONSTRUCTION DOCUMENTS 08/05/2020

32 71

H

G

F

17 16 15 14 13 12 11 10 9 8.6 8.5 8.3 8 7.9

(E) 2" HW

(E) 3/4" HW

(E) 2" HW

H W

(E) 2" CW

(E) 3/4" HW

(E) 3/4" CW

C W

(E) 3" HW

(E) 3" CW

CW

HW

(E) 3/4" CW

(E) 3/4" HWR

(E) 3" HW

(E) 1 1/2" CW

(E) 1" CW

(E) 3/4" HW

HW

HWCW

(E) 3/4" HW

(E) 2" CW

(E) 3/4" HW

(E) 3/4" HW

H W

(E) 2" HW

(E) 2" HW

H W

(E) 2" CW

C W

(E) 3/4" HW

(E) 3/4" CW

C W

(E) 2" CW

C W

(E) 2" HW

SO

V

(N) 2" CW

(N) 2" CW

2 2

2 2

2 1

2 2

(N) 3/4" HWS

(N) 2" CW

HWS

CW

HWS

CW

(E) 3" CW

(N) 3" CW

SO

V

(E) 3" HW

(E) 3" HW

(N) 3" HWS

(E) 3" CW

(E) 2" HW

(N) 2" HWS

(N) 3" CW

(N) 2" HWS

(N) 2" CW

(N) 1 1/2" CW

(N) 2" HWS

(N) 3" CW

(N) 3" CW

(E) 3" HW

(E) 3/4" HWR

(N) 3/4" HWS

(N) 2" CW

(N) 1" HWS

(N) 1" HWS

SOV

SOV

(N) 3/4" CW

(E) 2" CW

(N) 2" CW

(N) 2" CW

(N) 3/4" CWR

(N) 1" HWS

(N) 3/4" HWS

(N) 1 1/2" HWS

(E) 2" HW

(N) 1" HWS

(N) 1 1/2" HWS

(N) 2" HWS

(N) 3" HWS

(N) 2" CW

(N) 3/4" HWS

(N) 1" HWS

(N) 3" CW

PW-501

PW-501

(N) 3/4" CW

CP

WFM

WFM

(E)

CP

WFM

WFM

(E)

(N) 3" HWS

(N) 3" CW

(N) 3" HWS

(N) 3" CW

(N) 2" CW

(N) 1" HWS

(N) 2" CW

(N) 2" CW

(N) 1" HWS

1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF

EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD

LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD

ENDS SHALL BE ALLOWED PER VA DIRECTIVE.

2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION

CHART ON SHEET P001.

3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE

TO PROVIDE A CONTINUOS FLOW.

4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL

EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.

POC - CONNECT NEW COLD WATER TO EXISTING COLD

WATER IN INTERSTITIAL SPACE.

POC - CONNECT NEW HOT AND COLD WATER TO EXISTING

HOT /COLD WATER IN INTERSTITIAL SPACE.

3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)

4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC

COLD WATER LOOPING SYSTEM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

FI

N

AL

C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00

C :\U se rs

\rm ar tin ez

\D oc um en ts \V

AL

L

- L eg io ne lla S tu dy

Pl um bi ng _P bs en gi ne er s.

rv t

/1

7/

:4 7:

A

M

PW-304

NEW PARTIAL THIRD FLOOR PLAN #4 RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

C.N. G.H.

KEY NOTES

TRUE

NORTH

N

SERVICE BAY 1

SERVICE BAY 3

SERVICE BAY 5

SERVICE BAY 7

SERVICE BAY 2

SERVICE BAY 4

SERVICE BAY 6

SERVICE BAY 8

W

O

K G

S

C

V

N

J

F

R

B

X

T

D

H

L

P

U

A

E

I

M

Q

GENERAL NOTES

1/8" = 1'-0"1 03 Water - Segment D New

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

100% CONSTRUCTION DOCUMENTS 08/05/2020

33 71

IMIM

F

E.5

E

D

C

E.9

24.9 24 23 22 21 20.5 20 19 18 17

C W

H W

(E) 3/4" HW

(E) 3/4" CW

(E) 3/4" CW

(E) 3/4" HW

(E) 3/4" CW

(E) 1 1/2" CW

(E) 3/4" HW

(E) 1 1/2" CW

(E) 2 1/2" HW

(E) 3/4" HWR

(E) 1/2" CW

(E) 3" CW

(E) 1 1/2" HW

(E) 3/4" HW

(E) 3/4" HW

(E) 3/4" HW

(E) 3/4" CW

(E) 3" CW

(E) 2" HW

(E) 3/4" HW

(E) 1 1/2" CW

(E) 3/4" HW

(E) 2" HW

(E) 2" HW

(E) 2" HW

(E) 3/4" CW

(E) 3/4" HW

(E) 3" CW

(E) 2" HW(E) 2" HW

(N) 2 1/2" CW (N) 2 1/2" CW

(N) 2" HWS

(N) 3/4" CW

2 2

(E) 1" CW

22 2

(E) 1/2" HW

2 1

(N) 3/4" HWS

(N) 1" HWS

(E) 2" HW

(N) 2" HWS

(N) 2" HWS

(N) 2 1/2" HWS

(N) 2" CW

(N) 2" CW

(E) 3" CW

PW-501

CWR

CW

HW

HWR

HWS

CW

HW

CW

HW

CWCW

HW

H

WC

W

CP

WFM

WFM

(E)

(N) 2 1/2" HWS

(N) 3" CW

(N) 3" CW

(N) 2 1/2" HWS

(E) 2 1/2" HW

(E) 2" CW

(N) 3" CW

(N) 2" HWS

(E) 3" CW

(E) 3" CW (E) 3/4" HW

(E) 3/4" HWR

(N) 2" CW

1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF

EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD

LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD

ENDS SHALL BE ALLOWED PER VA DIRECTIVE.

2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION

CHART ON SHEET P001.

3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE

TO PROVIDE A CONTINUOS FLOW.

4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL

EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.

POC - CONNECT NEW COLD WATER TO EXISTING COLD

WATER IN INTERSTITIAL SPACE.

POC - CONNECT NEW HOT AND COLD WATER TO EXISTING

HOT /COLD WATER IN INTERSTITIAL SPACE.

3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)

4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC

COLD WATER LOOPING SYSTEM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

FI

N

AL

C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00

C :\U se rs

\rm ar tin ez

\D oc um en ts \V

AL

L

- L eg io ne lla S tu dy

Pl um bi ng _P bs en gi ne er s.

rv t

/1

7/

:4 7:

A

M

PW-305

NEW PARTIAL THIRD FLOOR PLAN #5 RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

C.N. G.H.

KEY NOTES

TRUE

NORTH

N

SERVICE BAY 1

SERVICE BAY 3

SERVICE BAY 5

SERVICE BAY 7

SERVICE BAY 2

SERVICE BAY 4

SERVICE BAY 6

SERVICE BAY 8

W

O

K G

S

C

V

N

J

F

R

B

X

T

D

H

L

P

U

A

E

I

M

Q

GENERAL NOTES

1/8" = 1'-0"1 03 Water - Segment E New

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

100% CONSTRUCTION DOCUMENTS 08/05/2020

34 71

E.5

E

D

C

E.9

16 15 14 13 12 11 10 9 8.6 8.5 8.3 8 7.9

(E) 1 1/2" CW

(E) 2 1/2" HW

(E) 3/4" CW

(E) 2 1/2" HW

(E) 3" CW

(E) 3/4" HWR(E) 3" CW

(E) 3/4" HWR

(E) 3" CW

(E) 3/4" HW

(E) 1 1/2" CW

(E ) 3

/4 " H

W

(E ) 3

/4 " C

W

(E) 1" HW(E) 3/4" HW

(E) 3/4" CW

(E) 1 1/4" HW

(E) 3" CW

CW

(E) 2 1/2" HW

HW

(E) 2" CW(E) 2" CW(E) 2" CW

(E) 3/4" CW

(E) 2 1/2" HW

(E) 1 1/2" CW

(E) 1 1/4" HW(E) 1 1/2" HW

(E) 3/4" CW

(E) 1" CW

(E) 2" HW

(E) 3/4" HW

(E) 1" HW

(E) 2 1/2" CW

(E) 3/4" CW

(E) 2" CW

(E) 2" CW

(E) 3" CW(E) 2 1/2" CW

(E) 2 1/2" HW

(E) 1" HW

(E) 2 1/2" HW

(E) 3/4" HW

(E) 2" HW(E) 2" HW

(E) 3/4" HW

2 2

2 2

(E) 1" CW

2 2

22 2

(E) 1 1/2" CW

(E) 2 1/2" HW

(N) 1 1/2" CW

(N) 2 1/2" HWS

(N) 1 1/2" HWS

(N) 1 1/2" HWS

(N) 2 1/2" CW

PW-502

WFM

CP

WFM

(E)

1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF

EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD

LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD

ENDS SHALL BE ALLOWED PER VA DIRECTIVE.

2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION

CHART ON SHEET P001.

3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE

TO PROVIDE A CONTINUOS FLOW.

4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL

EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.

POC - CONNECT NEW COLD WATER TO EXISTING COLD

WATER IN INTERSTITIAL SPACE.

POC - CONNECT NEW HOT AND COLD WATER TO EXISTING

HOT /COLD WATER IN INTERSTITIAL SPACE.

3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)

4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC

COLD WATER LOOPING SYSTEM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

FI

N

AL

C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00

C :\U se rs

\rm ar tin ez

\D oc um en ts \V

AL

L

- L eg io ne lla S tu dy

Pl um bi ng _P bs en gi ne er s.

rv t

/1

7/

:4 7:

A

M

PW-306

NEW PARTIAL THIRD FLOOR PLAN #6 RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

C.N. G.H.

KEY NOTES

TRUE

NORTH

N

SERVICE BAY 1

SERVICE BAY 3

SERVICE BAY 5

SERVICE BAY 7

SERVICE BAY 2

SERVICE BAY 4

SERVICE BAY 6

SERVICE BAY 8

W

O

K G

S

C

V

N

J

F

R

B

X

T

D

H

L

P

U

A

E

I

M

Q

GENERAL NOTES

1/8" = 1'-0"1 03 Water - Segment F New

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

100% CONSTRUCTION DOCUMENTS 08/05/2020

35 71

N N

M M

C C

D D

E E

F F

G G

H H

J J

K K

L L

PW-504

PW-504

PW-504

PW-504

PW-504

PW-504

PW-504

PW-504

PW-401

PW-402

PW-403

1 PW-404

PW-405

PW-406

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

FI

N

AL

C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00

C :\U se rs

\rm ar tin ez

\D oc um en ts \V

AL

L

- L eg io ne lla S tu dy

Pl um bi ng _P bs en gi ne er s.

rv t

/1

7/

:4 8:

A

M

PW-400

OVERALL FOURTH FLOOR PLAN RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

C.N. G.H.

3/64" = 1'-0"1 OVERALL 04 - 4TH FLOOR PLAN - Waste & Vent - New

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

100% CONSTRUCTION DOCUMENTS 08/05/2020

36 71

N.2

N

M.5

M

L

K.1

24.9 24 23 22 21 20.5 20 19 18 17

3/4"

H W

1 2

(N) 2" CW

(N) 1" HWS

(N) 1 1/2" HWS

(N) 2" HWS

(N) 1 1/2" HWS

(N) 1" HWS

(N) 3/4" HWS

(N) 1" CW

(N) 3/4" CW

(N) 2" CW

(N) 1" CW

(N) 2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2" HWS

PW-504

(N) 2 1/2" CW

(N) 2" HWS

(E) 2" HW

(E) 3/4" HWR

SERVICE BAY

SERVICE BAY

(N) 3" CW

WFM

WFM

CP

(E)

1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF

EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD

LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD

ENDS SHALL BE ALLOWED PER VA DIRECTIVE.

2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION

CHART ON SHEET P001.

3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE

TO PROVIDE A CONTINUOS FLOW.

4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL

EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.

POC - CONNECT NEW COLD WATER TO EXISTING COLD

WATER IN INTERSTITIAL SPACE.

POC - CONNECT NEW HOT AND COLD WATER TO EXISTING

HOT /COLD WATER IN INTERSTITIAL SPACE.

3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)

4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC

COLD WATER LOOPING SYSTEM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

FI

N

AL

C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00

C :\U se rs

\rm ar tin ez

\D oc um en ts \V

AL

L

- L eg io ne lla S tu dy

Pl um bi ng _P bs en gi ne er s.

rv t

/1

7/

:4 8:

A

M

PW-401

NEW PARTIAL FOURTH FLOOR PLAN #1 RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

C.N. G.H.

KEY NOTES

TRUE

NORTH

N

SERVICE BAY 1

SERVICE BAY 3

SERVICE BAY 5

SERVICE BAY 7

SERVICE BAY 2

SERVICE BAY 4

SERVICE BAY 6

SERVICE BAY 8

W

O

K G

S

C

V

N

J

F

R

B

X

T

D

H

L

P

U

A

E

I

M

Q

GENERAL NOTES

1/8" = 1'-0"1 04 Water - Segment A New

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

100% CONSTRUCTION DOCUMENTS 08/05/2020

37 71

N.2

N

M.5

M

L

K.1

17 16 15 14 13 12 11 10 9 8.6 8.5 8.3 8 7.9

(E) 3/4" HW

2 2

(N) 3/4" HWS

(N) 3/4" CW

(N) 2" HWS

(N) 1 1/2" HWS

(N) 2" HWS

(N) 1" HWS(N) 1 1/2" HWS

(N) 1" HWS

(N) 2" CW

(N) 2 1/2" CW

(N) 1" CW

(N) 2" CW

(N) 2 1/2" CW

(N) 2" CW

(N) 2 1/2" CW

PW-504

SERVICE BAY

SB04-2

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" HWS

WFM

WFM

(E)

CP

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" HWS

(N) 2 1/2" CW

(N) 1 1/2" HWS

(N) 3" CW

(N) 1" HWS

(N) 3" CW (N) 1" HWS (N) 1" CW

(N) 1" HWS

(N) 1" CW

(N) 2 1/2" CW

(N) 2" HWS

(N) 2" HWS

(N) 2" HWS

(N) 2" CW

(N) 3" CW

(N) 1 1/2" HWS

(N) 3" CW

(N) 1 1/2" HWS

1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF

EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD

LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD

ENDS SHALL BE ALLOWED PER VA DIRECTIVE.

2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION

CHART ON SHEET P001.

3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE

TO PROVIDE A CONTINUOS FLOW.

4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL

EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.

POC - CONNECT NEW COLD WATER TO EXISTING COLD

WATER IN INTERSTITIAL SPACE.

POC - CONNECT NEW HOT AND COLD WATER TO EXISTING

HOT /COLD WATER IN INTERSTITIAL SPACE.

3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)

4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC

COLD WATER LOOPING SYSTEM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

FI

N

AL

C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00

C :\U se rs

\rm ar tin ez

\D oc um en ts \V

AL

L

- L eg io ne lla S tu dy

Pl um bi ng _P bs en gi ne er s.

rv t

/1

7/

:4 8:

A

M

PW-402

NEW PARTIAL FOURTH FLOOR PLAN #2 RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

C.N. G.H.

KEY NOTES

TRUE

NORTH

N

SERVICE BAY 1

SERVICE BAY 3

SERVICE BAY 5

SERVICE BAY 7

SERVICE BAY 2

SERVICE BAY 4

SERVICE BAY 6

SERVICE BAY 8

W

O

K G

S

C

V

N

J

F

R

B

X

T

D

H

L

P

U

A

E

I

M

Q

GENERAL NOTES

1/8" = 1'-0"1 04 Water - Segment B New

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

100% CONSTRUCTION DOCUMENTS 08/05/2020

38 71

J

H

G

F

24.9 24 23 22 21 20.5 20 19 18 17

(E) 3/4" HWR

H W

3"2"

CW

HW

(E) 3" CW

HW

3/4"

CW

(E) 2" HW

HWR

3/4"

CAPPED

CP

2 2 2 2 2

1 1

1 2

(N) 3/4" CW

(N) 2" CW

(N) 2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 3/4" HWS

(N) 1" HWS

(N) 2" HWS

(N) 2" HWS

(N) 3/4" CW

(N) 2 1/2" CW

(N) 3/4" HWS

(N) 1" HWS

(N) 1 1/2" HWS

(N) 1 1/2" HWS

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" CW

(N) 1" CW

(N) 2" CW

(N) 3" CWSERVICE BAY

SB004-05

PW-504

PW-504

WFM

3WFM

(E)

(E) 3/4" HW

CP

WFM

WFM

(E)

(N) 3" CW

(N) 1 1/2" HWS (N) 3" CW

(N) 1 1/2" HWS

(N) 3" CW

(N) 1 1/2" HWS

(N) 1 1/2" HWS

(N) 3" CW

(N) 1 1/2" HWS

(N) 3" CW

(N) 3/4" CW

(N) 3/4" CW

(N) 1 1/2" CW

(N) 1 1/2" HWS

(N) 3" CW

(N) 2 1/2" CW

(N) 1 1/2" HWS

(N) 2" HWS

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2" HWS

(N) 3/4" CW

(N) 2 1/2" CW

(N) 1 1/2" HWS

(N) 1 1/2" HWS

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 1" HWS

(N) 2 1/2" CW

(N) 1" HWS

(N) 2 1/2" CW

(N) 1" HWS

(N) 2" CW

(N) 2" HWS

(N) 2" CW

(N) 2" HWS

(N) 3/4" CW

(N) 1 1/2" HWS

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 1 1/2" HWS

(N) 1 1/2" HWS

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 1 1/2" HWS

(N) 2 1/2" CW

(N) 1 1/2" HWS

(N) 3/4" CW

(N) 1" HWS

(N) 2 1/2" CW

1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF

EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD

LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD

ENDS SHALL BE ALLOWED PER VA DIRECTIVE.

2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION

CHART ON SHEET P001.

3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE

TO PROVIDE A CONTINUOS FLOW.

4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL

EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.

POC - CONNECT NEW COLD WATER TO EXISTING COLD

WATER IN INTERSTITIAL SPACE.

POC - CONNECT NEW HOT AND COLD WATER TO EXISTING

HOT /COLD WATER IN INTERSTITIAL SPACE.

3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)

4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC

COLD WATER LOOPING SYSTEM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

FI

N

AL

C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00

C :\U se rs

\rm ar tin ez

\D oc um en ts \V

AL

L

- L eg io ne lla S tu dy

Pl um bi ng _P bs en gi ne er s.

rv t

/1

7/

:4 9:

A

M

PW-403

NEW PARTIAL FOURTH FLOOR PLAN #3 RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

C.N. G.H.

KEY NOTES

TRUE

NORTH

N

SERVICE BAY 1

SERVICE BAY 3

SERVICE BAY 5

SERVICE BAY 7

SERVICE BAY 2

SERVICE BAY 4

SERVICE BAY 6

SERVICE BAY 8

W

O

K G

S

C

V

N

J

F

R

B

X

T

D

H

L

P

U

A

E

I

M

Q

GENERAL NOTES

1/8" = 1'-0"1 04 Water - Segment C New

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

100% CONSTRUCTION DOCUMENTS 08/05/2020

39 71

H

G

F

17 16 15 14 13 12 11 10 9 8.6 8.5 8.3 8 7.9

(E) 1/2" HW

(E) 3/4" HW

(E) 2" HW

(E) 2" HW

(E) 3/4" HWR

(E) 2" CW

(E) 3/4" CW

(E) 1" CW

(E) 1 1/2" CW

(E) 1" CW

(E) 1" HW

(E) 1" HW

HW

HWR

H W

HW

(E) 3/4" HW

(E) 2" CW

C W

H W

(E) 3" CW

(E) 3/4" CW

(E) 1" HW

HW

(E) 3/4" HW

(E) 3/4" HWR

HWR

HW

H W

C W

(E) 1" HW

(E) 2" CW

(E) 3/4" HW

(E) 2 1/2" HW

HW

3/4"

3/4"

3/4"

3/4"

3/4" 3/4" 3/4"

3/4"

3/4"

CW

3/4"

(E) 1" HW

1"

3/4"

(E) 3/4" HW

3/4"

(E) 3/4" HW

(E) 3/4" CW

(E) 3/4" CW

(E) 3/4" HW

CW

HW

(E) 3/4" HW

(E) 3/4" CW

1 1/2"

CW

(E) 3" CW

3/4"

2 2

HWS

2 2

2 2

1 2

CW

(N) 2" HWS

(N) 2" HWS

(N) 2" HWS

(N) 3" CW

(N) 1 1/2" HWS

(N) 1" HWS

(N) 1" HWS

2(N) 2" CW

(E) 1" CW

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" CW

(N) 1 1/2" CW

(N) 1 1/2" CW

(N) 1 1/2" CW

(N) 1 1/2" CW

(N) 3/4" CW

(N) 3/4" HWS

(N) 2" CW

(N) 2" CW

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" HWS

(N) 3/4" HWS

(N) 3/4" CW

(N) 3/4" CW

(N) 3/4" HWR

(N) 1" HWR

(N) 1" CW

(N) 1" CW

(N) 1" HWS

(N) 1 1/2" HWS

(N) 1 1/2" CW

(N) 1 1/2" HWS

(N) 2" HWS

(N) 1 1/2" CW

(N) 2" CW

(N) 2 1/2" CW

SERVICE BAY

SB004-06

PW-501

PW-504

(N) 1 1/2" HWS

(N) 1 1/2" HWS

(N) 1 1/2" HWS

(N) 1 1/2" HWS

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" CW

(N) 1 1/2" HWS

SERVICE BAY

SB004-06

WFM

WFM

CP

(E)

WFM

WFM

(E)

CW

CWR

CP

1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF

EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD

LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD

ENDS SHALL BE ALLOWED PER VA DIRECTIVE.

2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION

CHART ON SHEET P001.

3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE

TO PROVIDE A CONTINUOS FLOW.

4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL

EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.

POC - CONNECT NEW COLD WATER TO EXISTING COLD

WATER IN INTERSTITIAL SPACE.

POC - CONNECT NEW HOT AND COLD WATER TO EXISTING

HOT /COLD WATER IN INTERSTITIAL SPACE.

3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)

4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC

COLD WATER LOOPING SYSTEM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

FI

N

AL

C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00

C :\U se rs

\rm ar tin ez

\D oc um en ts \V

AL

L

- L eg io ne lla S tu dy

Pl um bi ng _P bs en gi ne er s.

rv t

/1

7/

:4 9:

A

M

PW-404

NEW PARTIAL FOURTH FLOOR PLAN #4 RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

C.N. G.H.

KEY NOTES

TRUE

NORTH

N

SERVICE BAY 1

SERVICE BAY 3

SERVICE BAY 5

SERVICE BAY 7

SERVICE BAY 2

SERVICE BAY 4

SERVICE BAY 6

SERVICE BAY 8

W

O

K G

S

C

V

N

J

F

R

B

X

T

D

H

L

P

U

A

E

I

M

Q

GENERAL NOTES

1/8" = 1'-0"1 04 Water - Segment D New

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

100% CONSTRUCTION DOCUMENTS 08/05/2020

40 71

PATIENT

BEDROOM

4D-21

PATIENT

TOILET /

SHOWER

4D-21A

CORRIDOR

C4-80

WAITING

ALCOVE

4D-22

R

1- HO UR RATED W ALL

FLO O R DRAI N

CR W ALL M O UNTED CARD

READER

AREA O F BUI LDING NOT I N

SCO PE O F W O RK

LE G E N D :

2- HO UR RATED W ALL

4D-45

H/C BED ROOM

4D-45A

H/C TLT

4D-26

CONF-CLASS

SH04-9

SHAFT

4D-66

SOCIAL WORKERS

OFFICE

C4-75

CORR

4D-68

NURSE OFFICE

4D-67

INTERDISCIPLINARY

OFFICE

4D-69

LOUNGE

4D-05

CLEAN UTILITY

4D-04

CLEAN UTILITY

EL04-S8

ELEV

EL04-S7

ELEV

C4-70

CORR

SH04-8

SHAFT

AL

IG

N

CR

W3

PATIENT

BEDROOM

4D-21

PATIENT

TOILET /

SHOWER

4D-21A

CORRIDOR

C4-80

WAITING

ALCOVE

4D-22

R

1- HO UR RATED W ALL

FLO O R DRAI N

CR W ALL M O UNTED CARD

READER

AREA O F BUI LDING NOT I N

SCO PE O F W O RK

LE G E N D :

2- HO UR RATED W ALL

4D-45

H/C BED ROOM

4D-45A

H/C TLT

4D-26

CONF-CLASS

SH04-9

SHAFT

4D-66

SOCIAL WORKERS

OFFICE

C4-75

CORR

4D-68

NURSE OFFICE

4D-67

INTERDISCIPLINARY

OFFICE

4D-69

LOUNGE

4D-05

CLEAN UTILITY

4D-04

CLEAN UTILITY

EL04-S8

ELEV

EL04-S7

ELEV

C4-70

CORR

SH04-8

SHAFT

AL

IG

N

CR

W3

26 25.5 25.4 25

F

E.5

E

D

C

E.9

24.9 24 23 22 21 20.5 20 19 18 17

(E) 3/4" HW

(E) 2" HW

(E) 3/4" CW

(E) 3/4" HW

(E) 1 1/4" CW

(E) 1 1/4" CW

(E) 3/4" HW

(E) 3/4" CW

(E) 3/4" HW

(E) 3/4" HWR

(E) 3/4" CW (E) 1" HW (E) 1 1/4" HW

(E) 3/4" CW

(E) 3" CW

(E) 2 1/2" HW

(E) 3/4" HWR

HW

H W

C W

HW

HWR

HW (E) 3/4" HW

(E) 3/4" CW

(E) 1 1/2" CW(E) 1 1/2" CW

(E) 1 1/2" CW

(E) 3/4" CW

(E) 3/4" HW

3 2

2 1

2 1

2 22

(E) 3/4" HW 2

2 2

1 1

(N) 3/4" HWS

C

W

(N) 3" CW

(N) 3" CW

(E) 3/4" CW

(E) 3/4" HW

(N) 3" CW

(N) 3" CW

(N) 1 1/2" CW

(N) 3" CW

(N) 3" CW

(N) 3" CW

(N) 3" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 1 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW (N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 2" CW

(N) 2" CW

(N) 2" CW

(N) 2" CW

(N) 3" CW

(N) 2 1/2" CW

(N) 2 1/2" CW(N) 2 1/2" CW

(N) 2 1/2" CW

(N) 1" HWS

(N) 1" HWS

(N) 2" CW

(N) 1 1/2" HWS

(N) 1 1/2" HWS

(N) 2 1/2" CW

(N) 1 1/2" HWS

(N) 2 1/2" CW

(N) 2" HWS

(N) 2" HWS (N) 2" HWS

(N) 2" HWS

(N) 2 1/2" HWS

(N) 2 1/2" HWS

(N) 2 1/2" HWS

(N) 2 1/2" HWS

(N) 2 1/2" HWS

(N) 2 1/2" HWS

(N) 2 1/2" HWS

(N) 2 1/2" HWS

(N) 2 1/2" HWS

(N) 1" HWS

(N) 1" HWS

(N) 2 1/2" HWS

(N) 2 1/2" HWS

(N) 3" CW

(N) 2 1/2" HWS

(N) 2" HWS

(N) 2 1/2" CW

(N) 2" HWS

(N) 1 1/2" CW

SERVICE BAY

SB004-07

PW-501

WFM

WFM

CP

(E)

CWR

1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF

EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD

LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD

ENDS SHALL BE ALLOWED PER VA DIRECTIVE.

2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION

CHART ON SHEET P001.

3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE

TO PROVIDE A CONTINUOS FLOW.

4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL

EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.

POC - CONNECT NEW COLD WATER TO EXISTING COLD

WATER IN INTERSTITIAL SPACE.

POC - CONNECT NEW HOT AND COLD WATER TO EXISTING

HOT /COLD WATER IN INTERSTITIAL SPACE.

3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)

4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC

COLD WATER LOOPING SYSTEM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1000 S FREMONT AVE, UNIT 53,

BLDG. A1, SUITE 1218

ALHAMBRA CALIFORNIA 91803

3920 E. CORONADO STREET, SUITE 201

ANAHEIM CALIFORNIA 92807

ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT

www.SRDArchitectsInc.com

O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244

ARCHITECTS INC

Dwg. of

FINAL CONSTRUCTION DOCUMENTS

FI

N

AL

C

O N

ST

R

U C

TI

O

N D

O C

U M

EN

TS

2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00

C :\U se rs

\rm ar tin ez

\D oc um en ts \V

AL

L

- L eg io ne lla S tu dy

Pl um bi ng _P bs en gi ne er s.

rv t

/1

7/

:4 9:

A

M

PW-405

NEW PARTIAL FOURTH FLOOR PLAN #5 RENOVATE DOMESTIC WATER PIPING

JERRY L. PETTIS MEMORIAL

605-20-201

12/10/2020

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

C.N. G.H.

KEY NOTES

TRUE

NORTH

N

SERVICE BAY 1

SERVICE BAY 3

SERVICE BAY 5

SERVICE BAY 7

SERVICE BAY 2

SERVICE BAY 4

SERVICE BAY 6

SERVICE BAY 8

W

O

K G

S

C

V

N

J

F

R

B

X

T

D

H

L

P

U

A

E

I

M

Q

GENERAL NOTES

1/8" = 1'-0"1 04 Water - Segment E New

Revisions: Date:

35% SCHEMATIC DESIGN 02/16/2020

65% DESIGN SUBMITTAL 04/20/2020

100% CONSTRUCTION DOCUMENTS 08/05/2020

41 71

W1

W1W1 W1

W1W1 W1

W1 W1W1W1 W1

ANTEROOM

4D-50

PATIENT

BEDROOM

4D-12

PATIENT

BEDROOM

4D-11

PATIENT

BEDROOM

4D-10

PATIENT

BEDROOM

4D-14

PATIENT

BEDROOM

4D-13

PATIENT

BEDROOM

4D-15

PATIENT

BEDROOM

4D-17

PATIENT

BEDROOM

4D-20

PATIENT

BEDROOM

4D-16

PATIENT

BEDROOM

4D-18

PATIENT

BEDROOM

4D-19

PATIENT

BEDROOM

4D-21

PATIENT

BEDROOM,

BARIATRIC /

AIRBORNE

INFECTION

ISOLATION

4D-08

PATIENT

ISOLATION

BEDROOM

4D-09

BARIATRIC

PATIENT

BEDROOM

4D-07

BARIATRIC

PATIENT

BEDROOM

4D-06

BARIATRIC

PATIENT

TOILET /

SHOWER

4D-07A

BARIATRIC

PATIENT

TOILET /

SHOWER

4D-06A

PATIENT

TOILET /

SHOWER

4D-16A

PATIENT

TOILET /

SHOWER

4D-17A

PATIENT

TOILET /

SHOWER

4D-15A

PATIENT

TOILET /

SHOWER

4D-20A

PATIENT

TOILET /

SHOWER

4D-18A

PATIENT

TOILET /

SHOWER

4D-11A

PATIENT

TOILET /

SHOWER

4D-10A

PATIENT

TOILET /

SHOWER

4D-13A

PATIENT

TOILET /

SHOWER

4D-14A

PATIENT

TOILET /

SHOWER

4D-19A

PATIENT

TOILET /

SHOWER

4D-12A

TOILET /

SHOWER /

BARIATRIC,

PATIENT

ISOLATION

4D-08A

PHARMACIST

SHARED

OFFICE

4D-38

STORAGE,

EQUIPMENT

4D-39

CORRIDOR

C4-86

CORRIDOR

C4-81A

HALL1

RRIDOR

C4-80

CORRIDOR

C4-83A

HALL1

HAC

4D-40

WAITING

ALCOVE

4D-22

STAFF

LOUNGE

4D-37

SOILED

UTILITY

ROOM

4D-30

CONSULT

4D-24

NURSE

STATION

C4-85

HAC

4D-41 CLEAN

UTILITY

ROOM

4D-27

SHARED

OFFICE

4D-31

NURSE

MANAGER

OFFICE

4D-33

ASST

NURSE

MGR

OFFICE

4D-32

RECEPTION

4D-23

ALCOVE,

CRASH

CART

4H-33

ALCOVE,

GURNEY

4D-34

STORAGE

4D-35

NOURISHMENT

STATION

4D-29

MEDICATION

4D-28STAFF

TOILET

4D-42

STAFF

TOILET

4D-37A

CORRIDOR

C4-82

CORRIDOR

C4-84

CORRIDOR

C4-83

CORRIDOR

C4-86A

CORRIDOR

C4-81

HALL1

STORAGE

4D-36

RCA01

PATIENT

TOILET /

SHOWER

4D-9A

4C-25

RSRCH LAB

4D-26

CONF-CLASS

4D-25A

STAFF TLT

4D-26A

WAITING RM

4D-25B

SUPPLY RM

4C-28

OFFICE

SB04-8A

EQUIP RM

SB04-8

SERV BAY

C4-88

CORR

C4-89

CORR

C4-71

CORR

C4-30

OFFICE

4C-24

PROCEDURE ROOM

C4-71

CORR

C4-71

CORR

C4-71

CORR

C4-71

CORR

4C-28

OFFICE

4C-27

OFFICE

4C-29

OFFICE

SH04-7

SHAFT

MA04-23

CORR ST04-8

STAIR

4-70

ORR

EL04-T2

ELEV

4D-03

STORAGE

(E) LIGHTWELL

AL

IG

N

CR

CR

CR

W3 W3 W3 W3 W3 W3 W3 W3

W4

W1

W1W1 W1

W1W1 W1

W1 W1W1W1 W1

ANTEROOM

4D-50

PATIENT

BEDROOM

4D-12

PATIENT

BEDROOM

4D-11

PATIENT

BEDROOM

4D-10

PATIENT

BEDROOM

4D-14

PATIENT

BEDROOM

4D-13

PATIENT

BEDROOM

4D-15

PATIENT

BEDROOM

4D-17

PATIENT

BEDROOM

4D-20

PATIENT

BEDROOM

4D-16

PATIENT

BEDROOM

4D-18

PATIENT

BEDROOM

4D-19

PATIENT

BEDROOM

4D-21

PATIENT

BEDROOM,

BARIATRIC /

AIRBORNE

INFECTION

ISOLATION

4D-08

PATIENT

ISOLATION

BEDROOM

4D-09

BARIATRIC

PATIENT

BEDROOM

4D-07

BARIATRIC

PATIENT

BEDROOM

4D-06

BARIATRIC

PATIENT

TOILET /

SHOWER

4D-07A

BARIATRIC

PATIENT

TOILE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .