36C25821R0015 0002.docx

DOCX document 27 KB Posted

Attached to
Z1DA--Service-Renovate Domestic Water Piping Projects FMS (VA-21-00001742)605-21-1-6043-0001-
Solicitation number
36C25821R0015
Issued by

About this file

This document contains an amendment to a solicitation for renovating domestic water piping projects at a Department of Veterans Affairs medical center. The amendment extends the proposal due date to August 30, 2021 at 2:00 PM Pacific Time for solicitation number 36C25821R0015. It provides answers to requests for information received, clarifying that commissioning will be the responsibility of the contractor, asbestos and lead-based paint reports will be provided by the VA, the site superintendent can also serve as the Site Safety and Health Officer and Construction Quality Control manager if qualified, firestopping will be inspected by the VA Contracting Officer with mechanical shop assistance, work can occur during nights and weekends, and specifications for connecting monitoring stations to the building management system are attached.

View the file

Other files

File Type Posted
36C25821R0015 0006.docx DOCX document
Questions - RFI last Questions.pdf PDF
36C25821R0015 0005.docx DOCX document
CLC_RCP-A-131-2019-11-18.pdf PDF
CLC2_RCP-AE1-16-2019-11-18.pdf PDF
Second Set of Questions.pdf PDF
36C25821R0015 0004.docx DOCX document
Site Walk Sign In Sheet.pdf PDF
36C25821R0015 0003.docx DOCX document
Questions.pdf PDF
Volume II Building 1 Loma Linda Final.pdf PDF
36C25821R0015 0001.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL2 Part C 22 Dec 20.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL2 Part B 22 Dec 20.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL1 PART A 22 Dec 20.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL1 PART B 22 Dec 20.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL2 Part A 22 Dec 20.pdf PDF
Attachment J Legionella 1061 Directive.pdf PDF
Attachment F AWWA C651-14 Disinfecting Water Mains.pdf PDF
Attachment H Loma Linda HCS Infection Prevention Guide.pdf PDF
Attachment C Self Performance Calculations.docx DOCX document
Attachment B Bid Breakout Form.docx DOCX document
S20 SPEC FINAL SUBMITTAL 22 Dec 20.pdf PDF
Attachment I 1061 D 2021-02-16.pdf PDF
Attachment E Davis Bacon Wage 06.25.21.docx DOCX document
Attachment A Instructions for Contractors 07.27.docx DOCX document
Attachment G Part 8 ICRA for Loma Linda Renovate Domestic Piping.doc DOC document
Attachment D Past Performance Survey 07.27.docx DOCX document
36C25821R0015_1.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 08/05/2021 605-21-1-6043-0001 605-20-201 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 To all Offerors/Bidders

36C25821R0015 08-05-2021

X

605-3610162-6043-854200 M\T\R-3220 23NR9VC39

X One The Purpose of this amendment for Project 605-20-201 Renovate Domestic Water Piping is to:

1.

Extend the Proposal Due Date to 30 August 2021, 2PM PST.

All RFIs must be submitted in writing to Xochipilli.Valdivia@va.gov and Tina.Kennedy@va.gov.

2.

Provide VA Answers to Reque st f or Information’s (RFI’s) received.

All other terms and conditions remain unchanged at this time

Tina M. Kennedy

1. Will the VA confirm that formal commissioning will be required for this project? If so, Section 01 91 00 – General Commissioning, Part 1.9 was deleted. Will the VA clarify if the Commissioning Agent (CxA) will be hired by the VA or by the Contractor? Commissioning will be provided by the Contractor

2. Will the VA clarify whether any Asbestos or Lead-Based Paint containing materials will be encountered or disturbed during this project? If so, will the VA issue abatement specifications and the Hazardous Material Survey covering the areas of work?

AE Response: VA to provide reports.

3. Will the VA clarify is the Site Supt. can, if duly qualified, also serve in the roles of SSHO and CQC, or will a separate individual be required for either of those two roles? The Site Super Must be qualified for all roles.

4. Section 07 84 00 – Firestopping, Part 1.4-C requires a third-party firestopping inspector. Will the VA confirm this will be a requirement for this project? VA COR will inspect all firestopping with the assistance of the mechanical shop.

5. Will the VA confirm that the intent is for this work to be performed during off-hours, nights, or weekends? Work will be performed during work hours, nights, and weekends

6. Drawing EP-201 (typ), Keynote #6 requires the Contractor to run conduit and wire from the monitoring stations for connection to the hospital BMS system. Specifications were not included for Direct Digital Control work and BMS specifications. Will the VA provide specifications and necessary information for the connection and required integration for the VA Loma Linda BMS requirements?

AE Response: Per Key notes 6&7 contractor is required to route (1) ½”C with control wires to existing Siemens BMS panel from each of the two Chlorine Analyzer panels. One of the (2) available control outputs in each Chlorine Analyzer panel to be used. Recommend a minimum of 4#14 wires for each control feeder that is to be coordinated with Controls Contractor as required. Verify and utilize spare terminal at each BMS panel. Typical for each service bay. Each service bay BMS panel seems to be already connected to all other service bays in an existing BMS network.

See attached document: Volume II Building 1 Loma Linda Final.

File details come from the government source that posted it. Updated .