S02 DWG FINAL SUBMITTAL-VOL2 Part A 22 Dec 20.pdf
PDF 12 MB Posted
- Attached to
- Z1DA--Service-Renovate Domestic Water Piping Projects FMS (VA-21-00001742)605-21-1-6043-0001-
- Solicitation number
- 36C25821R0015
About this file
This federal contract opportunity solicitation is seeking proposals for a project to renovate domestic water piping at a Department of Veterans Affairs facility. Proposals are due no later than August 28, 2021 at 2:00 PM Pacific Standard Time. Any requests for information must be submitted in writing to the specified points of contact by August 16, 2021 at 2:00 PM Arizona Time. The solicitation number is 36C25821R0015 and is being conducted by the Veterans Health Administration Veterans Integrated Service Network 22 on behalf of the Department of Veterans Affairs. The project, numbered 605-20-201, will renovate domestic water piping at the specified location.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F
A
D
I
E
T
D
ST
N U
E T
M
AP
R
E
NT O
S
A
T SE FO
R E
M
A
CI
N
VE RA
TE
A
FA
I R F
S
PROJECT TEAM
VA REPRESENTATIVES:
James Otwell Project Manager / COR VA Loma Linda Healthcare System 11201 Benton Street Loma Linda, CA 92357 Phone: (909) 825-7084 ext. 6812 Cell: (951) 258-3920
John T. Kamerer Contract Specialist/NCO 22 Gilbert Office: 520-629-4613 Construction Services 3601 S. 6th Avenue, Building 45 Tucson, AZ 85723
ARCHITECT:
SRD Architects Inc.
3920 East Coronado Street Suite #201 Anaheim, CA 92807 Phone: (714) 688 0212 Fax: (714) 688 0244 www.srdarchitectsinc.com
MECHANICAL/ELECTRICAL/PLUMBING:
PBS Engineers 2100 East Route 66, Suite 210 Glendora, CA 91740 Phone: (626) 650 0350
T
CI
T A
E
S
L
O
R
FI
AC L
HCRA
I T E
C
A N
I
T
E O
N
SE
F
SHIRISH R.DESAI
D
04/30/21
C-20141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
F
IN
A L
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
D w in g k \D o c u m e n ts
\V A
L L
-2
-2
C e n tr a l_ w in g
.h o .r v t
/7 /2
:2
:3
P
M
GI-000.1
COVER SHEET RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020 S.D. W.H.
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
DEPARTMENT OF VETERANS AFFAIRS
LOMA LINDA HEALTHCARE SYSTEM
RENOVATE DOMESTIC WATER PIPING
VOLUME -2
11201 BENTON STREET, LOMA LINDA, CA 92357
VA PROJECT NO. 605-20-201
FINAL CONSTRUCTION DOCUMENTS
DATE: DECEMBER 10, 2020
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
95% CONSTRUCTION DOCUMENTS 06/08/2020
100% CONSTRUCTION DOCUMENTS 08/10/2020
FINAL CONSTRUCTION DOCUMENTS 12/10/2020
1 71
T
CI
T A
E
S
L
O
R
FI
AC L
HCRA
I T E
C
A N
I
T
E O
N
SE
F
SHIRISH R.DESAI
D
04/30/21
C-20141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
F
IN
A L
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
D w in g k \D o c u m e n ts
\V A
L L
-2
-2
C e n tr a l_ w in g
.h o .r v t
/3 /2
:0
:4
P
M
GI-001.1
DRAWING INDEX RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020 S.D. W.H.
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
VOLUME 1 VOLUME 2
SHEET INDEX
SHEET
NUMBER SHEET NAME
PW-B01 NEW OVERALL BASEMENT FLOOR PLAN #1
PW-B02 NEW PARTIAL BASEMENT FLOOR PLAN #2
PW-B03 NEW PARTIAL BASEMENT FLOOR PLAN #3
PW-B04 NEW PARTIAL BASEMENT FLOOR PLAN #4
PW-B05 NEW PARTIAL BASEMENT FLOOR PLAN #5
PW-B06 NEW PARTIAL BASEMENT FLOOR PLAN #6
PW-B07 NEW PARTIAL BASEMENT FLOOR PLAN #7
PW-B08 NEW PARTIAL BASEMENT FLOOR PLAN #8
PW-100 OVERALL FIRST FLOOR PLAN
PW-101 NEW PARTIAL FIRST FLOOR PLAN #1
PW-102 NEW PARTIAL FIRST FLOOR PLAN #2
PW-103 NEW PARTIAL FIRST FLOOR PLAN #3
PW-104 NEW PARTIAL FIRST FLOOR PLAN #4
PW-105 NEW PARTIAL FIRST FLOOR PLAN #5
PW-106 NEW PARTIAL FIRST FLOOR PLAN #6
PW-107 NEW PARTIAL FIRST FLOOR PLAN #7
PW-108 NEW PARTIAL FIRST FLOOR PLAN #8
PW-109 NEW PARTIAL FIRST FLOOR PLAN #9
PW-110 NEW PARTIAL FIRST FLOOR PLAN #10
PW-200 OVERALL SECOND FLOOR PLAN
PW-201 NEW PARTIAL SECOND FLOOR PLAN #1
PW-202 NEW PARTIAL SECOND FLOOR PLAN #2
PW-203 NEW PARTIAL SECOND FLOOR PLAN #3
PW-204 NEW PARTIAL SECOND FLOOR PLAN #4
PW-205 NEW PARTIAL SECOND FLOOR PLAN #5
PW-206 NEW PARTIAL SECOND FLOOR PLAN #6
PW-300 OVERALL THIRD FLOOR PLAN
PW-301 NEW PARTIAL THIRD FLOOR PLAN #1
PW-302 NEW PARTIAL THIRD FLOOR PLAN #2
PW-303 NEW PARTIAL THIRD FLOOR PLAN #3
PW-304 NEW PARTIAL THIRD FLOOR PLAN #4
PW-305 NEW PARTIAL THIRD FLOOR PLAN #5
PW-306 NEW PARTIAL THIRD FLOOR PLAN #6
PW-400 OVERALL FOURTH FLOOR PLAN
PW-401 NEW PARTIAL FOURTH FLOOR PLAN #1
PW-402 NEW PARTIAL FOURTH FLOOR PLAN #2
PW-403 NEW PARTIAL FOURTH FLOOR PLAN #3
PW-404 NEW PARTIAL FOURTH FLOOR PLAN #4
PW-405 NEW PARTIAL FOURTH FLOOR PLAN #5
PW-406 NEW PARTIAL FOURTH FLOOR PLAN #6
PW-501 SERVICE BAY ENLARGED PLANS
PW-502 SERVICE BAY ENLARGED PLANS
PW-503 SERVICE BAY ENLARGED PLANS
PW-504 SERVICE BAY ENLARGED PLANS
PW-600 DOMESTIC WATER RISER DIAGRAM
04-ELECTRICAL
EP-001 GENERAL NOTES, SYMBOL LIST AND SHEET INDEX
EP-002 SINGLE LINE DIAGRAMS
EP-003 SINGLE LINE DIAGRAMS
EP-005 PANEL SCHEDULES
EP-006 PANEL SCHEDULES
EP-007 PANEL SCHEDULES
EP-205 PARTIAL BOILER ROOM ELECTRICAL PLAN/EXISTING PHOTO
EP-101 OVERALL FIRST FLOOR ELECTRICAL PLAN
EP-102 OVERALL SECOND FLOOR ELECTRICAL PLAN
EP-103 OVERALL THIRD FLOOR ELECTRICAL PLAN
EP-104 OVERALL FOURTH FLOOR ELECTRICAL PLAN
EP-201 FIRST FLOOR SERVICE BAYS ENLARGED ELECTRICAL PLAN
EP-202 SECOND FLOOR SERVICE BAYS ELECTRICAL ENLARGED PLANS
EP-203 THIRD FLOOR SERVICE BAYS ENLARGED ELECTRICAL PLAN
EP-204 FOURTH FLOOR SERVICE BAYS ENLARGED ELECTRICAL PLAN
EP-004 PANEL SCHEDULES
EP-301 ELECTRICAL DETAILS/EXISTING PHOTOS
05-REFERENCE
RS-101 REFERENCE - STRUCTURAL FRAMING PLAN
RS-102 REFERENCE - STRUCTURAL FRAMING PLAN
RS-103 REFERENCE - STRUCTURAL FRAMING PLAN
RS-104 REFERENCE - STRUCTURAL FRAMING PLAN
RS-105 REFERENCE - STRUCTURAL FRAMING PLAN
RS-106 REFERENCE - STRUCTURAL FRAMING PLAN
RS-107 REFERENCE - STRUCTURAL DETAILS
SHEET INDEX
SHEET
NUMBER SHEET NAME
01-GENERAL
GI-000 COVER SHEET
GI-001 DRAWING INDEX, PROJECT INFORMANTION, VICINITY MAP
GI-002 STAGING PLAN
GI-003 SYMBOLS AND ABBREVIATIONS
GI-004 GENERAL NOTES
02-ARCHITECTURAL
AE-100 OVERALL PLAN - BASEMENT
AE-101 OVERALL PLAN - FIRST FLOOR
AE-102 OVERALL PLAN - FIRST FLOOR
AE-103 OVERALL FIRST FLOOR INTERSTITIAL PLAN
AE-104 OVERALL PLAN - SECOND FLOOR
AE-105 OVERALL SECOND FLOOR INTERSTITIAL PLAN
AE-106 OVERALL THIRD FLOOR PLAN
AE-107 OVERALL THIRD FLOOR INTERSTITIAL FLOOR
AE-108 OVERALL FOURTH FLOOR PLAN
AE-109 OVERALL FOURTH FLOOR INTERSTITIAL PLAN
AE-510 PENETRATION DETAILS
03-PLUMBING
P-001 GENERAL NOTES, LEGEND, ABBREVIATIONS & SHEET INDEX
P-002 PLUMBING SCHEDULE
P-003 PLUMBING DETAILS
P-004 PLUMBING DETAILS
P-005 PLUMBING SECTION DETAILS
P-006 PLUMBING SECTION DETAILS
PD-B01 OVERALL BASEMENT FLOOR PLAN
PD-B02 PARTIAL BASEMENT FLOOR PLAN #1
PD-B03 PARTIAL BASEMENT FLOOR PLAN #2
PD-B04 PARTIAL BASEMENT FLOOR PLAN #3
PD-B05 PARTIAL BASEMENT FLOOR PLAN #4
PD-B06 PARTIAL BASEMENT FLOOR PLAN #5
PD-B07 PARTIAL BASEMENT FLOOR PLAN #6
PD-100 OVERALL FIRST FLOOR PLAN
PD-101 PARTIAL FIRST FLOOR PLAN #1
PD-102 PARTIAL FIRST FLOOR PLAN #2
PD-103 PARTIAL FIRST FLOOR PLAN #3
PD-104 PARTIAL FIRST FLOOR PLAN #4
PD-105 PARTIAL FIRST FLOOR PLAN #5
PD-106 PARTIAL FIRST FLOOR PLAN #6
PD-107 PARTIAL FIRST FLOOR PLAN #7
PD-108 PARTIAL FIRST FLOOR PLAN #8
PD-109 PARTIAL FIRST FLOOR PLAN #9
PD-110 PARTIAL FIRST FLOOR PLAN #10
PD-111 PARTIAL FIRST FLOOR PLAN #11
PD-200 OVERALL SECOND FLOOR PLAN
PD-201 PARTIAL SECOND FLOOR PLAN #1
PD-202 PARTIAL SECOND FLOOR PLAN #2
PD-203 PARTIAL SECOND FLOOR PLAN #3
PD-204 PARTIAL SECOND FLOOR PLAN #4
PD-205 PARTIAL SECOND FLOOR PLAN #5
PD-206 PARTIAL SECOND FLOOR PLAN #6
PD-300 OVERALL THIRD FLOOR PLAN
PD-301 PARTIAL THIRD FLOOR PLAN #1
PD-302 PARTIAL THIRD FLOOR PLAN #2
PD-303 PARTIAL THIRD FLOOR PLAN #3
PD-304 PARTIAL THIRD FLOOR PLAN #4
PD-305 PARTIAL THIRD FLOOR PLAN #5
PD-306 PARTIAL THIRD FLOOR PLAN #6
PD-400 OVERALL FOURTH FLOOR PLAN
PD-401 PARTIAL FOURTH FLOOR PLAN #1
PD-402 PARTIAL FOURTH FLOOR PLAN #2
PD-403 PARTIAL FOURTH FLOOR PLAN #3
PD-404 PARTIAL FOURTH FLOOR PLAN #4
PD-405 PARTIAL FOURTH FLOOR PLAN #5
PD-406 PARTIAL FOURTH FLOOR PLAN #6
Revisions: Date:
100% CONSTRUCTION DOCUMENTS 08/10/2020
2 71
K
26 25.525.4 25
J
N
M.5
M
L
K.1
H
G
F
E.5
E
D
C
24.9 24 23 22 21 20.5 20 19 18 17 16 15 14 13 12 11 10 9 8.6 8.5 8.3 8 7.9 7 6 5 4
HWR HWR
HWR
H W
R H
W R
H W
H W
H W
R
H W
H W
R H
W R
SERVICE BAY
SERVICE BAY
SERVICE BAY
SERVICE BAY
SERVICE BAY
SERVICE BAY
SERVICE BAY
SERVICE BAY SB01-1
SB01-3
SB01-5
SB01-7
SB01-4
SB01-6
SB01-8
SB01-2
PW-501
PW-501
PW-501
PW-501
PW-501
PW-501
PW-501
PW-501
PW-B02
PW-B03
PW-B06
PW-B04
PW-B05
PW-B07
PW-B08
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
FI
N
AL
C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00
C :\U se rs
\rm ar tin ez
\D oc um en ts \V
AL
L
- L eg io ne lla S tu dy
Pl um bi ng _P bs en gi ne er s.
rv t
/1
7/
:5 0:
A
M
PW-B01
NEW OVERALL BASEMENT FLOOR
PLAN #1
RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
C.N. G.H.
TRUE
NORTH
N
3/64" = 1'-0"1 OVERALL BASEMENT FLOOR PLAN
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
100% CONSTRUCTION DOCUMENTS 08/05/2020
3 71
26 25.5 25.4 25
E.5
E
D
24.9
(E) 1" HWR
(N) 4" CW
(E) 1 1/2" HW
(E) 1" HWR
(E) 2 1/2" CW
SERVICE BAY
SB00-7
PW-501
7FOR CONTINUATION
SEE
(N) 4" HWS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
FI
N
AL
C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00
C :\U se rs
\rm ar tin ez
\D oc um en ts \V
AL
L
- L eg io ne lla S tu dy
Pl um bi ng _P bs en gi ne er s.
rv t
/1
7/
:5 1:
A
M
PW-B02
NEW PARTIAL BASEMENT FLOOR PLAN
#2
RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
C.N. G.H.
GENERAL NOTES
KEY NOTES
INSULATE PIPE, REFER TO "PIPE INSULATION CHART" SHEET
P-001.
NEW 4" COLD WATER RISER UP THROUGH SERVICE BAY.
NEW 3" HOT WATER RISER UP THROUGH SERVICE BAY.
EXISTING 1" HOT WATER RETURN RISER FROM SERVICE BAY
ABOVE.
POC-CONNECT EXISTING 2 1/2" COLD WATER COPPER PIPE TO
NEW 4" COLD WATER COPPER PIPE.
EXISTING 2 1/2" DOMESTIC COLD WATER, 2" HOT WATER, AND 1"
HOT WATER RETURN TO BUILDING 51.
TRUE
NORTH
N
SERVICE BAY 1
SERVICE BAY 3
SERVICE BAY 5
SERVICE BAY 7
SERVICE BAY 2
SERVICE BAY 4
SERVICE BAY 6
SERVICE BAY 8
ON
X
T
D
H
L
P
U
A
E
I
M
Q
1/8" = 1'-0"1 PARTIAL BASEMENT FLOOR PLAN #5
1. ALL GALVANIZED PIPING FOR DOMESTIC HOT, HOT WATER
RETURN AND COLD WATER SHALL BE REPLACED WITH
COPPER PIPING.
2. CONTRACTOR TO COORDINATE WITH ARCHITECT AND/OR
BUILDING PERSONAL FOR SHUT DOWN OF ALL DOMESTIC
WATER.
3. SHUT OFF MAIN WATER SUPPLY SHALL BE LIMITED AS
POSSIBLE PER VA STANDARDS.
4. DOMESTIC HOT, HOT WATER RETURN, AND COLD WATER
SHALL BE INSULATED AS PER VA STANDARDS.
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
100% CONSTRUCTION DOCUMENTS 08/05/2020
4 71
J
H
G
24.9 24 23 22 21 20.5 20 19 18 17
(N) 4" HWS
(E) 2" HWR
(N) 6" CW
(E) 1" HWR
(N) 4" CW
(E) 3" HW
(N) 6" CW
(E) 1 1/4" HWR
(N) 4" HWS
(N) 6" CW
(E) 2" HWR
(N) 4" HWS
(N) 4" CW
(E) 1" HWR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
FI
N
AL
C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00
C :\U se rs
\rm ar tin ez
\D oc um en ts \V
AL
L
- L eg io ne lla S tu dy
Pl um bi ng _P bs en gi ne er s.
rv t
/1
7/
:5 1:
A
M
PW-B03
NEW PARTIAL BASEMENT FLOOR PLAN
#3
RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
C.N. G.H.
GENERAL NOTES
KEY NOTES
TRUE
NORTH
N
SERVICE BAY 1
SERVICE BAY 3
SERVICE BAY 5
SERVICE BAY 7
SERVICE BAY 2
SERVICE BAY 4
SERVICE BAY 6
SERVICE BAY 8
ON
X
T
D
H
L
P
U
A
E
I
M
Q
1. ALL GALVANIZED PIPING FOR DOMESTIC HOT, HOT WATER
RETURN AND COLD WATER SHALL BE REPLACED WITH
COPPER PIPING.
2. CONTRACTOR TO COORDINATE WITH ARCHITECT AND/OR
BUILDING PERSONAL FOR SHUT DOWN OF ALL DOMESTIC
WATER.
3. SHUT OFF MAIN WATER SUPPLY SHALL BE LIMITED AS
POSSIBLE PER VA STANDARDS.
4. DOMESTIC HOT, HOT WATER RETURN, AND COLD WATER
SHALL BE INSULATED AS PER VA STANDARDS.
INSULATE PIPE, REFER TO "PIPE INSULATION CHART" SHEET
P-001.
NEW 4" COLD WATER RISER UP THROUGH SERVICE BAY.
NEW 3" HOT WATER RISER UP THROUGH SERVICE BAY.
EXISTING 1" HOT WATER RETURN RISER FROM SERVICE BAY
ABOVE.
POC-CONNECT EXISTING 3" HOT WATER COPPER PIPE TO NEW
4" HOT WATER COPPER PIPE.
NEW LINE SIZE ISOLATION VALVE. COVER WITH INSULATION.
1/8" = 1'-0"1 PARTIAL BASEMENT FLOOR PLAN #5
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
100% CONSTRUCTION DOCUMENTS 08/05/2020
5 71
N.2
N
M.5
M
L
K.1
24.9
(E) 1" HWR
(E) 3" HW
(N) 4" CW
(N) 4" CW
(E) 1" HWR
(E) 3" HW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
FI
N
AL
C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00
C :\U se rs
\rm ar tin ez
\D oc um en ts \V
AL
L
- L eg io ne lla S tu dy
Pl um bi ng _P bs en gi ne er s.
rv t
/1
7/
:5 1:
A
M
PW-B04
NEW PARTIAL BASEMENT FLOOR PLAN
#4
RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
C.N. G.H.
GENERAL NOTES
KEY NOTES
TRUE
NORTH
N
SERVICE BAY 1
SERVICE BAY 3
SERVICE BAY 5
SERVICE BAY 7
SERVICE BAY 2
SERVICE BAY 4
SERVICE BAY 6
SERVICE BAY 8
ON
X
T
D
H
L
P
U
A
E
I
M
Q
INSULATE PIPE, REFER TO "PIPE INSULATION CHART" SHEET
P-001.
NEW 4" COLD WATER RISER UP THROUGH SERVICE BAY.
EXISTING 3" HOT WATER RISER UP THROUGH SERVICE BAY.
EXISTING 1" HOT WATER RETURN RISER FROM SERVICE BAY
ABOVE.
1/8" = 1'-0"1 PARTIAL BASEMENT FLOOR PLAN #5
1. ALL GALVANIZED PIPING FOR DOMESTIC HOT, HOT WATER
RETURN AND COLD WATER SHALL BE REPLACED WITH
COPPER PIPING.
2. CONTRACTOR TO COORDINATE WITH ARCHITECT AND/OR
BUILDING PERSONAL FOR SHUT DOWN OF ALL DOMESTIC
WATER.
3. SHUT OFF MAIN WATER SUPPLY SHALL BE LIMITED AS
POSSIBLE PER VA STANDARDS.
4. DOMESTIC HOT, HOT WATER RETURN, AND COLD WATER
SHALL BE INSULATED AS PER VA STANDARDS.
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
100% CONSTRUCTION DOCUMENTS 08/05/2020
6 71
N
M.5
M
L
K.1
10 9 8.6 8.5 8.3
1"
H W
R
1"
3"
HWR
HW
(N) 4" CW
(E) 1" HWR
(E) 3" HW
SERVICE BAY
SB00-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
FI
N
AL
C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00
C :\U se rs
\rm ar tin ez
\D oc um en ts \V
AL
L
- L eg io ne lla S tu dy
Pl um bi ng _P bs en gi ne er s.
rv t
/1
7/
:5 1:
A
M
PW-B05
NEW PARTIAL BASEMENT FLOOR PLAN
#5
RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
C.N. G.H.
GENERAL NOTES
KEY NOTES
TRUE
NORTH
N
SERVICE BAY 1
SERVICE BAY 3
SERVICE BAY 5
SERVICE BAY 7
SERVICE BAY 2
SERVICE BAY 4
SERVICE BAY 6
SERVICE BAY 8
ON
X
T
D
H
L
P
U
A
E
I
M
Q
INSULATE PIPE, REFER TO "PIPE INSULATION CHART" SHEET
P-001.
NEW 4" COLD WATER RISER UP THROUGH SERVICE BAY.
(E) 3" HOT WATER RISER UP THROUGH SERVICE BAY.
(E)1" HOT WATER RETURN RISER FROM SERVICE BAY ABOVE.
1/8" = 1'-0"1 PARTIAL BASEMENT FLOOR PLAN #5
1. ALL GALVANIZED PIPING FOR DOMESTIC HOT, HOT WATER
RETURN AND COLD WATER SHALL BE REPLACED WITH
COPPER PIPING.
2. CONTRACTOR TO COORDINATE WITH ARCHITECT AND/OR
BUILDING PERSONAL FOR SHUT DOWN OF ALL DOMESTIC
WATER.
3. SHUT OFF MAIN WATER SUPPLY SHALL BE LIMITED AS
POSSIBLE PER VA STANDARDS.
4. DOMESTIC HOT, HOT WATER RETURN, AND COLD WATER
SHALL BE INSULATED AS PER VA STANDARDS.
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
100% CONSTRUCTION DOCUMENTS 08/05/2020
7 71
J
H
G
15 14 13 12 11 10 9 8.6 8.5 8.3 8 7.9 7 6 5 4
HWR
(N) 5" HWS
(N) 6" CW
(N) 4" HWS
(N) 6" CW
(N) 6" CW
(E) 2" HWR
(N) 4" HWS
1" HWR
(N) 4" CW
1 (N) 6" CW
(N) 5" HWS
(N) 6" CW
(N) 5" HWS
(E) 1 1/4" HWR
(E) 2" HWR
(E) 1 1/4" HWR
(E) 3" HWR
(N) 6" CW
(N) 5" HWS
(E) 3" HWR
SERVICE BAY
SB00-4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
FI
N
AL
C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00
C :\U se rs
\rm ar tin ez
\D oc um en ts \V
AL
L
- L eg io ne lla S tu dy
Pl um bi ng _P bs en gi ne er s.
rv t
/1
7/
:5 1:
A
M
PW-B06
NEW PARTIAL BASEMENT FLOOR PLAN
#6
RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
C.N. G.H.
GENERAL NOTES
KEY NOTES
TRUE
NORTH
N
SERVICE BAY 1
SERVICE BAY 3
SERVICE BAY 5
SERVICE BAY 7
SERVICE BAY 2
SERVICE BAY 4
SERVICE BAY 6
SERVICE BAY 8
ON
X
T
D
H
L
P
U
A
E
I
M
Q
1. ALL GALVANIZED PIPING FOR DOMESTIC HOT, HOT WATER
RETURN AND COLD WATER SHALL BE REPLACED WITH
COPPER PIPING.
2. CONTRACTOR TO COORDINATE WITH ARCHITECT AND/OR
BUILDING PERSONAL FOR SHUT DOWN OF ALL DOMESTIC
WATER.
3. SHUT OFF MAIN WATER SUPPLY SHALL BE LIMITED AS
POSSIBLE PER VA STANDARDS.
4. DOMESTIC HOT, HOT WATER RETURN, AND COLD WATER
SHALL BE INSULATED AS PER VA STANDARDS.
INSULATE PIPE, REFER TO "PIPE INSULATION CHART" SHEET
P-001.
NEW 4" COLD WATER RISER UP THROUGH SERVICE BAY.
EXISTING 3" HOT WATER RISER UP THROUGH SERVICE BAY.
EXISTING 1" HOT WATER RETURN RISER FROM SERVICE BAY
ABOVE.
POC-CONNECT EXISTING 3" HOT WATER COPPER PIPE TO NEW
4" HOT WATER COPPER PIPE.
NEW LINE SIZE ISOLATION VALVE. COVER WITH INSULATION.
NEW 5" HOT WATER RISER UP THROUGH SERVICE BAY.
1/8" = 1'-0"1 PARTIAL BASEMENT FLOOR PLAN #5
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
100% CONSTRUCTION DOCUMENTS 08/05/2020
8 71
F
E
D
10 9 8.6 8.5 8.3 8 7.9
H W
R H
W H
W R
H W
HW
HWR
HWR
HW
(N) 4" CW
5 (N) 4" CW
SERVICE BAY
SB00-6
SERVICE BAY
SB00-8
(E) 3" HW
(E) 1" HWR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
FI
N
AL
C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00
C :\U se rs
\rm ar tin ez
\D oc um en ts \V
AL
L
- L eg io ne lla S tu dy
Pl um bi ng _P bs en gi ne er s.
rv t
/1
7/
:5 1:
A
M
PW-B07
NEW PARTIAL BASEMENT FLOOR PLAN
#7
RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
C.N. G.H.
GENERAL NOTES
KEY NOTES
TRUE
NORTH
N
SERVICE BAY 1
SERVICE BAY 3
SERVICE BAY 5
SERVICE BAY 7
SERVICE BAY 2
SERVICE BAY 4
SERVICE BAY 6
SERVICE BAY 8
ON
X
T
D
H
L
P
U
A
E
I
M
Q
1. ALL GALVANIZED PIPING FOR DOMESTIC HOT, HOT WATER
RETURN AND COLD WATER SHALL BE REPLACED WITH COPPER
PIPING.
2. CONTRACTOR TO COORDINATE WITH ARCHITECT AND/OR
BUILDING PERSONAL FOR SHUT DOWN OF ALL DOMESTIC
WATER.
3. SHUT OFF MAIN WATER SUPPLY SHALL BE LIMITED AS POSSIBLE
PER VA STANDARDS.
4. DOMESTIC HOT, HOT WATER RETURN, AND COLD WATER SHALL
BE INSULATED AS PER VA STANDARDS.
INSULATE PIPE, REFER TO "PIPE INSULATION CHART" SHEET
P-001.
NEW 4" COLD WATER RISER UP THROUGH SERVICE BAY.
EXISTING 3" HOT WATER RISER UP THROUGH SERVICE BAY.
EXISTING 1" HOT WATER RETURN RISER FROM SERVICE BAY
ABOVE.
POC-CONNECT EXISTING 3" HOT WATER COPPER PIPE TO NEW
4" HOT WATER COPPER PIPE.
1/8" = 1'-0"1 PARTIAL BASEMENT FLOOR PLAN #5
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
100% CONSTRUCTION DOCUMENTS 08/05/2020
9 71
H
G
7 6 5 4
HWR
(N) 6" CW
(N) 5" HWS
(E) 3" HWR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
FI
N
AL
C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00
C :\U se rs
\rm ar tin ez
\D oc um en ts \V
AL
L
- L eg io ne lla S tu dy
Pl um bi ng _P bs en gi ne er s.
rv t
/1
7/
:5 1:
A
M
PW-B08
NEW PARTIAL BASEMENT FLOOR PLAN
#8
RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
C.N. G.H.
GENERAL NOTES
KEY NOTES
TRUE
NORTH
N
SERVICE BAY 1
SERVICE BAY 3
SERVICE BAY 5
SERVICE BAY 7
SERVICE BAY 2
SERVICE BAY 4
SERVICE BAY 6
SERVICE BAY 8
ON
X
T
D
H
L
P
U
A
E
I
M
Q
1. ALL GALVANIZED PIPING FOR DOMESTIC HOT, HOT WATER
RETURN AND COLD WATER SHALL BE REPLACED WITH COPPER
PIPING.
2. CONTRACTOR TO COORDINATE WITH ARCHITECT AND/OR
BUILDING PERSONAL FOR SHUT DOWN OF ALL DOMESTIC
WATER.
3. SHUT OFF MAIN WATER SUPPLY SHALL BE LIMITED AS POSSIBLE
PER VA STANDARDS.
4. DOMESTIC HOT, HOT WATER RETURN, AND COLD WATER SHALL
BE INSULATED AS PER VA STANDARDS.
INSULATE PIPE, REFER TO "PIPE INSULATION CHART" SHEET
P-001.
NEW 6" COLD WATER RISER UP THROUGH MECHANICAL ROOM.
NEW 5" HOT WATER RISER UP THROUGH MECHANICAL ROOM.
EXISTING 3" HOT WATER RETURN RISER UP THROUGH
MECHANICAL
1/8" = 1'-0"1 PARTIAL BASEMENT FLOOR PLAN #5
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
100% CONSTRUCTION DOCUMENTS 08/05/2020
10 71
N N
M M
C C
D D
E E
F F
G G
H H
J J
K K
L L
PW-501
PW-501
PW-501
PW-501
PW-501
PW-501
PW-501
PW-501
PW-101
PW-102
PW-103
PW-104
PW-105
PW-106
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
FI
N
AL
C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00
C :\U se rs
\rm ar tin ez
\D oc um en ts \V
AL
L
- L eg io ne lla S tu dy
Pl um bi ng _P bs en gi ne er s.
rv t
/1
7/
:4 1:
A
M
PW-100
OVERALL FIRST FLOOR PLAN RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
C.N. G.H.
1" = 20'-0"1 OVERALL FIRST FLOOR PLAN
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
100% CONSTRUCTION DOCUMENTS 08/05/2020
11 71
26 25.5 25.4 25
N.7
N.2
N
M.5
M
L
K.1
24.9 24 23 22 21 20.5 20 19 18 17
(E) 3" CW
C W
CW
HW
HW
CAPPED
H W
(E) 2 1/2" HW
SOV
(N)3"CW
(N)1-1/2"HW
(N)3"CW
(N)3"CW
(N)1-1/2"HW
(N)2"CW
(N)1-1/2"HW
(N)2"CW
(N)1-1/2"HW
(N)3"CW
(N) 3" CW
(N) 2 1/2" HWS
(N) 1" HWS
(N) 2" CW
(N) 1 1/2" HWS
(N) 2" CW
(N) 3/4" HWS
(N) 3/4" CW
(N) 1" HWS
(N) 3" CW
(N)3/4"CW
(N)3/4"HW
(N)3/4"CW
(N)3/4"CW
(N)1-1/2"HW
(N)3"CW
(E)1-1/2"CW
2 2
CAPP IN INTERSTITIAL
SPACE
2 2 2 2
2 2
(N) 3" CW
(N) 2 1/2" HWS
(N) 1" CW
(N) 1" HWS
(E) 3" CW
(N) 3/4" HWS
(N) 2 1/2" CW
(N) 2" CW
(N) 2" CW
(N) 2" CW
(N) 2" CW
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 2" HWS
(N) 1 1/2" HWS
(E) 2" HW
(E) 2 1/2" HW
(E) 1 1/2" HW
(N) 2" HWS
(N) 2 1/2" HWS
(N) 1 1/2" HWS
(N) 2" HWS
(E) 2" HW
(N) 2" HWS
PW-501
(N) 1 1/4" HWS
(N) 2 1/2" CW
(N) 3" CW
(N) 2" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 3" CW
(N) 2" HWS
(N) 2" HWS
(N) 3" CW
(N) 3" CW
(N) 2" HWS
(N) 3" CW
(N) 2" HWS(N) 3" CW
(N) 1 1/2" HWS
(E)SOV
(N) 1 1/2" HWS
(N) 3" CW
(N) 3" CW
(N) 1 1/2" HWS
(N) 3" CW
(N) 2 1/2" CW
(N) 2" HWS
(N) 2" HWS
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 2 1/2" HWS
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 2 1/2" HWS
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 2" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 2" HWS
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 2" HWS
2 2
(N) 2 1/2" CW
(N) 2" HWS
(N) 2 1/2" CW
(N) 2 1/2" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 2 1/2" CW
(N) 2 1/2" HWS
(N) 3" CW
(N) 2" HWS
(N) 2" HWS
(N) 3" CW
(N) 2 1/2" HWS
(N) 3" CW
(N) 2 1/2" HWS
(N) 3" CW
(N) 2 1/2" HWS
(N) 3" CW
WFM
CP
WFM
(E)
(N) 2" CW
(N) 1 1/2" HWS
1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF
EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD
LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD
ENDS SHALL BE ALLOWED PER VA DIRECTIVE.
2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION
CHART ON SHEET P001.
3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE
TO PROVIDE A CONTINUOS FLOW.
4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL
EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.
POC - CONNECT NEW COLD WATER TO EXISTING COLD
WATER IN INTERSTITIAL SPACE.
POC - CONNECT NEW HOT AND COLD WATER TO EXISTING
HOT /COLD WATER IN INTERSTITIAL SPACE.
3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)
4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC
COLD WATER LOOPING SYSTEM.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
FI
N
AL
C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00
C :\U se rs
\rm ar tin ez
\D oc um en ts \V
AL
L
- L eg io ne lla S tu dy
Pl um bi ng _P bs en gi ne er s.
rv t
/1
7/
:4 1:
A
M
PW-101
NEW PARTIAL FIRST FLOOR PLAN #1 RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
C.N. G.H.
SERVICE BAY 1
SERVICE BAY 3
SERVICE BAY 5
SERVICE BAY 7
SERVICE BAY 2
SERVICE BAY 4
SERVICE BAY 6
SERVICE BAY 8
DDBB
CCAA
Y Z A1 A2
A3 A4
W
O
K
G
S
C
V
N
J
F
R
B
X
T
D
H
L
P
U
A
E
M
Q
I
A5
TRUE
NORTH
N
GENERAL NOTES
KEY NOTES
1/8" = 1'-0"1 01 Water - Segment A New
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
100% CONSTRUCTION DOCUMENTS 08/05/2020
12 71
N
M.5
M
L
K.1
17 16 15 14 13 12 11 10 9 8.6 8.5 8.3 8 7.9
(E) 2" HW
HW
HW
(E) 1" HWR
(E) 3/4" HW
VA POLICE
2 2
2 2
2 2 2 SOV
2 2
2 2
(N) 3/4" HWS
(N) 3/4" CW
(N) 3/4" HWS
(N) 3/4" CW
(N) 1" HWS
(N) 1" CW
(N) 1" HWS
(N) 1" CW
(N) 3/4" HWS
(N) 3/4" CW
(N) 1" HWS
(N) 1" CW
(N) 1 1/2" CW
(N) 1 1/2" HWS
(N) 1 1/2" CW
(N) 1 1/2" HWS
(N) 3/4" CW
(N) 3/4" HWS
(N) 1 1/2" HWS
(N) 1 1/2" CW
(N) 1 1/2" HWS
(N) 1 1/2" CW
(N) 1 1/4" CW
(N) 1 1/2" CW
(N) 1 1/2" HWS
(N) 1" HWS
(N) 1 1/2" CW
(N) 3/4" HWS
(N) 3/4" CW
(N) 1 1/2" CW(N) 1" HWS
(N) 3/4" CW
(N) 3/4" HWS
(N) 3/4" HWS
(N) 1 1/2" HWS
(N) 1 1/2" CW
(N) 1 1/2" CW
(N) 1 1/2" HWS
(N) 1 1/2" HWS
(N) 1 1/2" CW
(N) 3/4" CW
(N) 3/4" HWS
(N) 1 1/2" HWS
(N) 1 1/2" CW
(N) 1 1/4" CW
(N) 1 1/2" HWS
(N) 1 1/2" CW
(N) 3/4" HWS
(N) 3/4" CW
(N) 1 1/2" HWS
(N) 1 1/2" CW
(N) 3/4" HWS
(N) 3/4" CW
(N) 1 1/2" HWS
(N) 1 1/2" CW
(N) 1 1/2" HWS
(N) 1 1/2" CW
(N) 3/4" CW
(N) 3/4" HWS
(N) 1 1/2" HWS
(N) 1 1/2" CW
(N) 1 1/2" HWS
(N) 1 1/2" CW
(N) 3/4" CW
(N) 3/4" HWS
(N) 2" HWS
(N) 2" CW
(N) 3/4" CWR
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 1" CW
(N) 1" HWS
(N) 1" CW
(N) 1" CW
(N) 1 1/2" HWS
(N) 1 1/2" CW
(N) 1 1/2" HWS
(N) 3" CW
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 2 1/2" CW
(E) 4" CW
(N) 2" HWS
(N) 2" HWS(N) 2" HWS
PW-501
(N) 2 1/2" CW
(N) 2" HWS
(N) 2" HWS
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 2" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 2" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 2" HWS
(N) 3" CW (N) 2" HWS
(N) 1" CW
(N) 1 1/2" HWS
(N) 1" CW
(E) 1" HW
(N) 1" HWS
(N) 1" CW
WFM
CP
WFM
(E)
(N) 2 1/2" CW
(N) 2" HWS (N) 2" HWS
(N) 3" CW
(N) 3" CW
(N) 2" HWS
(N) 1" CW
(N) 1 1/2" HWS
1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF
EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD
LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD
ENDS SHALL BE ALLOWED PER VA DIRECTIVE.
2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION
CHART ON SHEET P001.
3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE
TO PROVIDE A CONTINUOS FLOW.
4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL
EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.
POC - CONNECT NEW COLD WATER TO EXISTING COLD
WATER IN INTERSTITIAL SPACE.
POC - CONNECT NEW HOT AND COLD WATER TO EXISTING
HOT /COLD WATER IN INTERSTITIAL SPACE.
3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)
4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC
COLD WATER LOOPING SYSTEM.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
FI
N
AL
C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00
C :\U se rs
\rm ar tin ez
\D oc um en ts \V
AL
L
- L eg io ne lla S tu dy
Pl um bi ng _P bs en gi ne er s.
rv t
/1
7/
:4 1:
A
M
PW-102
NEW PARTIAL FIRST FLOOR PLAN #2 RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
C.N. G.H.
SERVICE BAY 1
SERVICE BAY 3
SERVICE BAY 5
SERVICE BAY 7
SERVICE BAY 2
SERVICE BAY 4
SERVICE BAY 6
SERVICE BAY 8
DDBB
CCAA
Y Z A1 A2
A3 A4
W
O
K
G
S
C
V
N
J
F
R
B
X
T
D
H
L
P
U
A
E
M
Q
I
A5
TRUE
NORTH
N
KEY NOTES
GENERAL NOTES
1/8" = 1'-0"1 01 Water - Segment B New
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
100% CONSTRUCTION DOCUMENTS 08/05/2020
13 71
IMIM
26 25.5 25.4 25
J
H
G
F
24.9 24 23 22 21 20.5 20 19 18 17
(E) 1" HWR
HWR
HW
(N) 3" CW
(E) 3/4" HWR
(E) 3" HW
HOSE BIBB IN
INTESTINAL SPACE.
(E) 1 1/2" HW
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 3/4" HWS
(N) 3/4" CW
(N) 2" CW(N) 2 1/2" CW
(N) 1 1/2" HWS (N) 2 1/2" CW (N) 3/4" HWS
(N) 3/4" CW
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 3/4" CWR
(N) 1 1/2" CW
(N) 1 1/2" HWS
(N) 3/4" HWS
(N) 3/4" CW
(N) 1 1/2" CW
(N) 1" HWS
(N) 3/4" CW
(N) 3/4" HWS
(N) 1 1/2" HWS
(N) 3/4" CW
(N) 3/4" HWS
(N) 1" CW
(N) 1" HWS
(N) 1" CW
(N) 1" HWS
(N) 3/4" CW
(N) 3/4" HWS
(N) 1" CW
(N) 1" HWS
(N) 3/4" CW
(N) 3/4" HWS(N) 1" HWS
(N) 1" CW
(N) 3/4" CWR
(N) 3/4" HWR
(N) 3/4" CW
(N) 3/4" HWS
(N) 3/4" CW
(N) 2" HWS
(N) 2 1/2" CW
(N) 3/4" CW
(N) 3/4" HWS
(N) 3/4" CW
(N) 3/4" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 2" HWS
(N) 3/4" CW
(N) 3/4" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 2" CW
(N) 1" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 3/4" CW
(N) 3/4" HWS
(N) 2" HWS
(N) 2 1/2" CW
(N) 1 1/2" CW
(N) 3/4" CW
(N) 3/4" HWS
(N) 2" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 3/4" HWS
(N) 3/4" CW
(N) 2 1/2" CW
(N) 1 1/2" CW
(N) 2" HWS
(N) 2 1/2" CW (N) 3/4" HWS
(N) 3/4" CW
(N) 2" HWS
(N) 2 1/2" CW
(N) 3/4" HWS
(N) 3/4" CW
(N) 2" HWS
(N) 2" CW
(N) 2" CW
(N) 2" HWS
(N) 3/4" CW
(N) 3/4" HWS
(N) 2" CW
(N) 2" HWS
(N) 2" CW
(N) 2" HWS
(N) 2" HWS
(N) 2" CW
(N) 3/4" HWS
(N) 3/4" CW (N) 2" HWS
(N) 2" CW
(N) 3/4" CW
(N) 3/4" HWS
(N) 3/4" HWS
(N) 3/4" CW
(N) 1 1/2" HWS
(N) 2" CW
(N) 2" CW
(N) 1 1/2" HWS
(N) 2" CW
(N) 1 1/2" HWS
(N) 3/4" CW
(N) 3/4" HWS
(N) 1 1/2" HWS
(N) 2" CW
(N) 3/4" CW
(N) 3/4" HWS
(N) 1 1/2" HWS
(N) 2" CW
(N) 3/4" HWS
(N) 1 1/2" HWS
(N) 2" CW
(N) 1 1/2" HWS
(N) 2" CW
(N) 3/4" HWS
(N) 1 1/2" CW
(N) 1 1/2" CW
(N) 1 1/2" HWS
(N) 3/4" HWS
(N) 3/4" CW
(N) 1 1/2" CW
(N) 1 1/2" HWS
(N) 3/4" HWS
(N) 3/4" CW
(N) 1" CW
(N) 1" HWS
(N) 3/4" HWR
(N) 3/4" CW
(N) 3/4" HWR
(N) 1" CW
(N) 1" HWS (N) 3/4" HWS
(N) 3/4" CW
(N) 2" CW
(N) 1 1/2" HWS
(N) 3/4" HWR
(N) 2 1/2" CW
PW-501
PW-501
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 3/4" CWR
(N) 1 1/2" CW
(N) 1" CW
CP
WFM
WFM
(E)
CP
WFM
(E)
WFM
(N) 2" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF
EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD
LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD
ENDS SHALL BE ALLOWED PER VA DIRECTIVE.
2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION
CHART ON SHEET P001.
3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE
TO PROVIDE A CONTINUOS FLOW.
4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL
EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.
POC - CONNECT NEW COLD WATER TO EXISTING COLD
WATER IN INTERSTITIAL SPACE.
POC - CONNECT NEW HOT AND COLD WATER TO EXISTING
HOT /COLD WATER IN INTERSTITIAL SPACE.
3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)
4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC
COLD WATER LOOPING SYSTEM.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
FI
N
AL
C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00
C :\U se rs
\rm ar tin ez
\D oc um en ts \V
AL
L
- L eg io ne lla S tu dy
Pl um bi ng _P bs en gi ne er s.
rv t
/1
7/
:4 1:
A
M
PW-103
NEW PARTIAL FIRST FLOOR PLAN #3 RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
C.N. G.H.
SERVICE BAY 1
SERVICE BAY 3
SERVICE BAY 5
SERVICE BAY 7
SERVICE BAY 2
SERVICE BAY 4
SERVICE BAY 6
SERVICE BAY 8
DDBB
CCAA
Y Z A1 A2
A3 A4
W
O
K
G
S
C
V
N
J
F
R
B
X
T
D
H
L
P
U
A
E
M
Q
I
A5
TRUE
NORTH
N
KEY NOTES
GENERAL NOTES
1/8" = 1'-0"1 01 Water - Segment C New
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
100% CONSTRUCTION DOCUMENTS 08/05/2020
14 71
H
G
F
17 16 15 14 13 12 11 10 9 8.6 8.5 8.3 8 7.9
HW
CW
HW
CW
HW
CW
1" HW
(N) 2" HWS
HWS HWS
(E) 2" CW
(E) 1" HW(E) 1" HW
(E) 2" CW
2 (N) 2" HWS
(N) 1" CW
(N) 1" HWS(N) 1" HWS
(N) 1 1/2" CW
(N) 1" HWS
(N) 1 1/2" CW
(N) 3/4" HWS
(N) 3/4" CW
(N) 1" HWS
(N) 1 1/2" CW
(N) 3" CW
(N) 2" CW
(N) 1 1/4" CW(N) 1 1/4" CW
(N) 2" CW
(N) 2" CW
(N) 3/4" CW
(N) 1" CW
(N) 2" CW
(N) 3/4" CW
(N) 2" CW
(N) 1 1/2" CW
(N) 2" CW
(N) 2" CW
(N) 3/4" CW
(N) 3/4" CW
(N) 1 1/2" HWS
(N) 2" CW
(N) 2" HWS
(N) 1" HWS
(N) 2" HWS
(N) 3/4" HWS
(N) 1 1/2" HWS
(N) 1 1/2" HWS
(N) 3/4" HWS
(N) 3/4" HWS
(N) 3/4" HWS
(N) 3/4" CW
(N) 3/4" HWS
(N) 3/4" CW
(N) 3/4" CW
(N) 3/4" HWS
(N) 1" HWS
(N) 2" CW
(N) 3/4" HWS
(N) 3/4" CW
(N) 2" CW
(N) 1" HWS
(N) 2" CW
(N) 1" HWS
(N) 3/4" CW
(N) 3/4" HWS
(N) 1" HWS
(N) 2" CW(N) 1 1/2" CW
(N) 1 1/2" CW
(N) 3/4" HWS
(N) 3/4" CWR
(N) 3/4" HWR
(N) 3/4" HWS
(N) 3/4" CW
(N) 3/4" CW
(N) 3/4" HWS
(N) 1" CW
(N) 1" HWS
(N) 3/4" CW
(N) 1 1/2" CW(N) 1" HWS
(N) 1" CW
(N) 1" HWS
PW-501
PW-501
WFM
CP
WFM
(E)
CP
WFM
WFM
(E)
CW
HWS
CWR
C W
HW
H W
S
CW
CW
HWS
(N) 3" CW
1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF
EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD
LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD
ENDS SHALL BE ALLOWED PER VA DIRECTIVE.
2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION
CHART ON SHEET P001.
3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE
TO PROVIDE A CONTINUOS FLOW.
4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL
EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.
POC - CONNECT NEW COLD WATER TO EXISTING COLD
WATER IN INTERSTITIAL SPACE.
POC - CONNECT NEW HOT AND COLD WATER TO EXISTING
HOT /COLD WATER IN INTERSTITIAL SPACE.
3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)
4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC
COLD WATER LOOPING SYSTEM.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
FI
N
AL
C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00
C :\U se rs
\rm ar tin ez
\D oc um en ts \V
AL
L
- L eg io ne lla S tu dy
Pl um bi ng _P bs en gi ne er s.
rv t
/1
7/
:4 2:
A
M
PW-104
NEW PARTIAL FIRST FLOOR PLAN #4 RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
C.N. G.H.
SERVICE BAY 1
SERVICE BAY 3
SERVICE BAY 5
SERVICE BAY 7
SERVICE BAY 2
SERVICE BAY 4
SERVICE BAY 6
SERVICE BAY 8
DDBB
CCAA
Y Z A1 A2
A3 A4
W
O
K
G
S
C
V
N
J
F
R
B
X
T
D
H
L
P
U
A
E
M
Q
I
A5
TRUE
NORTH
N
KEY NOTES
GENERAL NOTES
1/8" = 1'-0"1 01 Water - Segment D New
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
100% CONSTRUCTION DOCUMENTS 08/05/2020
15 71
IM
W D
IM
W D
26 25.5 25.4 25
F
E.5
E
D
C
E.9
24.9 24 23 22 21 20.5 20 19 18 17
(N) 1 1/2" HWS
(N) 2" HWS
(N) 2" HWS
(N) 1" HWS
(N) 1 1/2" HWS
(N) 2" HWS
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 3" CW
PW-501
(N) 3/4" CWR
(N) 3/4" HWS
(N) 3" CW
(N) 2" HWS
(N) 3" CW
(N) 1 1/2" CW
(N) 3/4" CW
(N) 3" CW
(N) 1 1/2" CW(N) 3" CW
(N) 3" CW
(N) 2" HWS
(N) 3" CW
(N) 2 1/2" CW
(N) 3" CW
(N) 1" HWS
(N) 1 1/2" CW
(N) 2" CW
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 2 1/2" CW (N) 1 1/2" HWS
(N) 1 1/2" HWS
(N) 1 1/2" HWS (N) 2 1/2" CW
(N) 2 1/2" CW
(N) 2" HWS
(N) 3" CW
(N) 3" CW
(N) 2" HWS
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 2" CW
(N) 1" HWS
(N) 1 1/2" CW
(N) 1" HWS
(N) 2" CW
(N) 1" HWS
(N) 1" CW
(N) 1" HWS
(N) 3/4" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 1 1/2" HWS(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
CP
WFM
WFM
(E)
1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF
EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD
LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD
ENDS SHALL BE ALLOWED PER VA DIRECTIVE.
2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION
CHART ON SHEET P001.
3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE
TO PROVIDE A CONTINUOS FLOW.
4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL
EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.
POC - CONNECT NEW COLD WATER TO EXISTING COLD
WATER IN INTERSTITIAL SPACE.
POC - CONNECT NEW HOT AND COLD WATER TO EXISTING
HOT /COLD WATER IN INTERSTITIAL SPACE.
3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)
4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC
COLD WATER LOOPING SYSTEM.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
FI
N
AL
C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00
C :\U se rs
\rm ar tin ez
\D oc um en ts \V
AL
L
- L eg io ne lla S tu dy
Pl um bi ng _P bs en gi ne er s.
rv t
/1
7/
:4 2:
A
M
PW-105
NEW PARTIAL FIRST FLOOR PLAN #5 RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
C.N. G.H.
SERVICE BAY 1
SERVICE BAY 3
SERVICE BAY 5
SERVICE BAY 7
SERVICE BAY 2
SERVICE BAY 4
SERVICE BAY 6
SERVICE BAY 8
DDBB
CCAA
Y Z A1 A2
A3 A4
W
O
K
G
S
C
V
N
J
F
R
B
X
T
D
H
L
P
U
A
E
M
Q
I
A5
TRUE
NORTH
N
KEY NOTES
GENERAL NOTES
1/8" = 1'-0"1 01 Water - Segment E New
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
100% CONSTRUCTION DOCUMENTS 08/05/2020
16 71
IMIM
E
D
C
E.9
16 15 14 13 12 11 10 9 8.6 8.5 8.3 8 7.9 7
(E) 3/4" HWR
(E) 3/4" HWR
H W
R
(E) 2" HW
HW
(E) 1" HWR
HWR
HW
CW
HW
(E) 2" HW
(E) 2 1/2" CW
STEAM
HEAT
EXCHANGE
R
(N) 3/4" CWR
(N) 3/4" CWR
(N) 3/4" HWS
(N) 3/4" HWS
(N) 1 1/2" CW
(N) 2" CW
(N) 1" HWS
(N) 1 1/2" CW
(N) 3/4" HWS
(N) 1" HWS
(N) 2" CW
(N) 3/4" HWS
(N) 1 1/2" CW
(N) 1" HWS
(N) 2" CW
(N) 1 1/2" CW
(N) 1 1/2" CW
(N) 3/4" HWS
(N) 3/4" HWS
(N) 2" CW
(N) 1" HWS
(N) 3/4" HWS
(N) 3/4" CW
(N) 1" HWS
(N) 2" CW
(N) 1" HWS
(N) 1" HWS
(N) 2" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 3/4" CW
(N) 3/4" HWS
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 1 1/2" CW
(N) 1" CW
(N) 3/4" HWS
(N) 3/4" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 3/4" HWS
(N) 3/4" CW
(N) 1 1/2" HWS(N) 1 1/2" HWS
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 3/4" CW
(N) 3/4" HWS
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 3/4" CW
(N) 3/4" HWS
(N) 3/4" HWS
(N) 3/4" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 3/4" CW
(N) 3/4" HWS
(N) 2" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 3/4" CW
(N) 3/4" HWS
(N) 3/4" HWS
(N) 3/4" CW
(N) 2 1/2" CW
(N) 2" HWS (N) 3/4" HWS
(N) 3/4" CW
(N) 2 1/2" CW
(N) 2" HWS
(N) 2" HWS
(N) 2 1/2" CW
(N) 3/4" CW
(N) 3/4" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 2 1/2" CW
(N) 2 1/2" CW
CAPP IN
INTERSTITIAL
SPACE
CAPP IN
INTERSTITIAL
SPACE
(N) 3/4" CW
(N) 3/4" HWS
CAPP IN
INTERSTITIAL
SPACE
(N) 1" CW
(E) 1" HWR
(E) 2" HW
PW-502
(N) 3/4" CWR
(E) 2" HW
(N) 3/4" CWR
(E) 3" CW
WFM
WFM
CP
(E)
1. BRING NEW HOT AND COLD WATER LOOP WITHIN (6) SIX FEET OF
EXISTING POINT OF CONNECTION(S) TO AVOID CREATING A DEAD
LEG OR A DEAD END AT INTERSTITIAL SPACE. NO DEAD LEG/DEAD
ENDS SHALL BE ALLOWED PER VA DIRECTIVE.
2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION
CHART ON SHEET P001.
3. TO PREVENT STAGNATE WATER A LOOPING SYSTEM IS IN PLACE
TO PROVIDE A CONTINUOS FLOW.
4. FOR EXISTING PIPES THAT WILL BE REUSED, REMOVE ALL
EXISTING INSULATION AND REPLACE WITH NEW INSUALTION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
FI
N
AL
C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00
C :\U se rs
\rm ar tin ez
\D oc um en ts \V
AL
L
- L eg io ne lla S tu dy
Pl um bi ng _P bs en gi ne er s.
rv t
/1
7/
:4 2:
A
M
PW-106
NEW PARTIAL FIRST FLOOR PLAN #6 RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
C.N. G.H.
SERVICE BAY 1
SERVICE BAY 3
SERVICE BAY 5
SERVICE BAY 7
SERVICE BAY 2
SERVICE BAY 4
SERVICE BAY 6
SERVICE BAY 8
DDBB
CCAA
Y Z A1 A2
A3 A4
W
O
K
G
S
C
V
N
J
F
R
B
X
T
D
H
L
P
U
A
E
M
Q
I
A5
KEY NOTES
TRUE
NORTH
N
GENERAL NOTES
1/8" = 1'-0"1 01 Water - Segment F New
POC - CONNECT NEW COLD WATER TO EXISTING COLD
WATER IN INTERSTITIAL SPACE.
POC - CONNECT NEW HOT AND COLD WATER TO EXISTING
HOT /COLD WATER IN INTERSTITIAL SPACE.
SEE DETAIL "8" ON SHEET P-002. (TYPICAL)
RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC
COLD WATER LOOPING SYSTEM.
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
100% CONSTRUCTION DOCUMENTS 08/05/2020
17 71
WD WD
1H01
VESTIBULE
C
E.9
C.3
C.2
B.9
B.3
A.6
A.1
1.1 2.1 3.1 4.1 5.1 5.5 6.1
B
(N) 1 1/2" CW
(N) 1 1/2" CW
(N) 1 1/2" CW
(N) 1 1/2" CW
(N) 1 1/2" CW
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 1 1/2" HWS (N) 1 1/2" CW
(N) 3/4" CW
(N) 3/4" HWS
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 1" HWS
(N) 2 1/2" CW
(N) 1" HWS
(N) 1" HWS
(N) 2" CW
(N) 1" HWS
(N) 2" CW
(N) 1" HWS
(N) 2" CW
(N) 2" CW
(N) 2" CW
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 2" HWS
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 2" HWS
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 2" HWS
(N) 2" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 2" HWS (N) 2" HWS
(N) 2" HWS
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 2" HWS
(N) 3/4" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 1 1/2" HWS(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 1 1/2" CW
(N) 1 1/2" CW
(N) 2 1/2" CW
(N) 3/4" CW
(N) 1 1/2" HWS
(N) 1 1/2" CW
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 1 1/2" HWS
(N) 1 1/2" HWS
(N) 2 1/2" CW
(N) 2" HWS
(N) 2" HWS
POC - CONNECT NEW COLD WATER TO EXISTING COLD
WATER IN INTERSTITIAL SPACE.
POC - CONNECT NEW HOT AND COLD WATER TO EXISTING
HOT /COLD WATER IN INTERSTITIAL SPACE.
3 SEE DETAIL "6 & 7" ON SHEET P-004. (TYPICAL)
4 RECIRCULATING PUMP IN INTERSTITIAL SPACE FOR DOMESTIC
COLD WATER LOOPING SYSTEM.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
1000 S FREMONT AVE, UNIT 53,
BLDG. A1, SUITE 1218
ALHAMBRA CALIFORNIA 91803
3920 E. CORONADO STREET, SUITE 201
ANAHEIM CALIFORNIA 92807
ARCHITECTURE | INTERIORS | PROJECT MANAGEMENT
www.SRDArchitectsInc.com
O: 714 688 0212 | 626 202 0546 FAX: 714 688 0244
ARCHITECTS INC
Dwg. of
FINAL CONSTRUCTION DOCUMENTS
FI
N
AL
C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
2100 East Route 66, Suite 210 Glendora, CA 91740 Tel: 626.650.0350 Fax: 626.650.0352 Job No. 2019-083-00
C :\U se rs
\rm ar tin ez
\D oc um en ts \V
AL
L
- L eg io ne lla S tu dy
Pl um bi ng _P bs en gi ne er s.
rv t
/1
7/
:4 2:
A
M
PW-107
NEW PARTIAL FIRST FLOOR PLAN #7 RENOVATE DOMESTIC WATER PIPING
JERRY L. PETTIS MEMORIAL
605-20-201
12/10/2020
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
C.N. G.H.
SERVICE BAY 1
SERVICE BAY 3
SERVICE BAY 5
SERVICE BAY 7
SERVICE BAY 2
SERVICE BAY 4
SERVICE BAY 6
SERVICE BAY 8
DDBB
CCAA
Y Z A1 A2
A3 A4
W
O
K
G
S
C
V
N
J
F
R
B
X
T
D
H
L
P
U
A
E
M
Q
I
A5
KEY NOTES
TRUE
NORTH
N
GENERAL NOTES
1/8" = 1'-0"1 01 Water - Segment G New
1. ELIMINATE DEAD LEGS/DEAD ENDS BY RUNNING A HOT AND
COLD WATER LOOP TO AS CLOSE TO THE FIXTURE POC AS
POSSIBLE.
2. HOT AND COLD WATER TO BE INSULATED AS PER INSULATION
CHART ON SHEET P001.
3. PROVIDE HOT AND COLD WATER TO EACH FIXTURE TO
PROVIDE A CONTINUOUS FLOW PREVENTING STAGNATE
WATER.
Revisions: Date:
35% SCHEMATIC DESIGN 02/16/2020
65% DESIGN SUBMITTAL 04/20/2020
100% CONSTRUCTION DOCUMENTS 08/05/2020
18 71
C
E.9
E.3
D.9
D.6
C.9
C.7
C.3
C.2
B.9
B.3
A.6
A.1
6.5 7.1 7.5 8.1 8.4 9.1 9.5 10.1
11.1 11.7 12.2 13.1
B
(N) 2" HWS
H W
(E) 3/4" HW
(E) 3/4" HW
(E) 3/4" HW
(E) 1 1/2" CW(E) 3/4" CW
H W
(E) 1" CW
1 1
2 2 2 2
(E) 2" HW
(E) 2" HW
(E)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .