Attachment C Self Performance Calculations.docx

DOCX document 41 KB Posted

Attached to
Z1DA--Service-Renovate Domestic Water Piping Projects FMS (VA-21-00001742)605-21-1-6043-0001-
Solicitation number
36C25821R0015
Issued by

About this file

This document contains a self-performance worksheet and instructions for a federal solicitation to renovate domestic water piping. The solicitation is a 100% SDVOSB set-aside issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22. Offerors must complete the worksheet calculating the percentage of work to be self-performed, which must be at least 50% of total contract costs excluding materials, overhead, and profit. The worksheet also requires a list of proposed subcontractors and values. Proposals are due by August 28, 2021 and RFIs are due by August 16, 2021. The awardee will submit actual self-performance calculations upon completion of the task order.

View the file

Other files

File Type Posted
36C25821R0015 0006.docx DOCX document
Questions - RFI last Questions.pdf PDF
36C25821R0015 0005.docx DOCX document
CLC_RCP-A-131-2019-11-18.pdf PDF
CLC2_RCP-AE1-16-2019-11-18.pdf PDF
Second Set of Questions.pdf PDF
36C25821R0015 0004.docx DOCX document
Site Walk Sign In Sheet.pdf PDF
36C25821R0015 0003.docx DOCX document
Questions.pdf PDF
Volume II Building 1 Loma Linda Final.pdf PDF
36C25821R0015 0002.docx DOCX document
36C25821R0015 0001.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL2 Part C 22 Dec 20.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL2 Part B 22 Dec 20.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL1 PART A 22 Dec 20.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL1 PART B 22 Dec 20.pdf PDF
S02 DWG FINAL SUBMITTAL-VOL2 Part A 22 Dec 20.pdf PDF
Attachment J Legionella 1061 Directive.pdf PDF
Attachment F AWWA C651-14 Disinfecting Water Mains.pdf PDF
Attachment H Loma Linda HCS Infection Prevention Guide.pdf PDF
Attachment B Bid Breakout Form.docx DOCX document
S20 SPEC FINAL SUBMITTAL 22 Dec 20.pdf PDF
Attachment I 1061 D 2021-02-16.pdf PDF
Attachment E Davis Bacon Wage 06.25.21.docx DOCX document
Attachment A Instructions for Contractors 07.27.docx DOCX document
Attachment G Part 8 ICRA for Loma Linda Renovate Domestic Piping.doc DOC document
Attachment D Past Performance Survey 07.27.docx DOCX document
36C25821R0015_1.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SELF-PERFORMED WORK AND LIMITATIONS ON SUBCONTRACTING

This procurement is a 100% SDVOSB set-aside. FAR 52.219-14 (NOV 2011), FAR 52.219-17 (DEC 1996), FAR 52.219-27 (NOV2011) and VAAR 852.219-10 (DEC 2009) are incorporated by reference. Offeror to complete and submit this worksheet with their proposal documents. The period of time used to determine offeror’s compliance with the requirements for self-performance of work and the limitations on subcontracting will be the period the Agency uses to evaluate the proposal of this pending Task Order.

OFFEROR’S SELF PERFORMANCE WORKSHEET

Offeror’s are required to complete this Worksheet for this Task Order.

a) Offeror’s total proposed price$
b) Subtract profit or fees$
c) Subtract cost of materials$

d) Offeror’s total estimated cost of contract performance for personnel (a-b-c=d) $

e) Offeror’s total estimated self-performed cost of contract performance incurred for personnel who are offeror’s employees or

the employees of other SDVO SBC’s$
f) Offeror’s percentage of self-performed work (e/d X 100 = %)%

List of Proposed Subcontractors for this project /Value of those subcontracts:

Subcontractor $Value

Subcontractor $Value

Subcontractor $Value

Subcontractor $Value

Subcontractor $Value

Subcontractor $Value

List of “Self-Performed” work activities to be performed by the SDVOSB:

Section J

Solicitation No. 36C25821R0015, Renovate Domestic Water Piping, Self-Performance Worksheet

At completion of this Task Order, the awardee shall complete and submit calculations to the Contracting Department for the actual results achieved.

a) Offeror’s total proposed price$
b) Subtract profit or fees$
c) Subtract cost of materials$

d) Offeror’s total estimated cost of contract performance for personnel (a-b-c=d) $

e) Offeror’s total estimated self-performed cost of contract performance incurred for personnel who are offeror’s employees or

the employees of other SDVO SBC’s$
f) Offeror’s percentage of self-performed work (e/d X 100 = %)%

Cost of the contract. All allowable direct and indirect costs allocable to the contract, excluding profit or fees.

Cost of contract performance incurred for personnel. Direct labor costs and any overhead which has only direct labor as its base, plus the concern's General and Administrative rate multiplied by the labor cost.

Cost of materials. Includes costs of the items purchased, handling and associated shipping costs for the purchased items (which includes raw materials), off-the-shelf items (and similar proportionately high-cost common supply items requiring additional manufacturing or incorporation to become end items), special tooling, special testing equipment, and construction equipment purchased for and required to perform on the contract. In the case of a supply contract, the acquisition of services or products from outside sources following normal commercial practices within the industry are also included.

Personnel. Individuals who are “employees” under §121.106 of this chapter except for purposes of the HUBZone program, where the definition of “employee” is found in §126.103 of this chapter.

Subcontracting. That portion of the contract performed by a firm, other than the concern awarded the contract, under a second contract, purchase order, or agreement for any parts, supplies, components, or subassemblies which are not available off-the-shelf, and which are manufactured in accordance with drawings, specifications, or designs furnished by the contractor, or by the government as a portion of the solicitation. Raw castings, forgings, and moldings are considered as materials, not as subcontracting costs. Where the prime contractor has been directed by the Government to use any specific source for parts, supplies, components subassemblies or services, the costs associated with those purchases will be considered as part of the cost of materials, not subcontracting costs.